Summary_of_Changes.pdf

PDF 14 KB Posted

Attached to
Mark Twain Mowing
Solicitation number
W912P9-17-R-0001
Issued by

About this file

Summary of Changes

View the file

Other files

File Type Posted
Amendment_0003.pdf PDF
049_Typical_Roadway_Mowing.pdf PDF
Contractor_Questions.pdf PDF
App_B_15-31_Mowing_Maps.7z 7Z file
Additional_Contractor_Questions.pdf PDF
050_Typical_Campsite.pdf PDF
048_Typical_HF_Lot.pdf PDF
App_B_1-14_Mowing_Maps.7z 7Z file
Contractor_Questions.pdf PDF
Attachment_1_Price_Schedule.pdf PDF
Revised_PWS_Amend_0003.pdf PDF
051_HF_Lot_Locations.pdf PDF
App_B_32-45_Mowing_Maps.7z 7Z file
App_B_1-15_1.7z 7Z file
Appendix_A.pdf PDF
Amendment_0001.pdf PDF
A02-Appendix_I_Master_Work_Plan.pdf PDF
A02-Appendix_A_Grounds_Description_Workload_Estimates.pdf PDF
A02-Appendix_G2_Accident_Prevention_Plan.pdf PDF
A02-Appendix_H_Vegetation_Control_Chart.pdf PDF
A02-Appendix_D_Definitions.pdf PDF
A02-Appendix_E_Vehicle_Signs.pdf PDF
A02-Appendix_F-2_Pesticide_Usage_Forms.pdf PDF
A02-Appendix_G3_Accident_Prevention_Plan.pdf PDF
A02-Appendix_F-1_Pesticide_Usage_Forms.pdf PDF
A02-Appendix_G2_Accident_Prevention_Plan.pdf PDF
A02-Appendix_B_KEY.pdf PDF
A02-Appendix_C_Data_Requirements.pdf PDF
A20_-_Attachment_2_Wage_Determination_15-2309.pdf PDF
A02-Appendix_(Combined)_B-1_-_B-53_Area_Maps_or_Site_Plans.pdf PDF
A22-Attachment_1_-_Price_Schedule.xlsb XLSB spreadsheet
A02-_PWS_Mowing_Contract_2016_Mark_Twain_Lake_(4_0).pdf PDF
17_R_0001_Mark_Twain_Mowing.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary of Changes:

Item 1. Solicitation, Page 1, Block 7a – Change “Timothy A Gould” to “Lisa M White”.

Item 2. Solicitation, Page 1, Block 7b – Change “314-331-8506” to “314-331-8518”.

Item 3. Replace existing Attachment 1, Price Schedule with new Attachment 1, Price Schedule.

Item 4. PWS, Page 2, Table of Contents – Change “1.3. Turf Renovation” to “1.4. Turf Renovation”.

Item 5. PWS, Page 2, Table of Contents – Change “5.5. Hazardous Materials” to “5.5.

Hazardous Materials Inventory”.

Item 6. PWS, Page 2, Table of Contents – Change “5.15. Changes in Work” to “5.15.

Notifications”.

Item 7. PWS, Page 3, 1., Sentence 6 – Remove “as outlined by the Professional Grounds Management Society (PGMS)”. Sentence shall end after “standards”.

Item 8. PWS, Page 3, 1., Last Sentence – Remove “clockwise or”.

Item 9. PWS, Page 3, 1.1.1.1., e. – Change “for feet” to “four feet”.

Item 10. PWS, Page 4 – Change “1.1.5. Lawn Renovation” to “1.1.4. Lawn Renovation”.

Item 11. PWS, Page 4, 1.2., Sentence 4 – Remove sentence 4, “The Contractor shall mow un-improved grounds a minimum of once per year and a maximum of three times per year, at appropriate dates determined by KO or COR based upon weather forecasts and ground conditions.” Entirely.

Item 12. PWS, Page 5, Service Delivery Summary Table, SDS-3 – Change “Turf Renovation” to “Vegetation Control”.

Item 13. PWS, Page 5, Service Delivery Summary Table, Performance Threshold Column – Change each mention of “month” in rows 1 through 3 to “cycle”

Item 14. PWS, Page 5, Service Delivery Summary Table, Remedy Column – Change each mention of “CO” in rows 1 through 3 to “KO”.

Item 15. PWS, Page 5, Service Delivery Summary Table, Performance Threshold Column – Change wording in rows 1 through 3 to “No more than two (2) defects per cycle”.

Item 16. PWS, Page 5, 2.2., Last Sentence – Change “days” to “day”.

Item 17. PWS, Page 5, 2.3.1., Sentence 4 – Change “any one calendar month” to “any one cycle within a task order”.

Item 18. PWS, Page 5, 2.3.1, Sentence 4 – Change “CO” to “KO”.

Item 19. PWS, Page 6, 5.3., Sentence 4 – Change “CO” to “KO”.

Item 20. PWS, Page 8, 5.18., Sentence 6 – Change sentence 6 to “Performance period for cycles within a task order is seven (7) work days.”.

Item 21. PWS, Page 8 – Add “5.19. Equipment Storage Areas. No storage and/or staging areas are available to the contractor between cycles. Locations for storage and/or staging areas for equipment only may be permitted during a cycle upon approval 24 hours in advance by the COR.”.

Item 22. Replace existing Appendix A with new Appendix A.

Item 23. Replace existing Appendix B with new Appendix B (Includes B through B-53).

Item 24. Missing Appendix G-1. Appendix G-2 is duplicated, delete one copy of Appendix G-2 and add Appendix G-1.

File details come from the government source that posted it. Updated .