TECHNICAL EXHIBIT 8 - Key Personnel Qualifications.pdf

PDF 174 KB Posted

Attached to
PREVENTIVE MAINTENANCE AND REPAIR OF REAL PROPERTY EQUIPMENT USAG ANSBACH
Solicitation number
W912PB24R3010
Issued by

About this file

This document is a Technical Exhibit 8 - Key Personnel Qualifications, which outlines the required qualifications for key personnel to support a federal contract opportunity.

The key personnel required include:

  • Kaelteanlagenbau - Meister or Ingenieur (Master or Engineer level of Refrigerant systems)
  • Heizungsbau-Meister or Ingenieur (Master or Engineer level of Heating Equipment)
  • Elektro/Elektronik-Meister or Ingenieur (Master or Engineer level of Electro mechanic)
  • Wasser- und Gasversorgungs-Meister or Ingenieur (Master or Engineer level of Water/Gas systems)

This Technical Exhibit is related to a federal contract opportunity titled "PREVENTIVE MAINTENANCE AND REPAIR OF REAL PROPERTY EQUIPMENT USAG ANSBACH" (Solicitation Number W912PB24R3010). This is a non-personal services contract for the Department of the Army Materiel Command Army Contracting Command to provide preventive maintenance and repair of heating, cooling, and other real property equipment at USAG Ansbach. The contractor shall provide all required personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services.

View the file

Other files

File Type Posted
TECHNICAL EXHIIBIT 17 - Water Reservoirs (1).pdf PDF
Site Visit RFI 9-16.pdf PDF
W912PB-24-R-3010 RPE amendment 2.pdf PDF
RPE PWS Updates_19 Sep_2024_Rvsd.pdf PDF
ELIN Sheet_Rvsd 9-18-2024 Final.xlsx XLSX spreadsheet
TECHNICAL EXHIBIT 12 - FREQUENCY SECHEDULE RVSD 9-19.xlsx XLSX spreadsheet
RPE PWS Updates_5 Sep_2024_Rvsd.pdf PDF
TECHNICAL EXHIBIT 2 - CLS 411 revised.pdf PDF
RFI 5SEP24 Final (002).pdf PDF
W912PB-24-R-3010 RPE amendment 1.pdf PDF
TECHNICAL EXHIBIT 12 - FREQUENCY SECHEDULE RVSD.xlsx XLSX spreadsheet
ELIN Sheet_Rvsd 9-12-2024.xlsx XLSX spreadsheet
TECHNICAL EXHIBIT 6 - USAG Asbach Environmental Compliance.pdf PDF
TECHNICAL EXHIBIT 16 - BHKW Technical Data english.pdf PDF
TECHNICAL EXHIBIT 9 - Required Special qualifications.pdf PDF
TECHNICAL EXHIBIT 2 - CLS 411.pdf PDF
TECHNICAL EXHIBIT 12 - FREQUENCY SECHEDULE.pdf PDF
TECHNICAL EXHIBIT 14 - PM SCHEDULE EXAMPLE.xls XLS spreadsheet
TECHNICAL EXHIBIT 15 - ELIN List - Equipment Category.pdf PDF
RPE PWS Final 03 June 24.pdf PDF
TECHNICAL EXHIBIT 5 - Other Applicable Publications.pdf PDF
TECHNICAL EXHIBIT 1 - INVENTORY LIST RPE.xlsx XLSX spreadsheet
TECHNICAL EXHIBIT 4 - IMCOM FACILITIES MAINTENANCE INSTRUCTION.pdf PDF
TECHNICAL EXHIBIT 10 - Required Certifications.pdf PDF
TECHNICAL EXHIBIT 11 - INTEGRATED CULTURAL RESOURCES MANAGEMENT PLAN.pdf PDF
TECHNICAL EXHIBIT 13 - Work Certificate Example.pdf PDF
TECHNICAL EXHIBIT 7 - Work Site Location.pdf PDF
TECHNICAL EXHIBIT 3 - CLIN MAINTENANCE PROCEDURES.pdf PDF
W912PB24R3010 Final IDT RPE.pdf PDF
ELIN Sheet_Rvsd.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 8

KEY PERSONNEL QUALIFICATIONS

• Kaelteanlagenbau - Meister or Ingenieur − Person with a Master or Engineer level of Refrigerant systems

• Heizungsbau-Meister or Ingenieur − Person with a Master or Engineer level of Heating Equipment

• Elektro/Elektronik-Meister or Ingenieur − Person with a Master or Engineer level of Electro mechanic

• Wasser- und Gasversorgungs-Meister or Ingenieur − Person with a Master or Engineer level of Water/Gas systems

File details come from the government source that posted it. Updated .