Design-Bid-Build (DBB) Repair of Storm Sewer Water and Sanitary Sewer Systems, Caserma Miotto, Longare, Vicenza, Italy.
Solicitation number
W912PF26RA011
Issued by

About this file

This is a Statement of Work (SOW) attachment for a Design-Bid-Build construction project focused on repairing sanitary sewer systems at Caserma Miotto in Longare, Vicenza, Italy. The SOW specifies the complete scope of work required to repair, upsize, and decouple cross-connected sanitary and stormwater sewer systems to achieve environmental compliance and prevent future flooding at the military installation. Key work elements include repairing and extending failed sanitary sewer piping, constructing new connections to the Bisatto River via underground TOC piping, separating interconnected sanitary and storm lines, and performing site remediation to address erosion and landslide vulnerabilities. The project also requires installing a mandated stormwater lamination tank beneath a municipal sports field per Italian regulatory requirements, restoring the training field with synthetic turf, and integrating naturalistic design features such as sedimentation tanks and retention ponds to reduce stormwater velocity before discharge.

The solicitation is an unrestricted Design-Bid-Build procurement advertised for full and open competition under Solicitation Number W912PF26RA011, issued by the Department of the Army Materiel Command Army Contracting Command. The initial RFP was posted on 29 July 2026, with amendments issued on 10 August 2026 and 19 August 2026 incorporating the 100% design package and addressing pre-proposal inquiries. The source selection process requires both technical and price proposals evaluated using the best value continuum tradeoff approach, with evaluation factors including corporate experience (revised to eight years requirement), technical capability, past performance, and pricing. Optional work items include asbestos pipe removals, sports field reinstallation, landslide area repairs, and sedimentation pond installation.

Other files

File Type Posted
B08-W912PF26RA011_AMD0003_CONFORMED_20260821.pdf PDF
B08-W912PF26RA011_ATT11_VINCA_APPROVAL.zip ZIP file
B08-W912PF26RA011_AMD0003_SF30_20260821.pdf PDF
B08-W912PF26RA011_AMD0002_SF30_20260819.pdf PDF
B08-W912PF26RA011_AMD0002_CONFORMED_20260819.pdf PDF
B08-W912PF26RA011_ATT D_BIDSHEET_REV01.xlsx XLSX spreadsheet
B08-W912PF26RA011_ATT01_SOW_REV01_20260818.pdf PDF
B08-W912PF26RA011_ATT07_PPI LOG_20260819.pdf PDF
B08-W912PF26RA011_ATT08_THIRD_PARTY_AGENCY_PKGS.zip ZIP file
B08-W912PF26RA011_ATT10_MODULO MU19 SIGNED.pdf PDF
B08-W912PF26RA011_ATT09_MOU_LICENSES.zip ZIP file
B08-W912PF26RA011_ATT04-05_SOW_STORM_100.zip ZIP file
B08-W912PF26RA011_ATT E_SITE VISIT_ROUTE.pdf PDF
B08-W912PF26RA011_ATT G_SITE VISIT_ATTENDANCE_Redacted.pdf PDF
B08-W912PF26RA011_ATT C_PPQ_AMD01.pdf PDF
B08-W912PF26RA011_ATT07_PPI LOG_20260810.pdf PDF
B08-W912PF26RA011_AMD0001_CONFORMED_20260810.pdf PDF
B08-W912PF26RA011_ATT06_THIRD_PARTY_AGENCY_DOCS.zip ZIP file
B08-W912PF26RA011_ATT F_SITE VISIT_PHOTOS.pdf PDF
B08-W912PF26RA011_AMD0001_SF30_20260810.pdf PDF
B08-W912PF26RA011_ATT04_SOW_STORM_1.zip ZIP file
B08-W912PF26RA011_20260729.pdf PDF
B08-W912PF26RA011_ATT B_EXPERIENCE.docx DOCX document
B08-W912PF26RA011_ATT03_SOW_SEWER.zip ZIP file
B08-W912PF26RA011_ATT A_PPI.xlsx XLSX spreadsheet
B08-W912PF26RA011_ATT D_BIDSHEET.xlsx XLSX spreadsheet
B08-W912PF26RA011_ATT C_PPQ.pdf PDF
B08-W912PF26RA011_ATT01_SOW_20260629.pdf PDF
B08-W912PF26RA011_ATT02_SOW_GENERAL.zip ZIP file
B08-W912PF26RA011_ATT05_SOW_STORM_2.zip ZIP file
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .