TECHNICAL EXHIBIT 12 - FREQUENCY SECHEDULE RVSD 9-19.xlsx
XLSX spreadsheet 26 KB Posted
- Solicitation number
- W912PB24R3010
About this file
This document is a technical exhibit that provides a detailed frequency schedule for preventive maintenance on various real property equipment and systems at USAG Ansbach over a 5-year contract period from December 1, 2024 to November 30, 2029. The equipment and systems include HVAC, plumbing, electrical, and other building infrastructure. The exhibit specifies the type of equipment, units, and number of preventive maintenance visits per year. This technical exhibit supports a federal contract opportunity for "Preventive Maintenance and Repair of Real Property Equipment" at USAG Ansbach, which is solicited by the Department of the Army Materiel Command Army Contracting Command. The contract requires providing all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to maintain and repair the specified real property equipment and systems. The contract has a base period of 1 year with 4 option years.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1 Contract Ansbach OMA Basic Period: 1 Dec 2024 - 30 Nov 2025 Preventive Maintenance
| Item | ||||
| No | DESCRIPTION | Units | EA | PM |
Visits
| Preventive Maintenance as prescribed in TE 2,TE 3 and TE 17 | |||||
| 1 | ED | Walk-in Refrigerator/Freezer | 42 | EA | 2 |
| 2 | FB | VRV Unit Water Chiller | 13 | EA | 2 |
| 3 | FC | Air Conditioning System up to 30 KW incl. Filters, Cond. Units | 55 | EA | 2 |
| 4 | FF | Air Conditioner (window type) including Filters | 18 | EA | 2 |
| 5 | FG | Air Conditioner (split type) including Filters | 154 | EA | 2 |
| 6 | FL | Room Fan | 593 | EA | 1 |
| 7 | FR | Ventilation Exhaust System incl. Air Filter | 283 | EA | 2 |
| 8 | FS | Ventilation Exhaust System incl. Exhaust Hoods, Fans and Grease Filter | 209 | EA | 2 |
| 9 | FU | Ventilation System w/Heat | 145 | EA | 2 |
| 10 | GL | Decalcifying System | 26 | EA | 4 |
| 11 | HD | Gas Burner System | 15 | EA | 1 |
| 12 | HY | Motor Driven Sliding Door | 221 | EA | 2 |
| 13 | HZ | Drop Arm System | 27 | EA | 2 |
| 14 | JK | Emergency Light Equipment | 99 | EA | 1 |
| 15 | JM | Emergency Power Unit | 37 | EA | 1 |
| 16 | KF | Food Court Vent. Exhaust Systems | 4 | EA | 12 |
| 17 | LL | Air Compressor | 49 | EA | 1 |
| 18 | LT | Crane Hoist | 49 | EA | 4 |
| 19 | LU | Elevator System | 20 | EA | 4 |
| 20 | QP | Washer (commercial) | 10 | EA | 2 |
| 21 | QR | Dryer (commercial) | 21 | EA | 2 |
| 22 | RB | Grounding / Lighting | 29 | EA | 1 |
| 23 | SB | Generator Test Run | 33 | EA | 12 |
| 24 | SC | Water Treatment Plant | 22 | EA | 12 |
| 25 | SS | Ducts (meter ea) | 3258 | EA | 1 |
| 26 | TQ | Retractable Bollard System | 20 | EA | 4 |
| 27 | UB | Flue Gas and Electrical System for Roof Windows | 181 | EA | 1 |
| 28 | UC | UPS uninterruptible Power Supply System | 13 | EA | 1 |
| 29 | CK | Dispenser Drinking Water | 56 | EA | 2 |
| 30 | HS | Helicopter Service Stations | 24 | EA | 1 |
| 31 | QS | Gas Distrobution Network Maintenance | 1 | EA | 2 |
| 32 | FP | Forced Air oil fired Burner (Boiler System up to 50kW on/off controlled) | 2 | EA | 1 |
| 33 | FP | Forced Air oil fired Burner (Boiler System over 50kW with two stage cont | 2 | EA | 1 |
| 34 | FP | Forced Air oil fired Burner (air heating boiler with two stage control) | 1 | EA | 1 |
| 35 | PT | Forced Air natural gas fired burner (air heating boiler with two stage cont | 3 | EA | 1 |
| 36 | PT | Forced Air natural gas fired burner (air heating boiler with Modular contro | 2 | EA | 1 |
| 37 | PT | Forced Air natural gas fired burner (air heating boiler wall mounted) | 2 | EA | 1 |
| 38 | KV | Boiler Plant Pressure equalization control | 8 | EA | 1 |
| 39 | TW | Boiler Plant de-aeration control | 2 | EA | 1 |
| 40 | SE | Smokestack installation and personal safety equipment | 1 | EA | 1 |
| 41 | CG | CO-Generator BHKW | 1 | EA | 4 |
| 42 | PL | Industrial Plotter | 5 | EA | 1 |
| 43 | LZ | Laser Plotter | 1 | EA | 1 |
| A056 | SP | Sewer Pump under 15 KW | 6 | EAEAEA | 1 |
| A057 | SP | Sewer Pump over 15 KW | 3 | EA | 1 |
| A058 | DP | Domestic Water Pump | 15 | EA | 1 |
| A059 | PS | Solar Systems over 12 sqm | 2 | EA | 1 |
| A060 | Cleaning domestic water reservoir 250qm-1700qm | 5 | EA | 1 | |
| 43 | LZ | Laser Plotter | 1 | EA | 1 |
| AFH Basic Period: 1 Dec 2024 - 30 Nov 2025 |
Preventive Maintenance
| Item | ||||
| No | DESCRIPTION | Units | EA | PM |
Visits
| Preventive Maintenance as prescribed in TE 2 and TE 3 | |||||
| 1 | HY | Motor Driven Sliding Door | 108 | EA | 1 |
| 2 | JK | Emergency Light Equipment | 42 | EA | 1 |
| 3 | SS | Ducts (meter ea) | 1750 | EA | 1 |
| 4 | FU | Ventilation System w/Heat | 108 | EA | 2 |
| 5 | HD | Gas Burner System | 108 | EA | 1 |
| 6 | FS | Ventilation Exhaust System incl. Exhaust Hoods, Fans and Grease Filter | 120 | EA | 2 |
| 7 | FP | Forced Air oil fired Boiler System up to 50kW on/off controlled | 2 | EA | 1 |
| 8 | FP | Forced Air oil fired Boiler System over 50kW with two stage control | 1 | EA | 1 |
| 9 | QS | Gas Distro Network Maintenance Urlas | 2 | EA | 1 |
| 11 | PV | Solar System with Geothermal collector | 20 | EA | 1 |
| RPE Contract Ansbach |
OMA 1 OY Period: 1 Dec 2025 - 30 Nov 2026 Preventive Maintenance
| Item | ||||
| No | DESCRIPTION | Units | EA | PM |
Visits
| Preventive Maintenance as prescribed in TE 2,TE 3 and TE 17 | |||||
| 1 | ED | Walk-in Refrigerator/Freezer | 42 | EA | 2 |
| 2 | FB | VRV Unit Water Chiller | 13 | EA | 2 |
| 3 | FC | Air Conditioning System up to 30 KW incl. Filters, Cond. Units | 55 | EA | 2 |
| 4 | FF | Air Conditioner (window type) including Filters | 18 | EA | 2 |
| 5 | FG | Air Conditioner (split type) including Filters | 154 | EA | 2 |
| 6 | FL | Room Fan | 593 | EA | 1 |
| 7 | FR | Ventilation Exhaust System incl. Air Filter | 283 | EA | 2 |
| 8 | FS | Ventilation Exhaust System incl. Exhaust Hoods, Fans and Grease Filter | 209 | EA | 2 |
| 9 | FU | Ventilation System w/Heat | 145 | EA | 2 |
| 10 | GL | Decalcifying System | 26 | EA | 4 |
| 11 | HD | Gas Burner System | 15 | EA | 1 |
