This is a Direct Cost Bid Sheet (Attachment D) for a Design-Bid-Build construction solicitation (W912PF26RA011) for repair of storm and sanitary sewer systems at Caserma Miotto in Longare, Vicenza, Italy. Offerors must complete all blue-shaded fields with prices proposed in Euros (EUR).
Part 1 requires offerors to provide direct costs only (labor, materials, equipment) for each definable feature of work without including profit, overhead, or bond costs. The bid sheet covers CLIN 0001 (Base: Storm Water System Repairs including lamination tanks, retaining walls, temporary fencing, TOC, wellpoint system, sewer lines, natural ditch, concrete channel, two lift stations, and first flush system); CLIN 0002 (Base: Sanitary Sewer Lines Repairs); CLIN 0003 (Option 1: Asbestos Water Pipe Removal and Disposal at 100 linear meters across three time periods); CLIN 0004 (Option 2: Reinstallation of Existing Sport Field Synthetic Turf); CLIN 0005 (Option 3: Repair of Landslides Areas); and CLIN 0006 (Option 4: Sedimentation Pond Installation). Part 2 requires unburdened daily rates for four Key Personnel positions—Project Manager, Quality Control Manager, Site Safety & Health Officer, and Site Superintendent—each estimated at 1,010 days. Offerors must then transfer direct costs from Part 1 to the SF 1442 schedule with all applicable indirect costs, overheads, and profit applied for final fully burdened total pricing by CLIN or unit price for CLIN 0003.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Sheet
DBB STORM & SANITARY SEWER REPAIR
CASERMA MIOTTO
W912PF26RA011 ATTACHMENT D
DIRECT COST BID SHEET
OFFEROR NAME:
| INSTRUCTIONS TO OFFERORS | |
| 1 | Offerors must complete all blue shaded fields. Prices must be proposed in Euros (€). |
| 2 | Part 1 Direct Costs: Provide the Direct Cost only (e.g., labor, materials, equipment) for each Definable Feature of Work. Do not include profit, home office overhead, field office overhead, or bond costs in this section. |
| 3 | Part 2 Key Personnel Rates: Provide the unburdened daily rate for the identified Key Personnel. This rate is evaluated for reasonableness but is not included in the Total Evaluated Price (TEP) for tradeoff purposes. |
| 4 | SF 1442 Total Pricing: Offerors shall take the direct costs from Part 1, apply all applicable indirect costs, overheads, and profit, and enter the final, fully burdened total price for each CLIN (0001, 0002, 0004-0006) directly onto the SF 1442 schedule. For CLIN 0003 (SLINs 0003AA, 0003AB, 0003AC), enter the fully burdened Unit Price. |
PART 1: DIRECT COSTS FOR DEFINABLE FEATURES OF WORK
(Note: Provide Direct Costs ONLY in this section. Do not include overhead or profit)
| CLIN | Description / Definable Feature of Work | Qty | Unit | Unit Price (€) | Cost Sum (€) |
| 0001 | BASE: Storm Water System Repairs | ||||
| Laminiation Tanks and Various Structural Works | 1 | Job | N/A | € - 0 | |
| Retaining Walls and Temporary Perimeter Fence | 1 | Job | N/A | € - 0 | |
| TOC | 1 | Job | N/A | € - 0 | |
| Wellpoint System | 1 | Job | N/A | € - 0 | |
| Storm Sewer Line Site Civil/Mechanical Utilities | 1 | Job | N/A | € - 0 | |
| Natural Ditch | 1 | Job | N/A | € - 0 | |
| Concrete Channel & Motor Pool | 1 | Job | N/A | € - 0 | |
| Lift Station #1 | 1 | Job | N/A | € - 0 | |
| Lift Station #2 | 1 | Job | N/A | € - 0 | |
| 1st Flush System | 1 | Job | N/A | € - 0 | |
| CLIN 0001 Total Direct Cost | € - 0 |
0002 BASE: Sanitary Sewer Lines Repairs 1 Job N/A € - 0
| 0003 | OPTION #1: Asbestos Water Pipe Removal and Disposal | |||
| 0003AA | Asbestos Removal (if exercised Days 1 - 365) | 100 | LM | € - 0 |
| 0003AB | Asbestos Removal (if exercised Days 366 - 730) | 100 | LM | € - 0 |
| 0003AC | Asbestos Removal (if exercised Days 731 - Completion ) | 100 | LM | € - 0 |
| CLIN 0003 Total Direct Cost | € - 0 |
| 0004 | OPTION #2: Reinstallation of Existing Sport Field | ||||
| Synthetic Turf Sportfield | 1 | Job | N/A | € - 0 | |
| Polisportiva Longare Works | 1 | Job | N/A | € - 0 | |
| CLIN 0004 Total Direct Cost | € - 0 |
| 0005 | OPTION #3: Repair of Landslides Areas | ||||
| Naturalistic Sliding Interventions | 1 | Job | N/A | € - 0 | |
| Landscaping Mitigation Works | 1 | Job | N/A | € - 0 | |
| CLIN 0005 Total Direct Cost | € - 0 |
0006 OPTION #4: Sedimentation Pond Installation 1 Job N/A € - 0
PART 2: KEY PERSONNEL UNBURDENED DAILY RATES
(Note: These rates must be unburdened base daily rates).
| Key Personnel Role | Estimated Qty | Unit | Unburdened Daily Rate (€) |
| Project Manager | 1010 | Day | € - 0 |
| Quality Control Manager (QCM) | 1010 | Day | € - 0 |
| Site Safety & Health Officer (SSHO) | 1010 | Day | € - 0 |
| Site Superintendent | 1010 | Day | € - 0 |