This document is a Technical Exhibit that outlines requirements for cleaning and maintaining water reservoirs at three locations - Katterbach, Illesheim, and Urlas - as part of a larger federal contract opportunity.
The key requirements include mechanically cleaning and disinfecting the water reservoirs, spraying off solutions with water, neutralizing and disposing of resulting waste, cleaning surrounding areas with a biological disinfectant, taking water samples to verify sterility, and delivering and installing replacement filtering mats. The work must be performed in accordance with environmental management and drinking water regulations. Water sample test reports must be provided to the Contracting Officer's Representative within 10 calendar days of completing the work.
The related federal contract opportunity is for Preventive Maintenance and Repair of Heating, Cooling systems, and other real property equipment at USAG Ansbach, to be awarded by the Department of the Army Materiel Command Army Contracting Command.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Exhibit 17
5.2.1 Katterbach Water Reservoirs
• 5.2.1.1 The Contractor shall mechanical clean two (2) reservoirs (2 x 1700 m³). All areas in direct contact with water, to include ceiling and installations (guiding wall with 3 and 6 pillars) inside the container shall be spray cleaned - disinfected with a water pressure stream using permitted solutions. Bottom drain shall be emptied. If necessary execute cleaning with brushes, wipers and sponges to remove deposits effectively.
• 5.2.1.2 The Contractor shall soak time hose and spray off solutions thoroughly with plenty of water IAW manufacturer guidelines
• 5.2.1.3 Resulting dirt and rinse water shall be neutralized and disposed of according to ISO 14001:2004 Environmental Management Systems and dangerous good directives.
• 5.2.1.4 After completion of work all floor of the ante- the entry as well as the pump room shall be cleaned with a biological compatible disinfectant. Plant shall be left in a clean condition.
• 5.2.1.5 Water samples shall be taken from the filled water reservoir according to the DVGW Information sheet. The health department or an accredited testing facility shall proof the sterility in accordance with the drinking water regulation. Test report shall be provided in duplicate within ten (10) calendar days after completion of work and presented to the COR/KO.
• 5.2.1.6 The Contractor shall deliver and install filtering mats at the reservoir area conforming to existing ones.
5.2.2 Illesheim Water Reservoirs
• 5.2.2.1 The Contractor shall mechanical clean 1each reservoir (362 m³) as stated in position 5.2.1.1
• 5.2.2.2 The Contractor shall spray off with plenty of water as stated in position 5.2.1.2
• 5.2.2.3 The Contractor shall neutralize and dispose as stated in position 5.2.1.3
• 5.2.2.4 The Contractor shall clean with biological compatible disinfectant as stated in position 5.2.1.4
• 5.2.2.5 The Contractor shall take water samples as stated in position 5.2.1.5.
• 5.2.2.6 The Contractor shall deliver and install filtering mats as stated in position 5.2.1.6
5.2.3 Urlas Water Reservoirs
• 5.2.3.1 The Contractor shall mechanical clean two (2) reservoirs (250 m³/each) as stated in position 5.2.1.1
• 5.2.3.2 The Contractor shall spray off with plenty of water as stated in position 5.2.1.2
• 5.2.3.3 The Contractor shall neutralize and dispose as stated in position 5.2.1.3
• 5.2.3.4 The Contractor shall clean with biological compatible disinfectant as stated in position 5.2.1.4
• 5.2.3.5 The Contractor shall take water samples as stated in position 5.2.1.5
• 5.2.3.6 The Contractor shall deliver and install filtering mats as stated in position 5.2.1.6