| CHANGE REQUEST |
| for Contract # W912PB-08-0014, 2nd Option |
| Following Line Item must be changed: | | | | | |
| ITEM | DESCRIPTION | QUANTITY | U/I | UNIT | TOTAL |
| Following Line Item must be changed: | | | |
| 2003 | Operation of the Recycling Yard in | 2 | MO |
| accordance with Performance Work | | |
| Statement, para 2.5. | | |
| Operation days: Monday thru Saturday | | |
| Fixed Service | | |
Following Line Item must be added:
| 2010 | Operation of the Recycling Yard in | 10 | MO |
| accordance with Performance Work | | |
| Statement, para 2.5. | | |
| Operation days: Tuesday/Thursday/Saturday | | |
| Fixed Service | | |
ELIN Total
| ELIN SHEET | | | | |
| CONTRACT POP: 01 AUG 2026 - 31 JUL 2027 | | | | |
| Base Year (FY26) | | | | |
| Military Community Rose Barracks (RB) | | | | |
| CLIN | DESCRIPTION | QTY | U/I | UNIT |
| PRICE | TOTAL AMOUNT EURO | | | | |
| 0001 | Maintenance Work and safety inspections at the overaching fire extinguisher | | | |
Systems at Vilseck Rose Barracks (RB) for OMA Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | OMA | € - 0 |
0004 Maintenance Work and safety inspections at the overaching fire extinguisher Systems at Vilseck Rose Barracks (RB) for AFH Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | | | |
| | | | | AFH | € - 0 |
| | | | | Total Vilseck | € - 0 |
| Military Community Tower Barracks Grafenwoehr (TB) | | | | | |
| CLIN | DESCRIPTION | QTY | U/I | UNIT | |
| PRICE | TOTAL AMOUNT EURO | | | | | |
| 0007 | Maintenance Work and safety inspections at the overaching fire extinguisher | | | | |
Systems at Tower Barracks (TB) for OMA Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | OMA | € - 0 |
0010 Maintenance Work and safety inspections at the overaching fire extinguisher Systems at Tower Barracks (TB) for AFH Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | | | |
| | | | | AFH | € - 0 |
| | | | | Total Grafenwoehr | € - 0 |
| Military Community Hohenfels Training Area (HTA) | | | | | |
| CLIN | DESCRIPTION | QTY | U/I | UNIT | |
| PRICE | TOTAL AMOUNT EURO | | | | | |
| 0013 | Maintenance Work and safety inspections at the overaching fire extinguisher | | | | |
Systems at Hohenfels Training Area (HTA) for OMA Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | OMA | € - 0 |
0016 Maintenance Work and safety inspections at the overaching fire extinguisher Systems at Hohenfels Training Area (HTA) for AFH Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | | | | |
| | | | | AFH | € - 0 | |
| | | | | Total Hohenfels | € - 0 | |
| Military Community Garmisch - Partenkirchen (GAP) | | | | | | € 934,013.60 |
| CLIN | DESCRIPTION | QTY | U/I | UNIT | | |
| PRICE | TOTAL AMOUNT EURO | | | | | | |
| 0019 | Maintenance Work and safety inspections at the overaching fire extinguisher | | | | | |
Systems at Garmisch-Partenkirchen Area (GAP) for OMA Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | OMA | € - 0 |
0022 Maintenance Work and safety inspections at the overaching fire extinguisher Systems at Garmisch-Partenkirchen Area (GAP) for AFH Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | AFH | € - 0 |
| | | Total Garmisch | € - 0 |
| Consolidation Base Year: | | | |
| BY Rose Barracks | | | |
| BY Tower Barracks | | | |
| BY Hohenfels | | | |
| BY Garmisch-Partenkirchen | | | |
| Grand total Basic Year: | | | € - 0 |
| ELIN SHEET | | | | |
| CONTRACT POP: 01 AUG 2027- 31 JUL 2028 | | | | |
| Option Year 1 (FY27) | | | | |
| Military Community Rose Barracks (RB) | | | | |
| CLIN | DESCRIPTION | QTY | U/I | UNIT |
| PRICE | TOTAL AMOUNT EURO | | | | |
| 1001 | Maintenance Work and safety inspections at the overaching fire extinguisher | | | |
Systems at Vilseck Rose Barracks (RB) for OMA Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | OMA | € - 0 |
1004 Maintenance Work and safety inspections at the overaching fire extinguisher Systems at Vilseck Rose Barracks (RB) for AFH Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | | | |
| | | | | AFH | € - 0 |
| | | | | Total Vilseck | € - 0 |
| Military Community Tower Barracks Grafenwoehr (TB) | | | | | |
| CLIN | DESCRIPTION | QTY | U/I | UNIT | |
| PRICE | TOTAL AMOUNT EURO | | | | | |
| 1007 | Maintenance Work and safety inspections at the overaching fire extinguisher | | | | |
Systems at Tower Barracks (TB) for OMA Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | OMA | € - 0 |
1010 Maintenance Work and safety inspections at the overaching fire extinguisher Systems at Tower Barracks (TB) for AFH Buildings IAW Performance Work Statement and Contract Pricing Schedule ELINs and Subelins 1 AU
| | | | | AFH | |
| | | | | Total Grafenwoehr | € - 0 |
| Military Community Hohenfels Training Area (HTA) | | | | | |
| CLIN | DESCRIPTION | QTY | U/I | UNIT | |
| PRICE | TOTAL AMOUNT EURO | | | | | |
| 1013 | Maintenance Work and safety inspections at the | | | | |
overaching fire extinguisher Systems at Hohenfels Training Area (HTA) for OMA Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | |
| | | OMA |
1016 Maintenance Work and safety inspections at the overaching fire extinguisher Systems at Hohenfels Training Area (HTA) for AFH Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | | | |
| | | | | AFH | |
| | | | | Total Hohenfels | € 0.00 |
| Military Community Garmisch - Partenkirchen (GAP) | | | | | |
| CLIN | DESCRIPTION | QTY | U/I | UNIT | |
| PRICE | TOTAL AMOUNT EURO | | | | | |
| 1019 | Maintenance Work and safety inspections at the | | | | |
overaching fire extinguisher Systems at Garmisch-Partenkirchen Area (GAP) for OMA Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | |
| | | OMA |
1022 Maintenance Work and safety inspections at the overaching fire extinguisher Systems at Garmisch-Partenkirchen Area (GAP) for AFH Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | AFH | |
| | | Total Garmisch | € 0.00 |
| Consolidation OY 1 | | | |
| OY 1 Rose Barracks | | | |
| OY 1 Tower Barracks | | | |
| OY 1 Hohenfels | | | |
| OY 1 Garmisch-Partenkirchen | | | |
| Grand total OY 1: | | | € 0.00 |
| ELIN SHEET | | | | |
| CONTRACT POP: 01 AUG 2028- 31 July 2029 | | | | |
| Option Year 2 (FY28) | | | | |
| Military Community Rose Barracks (RB) | | | | |
| CLIN | DESCRIPTION | QTY | U/I | UNIT |
| PRICE | TOTAL AMOUNT EURO | | | | |
| 2001 | Maintenance Work and safety inspections at the | | | |
overaching fire extinguisher Systems at Vilseck Rose Barracks (RB) for OMA Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | |
| | | OMA |
2004 Maintenance Work and safety inspections at the overaching fire extinguisher Systems at Vilseck Rose Barracks (RB) for AFH Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | AFH | |
| | | Total Vilseck | € 0.00 |
| Military Community Tower Barracks Grafenwoehr (TB) | | | | |
| CLIN | DESCRIPTION | QTY | U/I | UNIT |
| PRICE | TOTAL AMOUNT EURO | | | | |
| 2007 | Maintenance Work and safety inspections at the | | | |
overaching fire extinguisher Systems at Tower Barracks (TB) for OMA Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | |
| | | OMA |
2010 Maintenance Work and safety inspections at the overaching fire extinguisher Systems at Tower Barracks (TB) for AFH Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | AFH | |
| | | Total Grafenwoehr | € 0.00 |
| Military Community Hohenfels Training Area (HTA) | | | | |
| CLIN | DESCRIPTION | QTY | U/I | UNIT |
| PRICE | TOTAL AMOUNT EURO | | | | |
| 2013 | Maintenance Work and safety inspections at the | | | |
overaching fire extinguisher Systems at Hohenfels Training Area (HTA) for OMA Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | |
| | | OMA |
2016 Maintenance Work and safety inspections at the overaching fire extinguisher Systems at Hohenfels Training Area (HTA) for AFH Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | AFH | |
| | | Total Hohenfels | 0.00 |
| Military Community Garmisch - Partenkirchen (GAP) | | | | |
| CLIN | DESCRIPTION | QTY | U/I | UNIT |
| PRICE | TOTAL AMOUNT EURO | | | | |
| 2019 | Maintenance Work and safety inspections at the overaching fire extinguisher | | | |
Systems at Garmisch-Partenkirchen Area (GAP) for OMA Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | OMA | € - 0 |
2022 Maintenance Work and safety inspections at the overaching fire extinguisher Systems at Garmisch-Partenkirchen Area (GAP) for AFH Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | AFH | € - 0 |
| | | Total Garmisch | € - 0 |
| Consolidation OY 2: | |
| OY 2 Rose Barracks | |
| OY 2 Tower Barracks | |
| OY 2 Hohenfels | |
| OY 2 Garmisch-Partenkirchen | |
| Grand total OY 2: | € - 0 |
| ELIN SHEET | | | | |
| CONTRACT POP: 01 AUG 2029 - 31 JUL 2030 | | | | |
| Option Year 3 (FY29) | | | | |
| Military Community Rose Barracks (RB) | | | | |
| CLIN | DESCRIPTION | QTY | U/I | UNIT |
| PRICE | TOTAL AMOUNT EURO | | | | |
| 3001 | Maintenance Work and safety inspections at the overaching fire extinguisher | | | |
Systems at Vilseck Rose Barracks (RB) for OMA Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | OMA | € - 0 |
3004 Maintenance Work and safety inspections at the overaching fire extinguisher Systems at Vilseck Rose Barracks (RB) for AFH Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | AFH | € - 0 |
| | | Total Vilseck | € - 0 |
| Military Community Tower Barracks Grafenwoehr (TB) | | | | |
| CLIN | DESCRIPTION | QTY | U/I | UNIT |
| PRICE | TOTAL AMOUNT EURO | | | | |
| 3007 | Maintenance Work and safety inspections at the overaching fire extinguisher | | | |
Systems at Tower Barracks (TB) for OMA Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | OMA | € - 0 |
3010 Maintenance Work and safety inspections at the overaching fire extinguisher Systems at Tower Barracks (TB) for AFH Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | AFH | € - 0 |
| | | Total Grafenwoehr | € - 0 |
| Military Community Hohenfels Training Area (HTA) | | | | |
| CLIN | DESCRIPTION | QTY | U/I | UNIT |
| PRICE | TOTAL AMOUNT EURO | | | | |
| 3013 | Maintenance Work and safety inspections at the overaching fire extinguisher | | | |
Systems at Hohenfels Training Area (HTA) for OMA Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | OMA | € - 0 |
3016 Maintenance Work and safety inspections at the overaching fire extinguisher Systems at Hohenfels Training Area (HTA) for AFH Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | AFH | € - 0 |
| | | Total Hohenfels | € - 0 |
| Military Community Garmisch - Partenkirchen (GAP) | | | | |
| CLIN | DESCRIPTION | QTY | U/I | UNIT |
| PRICE | TOTAL AMOUNT EURO | | | | |
| 3019 | Maintenance Work and safety inspections at the overaching fire extinguisher | | | |
Systems at Garmisch-Partenkirchen Area (GAP) for OMA Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | OMA | € - 0 |
3022 Maintenance Work and safety inspections at the overaching fire extinguisher Systems at Garmisch-Partenkirchen Area (GAP) for AFH Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | AFH | € - 0 |
| | | Total Garmisch | € - 0 |
| Consolidation OY 3: | |
| OY 3 Rose Barracks | |
| OY 3 Tower Barracks | |
| OY 3 Hohenfels | |
| OY 3 Garmisch-Partenkirchen | |
| Grand total OY 3: | € - 0 |
| ELIN SHEET | | | | |
| CONTRACT POP: 01 AUG 2030 - 31 JUL 2031 | | | | |
| Option Year 4 (FY30) | | | | |
| Military Community Rose Barracks (RB) | | | | |
| CLIN | DESCRIPTION | QTY | U/I | UNIT |
| PRICE | TOTAL AMOUNT EURO | | | | |
| 4001 | Maintenance Work and safety inspections at the overaching fire extinguisher | | | |
Systems at Vilseck Rose Barracks (RB) for OMA Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | OMA | € - 0 |
4004 Maintenance Work and safety inspections at the overaching fire extinguisher Systems at Vilseck Rose Barracks (RB) for AFH Buildings IAW Performance Work Statement and Contract Pricing Schedule ELINs and Subelins 1 AU
| AFH | € - 0 |
| Total Vilseck | € - 0 |
| Military Community Tower Barracks Grafenwoehr (TB) | | | | |
| CLIN | DESCRIPTION | QTY | U/I | UNIT |
| PRICE | TOTAL AMOUNT EURO | | | | |
| 4007 | Maintenance Work and safety inspections at the overaching fire extinguisher | | | |
Systems at Tower Barracks (TB) for OMA Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | OMA | € - 0 |
4010 Maintenance Work and safety inspections at the overaching fire extinguisher Systems at Tower Barracks (TB) for AFH Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | AFH | € - 0 |
| | | Total Grafenwoehr | € - 0 |
| Military Community Hohenfels Training Area (HTA) | | | | |
| CLIN | DESCRIPTION | QTY | U/I | UNIT |
| PRICE | TOTAL AMOUNT EURO | | | | |
| 4013 | Maintenance Work and safety inspections at the overaching fire extinguisher | | | |
Systems at Hohenfels Training Area (HTA) for OMA Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | OMA | € - 0 |
4016 Maintenance Work and safety inspections at the overaching fire extinguisher Systems at Hohenfels Training Area (HTA) for AFH Buildings IAW Performance Work Statement and Contract Pricing Schedule ELINs and Subelins 1 AU
AFH € - 0
Total Hohenfels € - 0
| Military Community Garmisch - Partenkirchen (GAP) | | | | |
| CLIN | DESCRIPTION | QTY | U/I | UNIT |
| PRICE | TOTAL AMOUNT EURO | | | | |
| 4019 | Maintenance Work and safety inspections at the overaching fire extinguisher | | | |
Systems at Garmisch-Partenkirchen Area (GAP) for OMA Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | OMA | € - 0 |
4022 Maintenance Work and safety inspections at the overaching fire extinguisher Systems at Garmisch-Partenkirchen Area (GAP) for AFH Buildings IAW Performance Work Statement
| and Contract Pricing Schedule ELINs and Subelins | 1 | AU | | |
| | | AFH | € - 0 |
| | | Total Garmisch | € - 0 |
| Consolidation OY 4 : | |
| OY 4 Rose Barracks | |
| OY 4 Tower Barracks | |
| OY 4 Hohenfels | |
| OY 4 Garmisch-Partenkirchen | |
| Grand total OY 4: | € - 0 |
Controlled Unclassified Information - CUI &P/&N
ELIN_RB_Vilseck
| BASIC CONTRACT PERIOD - 01 AUG 2026 - 31 JUL 2027 |
| VILSECK ROSE BARRACKS (RB) |
| Military Community Rose Barracks | |
| CLIN | ELIN | DESCRIPTION | QTY | U/I | UNIT | |
| PRICE | TOTAL AMOUNT €/$ | | | | | | |
| 0001 | V001 | Maintenance Work including technical safety inspection at Ansul (incl. Rotarex in Bldg. 150) extinguishing systems semiannual and annual IAW PWS, Attachment 01 - CLS 411 and TE 01 OMA Buildings | 2 | SVC | | - 0 |
| V002 | Maintenance Work including technical safety inspection at Guardian Kitchen extinguishing systems semiannual and annual IAW PWS, Attachment 01 - CLS 411 and TE 02 | | | |
| 0001 | V002AA | Systems at TE 02; OMA Buildings | 2 | SVC | - 0 |
| 0004 | V002AB | Systems at TE 02; AFH Buildings | 2 | SVC | - 0 |
0001 V003 Maintenance Work including technical safety inspection at Dry Chemical systems IAW PWS, Attachment 01 - CLS 411 and TE 03 OMA Buildings 1 SVC - 0
0001 V004 Maintenance Work including technical safety inspections at Gas extinguishing systems IAW PWS, Attachment 01 - CLS 411 and TE 05 OMA Buildings 1 SVC - 0
| V005 | Maintenance Work including technical safety inspection at Sprinkler extinguishing systems IAW PWS, Attachment 01 - CLS 411, TE 07 | | | |
| 0001 | V005AA | Systems OMA Buildings-Annually | 1 | SVC | - 0 |
| 0001 | V005AB | Systems at OMA Buildings-Semi-Annually | 1 | SVC | - 0 |
| 0001 | V005AC | Systems at OMA Buildings-Monthly | 10 | SVC | - 0 |
| 0004 | V005AD | Systems at AFH Buildings-Annually | 1 | SVC | - 0 |
| 0004 | V005AE | Systems at AFH Buildings-Semi-Annually | 1 | SVC | - 0 |
| 0004 | V005AF | Systems at AFH Buildings-Monthly | 10 | SVC | - 0 |
0001 V006 Maintenance Work including technical safety inspection at a Fire Water Restrain system IAW PWS, Attachment 01 - CLS, TE 04 OMA Building 1 SVC - 0
0001 V007 Maintenance Work including technical required safety inspection at Wall Hydrants IAW PWS, Attachment 01 - CLS 411 and TE 09 OMA Buildings 1 SVC - 0
| V008 | Liquid Servicing of Ansul Systems | | | |
| 0001 | V008AA | Changing of liquid agent at Ansul systems IAW PWS, Attachment 01 and TE 01 OMA Buildings | 20 | EA | - 0 |
| 0001 | V008AB | Changing of liquid agent at Ansul systems including change of container IAW PWS, Attachment 01 - CLS 411 and TE 01, OMA Buildings | 20 | EA | - 0 |
0001 V009 Servicing of Ansul systems after 10 years of operation IAW PWS and Attachment 01- CLS 411_ OMA Buildings 2 EA - 0
| | V010 | Servicing of Guardian Fire Extinguishing Systems | | | |
| 0001 | V010AA | Changing of liquid agent at Guardian systems IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 30 | EA | - 0 |
| 0004 | V010AB | Changing of liquid agent at Guardian systems IAW PWS and Attachment 01 - CLS 411_AFH Buildings | 25 | EA | - 0 |
| 0001 | V010AC | Changing of liquid agent including change of container at Guardian systems IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 25 | EA | - 0 |
| 0004 | V010AD | Changing of liquid agent including change of container at Guardian systems IAW PWS and Attachment 01 - CLS 411_AFH Buildings | 30 | EA | - 0 |
| 0004 | V010AE | Exchange Guardian Kitchen Hood includes procurement, installation incl. electrical services | | | |
| IAW PWS and Attachment 01 - CLS 411_AFH Buildings | 10 | EA | | - 0 | | |
| 0001 | V010AF | Exchange Guardian Kitchen Hood includes procurement, installation incl. electrical services | | | |
| IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 1 | EA | | - 0 | | |
| V011 | Servicing of Guardian Systems after 10 Years IAW PWS and Attachment 01-CLS 411 | | | |
| 0001 | V011AA | OMA Buildings | 5 | EA | - 0 |
| 0004 | V011AB | AFH Buildings | 5 | EA | - 0 |
V012 Inventory of new fire extinguishing systems into the maintenance cycle and technical exhibit lists (incl. monthly, annual, semiannual) systems at any kind of system at the applicable framework agreement price (Sprinkler, Ansul, Guardian etcpp.)
| 0001 | V012AA | OMA Buildings | 1 | AU | - 0 |
| 0004 | V012AB | AFH Buildings | 1 | AU | - 0 |
| 0001 | V012AC | monthly record keeping and generating demanded inventory, repair and financial reports IAW PWS, CLS, OMA Bldgs. | 12 | EA | - 0 |
| 0004 | V012AD | monthly record keeping and generating demanded inventory, repair and financial reports IAW PWS, CLS, AFH Bldgs. | 12 | EA | - 0 |
| V013 | Emergency On-Call-Services at all fire extinguishing systems IAW PWS and Attachment 01 - CLS 411 | | | |
| 0001 | V013AA | OMA Buildings Monday -Friday 16.00-07.30 | 10 | EA | - 0 |
| 0001 | V013AB | OMA Buildings Sat, Sun & Holidays 0-24.00hrs | 5 | EA | - 0 |
| 0001 | V013AC | OMA Buildings Monday-Friday 08.00-16.00 | 5 | EA | - 0 |
| 0004 | V013AD | AFH Buildings Monday -Friday 16.00-07.30 | 5 | EA | - 0 |
| 0004 | V013AE | AFH Buildings Sat, Sun & Holidays 0-24.00hrs | 5 | EA | - 0 |
| 0004 | V013AF | AFH Buildings Monday-Friday 08.00-16.00 | 5 | EA | - 0 |
| V014 | Inspection of Sprinkler system after 20/25 Years of operation IAW PWS and Attachment 01 - CLS 411 | | | | |
| 0001 | V014AA | OMA Buildings | 8 | EA | | - 0 |
| 0004 | V014AB | AFH Buildings | 2 | EA | | - 0 |
| | | | | OMA | - 0 |
| | | | | AFH | - 0 |
| | | | | Total | - 0 |
| Opt. Year 1 - 01 AUG 2027- 31 JUL 2028 |
| VILSECK ROSE BARRACKS (RB) |
| Military Community Rose Barracks | | | | | | |
| CLIN | ELIN | DESCRIPTION | QTY | U/I | UNIT | |
| PRICE | TOTAL AMOUNT €/$ | | | | | | |
| 1001 | V101 | Maintenance Work including technical safety inspection at Ansul (incl. Rotarex in Bldg. 150) extinguishing systems semiannual and annual IAW PWS, Attachment 01 - CLS 411 and TE 01 OMA Buildings | 2 | SVC | | - 0 |
| V102 | Maintenance Work including technical safety inspection at Guardian Kitchen extinguishing systems semiannual and annual IAW PWS, Attachment 01-CLS 411, TE 02 | | | |
| 1001 | V102AA | Systems at TE 02 OMA Buildings | 2 | SVC | - 0 |
| 1004 | V102AB | Systems at TE 02 AFH Buildings | 2 | SVC | - 0 |
1001 V103 Maintenance Work including technical safety inspection at Dry Chemical systems IAW PWS, Attachment 01 - CLS 411 and TE 03 OMA Buildings 1 SVC - 0
1001 V104 Maintenance Work including technical safety inspections at Gas extinguishing systems IAW PWS, Attachment 01 - CLS 411 and TE 05 OMA Buildings 1 SVC - 0
| V105 | Maintenance Work including technical safety inspection at Sprinkler extinguishing systems IAW PWS, Attachment 01 - CLS 411, TE 07 | | | |
| 1001 | V105AA | Systems OMA Buildings-Annually | 1 | SVC | - 0 |
| 1001 | V105AB | Systems OMA Buildings-Semi-Annually | 1 | SVC | - 0 |
| 1001 | V105AC | Systems OMA Buildings-Monthly | 10 | SVC | - 0 |
| 1004 | V105AD | Systems at AFH Buildings-Annually | 1 | SVC | - 0 |
| 1004 | V105AE | Systems at AFH Buildings-Semi-Annually | 1 | SVC | - 0 |
| 1004 | V105AF | Systems at AFH Buildings-Monthly | 10 | SVC | - 0 |
1001 V106 Maintenance Work including technical safety inspection at a Fire Water Restrain system IAW PWS, Attachment 01 - CLS, TE 04 OMA Building 1 SVC - 0
1001 V107 Maintenance Work including technical required safety inspection at Wall Hydrants IAW PWS, Attachment 01 - CLS 411 and TE 09 OMA Buildings 1 SVC - 0
| V108 | Servicing of Ansul Systems | | | |
| 1001 | V108AA | Changing of liquid agent at Ansul systems IAW PWS, Attachment 01 and TE 01 OMA Buildings | 20 | EA | - 0 |
| 1001 | V108AB | Changing of liquid agent at Ansul systems including change of container IAW PWS, Attachment 01 - CLS 411 and TE 01, OMA Buildings | 20 | EA | - 0 |
1001 V109 Servicing of Ansul systems after 10 years of operation IAW PWS and Attachment 01- CLS 411_ OMA Buildings, TE 01 2 EA - 0
| | V110 | Servicing of Guardian Fire Extinguishing Systems, TE 02 | | | |
| 1001 | V110AA | Changing of liquid agent at Guardian systems IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 30 | EA | - 0 |
| 1004 | V110AB | Changing of liquid agent at Guardian systems IAW PWS and Attachment 01 - CLS 411_AFH Buildings | 25 | EA | - 0 |
| 1001 | V110AC | Changing of liquid agent including change of container at Guardian systems IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 25 | EA | - 0 |
| 1004 | V110AD | Changing of liquid agent including change of container at Guardian systems IAW PWS and Attachment 01 - CLS 411_AFH Buildings | 30 | EA | - 0 |
| 1004 | V110AE | Exchange Guardian Kitchen Hood includes procurement, installation incl. electrical services | | | |
| IAW PWS and Attachment 01 - CLS 411_AFH Buildings | 10 | EA | | - 0 | | |
| 1001 | V110AF | Exchange Guardian Kitchen Hood includes procurement, installation incl. electrical services | | | |
| IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 1 | EA | | - 0 | | |
| V111 | Servicing of Guardian Systems after 10 Years IAW PWS and Attachment 01-CLS 411 | | | |
| 1001 | V111AA | OMA Buildings | 5 | EA | - 0 |
| 1004 | V111AB | AFH Buildings | 5 | EA | - 0 |
V112 Inventory of new fire extinguishing systems into the maintenance cycle and technical exhibit lists (incl. monthly, annual, semiannual) systems at any kind of system at the applicable framework agreement price (Sprinkler, Ansul, Guardian etcpp.)
| 1001 | V112AA | OMA Buildings | 1 | AU | - 0 |
| 1004 | V112AB | AFH Buildings | 1 | AU | - 0 |
| 1001 | V112AC | monthly record keeping and generating demanded inventory, repair and financial reports IAW PWS, CLS, OMA Bldgs. | 12 | EA | - 0 |
| 1004 | V112AD | monthly record keeping and generating demanded inventory, repair and financial reports IAW PWS, CLS, AFH Bldgs. | 12 | EA | - 0 |
| V113 | Emergency On-Call-Services at all fire extinguishing systems IAW PWS and Attachment 01 - CLS 411 | | | |
| 1001 | V113AA | OMA Buildings Monday -Friday 16.00-07.30 | 10 | EA | - 0 |
| 1001 | V113AB | OMA Buildings Sat, Sun & Holidays 0-24.00hrs | 5 | EA | - 0 |
| 1001 | V113AC | OMA Buildings Monday-Friday 08.00-16.00 | 5 | EA | - 0 |
| 1004 | V113AD | AFH Buildings Monday -Friday 16.00-07.30 | 5 | EA | - 0 |
| 1004 | V113AE | AFH Buildings Sat, Sun & Holidays 0-24.00hrs | 5 | EA | - 0 |
| 1004 | V113AF | AFH Buildings Monday-Friday 08.00-16.00 | 5 | EA | - 0 |
| V114 | Inspection of Sprinkler system after 20/25 Years of operation IAW PWS and Attachment 01 - CLS 411 | | | |
| 1001 | V114AA | OMA Buildings | 8 | EA | - 0 |
| 1004 | V114AB | AFH Buildings | 2 | EA | - 0 |
| | Opt. Year 2 - 01 AUG 2028- 31 JUL 2029 | | | | | |
| | VILSECK ROSE BARRACKS (RB) | | | | | |
| Military Community Rose Barracks | | | | | | |
| CLIN | ELIN | DESCRIPTION | QTY | U/I | UNIT | |
| PRICE | TOTAL AMOUNT €/$ | | | | | | |
| 2001 | V201 | Maintenance Work including technical safety inspection at Ansul (incl. Rotarex in Bldg. 150) extinguishing systems semiannual and annual IAW PWS, Attachment 01 - CLS 411 and TE 01 OMA Buildings | 2 | SVC | | - 0 |
| V202 | Maintenance Work including technical safety inspection at Guardian Kitchen extinguishing systems semiannual and annual IAW PWS, Attachment 01 - CLS 411 and TE 02 | | | |
| 2001 | V202AA | Systems at TE 02 OMA Buildings | 2 | SVC | - 0 |
| 2004 | V202AB | Systems at TE 02 AFH Buildings | 2 | SVC | - 0 |
2001 V203 Maintenance Work including technical safety inspection at Dry Chemical systems IAW PWS, Attachment 01 - CLS 411 and TE 03 OMA Buildings 1 SVC - 0
2001 V204 Maintenance Work including technical safety inspections at Gas extinguishing systems IAW PWS, Attachment 01 - CLS 411 and TE 05 OMA Buildings 1 SVC - 0
| V205 | Maintenance Work including technical safety inspection at Sprinkler extinguishing systems IAW PWS, Attachment 01 - CLS 411, TE 07 | | | |
| 2001 | V205AA | Systems OMA Buildings-Annually | 1 | SVC | - 0 |
| 2001 | V205AB | Systems OMA Buildings-Semi-Annually | 1 | SVC | - 0 |
| 2001 | V205AC | Systems OMA Buildings-Monthly | 10 | SVC | - 0 |
| 2004 | V205AD | Systems at AFH Buildings-Annually | 1 | SVC | - 0 |
| 2004 | V205AE | Systems at AFH Buildings-Semi-Annually | 1 | SVC | - 0 |
| 2004 | V205AF | Systems at AFH Buildings-Monthly | 10 | SVC | - 0 |
2001 V206 Maintenance Work including technical safety inspection at a Fire Water Restrain system IAW PWS, Attachment 01 - CLS, TE 04 OMA Building 1 SVC - 0
2001 V207 Maintenance Work including technical required safety inspection at Wall Hydrants IAW PWS, Attachment 01 - CLS 411 and TE 09 OMA Buildings 1 SVC - 0
| V208 | Servicing of Ansul Systems | | | |
| 2001 | V208AA | Changing of liquid agent at Ansul systems IAW PWS, Attachment 01 and TE 01 OMA Buildings | 20 | EA | - 0 |
| 2001 | V208AB | Changing of liquid agent at Ansul systems including change of container IAW PWS, Attachment 01 - CLS 411 and TE 01, OMA Buildings | 20 | EA | - 0 |
2001 V209 Servicing of Ansul systems after 10 years of operation IAW PWS and Attachment 01- CLS 411_ OMA Buildings 2 EA - 0
| | V210 | Servicing of Guardian Fire Extinguishing Systems | | | |
| 2001 | V210AA | Changing of liquid agent at Guardian systems IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 30 | EA | - 0 |
| 2004 | V210AB | Changing of liquid agent at Guardian systems IAW PWS and Attachment 01 - CLS 411_AFH Buildings | 25 | EA | - 0 |
| 2001 | V210AC | Changing of liquid agent including change of container at Guardian systems IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 25 | EA | - 0 |
| 2004 | V210AD | Changing of liquid agent including change of container at Guardian systems IAW PWS and Attachment 01 - CLS 411_AFH Buildings | 30 | EA | - 0 |
| 2004 | V210AE | Exchange Guardian Kitchen Hood includes procurement, installation incl. electrical services | | | |
| IAW PWS and Attachment 01 - CLS 411_AFH Buildings | 10 | EA | | - 0 | | |
| 2001 | V210AF | Exchange Guardian Kitchen Hood includes procurement, installation incl. electrical services | | | |
| IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 1 | EA | | - 0 | | |
| V211 | Servicing of Guardian Systems after 10 Years IAW PWS and Attachment 01-CLS 411 | | | |
| 2001 | V211AA | OMA Buildings | 5 | EA | - 0 |
| 2004 | V211AB | AFH Buildings | 5 | EA | - 0 |
V212 Inventory of new fire extinguishing systems into the maintenance cycle and technical exhibit lists (incl. monthly, annual, semiannual) systems at any kind of system at the applicable framework agreement price (Sprinkler, Ansul, Guardian etcpp.)
| 2001 | V212AA | OMA Buildings | 1 | AU | - 0 |
| 2004 | V212AB | AFH Buildings | 1 | AU | - 0 |
| 2001 | V212AC | monthly record keeping and generating demanded inventory, repair and financial reports IAW PWS, CLS, OMA Bldgs. | 12 | EA | - 0 |
| 2004 | V212AD | monthly record keeping and generating demanded inventory, repair and financial reports IAW PWS, CLS, AFH Bldgs. | 12 | EA | - 0 |
| V213 | Emergency On-Call-Services at all fire extinguishing systems IAW PWS and Attachment 01 - CLS 411 | | | |
| 2001 | V213AA | OMA Buildings Monday -Friday 16.00-07.30 | 10 | EA | - 0 |
| 2001 | V213AB | OMA Buildings Sat, Sun & Holidays 0-24.00hrs | 5 | EA | - 0 |
| 2001 | V213AC | OMA Buildings Monday-Friday 08.00-16.00 | 5 | EA | - 0 |
| 2004 | V213AD | AFH Buildings Monday -Friday 16.00-07.30 | 5 | EA | - 0 |
| 2004 | V213AE | AFH Buildings Sat, Sun & Holidays 0-24.00hrs | 5 | EA | - 0 |
| 2004 | V213AF | AFH Buildings Monday-Friday 08.00-16.00 | 5 | EA | - 0 |
| V214 | Inspection of Sprinkler system after 20/25 Years of operation IAW PWS and Attachment 01 - CLS 411 | | | |
| 2001 | V214AA | OMA Buildings | 8 | EA | - 0 |
| 2004 | V214AB | AFH Buildings | 2 | EA | - 0 |
| Opt. Year 3 - 01 AUG 2029- 31 JUL 2030 | | | | |
| VILSECK ROSE BARRACKS (RB) | | | | |
| Military Community Rose Barracks | | | | | |
| 3001 | V301 | Maintenance Work including technical safety inspection at Ansul (incl. Rotarex in Bldg. 150) extinguishing systems semiannual and annual IAW PWS, Attachment 01 - CLS 411 and TE 01 OMA Buildings | 2 | SVC | - 0 |
| V302 | Maintenance Work including technical safety inspection at Guardian Kitchen extinguishing systems semiannual and annual IAW PWS, Attachment 01 - CLS 411 and TE 02 | | | |
| 3001 | V302AA | Systems at TE 02 OMA Buildings | 2 | SVC | - 0 |
| 3004 | V302AB | Systems at TE 02 AFH Buildings | 2 | SVC | - 0 |
3001 V303 Maintenance Work including technical safety inspection at Dry Chemical systems IAW PWS, Attachment 01 - CLS 411 and TE 03 OMA Buildings 1 SVC - 0
3001 V304 Maintenance Work including technical safety inspections at Gas extinguishing systems IAW PWS, Attachment 01 - CLS 411 and TE 05 OMA Buildings 1 SVC - 0
| V305 | Maintenance Work including technical safety inspection at Sprinkler extinguishing systems IAW PWS, Attachment 01 - CLS 411, TE 07 | | | |
| 3001 | V305AA | Systems OMA Buildings-Annually | 1 | SVC | - 0 |
| 3001 | V305AB | Systems OMA Buildings-Semi-Annually | 1 | SVC | - 0 |
| 3001 | V305AC | Systems OMA Buildings-Monthly | 10 | SVC | - 0 |
| 3004 | V305AD | Systems at AFH Buildings-Annually | 1 | SVC | - 0 |
| 3004 | V305AE | Systems at AFH Buildings-Semi-Annually | 1 | SVC | - 0 |
| 3004 | V305AF | Systems at AFH Buildings-Monthly | 10 | SVC | - 0 |
3001 V306 Maintenance Work including technical safety inspection at a Fire Water Restrain system IAW PWS, Attachment 01 - CLS, TE 04 OMA Building 1 SVC - 0
3001 V307 Maintenance Work including technical required safety inspection at Wall Hydrants IAW PWS, Attachment 01 - CLS 411 and TE 09 OMA Buildings 1 SVC - 0
| V308 | Servicing of Ansul Systems | | | |
| 3001 | V308AA | Changing of liquid agent at Ansul systems IAW PWS, Attachment 01 and TE 01 OMA Buildings | 20 | EA | - 0 |
| 3001 | V308AB | Changing of liquid agent at Ansul systems including change of container IAW PWS, Attachment 01 - CLS 411 and TE 01, OMA Buildings | 20 | EA | - 0 |
3001 V309 Servicing of Ansul systems after 10 years of operation IAW PWS and Attachment 01- CLS 411_ OMA Buildings 2 EA - 0
| | V310 | Servicing of Guardian Fire Extinguishing Systems | | | |
| 3001 | V310AA | Changing of liquid agent at Guardian systems IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 30 | EA | - 0 |
| 3004 | V310AB | Changing of liquid agent at Guardian systems IAW PWS and Attachment 01 - CLS 411_AFH Buildings | 25 | EA | - 0 |
| 3001 | V310AC | Changing of liquid agent including change of container at Guardian systems IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 25 | EA | - 0 |
| 3004 | V310AD | Changing of liquid agent including change of container at Guardian systems IAW PWS and Attachment 01 - CLS 411_AFH Buildings | 30 | EA | - 0 |
| 3004 | V310AE | Exchange Guardian Kitchen Hood includes procurement, installation incl. electrical services | | | |
| IAW PWS and Attachment 01 - CLS 411_AFH Buildings | 10 | EA | | - 0 | | |
| 3001 | V310AF | Exchange Guardian Kitchen Hood includes procurement, installation incl. electrical services | | | |
| IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 1 | EA | | - 0 | | |
| V311 | Servicing of Guardian Systems after 10 Years IAW PWS and Attachment 01-CLS 411 | | | |
| 3001 | V311AA | OMA Buildings | 5 | EA | - 0 |
| 3004 | V311AB | AFH Buildings | 5 | EA | - 0 |
V312 Inventory of new fire extinguishing systems into the maintenance cycle and technical exhibit lists (incl. monthly, annual, semiannual) systems at any kind of system at the applicable framework agreement price (Sprinkler, Ansul, Guardian etcpp.)
| 3001 | V312AA | OMA Buildings | 1 | AU | - 0 |
| 3004 | V312AB | AFH Buildings | 1 | AU | - 0 |
| 3001 | V312AC | monthly record keeping and generating demanded inventory, repair and financial reports IAW PWS, CLS, OMA Bldgs. | 12 | EA | - 0 |
| 3004 | V312AD | monthly record keeping and generating demanded inventory, repair and financial reports IAW PWS, CLS, AFH Bldgs. | 12 | EA | - 0 |
| V313 | Emergency On-Call-Services at all fire extinguishing systems IAW PWS and Attachment 01 - CLS 411 | | | |
| 3001 | V313AA | OMA Buildings Monday -Friday 16.00-07.30 | 10 | EA | - 0 |
| 3001 | V313AB | OMA Buildings Sat, Sun & Holidays 0-24.00hrs | 5 | EA | - 0 |
| 3001 | V313AC | OMA Buildings Monday-Friday 08.00-16.00 | 5 | EA | - 0 |
| 3004 | V313AD | AFH Buildings Monday -Friday 16.00-07.30 | 5 | EA | - 0 |
| 3004 | V313AE | AFH Buildings Sat, Sun & Holidays 0-24.00hrs | 5 | EA | - 0 |
| 3004 | V313AF | AFH Buildings Monday-Friday 08.00-16.00 | 5 | EA | - 0 |
| V314 | Inspection of Sprinkler system after 20/25 Years of operation IAW PWS and Attachment 01 - CLS 411 | | | |
| 3001 | V314AA | OMA Buildings | 8 | EA | - 0 |
| 3004 | V314AB | AFH Buildings | 2 | EA | - 0 |
| Opt. Year 4 - 01 AUG 2030- 31 JUL 2031 | | | | |
| VILSECK ROSE BARRACKS (RB) | | | | |
| 4001 | V401 | Maintenance Work including technical safety inspection at Ansul (incl. Rotarex in Bldg. 150) extinguishing systems semiannual and annual IAW PWS, Attachment 01 - CLS 411 and TE 01 OMA Buildings | 2 | SVC | - 0 |
| V402 | Maintenance Work including technical safety inspection at Guardian Kitchen extinguishing systems semiannual and annual IAW PWS, Attachment 01 - CLS 411 and TE 02 | | | |
| 4001 | V402AA | Systems at TE 02 OMA Buildings | 2 | SVC | - 0 |
| 4004 | V402AB | Systems at TE 02 AFH Buildings | 2 | SVC | - 0 |
4001 V403 Maintenance Work including technical safety inspection at Dry Chemical systems IAW PWS, Attachment 01 - CLS 411 and TE 03 OMA Buildings 1 SVC - 0
4001 V404 Maintenance Work including technical safety inspections at Gas extinguishing systems IAW PWS, Attachment 01 - CLS 411 and TE 05 OMA Buildings 1 SVC - 0
| V405 | Maintenance Work including technical safety inspection at Sprinkler extinguishing systems IAW PWS, Attachment 01 - CLS 411, TE 07 | | | |
| 4001 | V405AA | Systems OMA Buildings-Annually | 1 | SVC | - 0 |
| 4001 | V405AB | Systems OMA Buildings-Semi-Annually | 1 | SVC | - 0 |
| 4001 | V405AC | Systems OMA Buildings-Monthly | 10 | SVC | - 0 |
| 4004 | V405AD | Systems at AFH Buildings-Annually | 1 | SVC | - 0 |
| 4004 | V405AE | Systems at AFH Buildings-Semi-Annually | 1 | SVC | - 0 |
| 4004 | V405AF | Systems at AFH Buildings-Monthly | 10 | SVC | - 0 |
4001 V406 Maintenance Work including technical safety inspection at a Fire Water Restrain system IAW PWS, Attachment 01 - CLS, TE 04 OMA Building 1 SVC - 0
4001 V407 Maintenance Work including technical required safety inspection at Wall Hydrants IAW PWS, Attachment 01 - CLS 411 and TE 09 OMA Buildings 1 SVC - 0
| V408 | Servicing of Ansul Systems | | | |
| 4001 | V408AA | Changing of liquid agent at Ansul systems IAW PWS, Attachment 01 and TE 01 OMA Buildings | 20 | EA | - 0 |
| 4001 | V408AB | Changing of liquid agent at Ansul systems including change of container IAW PWS, Attachment 01 - CLS 411 and TE 01, OMA Buildings | 20 | EA | - 0 |
4001 V409 Servicing of Ansul systems after 10 years of operation IAW PWS and Attachment 01- CLS 411_ OMA Buildings 2 EA - 0
| | V410 | Servicing of Guardian Fire Extinguishing Systems | | | |
| 4001 | V410AA | Changing of liquid agent at Guardian systems IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 30 | EA | - 0 |
| 4004 | V410AB | Changing of liquid agent at Guardian systems IAW PWS and Attachment 01 - CLS 411_AFH Buildings | 25 | EA | - 0 |
| 4001 | V410AC | Changing of liquid agent including change of container at Guardian systems IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 25 | EA | - 0 |
| 4004 | V410AD | Changing of liquid agent including change of container at Guardian systems IAW PWS and Attachment 01 - CLS 411_AFH Buildings | 30 | EA | - 0 |
| 4004 | V410AE | Exchange Guardian Kitchen Hood includes procurement, installation incl. electrical services | | | |
| IAW PWS and Attachment 01 - CLS 411_AFH Buildings | 10 | EA | | - 0 | | |
| 4001 | V410AF | Exchange Guardian Kitchen Hood includes procurement, installation incl. electrical services | | | |
| IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 1 | EA | | - 0 | | |
| V411 | Servicing of Guardian Systems after 10 Years IAW PWS and Attachment 01-CLS 411 | | | |
| 4001 | V411AA | OMA Buildings | 5 | EA | - 0 |
| 4004 | V411AB | AFH Buildings | 5 | EA | - 0 |
V412 Inventory of new fire extinguishing systems into the maintenance cycle and technical exhibit lists (incl. monthly, annual, semiannual) systems at any kind of system at the applicable framework agreement price (Sprinkler, Ansul, Guardian etcpp.)
| 4001 | V412AA | OMA Buildings | 1 | AU | - 0 |
| 4004 | V412AB | AFH Buildings | 1 | AU | - 0 |
| 4001 | V412AC | monthly record keeping and generating demanded inventory, repair and financial reports IAW PWS, CLS, OMA Bldgs. | 12 | EA | - 0 |
| 4004 | V412AD | monthly record keeping and generating demanded inventory, repair and financial reports IAW PWS, CLS, AFH Bldgs. | 12 | EA | - 0 |
| V413 | Emergency On-Call-Services at all fire extinguishing systems IAW PWS and Attachment 01 - CLS 411 | | | |
| 4001 | V413AA | OMA Buildings Monday -Friday 16.00-07.30 | 10 | EA | - 0 |
| 4001 | V413AB | OMA Buildings Sat, Sun & Holidays 0-24.00hrs | 5 | EA | - 0 |
| 4001 | V413AC | OMA Buildings Monday-Friday 08.00-16.00 | 5 | EA | - 0 |
| 4004 | V413AD | AFH Buildings Monday -Friday 16.00-07.30 | 5 | EA | - 0 |
| 4004 | V413AE | AFH Buildings Sat, Sun & Holidays 0-24.00hrs | 5 | EA | - 0 |
| 4004 | V413AF | AFH Buildings Monday-Friday 08.00-16.00 | 5 | EA | - 0 |
| V414 | Inspection of Sprinkler system after 20/25 Years of operation IAW PWS and Attachment 01 - CLS 411 | | | |
| 4001 | V414AA | OMA Buildings | 8 | EA | - 0 |
| 4004 | V414AB | AFH Buildings | 2 | EA | - 0 |
&P/&N
Please note: The numbering has changed since the ELINs for Time and Material (T&M) section Labor Hours as well as section Spare Parts have been eliminated. The 12-series and the 15-series have been removed, so the numbering has shifted.
Vendor Question (AAP list regarding 25 years inspection) subject V116, now V114.
The number V116 has changed from 116 to 114
Vendor Question V012
ELIN_TB_Graf
| | BASIC CONTRACT PERIOD - 01 AUG 2026 - 31 JUL 2027 | | | | | |
| | GRAFENWOEHR TOWER BARRACKS (TB) | | | | | |
| Military Community Tower Barracks | | | | | | |
| CLIN | ELIN | DESCRIPTION | QTY | U/I | UNIT | |
| PRICE | TOTAL AMOUNT €/$ | | | | | | |
| 0007 | G001 | Maintenance Work including technical safety inspection at Ansul extinguishing systems semiannual and annual IAW PWS, Attachment 01 - CLS 411 and TE 01 OMA Buildings | 2 | SVC | | - 0 |
| G002 | Maintenance Work including technical safety inspection at Guardian Kitchen extinguishing systems semiannual and annual IAW PWS, Attachment 01 - CLS 411 and TE 02 | | | |
| 0007 | G002AA | Systems at TE 02 OMA Buildings | 2 | SVC | - 0 |
| 0010 | G002AB | Systems at TE 02 AFH Buildings | 2 | SVC | - 0 |
| G003 | Maintenance Work including technical safety inspection at Sprinkler extinguishing systems IAW PWS, Attachment 01 - CLS 411, TE 07 | | | |
| 0007 | G003AA | Systems OMA Buildings-Annually | 1 | SVC | - 0 |
| 0007 | G003AB | Systems OMA Buildings-Semi-Annually | 1 | SVC | - 0 |
| 0007 | G003AC | Systems OMA Buildings-Monthly | 10 | SVC | - 0 |
| 0010 | G003AD | Systems at AFH Buildings-Annually | 1 | SVC | - 0 |
| 0010 | G003AE | Systems at AFH Buildings-Semi-Annually | 1 | SVC | - 0 |
| 0010 | G003AF | Systems at AFH Buildings-Monthly | 10 | SVC | - 0 |
0007 G004 Maintenance Work including technical safety inspections at Gas extinguishing systems IAW PWS, Attachment 01 - CLS 411 and TE 05 OMA Buildings 1 SVC - 0
0007 G005 Annual Maintenance of of the WILO-GEP Seperating Station at Bldg #329 + #542 1 SVC - 0
0007 G006 Annual Maintenance and Inspection of Smoke Detectors at Bldg #696; #313; #1363; #720 1 SVC - 0
0007 G007 Maintenance Work (semiannual, annual) including technical safety inspection at Spark Extinguishing System Bldg. 329 Carpenter Shop IAW PWS, Attachment 01 - CLS 411 and TE 06 OMA Buildings 2 SVC - 0
| G008 | Servicing of Ansul Systems | | | |
| 0007 | G008AB | Changing of liquid agent at Ansul systems IAW PWS, Attachment 01 and TE 01_OMA Buildings | 20 | EA | - 0 |
| 0007 | G008AA | Changing of liquid agent at Ansul systems including change of container IAW PWS, Attachment 01 - CLS 411 TE 01_OMA Buildings | 20 | EA | - 0 |
0007 G009 Inspection of Ansul systems after 10 years of operation IAW PWS and Attachment 01 - CLS 411, OMA Buildings 3 EA - 0
| | G010 | Servicing of Guardian Systems | | | |
| 0007 | G010AA | Changing of liquid agent at Guardian systems IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 30 | EA | - 0 |
| 0010 | G010AB | Changing of liquid agent at Guardian systems IAW PWS and Attachment 01 - CLS 411_AFH Buildings | 50 | EA | - 0 |
| 0007 | G010AC | Changing of liquid agent including changing the container at Guardian systems IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 20 | EA | - 0 |
| 0010 | G010AD | Changing of liquid agent including changing the container at Guardian systems IAW PWS and Attachment 01 -CLS 411_AFH Buildings | 20 | EA | - 0 |
| 0010 | G010AE | Exchange Guardian Kitchen Hood includes procurement, installation incl. electrical services | | | |
| IAW PWS and Attachment 01 - CLS 411_AFH Buildings | 5 | EA | | - 0 | | |
| 0007 | G010AF | Exchange Guardian Kitchen Hood includes procurement, installation incl. electrical services | | | |
| IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 2 | EA | | - 0 | | |
| G011 | Safety Inspection of Guardian system after 10 Years of operation IAW PWS and Attachment 01 - CLS 411 | | | |
| 0007 | G011AA | OMA Buildings | 5 | EA | - 0 |
| 0010 | G011AB | AFH Buildings | 5 | EA | - 0 |
G012 Inventory of new fire extinguishing systems into the maintenance cycle and technical exhibit lists (incl. monthly, annual, semiannual) systems at any kind of system at the applicable framework agreement price (Sprinkler, Ansul, Guardian etcpp.)
| 0007 | G012AA | OMA Buildings | 1 | AU | - 0 |
| 0010 | G012AB | AFH Buildings | 1 | EA | - 0 |
| 0007 | G012AC | monthly record keeping and generating demanded inventory, repair and financial reports IAW PWS, CLS, OMA Bldgs. | 12 | EA | - 0 |
| 0010 | G012AD | monthly record keeping and generating demanded inventory, repair and financial reports IAW PWS, CLS, AFH Bldgs. | 12 | EA | - 0 |
| G013 | Emergency On-Call-Services at all fire extinguishing systems IAW PWS and Attachment 01 - CLS 411 | | | |
| 0007 | G013AA | OMA Buildings Monday -Friday 16.00-07.30 | 10 | EA | - 0 |
| 0007 | G013AB | OMA Buildings Sat, Sun & Holidays 0-24.00hrs | 4 | EA | - 0 |
| 0007 | G013AC | OMA Buildings Monday-Friday 08.00-16.00 | 5 | EA | - 0 |
| 0010 | G013AD | AFH Buildings Monday -Friday 16.00-07.30 | 10 | EA | - 0 |
| 0010 | G013AE | AFH Buildings Sat, Sun & Holidays 0-24.00hrs | 4 | EA | - 0 |
| 0010 | G013AF | AFH Buildings Monday-Friday 08.00-16.00 | 5 | EA | - 0 |
| G014 | Scheduled replacement of back- up batteries in control boards IAW PWS and Attachment 01 - CLS 411_OMA Buildings | | | |
| 0007 | G014AA | VdS- proofed batteries 12V 7,2 Ah | 48 | EA | - 0 |
| 0007 | G014AB | VdS- proofed batteries 12V 12 Ah | 10 | EA | - 0 |
| 0007 | G014AC | VdS- proofed batteries 12V 18 Ah | 10 | EA | - 0 |
| G015 | Scheduled replacement of back- up batteries in control boards IAW PWS and Attachment 01 - CLS 411_AFH Buildings | | | |
| 0010 | G015AA | VdS- proofed batteries 12V 7,2 Ah | 20 | EA | - 0 |
| 0010 | G015AB | VdS- proofed batteries 12V 12 Ah | 10 | EA | - 0 |
| 0010 | G015AC | VdS- proofed batteries 12V 18 Ah | 10 | EA | - 0 |
| G016 | Inspection of Sprinkler systems after 20/25 Years of operation IAW PWS and Attachment 01 - CLS 411 | | | |
| 0007 | G016AA | OMA Buildings | 3 | EA | - 0 |
| 0010 | G016AB | AFH Buildings | 0 | EA | - 0 |
| | Opt. Year 1 - 01 AUG 2027- 31 JUL 2028 | | | | | |
| | GRAFENWOEHR TOWER BARRACKS (TB) | | | | | |
| Military Community Tower Barracks | | | | | | |
| CLIN | ELIN | DESCRIPTION | QTY | U/I | UNIT | |
| PRICE | TOTAL AMOUNT €/$ | | | | | | |
| 1007 | G101 | Maintenance Work including technical safety inspection at Ansul extinguishing systems semiannual and annual IAW PWS, Attachment 01 - CLS 411 and TE 01 OMA Buildings | 2 | SVC | | - 0 |
| G102 | Maintenance Work including technical safety inspection at Guardian Kitchen extinguishing systems semiannual and annual IAW PWS, Attachment 01 - CLS 411 and TE 02 | | | |
| 1007 | G102AA | Systems at TE 02 OMA Buildings | 2 | SVC | - 0 |
| 1010 | G102AB | Systems at TE 02 AFH Buildings | 2 | SVC | - 0 |
| G103 | Maintenance Work including technical safety inspection at Sprinkler extinguishing systems IAW PWS, Attachment 01 - CLS 411, TE 07 | | | |
| 1007 | G103AA | Systems OMA Buildings-Annually | 1 | SVC | - 0 |
| 1007 | G103AB | Systems OMA Buildings-Semi-Annually | 1 | SVC | - 0 |
| 1007 | G103AC | Systems OMA Buildings-Monthly | 10 | SVC | - 0 |
| 1010 | G103AD | Systems at AFH Buildings-Annually | 1 | SVC | - 0 |
| 1010 | G103AE | Systems at AFH Buildings-Semi-Annually | 1 | SVC | - 0 |
| 1010 | G103AF | Systems at AFH Buildings-Monthly | 10 | SVC | - 0 |
1007 G104 Maintenance Work including technical safety inspections at Gas extinguishing systems IAW PWS, Attachment 01 - CLS 411 and TE 05 OMA Buildings 1 SVC - 0
1007 G105 Annual Maintenance of of the WILO-GEP Seperating Station at Bldg #329 + #542 1 SVC - 0
1007 G106 Annual Maintenance and Inspection of Smoke Detectors at Bldg #313 + #1363 + #696 + #720 1 SVC - 0
1007 G107 Maintenance Work (semiannual, annual) including technical safety inspection at Spark Extinguishing System Bldg. 329 Carpenter Shop IAW PWS, Attachment 01 - CLS 411 and TE 06_OMA Buildings 2 SVC - 0
| G108 | Servicing of Ansul Systems | | | |
| 1007 | G108AB | Changing of liquid agent at Ansul systems IAW PWS, Attachment 01 and TE 01_OMA Buildings | 20 | EA | - 0 |
| 1007 | G108AA | Changing of liquid agent at Ansul systems including change of container IAW PWS, Attachment 01 - CLS 411 TE 01_OMA Buildings | 20 | EA | - 0 |
1007 G109 Inspection of Ansul systems after 10 years of operation IAW PWS and Attachment 01 - CLS 411, OMA Buildings 3 EA - 0
| | G110 | Servicing of Guardian Systems | | | |
| 1007 | G110AA | Changing of liquid agent at Guardian systems IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 30 | EA | - 0 |
| 1010 | G110AB | Changing of liquid agent at Guardian systems IAW PWS and Attachment 01 - CLS 411_AFH Buildings | 50 | EA | - 0 |
| 1007 | G110AC | Changing of liquid agent including changing the container at Guardian systems IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 20 | EA | - 0 |
| 1010 | G110AD | Changing of liquid agent including changing the container at Guardian systems IAW PWS and Attachment 01 -CLS 411_AFH Buildings | 20 | EA | - 0 |
| 1010 | G110AE | Exchange Guardian Kitchen Hood includes procurement, installation incl. electrical services | | | |
| IAW PWS and Attachment 01 - CLS 411_AFH Buildings | 5 | EA | | - 0 | | |
| 1007 | G110AF | Exchange Guardian Kitchen Hood includes procurement, installation incl. electrical services | | | |
| IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 2 | EA | | - 0 | | |
| G111 | Safety Inspection of Guardian system after 10 Years of operation IAW PWS and Attachment 01 - CLS 411 | | | |
| 1007 | G111AA | OMA Buildings | 5 | EA | - 0 |
| 1010 | G111AB | AFH Buildings | 5 | EA | - 0 |
G112 Inventory of new fire extinguishing systems into the maintenance cycle and technical exhibit lists (incl. monthly, annual, semiannual) systems at any kind of system at the applicable framework agreement price (Sprinkler, Ansul, Guardian etcpp.)