| 12 | HY | Motor Driven Sliding Door | 221 | EA | 2 |
| 13 | HZ | Drop Arm System | 27 | EA | 2 |
| 14 | JK | Emergency Light Equipment | 99 | EA | 1 |
| 15 | JM | Emergency Power Unit | 37 | EA | 1 |
| 16 | KF | Food Court Vent. Exhaust Systems | 4 | EA | 12 |
| 17 | LL | Air Compressor | 49 | EA | 1 |
| 18 | LT | Crane Hoist | 49 | EA | 4 |
| 19 | LU | Elevator System | 20 | EA | 4 |
| 20 | QP | Washer (commercial) | 10 | EA | 2 |
| 21 | QR | Dryer (commercial) | 21 | EA | 2 |
| 22 | RB | Grounding / Lighting | 29 | EA | 1 |
| 23 | SB | Generator Test Run | 33 | EA | 12 |
| 24 | SC | Water Treatment Plant | 22 | EA | 12 |
| 25 | SS | Ducts (meter ea) | 3258 | EA | 1 |
| 26 | TQ | Retractable Bollard System | 20 | EA | 4 |
| 27 | UB | Flue Gas and Electrical System for Roof Windows | 181 | EA | 1 |
| 28 | UC | UPS uninterruptible Power Supply System | 13 | EA | 1 |
| 29 | CK | Dispenser Drinking Water | 56 | EA | 2 |
| 30 | HS | Helicopter Service Stations | 24 | EA | 1 |
| 31 | QS | Gas Distrobution Network Maintenance | 1 | EA | 2 |
| 32 | FP | Forced Air oil fired Burner (Boiler System up to 50kW on/off controlled) | 2 | EA | 1 |
| 33 | FP | Forced Air oil fired Burner (Boiler System over 50kW with two stage cont | 2 | EA | 1 |
| 34 | FP | Forced Air oil fired Burner (air heating boiler with two stage control) | 1 | EA | 1 |
| 35 | PT | Forced Air natural gas fired burner (air heating boiler with two stage cont | 3 | EA | 1 |
| 36 | PT | Forced Air natural gas fired burner (air heating boiler with Modular contro | 2 | EA | 1 |
| 37 | PT | Forced Air natural gas fired burner (air heating boiler wall mounted) | 2 | EA | 1 |
| 38 | KV | Boiler Plant Pressure equalization control | 8 | EA | 1 |
| 39 | TW | Boiler Plant de-aeration control | 2 | EA | 1 |
| 40 | SE | Smokestack installation and personal safety equipment | 1 | EA | 1 |
| 41 | CG | CO-Generator BHKW | 1 | EA | 4 |
| 42 | PL | Industrial Plotter | 5 | EA | 1 |
| 43 | LZ | Laser Plotter | 1 | EA | 1 |
| 56 | SP | Sewer Pump under 15 KW | 6 | EAEAEA | 1 |
| 57 | SP | Sewer Pump over 15 KW | 3 | EA | 1 |
| 58 | DP | Domestic Water Pump | 15 | EA | 1 |
| 59 | PS | Solar Systems over 12 sqm | 2 | EA | 1 |
| 60 | WR | Cleaning domestic water reservoir 250qm-1700qm | 5 | EA | 1 |
AFH 1 OY Period: 1 Dec 2025 - 30 Nov 2026 Preventive Maintenance
| Item | ||||
| No | DESCRIPTION | Units | EA | PM |
Visits
| Preventive Maintenance as prescribed in TE 2and TE 3 | |||||
| 1 | HY | Motor Driven Sliding Door | 108 | EA | 1 |
| 2 | JK | Emergency Light Equipment | 42 | EA | 1 |
| 3 | SS | Ducts (meter ea) | 1750 | EA | 1 |
| 4 | FU | Ventilation System w/Heat | 108 | EA | 2 |
| 5 | HD | Gas Burner System | 108 | EA | 1 |
| 6 | FS | Ventilation Exhaust System incl. Exhaust Hoods, Fans and Grease Filter | 120 | EA | 2 |
| 7 | FP | Forced Air oil fired Boiler System up to 50kW on/off controlled | 2 | EA | 1 |
| 8 | FP | Forced Air oil fired Boiler System over 50kW with two stage control | 1 | EA | 1 |
| 9 | QS | Gas Distro Network Maintenance Urlas | 2 | EA | 1 |
