Design-Bid-Build (DBB) Repair of Storm Sewer Water and Sanitary Sewer Systems, Caserma Miotto, Longare, Vicenza, Italy.
Solicitation number
W912PF26RA011
Issued by

About this file

This is an experience attachment document that establishes qualification criteria for contractors bidding on a Design-Bid-Build sewer repair project at Caserma Miotto military installation in Longare, Vicenza, Italy. The file functions as an appendix detailing the contractor experience requirements necessary to submit a compliant proposal for this federal construction solicitation (W912PF26RA011).

The document appears to define minimum experience thresholds and demonstrated capabilities that prospective bidders must possess to qualify for competition. These experience requirements likely address the specialized nature of the work involved, including stormwater and sanitary sewer system repair, cross-connection decoupling, site remediation, underground piping installation, and integration of naturalistic stormwater management features. Given the project's location in Italy and involvement of Italian regulatory compliance (Genio Civile requirements) and municipal coordination, the experience criteria probably encompass international construction project management, coordination with foreign municipal authorities, and familiarity with Italian environmental regulations. Bidders must document relevant past performance on comparable sewer system rehabilitation projects, site remediation work, and infrastructure construction to demonstrate their capability to successfully execute this complex military installation renovation requiring both technical expertise and regulatory compliance expertise.

View the file

Other files

File Type Posted
B08-W912PF26RA011_ATT11_VINCA_APPROVAL.zip ZIP file
B08-W912PF26RA011_AMD0003_SF30_20260821.pdf PDF
B08-W912PF26RA011_AMD0003_CONFORMED_20260821.pdf PDF
B08-W912PF26RA011_ATT08_THIRD_PARTY_AGENCY_PKGS.zip ZIP file
B08-W912PF26RA011_ATT09_MOU_LICENSES.zip ZIP file
B08-W912PF26RA011_ATT10_MODULO MU19 SIGNED.pdf PDF
B08-W912PF26RA011_AMD0002_CONFORMED_20260819.pdf PDF
B08-W912PF26RA011_ATT01_SOW_REV01_20260818.pdf PDF
B08-W912PF26RA011_ATT07_PPI LOG_20260819.pdf PDF
B08-W912PF26RA011_AMD0002_SF30_20260819.pdf PDF
B08-W912PF26RA011_ATT03_SOW_SEWER_100.zip ZIP file
B08-W912PF26RA011_ATT D_BIDSHEET_REV01.xlsx XLSX spreadsheet
B08-W912PF26RA011_ATT04-05_SOW_STORM_100.zip ZIP file
B08-W912PF26RA011_AMD0001_CONFORMED_20260810.pdf PDF
B08-W912PF26RA011_ATT06_THIRD_PARTY_AGENCY_DOCS.zip ZIP file
B08-W912PF26RA011_ATT07_PPI LOG_20260810.pdf PDF
B08-W912PF26RA011_ATT F_SITE VISIT_PHOTOS.pdf PDF
B08-W912PF26RA011_ATT E_SITE VISIT_ROUTE.pdf PDF
B08-W912PF26RA011_ATT C_PPQ_AMD01.pdf PDF
B08-W912PF26RA011_AMD0001_SF30_20260810.pdf PDF
B08-W912PF26RA011_ATT G_SITE VISIT_ATTENDANCE_Redacted.pdf PDF
B08-W912PF26RA011_ATT D_BIDSHEET.xlsx XLSX spreadsheet
B08-W912PF26RA011_ATT05_SOW_STORM_2.zip ZIP file
B08-W912PF26RA011_ATT02_SOW_GENERAL.zip ZIP file
B08-W912PF26RA011_ATT04_SOW_STORM_1.zip ZIP file
B08-W912PF26RA011_ATT03_SOW_SEWER.zip ZIP file
B08-W912PF26RA011_20260729.pdf PDF
B08-W912PF26RA011_ATT01_SOW_20260629.pdf PDF
B08-W912PF26RA011_ATT C_PPQ.pdf PDF
B08-W912PF26RA011_ATT A_PPI.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DBB STORM & SANITARY SEWER REPAIR ATTACHMENT B

CASERMA MIOTTO

W912PF26RA011

CONSTRUCTION EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : CON #1 CON #2 CON #3 CON #4 CON #5

1. Experience for: Offeror Joint-Venture Other (Explain)

a. Firm Name:

b. Address:

c. Phone Number:

d. UEI Number:

e. Cage Code:

f. Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Subcontractor Joint Venture Other (Explain)

a. Percent of project work performed by your firm:

b. If subcontractor, who was prime (Name/Phone #):

c. Provide detailed description of work performed by your firm in block 9.

3. Contract information:

a. Contract Number / Delivery or Task Order Number:

b. Title:

c. Location:

4. Type of work:
New ConstructionRenovationRepairAlterationOther (explain):

5. Contract Duration (Time):

a. Award Date (mm/dd/yy):

b. Contract Completion Date (mm/dd/yy):

c. Actual Completion Date (mm/dd/yy):

d. Detailed explanation if actual completion date occurred before or after contract completion date:

6. Contract Value (Value) :

a. Initial Contract Award Price:

b. Final Contract Price (including all Modifications):

c. Total Net Value of Modifications (b minus a):

d. Percentage Price Growth ([c divided by a] x 100):

7. Modifications: Provide a detailed explanation detailing the root cause, necessity, and final resolution of any modifications executed during this project. Specifically address the primary drivers for these changes and describe how your firm managed the impact of these modifications on the overall project schedule and budget.

8. Provide a detailed description of the project and its relevancy to the project requirements of this RFP:

9. Provide a detailed description of what work your firm self-performed on this project:

10. Provide a concise narrative detailing significant technical, logistical, or administrative challenges encountered during performance and the specific actions your firm took to overcome them and mitigate impacts to project cost, schedule, and quality.

11. Other Information: