This document is a Technical Exhibit that outlines requirements for cleaning and maintaining water reservoirs at three locations - Katterbach, Illesheim, and Urlas - as part of a larger federal contract opportunity.

The key requirements include mechanically cleaning and disinfecting the water reservoirs, spraying off solutions with water, neutralizing and disposing of resulting waste, cleaning surrounding areas with a biological disinfectant, taking water samples to verify sterility, and delivering and installing replacement filtering mats. The work must be performed in accordance with environmental management and drinking water regulations. Water sample test reports must be provided to the Contracting Officer's Representative within 10 calendar days of completing the work.

The related federal contract opportunity is for Preventive Maintenance and Repair of Heating, Cooling systems, and other real property equipment at USAG Ansbach, to be awarded by the Department of the Army Materiel Command Army Contracting Command.

View the file

Other files

File Type Posted
Site Visit RFI 9-16.pdf PDF
W912PB-24-R-3010 RPE amendment 2.pdf PDF
RPE PWS Updates_19 Sep_2024_Rvsd.pdf PDF
ELIN Sheet_Rvsd 9-18-2024 Final.xlsx XLSX spreadsheet
TECHNICAL EXHIBIT 12 - FREQUENCY SECHEDULE RVSD 9-19.xlsx XLSX spreadsheet
RPE PWS Updates_5 Sep_2024_Rvsd.pdf PDF
TECHNICAL EXHIBIT 2 - CLS 411 revised.pdf PDF
RFI 5SEP24 Final (002).pdf PDF
W912PB-24-R-3010 RPE amendment 1.pdf PDF
TECHNICAL EXHIBIT 12 - FREQUENCY SECHEDULE RVSD.xlsx XLSX spreadsheet
ELIN Sheet_Rvsd 9-12-2024.xlsx XLSX spreadsheet
TECHNICAL EXHIBIT 6 - USAG Asbach Environmental Compliance.pdf PDF
TECHNICAL EXHIBIT 8 - Key Personnel Qualifications.pdf PDF
TECHNICAL EXHIBIT 16 - BHKW Technical Data english.pdf PDF
TECHNICAL EXHIBIT 9 - Required Special qualifications.pdf PDF
TECHNICAL EXHIBIT 2 - CLS 411.pdf PDF
TECHNICAL EXHIBIT 12 - FREQUENCY SECHEDULE.pdf PDF
TECHNICAL EXHIBIT 14 - PM SCHEDULE EXAMPLE.xls XLS spreadsheet
TECHNICAL EXHIBIT 15 - ELIN List - Equipment Category.pdf PDF
RPE PWS Final 03 June 24.pdf PDF
TECHNICAL EXHIBIT 5 - Other Applicable Publications.pdf PDF
TECHNICAL EXHIBIT 1 - INVENTORY LIST RPE.xlsx XLSX spreadsheet
TECHNICAL EXHIBIT 4 - IMCOM FACILITIES MAINTENANCE INSTRUCTION.pdf PDF
TECHNICAL EXHIBIT 10 - Required Certifications.pdf PDF
TECHNICAL EXHIBIT 11 - INTEGRATED CULTURAL RESOURCES MANAGEMENT PLAN.pdf PDF
TECHNICAL EXHIBIT 13 - Work Certificate Example.pdf PDF
TECHNICAL EXHIBIT 7 - Work Site Location.pdf PDF
TECHNICAL EXHIBIT 3 - CLIN MAINTENANCE PROCEDURES.pdf PDF
W912PB24R3010 Final IDT RPE.pdf PDF
ELIN Sheet_Rvsd.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit 17

5.2.1 Katterbach Water Reservoirs

• 5.2.1.1 The Contractor shall mechanical clean two (2) reservoirs (2 x 1700 m³). All areas in direct contact with water, to include ceiling and installations (guiding wall with 3 and 6 pillars) inside the container shall be spray cleaned - disinfected with a water pressure stream using permitted solutions. Bottom drain shall be emptied. If necessary execute cleaning with brushes, wipers and sponges to remove deposits effectively.

• 5.2.1.2 The Contractor shall soak time hose and spray off solutions thoroughly with plenty of water IAW manufacturer guidelines

• 5.2.1.3 Resulting dirt and rinse water shall be neutralized and disposed of according to ISO 14001:2004 Environmental Management Systems and dangerous good directives.

• 5.2.1.4 After completion of work all floor of the ante- the entry as well as the pump room shall be cleaned with a biological compatible disinfectant. Plant shall be left in a clean condition.

• 5.2.1.5 Water samples shall be taken from the filled water reservoir according to the DVGW Information sheet. The health department or an accredited testing facility shall proof the sterility in accordance with the drinking water regulation. Test report shall be provided in duplicate within ten (10) calendar days after completion of work and presented to the COR/KO.

• 5.2.1.6 The Contractor shall deliver and install filtering mats at the reservoir area conforming to existing ones.

5.2.2 Illesheim Water Reservoirs

• 5.2.2.1 The Contractor shall mechanical clean 1each reservoir (362 m³) as stated in position 5.2.1.1

• 5.2.2.2 The Contractor shall spray off with plenty of water as stated in position 5.2.1.2

• 5.2.2.3 The Contractor shall neutralize and dispose as stated in position 5.2.1.3

• 5.2.2.4 The Contractor shall clean with biological compatible disinfectant as stated in position 5.2.1.4

• 5.2.2.5 The Contractor shall take water samples as stated in position 5.2.1.5.

• 5.2.2.6 The Contractor shall deliver and install filtering mats as stated in position 5.2.1.6

5.2.3 Urlas Water Reservoirs

• 5.2.3.1 The Contractor shall mechanical clean two (2) reservoirs (250 m³/each) as stated in position 5.2.1.1

• 5.2.3.2 The Contractor shall spray off with plenty of water as stated in position 5.2.1.2

• 5.2.3.3 The Contractor shall neutralize and dispose as stated in position 5.2.1.3

• 5.2.3.4 The Contractor shall clean with biological compatible disinfectant as stated in position 5.2.1.4

• 5.2.3.5 The Contractor shall take water samples as stated in position 5.2.1.5