| 10 | PV | Solar System with Geothermal collector | 20 | EA | 1 |
| Contract Ansbach |
OMA 2 OY Period: 1 Dec 2026 - 30 Nov 2027 Preventive Maintenance
| Item | ||||
| No | DESCRIPTION | Units | EA | PM |
Visits
| Preventive Maintenance as prescribed in TE 2,TE 3 and TE 17 | |||||
| 1 | ED | Walk-in Refrigerator/Freezer | 42 | EA | 2 |
| 2 | FB | VRV Unit Water Chiller | 13 | EA | 2 |
| 3 | FC | Air Conditioning System up to 30 KW incl. Filters, Cond. Units | 55 | EA | 2 |
| 4 | FF | Air Conditioner (window type) including Filters | 18 | EA | 2 |
| 5 | FG | Air Conditioner (split type) including Filters | 154 | EA | 2 |
| 6 | FL | Room Fan | 593 | EA | 1 |
| 7 | FR | Ventilation Exhaust System incl. Air Filter | 283 | EA | 2 |
| 8 | FS | Ventilation Exhaust System incl. Exhaust Hoods, Fans and Grease Filter | 209 | EA | 2 |
| 9 | FU | Ventilation System w/Heat | 145 | EA | 2 |
| 10 | GL | Decalcifying System | 26 | EA | 4 |
| 11 | HD | Gas Burner System | 15 | EA | 1 |
| 12 | HY | Motor Driven Sliding Door | 221 | EA | 2 |
| 13 | HZ | Drop Arm System | 27 | EA | 2 |
| 14 | JK | Emergency Light Equipment | 99 | EA | 1 |
| 15 | JM | Emergency Power Unit | 37 | EA | 1 |
| 16 | KF | Food Court Vent. Exhaust Systems | 4 | EA | 12 |
| 17 | LL | Air Compressor | 49 | EA | 1 |
| 18 | LT | Crane Hoist | 49 | EA | 4 |
| 19 | LU | Elevator System | 20 | EA | 4 |
| 20 | QP | Washer (commercial) | 10 | EA | 2 |
| 21 | QR | Dryer (commercial) | 21 | EA | 2 |
| 22 | RB | Grounding / Lighting | 29 | EA | 1 |
| 23 | SB | Generator Test Run | 33 | EA | 12 |
| 24 | SC | Water Treatment Plant | 22 | EA | 12 |
| 25 | SS | Ducts (meter ea) | 3258 | EA | 1 |
| 26 | TQ | Retractable Bollard System | 20 | EA | 4 |
| 27 | UB | Flue Gas and Electrical System for Roof Windows | 181 | EA | 1 |
| 28 | UC | UPS uninterruptible Power Supply System | 13 | EA | 1 |
| 29 | CK | Dispenser Drinking Water | 56 | EA | 2 |
| 30 | HS | Helicopter Service Stations | 24 | EA | 1 |
| 31 | QS | Gas Distrobution Network Maintenance | 1 | EA | 2 |
| 32 | FP | Forced Air oil fired Burner (Boiler System up to 50kW on/off controlled) | 2 | EA | 1 |
| 33 | FP | Forced Air oil fired Burner (Boiler System over 50kW with two stage cont | 2 | EA | 1 |
| 34 | FP | Forced Air oil fired Burner (air heating boiler with two stage control) | 1 | EA | 1 |
| 35 | PT | Forced Air natural gas fired burner (air heating boiler with two stage cont | 3 | EA | 1 |
| 36 | PT | Forced Air natural gas fired burner (air heating boiler with Modular contro | 2 | EA | 1 |
| 37 | PT | Forced Air natural gas fired burner (air heating boiler wall mounted) | 2 | EA | 1 |
| 38 | KV | Boiler Plant Pressure equalization control | 8 | EA | 1 |
| 39 | TW | Boiler Plant de-aeration control | 2 | EA | 1 |
| 40 | SE | Smokestack installation and personal safety equipment | 1 | EA | 1 |
| 41 | CG | CO-Generator BHKW | 1 | EA | 4 |
| 42 | PL | Industrial Plotter | 5 | EA | 1 |
| 43 | LZ | Laser Plotter | 1 | EA | 1 |
| 56 | SP | Sewer Pump under 15 KW | 6 | EA | 1 |
| 57 | SP | Sewer Pump over 15 KW | 3 | EA | 1 |
| 58 | DP | Domestic Water Pump | 15 | EA | 1 |
| 59 | PS | Solar Systems over 12 sqm | 2 | EA | 1 |
| 60 | WR | Cleaning domestic water reservoir 250qm-1700qm | 7 | EA | 1 |
AFH 2 OY Period: 1 Dec 2026 - 30 Nov 2027 Preventive Maintenance
| Item | ||||
| No | DESCRIPTION | Units | EA | PM |
Visits
| Preventive Maintenance as prescribed in TE 2 and TE 3 | |||||
| 1 | HY | Motor Driven Sliding Door | 108 | EA | 1 |
| 2 | JK | Emergency Light Equipment | 42 | EA | 1 |
| 3 | SS | Ducts (meter ea) | 1750 | EA | 1 |
| 4 | FU | Ventilation System w/Heat | 108 | EA | 2 |
| 5 | HD | Gas Burner System | 108 | EA | 1 |
| 6 | FS | Ventilation Exhaust System incl. Exhaust Hoods, Fans and Grease Filter | 120 | EA | 2 |
| 7 | FP | Forced Air oil fired Boiler System up to 50kW on/off controlled | 2 | EA | 1 |
| 8 | FP | Forced Air oil fired Boiler System over 50kW with two stage control | 1 | EA | 1 |
| 9 | QS | Gas Distro Network Maintenance Urlas | 2 | EA | 1 |
| 10 | PV | Solar System with Geothermal collector | 20 | EA | 1 |
| Contract Ansbach |
OMA 3 OY Period: 1 Dec 2027 - 30 Nov 2028 Preventive Maintenance
| Item | ||||
| No | DESCRIPTION | Units | EA | PM |
Visits
| Preventive Maintenance as prescribed in TE 2, TE 3 and TE 17 | |||||
| 1 | ED | Walk-in Refrigerator/Freezer | 42 | EA | 2 |
| 2 | FB | VRV Unit Water Chiller | 13 | EA | 2 |
| 3 | FC | Air Conditioning System up to 30 KW incl. Filters, Cond. Units | 55 | EA | 2 |
| 4 | FF | Air Conditioner (window type) including Filters | 18 | EA | 2 |
| 5 | FG | Air Conditioner (split type) including Filters | 154 | EA | 2 |
| 6 | FL | Room Fan | 593 | EA | 1 |
| 7 | FR | Ventilation Exhaust System incl. Air Filter | 283 | EA | 2 |
| 8 | FS | Ventilation Exhaust System incl. Exhaust Hoods, Fans and Grease Filter | 209 | EA | 2 |
| 9 | FU | Ventilation System w/Heat | 145 | EA | 2 |
| 10 | GL | Decalcifying System | 26 | EA | 4 |
| 11 | HD | Gas Burner System | 15 | EA | 1 |
| 12 | HY | Motor Driven Sliding Door | 221 | EA | 2 |
| 13 | HZ | Drop Arm System | 27 | EA | 2 |
| 14 | JK | Emergency Light Equipment | 99 | EA | 1 |
| 15 | JM | Emergency Power Unit | 37 | EA | 1 |
| 16 | KF | Food Court Vent. Exhaust Systems | 4 | EA | 12 |
| 17 | LL | Air Compressor | 49 | EA | 1 |
| 18 | LT | Crane Hoist | 49 | EA | 4 |
| 19 | LU | Elevator System | 20 | EA | 4 |
| 20 | QP | Washer (commercial) | 10 | EA | 2 |
| 21 | QR | Dryer (commercial) | 21 | EA | 2 |
| 22 | RB | Grounding / Lighting | 29 | EA | 1 |
| 23 | SB | Generator Test Run | 33 | EA | 12 |
| 24 | SC | Water Treatment Plant | 22 | EA | 12 |
| 25 | SS | Ducts (meter ea) | 3258 | EA | 1 |
| 26 | TQ | Retractable Bollard System | 20 | EA | 4 |
| 27 | UB | Flue Gas and Electrical System for Roof Windows | 181 | EA | 1 |
| 28 | UC | UPS uninterruptible Power Supply System | 13 | EA | 1 |
| 29 | CK | Dispenser Drinking Water | 56 | EA | 2 |
| 30 | HS | Helicopter Service Stations | 24 | EA | 1 |
| 31 | QS | Gas Distrobution Network Maintenance | 1 | EA | 2 |
| 32 | FP | Forced Air oil fired Burner (Boiler System up to 50kW on/off controlled) | 2 | EA | 1 |
| 33 | FP | Forced Air oil fired Burner (Boiler System over 50kW with two stage cont | 2 | EA | 1 |
| 34 | FP | Forced Air oil fired Burner (air heating boiler with two stage control) | 1 | EA | 1 |
| 35 | PT | Forced Air natural gas fired burner (air heating boiler with two stage cont | 3 | EA | 1 |
| 36 | PT | Forced Air natural gas fired burner (air heating boiler with Modular contro | 2 | EA | 1 |
| 37 | PT | Forced Air natural gas fired burner (air heating boiler wall mounted) | 2 | EA | 1 |
| 38 | KV | Boiler Plant Pressure equalization control | 8 | EA | 1 |
| 39 | TW | Boiler Plant de-aeration control | 2 | EA | 1 |
| 40 | SE | Smokestack installation and personal safety equipment | 1 | EA | 1 |
| 41 | CG | CO-Generator BHKW | 1 | EA | 4 |
| 42 | PL | Industrial Plotter | 5 | EA | 1 |
| 43 | LZ | Laser Plotter | 1 | EA | 1 |
| 56 | SP | Sewer Pump under 15 KW | 6 | EA | 1 |
| 57 | SP | Sewer Pump over 15 KW | 3 | EA | 1 |
| 58 | DP | Domestic Water Pump | 15 | EA | 1 |
| 59 | PS | Solar Systems over 12 sqm | 2 | EA | 1 |
| 60 | WR | Cleaning domestic water reservoir 250qm-1700qm | 5 | EA | 1 |
AFH 3 OY Period: 1 Dec 2027 - 30 Nov 2028 Preventive Maintenance
| Item | ||||
| No | DESCRIPTION | Units | EA | PM |
Visits
| Preventive Maintenance as prescribed in TE 2 and TE 3 | |||||
| 1 | HY | Motor Driven Sliding Door | 108 | EA | 1 |
| 2 | JK | Emergency Light Equipment | 42 | EA | 1 |
| 3 | SS | Ducts (meter ea) | 1750 | EA | 1 |
| 4 | FU | Ventilation System w/Heat | 108 | EA | 2 |
| 5 | HD | Gas Burner System | 108 | EA | 1 |
| 6 | FS | Ventilation Exhaust System incl. Exhaust Hoods, Fans and Grease Filter | 120 | EA | 2 |
| 7 | FP | Forced Air oil fired Boiler System up to 50kW on/off controlled | 2 | EA | 1 |
| 8 | FP | Forced Air oil fired Boiler System over 50kW with two stage control | 1 | EA | 1 |
| 9 | QS | Gas Distro Network Maintenance Urlas | 2 | EA | 1 |
| 10 | PV | Solar System with Geothermal collector | 20 | EA | 1 |
| Contract Ansbach |
OMA 4 OY Period: 1 Dec 2028 - 30 Nov 2029 Preventive Maintenance
| Item | ||||
| No | DESCRIPTION | Units | EA | PM |
Visits
| Preventive Maintenance as prescribed in TE 2, TE 3 and TE 17 | |||||
| 1 | ED | Walk-in Refrigerator/Freezer | 42 | EA | 2 |
| 2 | FB | VRV Unit Water Chiller | 13 | EA | 2 |
| 3 | FC | Air Conditioning System up to 30 KW incl. Filters, Cond. Units | 55 | EA | 2 |
| 4 | FF | Air Conditioner (window type) including Filters | 18 | EA | 2 |
| 5 | FG | Air Conditioner (split type) including Filters | 154 | EA | 2 |
| 6 | FL | Room Fan | 593 | EA | 1 |
| 7 | FR | Ventilation Exhaust System incl. Air Filter | 283 | EA | 2 |
| 8 | FS | Ventilation Exhaust System incl. Exhaust Hoods, Fans and Grease Filter | 209 | EA | 2 |
| 9 | FU | Ventilation System w/Heat | 145 | EA | 2 |
| 10 | GL | Decalcifying System | 26 | EA | 4 |
| 11 | HD | Gas Burner System | 15 | EA | 1 |
| 12 | HY | Motor Driven Sliding Door | 221 | EA | 2 |
| 13 | HZ | Drop Arm System | 27 | EA | 2 |
| 14 | JK | Emergency Light Equipment | 99 | EA | 1 |
| 15 | JM | Emergency Power Unit | 37 | EA | 1 |
| 16 | KF | Food Court Vent. Exhaust Systems | 4 | EA | 12 |
| 17 | LL | Air Compressor | 49 | EA | 1 |
| 18 | LT | Crane Hoist | 49 | EA | 4 |
| 19 | LU | Elevator System | 20 | EA | 4 |
| 20 | QP | Washer (commercial) | 10 | EA | 2 |
| 21 | QR | Dryer (commercial) | 21 | EA | 2 |
| 22 | RB | Grounding / Lighting | 29 | EA | 1 |
| 23 | SB | Generator Test Run | 33 | EA | 12 |
| 24 | SC | Water Treatment Plant | 22 | EA | 12 |
| 25 | SS | Ducts (meter ea) | 3258 | EA | 1 |
| 26 | TQ | Retractable Bollard System | 20 | EA | 4 |
| 27 | UB | Flue Gas and Electrical System for Roof Windows | 181 | EA | 1 |
| 28 | UC | UPS uninterruptible Power Supply System | 13 | EA | 1 |
| 29 | CK | Dispenser Drinking Water | 56 | EA | 2 |
| 30 | HS | Helicopter Service Stations | 24 | EA | 1 |
| 31 | QS | Gas Distrobution Network Maintenance | 1 | EA | 2 |
| 32 | FP | Forced Air oil fired Burner (Boiler System up to 50kW on/off controlled) | 2 | EA | 1 |
| 33 | FP | Forced Air oil fired Burner (Boiler System over 50kW with two stage cont | 2 | EA | 1 |
| 34 | FP | Forced Air oil fired Burner (air heating boiler with two stage control) | 1 | EA | 1 |
| 35 | PT | Forced Air natural gas fired burner (air heating boiler with two stage cont | 3 | EA | 1 |
| 36 | PT | Forced Air natural gas fired burner (air heating boiler with Modular contro | 2 | EA | 1 |
| 37 | PT | Forced Air natural gas fired burner (air heating boiler wall mounted) | 2 | EA | 1 |
| 38 | KV | Boiler Plant Pressure equalization control | 8 | EA | 1 |
| 39 | TW | Boiler Plant de-aeration control | 2 | EA | 1 |
| 40 | SE | Smokestack installation and personal safety equipment | 1 | EA | 1 |
| 41 | CG | CO-Generator BHKW | 1 | EA | 4 |
| 42 | PL | Industrial Plotter | 5 | EA | 1 |
| 43 | LZ | Laser Plotter | 1 | EA | 1 |
| 56 | SP | Sewer Pump under 15 KW | 6 | EAEAEA | 1 |
| 57 | SP | Sewer Pump over 15 KW | 3 | EA | 1 |
| 58 | DP | Domestic Water Pump | 15 | EA | 1 |
| 59 | PS | Solar Systems over 12 sqm | 2 | EA | 1 |
| 60 | WR | Cleaning domestic water reservoir 250qm-1700qm | 5 | EA | 1 |
AFH 4 OY Period: 1 Dec 2028 - 30 Nov 2029 Preventive Maintenance
| Item | ||||
| No | DESCRIPTION | Units | EA | PM |
Visits
| Preventive Maintenance as prescribed in TE 2 and TE 3 | |||||
| 1 | HY | Motor Driven Sliding Door | 108 | EA | 1 |
| 2 | JK | Emergency Light Equipment | 42 | EA | 1 |
| 3 | SS | Ducts (meter ea) | 1750 | EA | 1 |
| 4 | FU | Ventilation System w/Heat | 108 | EA | 2 |
| 5 | HD | Gas Burner System | 108 | EA | 1 |
| 6 | FS | Ventilation Exhaust System incl. Exhaust Hoods, Fans and Grease Filter | 120 | EA | 2 |
| 7 | FP | Forced Air oil fired Boiler System up to 50kW on/off controlled | 2 | EA | 1 |
| 8 | FP | Forced Air oil fired Boiler System over 50kW with two stage control | 1 | EA | 1 |
| 9 | QS | Gas Distro Network Maintenance Urlas | 2 | EA | 1 |
| 10 | PV | Solar System with Geothermal collector | 20 | EA | 1 |
File details come from the government source that posted it. Updated .