| 1007 | G112AA | OMA Buildings | 1 | AU | - 0 |
| 1010 | G112AB | AFH Buildings | 1 | EA | - 0 |
| 1007 | G112AC | monthly record keeping and generating demanded inventory, repair and financial reports IAW PWS, CLS, OMA Bldgs. | 12 | EA | - 0 |
| 1010 | G112AD | monthly record keeping and generating demanded inventory, repair and financial reports IAW PWS, CLS, AFH Bldgs. | 12 | EA | - 0 |
| G113 | Emergency On-Call-Services at all fire extinguishing systems IAW PWS and Attachment 01 - CLS 411 | | | |
| 1007 | G113AA | OMA Buildings Monday -Friday 16.00-07.30 | 10 | EA | - 0 |
| 1007 | G113AB | OMA Buildings Sat, Sun & Holidays 0-24.00hrs | 4 | EA | - 0 |
| 1007 | G113AC | OMA Buildings Monday-Friday 08.00-16.00 | 5 | EA | - 0 |
| 1010 | G113AD | AFH Buildings Monday -Friday 16.00-07.30 | 10 | EA | - 0 |
| 1010 | G113AE | AFH Buildings Sat, Sun & Holidays 0-24.00hrs | 4 | EA | - 0 |
| 1010 | G113AF | AFH Buildings Monday-Friday 08.00-16.00 | 5 | EA | - 0 |
| G114 | Scheduled replacement of back- up batteries in control boards IAW PWS and Attachment 01 - CLS 411_OMA Buildings | | | |
| 1007 | G114AA | VdS- proofed batteries 12V 7,2 Ah | 48 | EA | - 0 |
| 1007 | G114AB | VdS- proofed batteries 12V 12 Ah | 10 | EA | - 0 |
| 1007 | G114AC | VdS- proofed batteries 12V 18 Ah | 10 | EA | - 0 |
| G115 | Scheduled replacement of back- up batteries in control boards IAW PWS and Attachment 01 - CLS 411_AFH Buildings | | | |
| 1010 | G115AA | VdS- proofed batteries 12V 7,2 Ah | 20 | EA | - 0 |
| 1010 | G115AB | VdS- proofed batteries 12V 12 Ah | 10 | EA | - 0 |
| 1010 | G115AC | VdS- proofed batteries 12V 18 Ah | 10 | EA | - 0 |
| G116 | Inspection of Sprinkler systems after 20/25 Years of operation IAW PWS and Attachment 01 - CLS 411 | | | |
| 1007 | G116AA | OMA Buildings | 3 | EA | - 0 |
| 1010 | G116AB | AFH Buildings | 0 | EA | - 0 |
| Opt. Year 2 - 01 AUG 2028- 31 JUL 2029 |
| GRAFENWOEHR TOWER BARRACKS (TB) |
| Military Community Tower Barracks | | | | | | |
| CLIN | ELIN | DESCRIPTION | QTY | U/I | UNIT | |
| PRICE | TOTAL AMOUNT €/$ | | | | | | |
| 2007 | G201 | Maintenance Work including technical safety inspection at Ansul extinguishing systems semiannual and annual IAW PWS, Attachment 01 - CLS 411 and TE 01 OMA Buildings | 2 | SVC | | - 0 |
| G202 | Maintenance Work including technical safety inspection at Guardian Kitchen extinguishing systems semiannual and annual IAW PWS, Attachment 01 - CLS 411 and TE 02 | | | |
| 2007 | G202AA | Systems at TE 02 OMA Buildings | 2 | SVC | - 0 |
| 2010 | G202AB | Systems at TE 02 AFH Buildings | 2 | SVC | - 0 |
| G203 | Maintenance Work including technical safety inspection at Sprinkler extinguishing systems IAW PWS, Attachment 01 - CLS 411, TE 07 | | | |
| 2007 | G203AA | Systems OMA Buildings-Annually | 1 | SVC | - 0 |
| 2007 | G203AB | Systems OMA Buildings-Semi-Annually | 1 | SVC | - 0 |
| 2007 | G203AC | Systems OMA Buildings-Monthly | 10 | SVC | - 0 |
| 2010 | G203AD | Systems at AFH Buildings-Annually | 1 | SVC | - 0 |
| 2010 | G203AE | Systems at AFH Buildings-Semi-Annually | 1 | SVC | - 0 |
| 2010 | G203AF | Systems at AFH Buildings-Monthly | 10 | SVC | - 0 |
2007 G204 Maintenance Work including technical safety inspections at Gas extinguishing systems IAW PWS, Attachment 01 - CLS 411 and TE 05 OMA Buildings 1 SVC - 0
2007 G205 Annual Maintenance of of the WILO-GEP Seperating Station at Bldg #329 + #542 1 SVC - 0
2007 G206 Annual Maintenance and Inspection of Smoke Detectors at Bldg #313 + #1363 + #696 + #720 1 SVC - 0
2007 G207 Maintenance Work (semiannual, annual) including technical safety inspection at Spark Extinguishing System Bldg. 329 Carpenter Shop IAW PWS, Attachment 01 - CLS 411 and TE 06_OMA Buildings 2 SVC - 0
| G208 | Servicing of Ansul Systems | | | |
| 2007 | G208AB | Changing of liquid agent at Ansul systems IAW PWS, Attachment 01 and TE6.1_OMA Buildings | 20 | EA | - 0 |
| 2007 | G208AA | Changing of liquid agent at Ansul systems including change of container IAW PWS, Attachment 01 - CLS 411 TE 01_OMA Buildings | 20 | EA | - 0 |
2007 G209 Inspection of Ansul systems after 10 years of operation IAW PWS and Attachment 01 - CLS 411, OMA Buildings 3 EA - 0
| | G210 | Servicing of Guardian Systems | | | |
| 2007 | G210AA | Changing of liquid agent at Guardian systems IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 30 | EA | - 0 |
| 2010 | G210AB | Changing of liquid agent at Guardian systems IAW PWS and Attachment 01 - CLS 411_AFH Buildings | 50 | EA | - 0 |
| 2007 | G210AC | Changing of liquid agent including changing the container at Guardian systems IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 20 | EA | - 0 |
| 2010 | G210AD | Changing of liquid agent including changing the container at Guardian systems IAW PWS and Attachment 01 -CLS 411_AFH Buildings | 20 | EA | - 0 |
| 2010 | G210AE | Exchange Guardian Kitchen Hood includes procurement, installation incl. electrical services | | | |
| IAW PWS and Attachment 01 - CLS 411_AFH Buildings | 5 | EA | | - 0 | | |
| 2007 | G210AF | Exchange Guardian Kitchen Hood includes procurement, installation incl. electrical services | | | |
| IAW PWS and Attachment 01 - CLS 411_OMA Buildings | 2 | EA | | - 0 | | |
| G211 | Safety Inspection of Guardian system after 10 Years of operation IAW PWS and Attachment 01 - CLS 411 | | | |
| 2007 | G211AA | OMA Buildings | 5 | EA | - 0 |
| 2010 | G211AB | AFH Buildings | 5 | EA | - 0 |
G212 Inventory of new fire extinguishing systems into the maintenance cycle and technical exhibit lists (incl. monthly, annual, semiannual) systems at any kind of system at the applicable framework agreement price (Sprinkler, Ansul, Guardian…
This is the start of the file's text. The full file is on GovTribe.