A02-Appendix_H_Vegetation_Control_Chart.pdf

PDF 26 KB Posted

Attached to
Mark Twain Mowing Federal contract opportunity
Solicitation number
W912P9-17-R-0001
Issued by
Department of the Army Corps of Engineers Engineering District St Louis

About this file

APPENDIX H

View the file

Other files for this federal contract opportunity

Other files attached to Mark Twain Mowing, newest first.
File Type Posted
Amendment_0003.pdf PDF
049_Typical_Roadway_Mowing.pdf PDF
Contractor_Questions.pdf PDF
App_B_15-31_Mowing_Maps.7z 7Z file
Additional_Contractor_Questions.pdf PDF
App_B_1-14_Mowing_Maps.7z 7Z file
Contractor_Questions.pdf PDF
Attachment_1_Price_Schedule.pdf PDF
Revised_PWS_Amend_0003.pdf PDF
Summary_of_Changes.pdf PDF
050_Typical_Campsite.pdf PDF
048_Typical_HF_Lot.pdf PDF
051_HF_Lot_Locations.pdf PDF
App_B_32-45_Mowing_Maps.7z 7Z file
App_B_1-15_1.7z 7Z file
Appendix_A.pdf PDF
Amendment_0001.pdf PDF
A02-Appendix_I_Master_Work_Plan.pdf PDF
A02-Appendix_A_Grounds_Description_Workload_Estimates.pdf PDF
A02-Appendix_G2_Accident_Prevention_Plan.pdf PDF
A02-Appendix_D_Definitions.pdf PDF
A02-Appendix_F-2_Pesticide_Usage_Forms.pdf PDF
A02-Appendix_G3_Accident_Prevention_Plan.pdf PDF
A02-Appendix_F-1_Pesticide_Usage_Forms.pdf PDF
A02-Appendix_G2_Accident_Prevention_Plan.pdf PDF
A02-Appendix_E_Vehicle_Signs.pdf PDF
A02-Appendix_B_KEY.pdf PDF
A02-Appendix_C_Data_Requirements.pdf PDF
A20_-_Attachment_2_Wage_Determination_15-2309.pdf PDF
A02-Appendix_(Combined)_B-1_-_B-53_Area_Maps_or_Site_Plans.pdf PDF
A22-Attachment_1_-_Price_Schedule.xlsb XLSB spreadsheet
A02-_PWS_Mowing_Contract_2016_Mark_Twain_Lake_(4_0).pdf PDF
17_R_0001_Mark_Twain_Mowing.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix H

Vegetation Control Area Chart (Appendix H)

For Level 1, Level 2, and Level 3

Level 1 Control. Level I control shall consist of non-selective or selective spot or band application to kill all live herbaceous and/or woody vegetation within the specified areas with pre- and/or post emergent herbicides or entire removal of live vegetation entirely including root systems and removal of dead vegetative material.

1. Riprap areas

a. Clarence Cannon Dam Stilling Basin

b. John Spalding Boat Ramp Area and High Water Boat Ramp Area

c. Ray Behrens Boat Ramp Area

d. Indian Creek East Boat Ramp Area, West Boat Ramp Area and Henderson Lake Dam Area. NOTE:

See map in Appendix B for exact limits of Level 1 Control at West Boat Ramp Area

e. Robert Allen Boat Ramp Area and High Water Boat Ramp Area

f. South Fork Boat Ramp Area

h. Stoutsville Boat Ramp Area and High Water Boat Ramp Area

i. Bluffview Recreation Area

j. M.W. Boudreaux Visitor Center Dry Creek Bed NOTE: See map in Appendix B for location of dry creek bed

2. Sand Beach Areas

a. John Spalding Beach, sanded areas and sidewalks

b. Indian Creek Beach and sanded areas

Level 2 Control. Level II control shall consist of selective spot applications and removal to kill all existing live woody vegetation within the areas listed and shown in Appendix B with post-emergent herbicides. Removal shall consist of cutting the plant no more than six (6) inches above the exposed surface and disposal. Post-emergent herbicide shall be applied to the remainder of the plant immediately after removal to insure a continued kill of the plant.

Riprap Areas

a. Clarence Cannon Dam Face and Exit Channel

b. Indian Creek West Boat Ramp Area. NOTE: See map in Appendix B for exact limits of Level 2 Control

c. Hunter/Fisherman Access Areas 11, 15, 20, 30, 61 and 70

Level 3 Control. Level III control shall consist of selective spot application to kill and /or inhibit all live herbaceous vegetation around all facility structures and improvements with pre- and /or post-emergent herbicides or entire removal of live vegetation including root systems and removal of dead vegetative material. Level III control limits shall overlap or be adjacent to the trimming limits as stated in Paragraph 5.1.2 contained herein. Note: The maximum allowable application bandwidth around objects within the Level III Control limits shall be 12 inches.

Post and/or Pre-emergent Herbicide

a. Paved, aggregated or bark chip sidewalks and trails

b. Paved or aggregate parking lots, Hunter/Fisherman Lots and associated gravel roads, boat launches, turn-around and pull-out areas (this includes control of vegetation Three (3) feet from outside of cable on Hunter/Fisherman parking lots that are not included in mowing limits)

c. Paved or aggregate roads and guardrails

d. Aggregate or bark chip shrub beds NOTE: Bark chip herbaceous plant beds located in the M.W.

Boudeaux Visitor Center shall not be treated.

e. Riprap

f. Chain link fences

g. Landscape trees and shrubs

h. Concrete and aggregate campsites, playgrounds and concrete play courts

Appendix H

i. Comfort stations, showing buildings, vault toilets, dumpster pads, project administration buildings, amphitheaters and picnic shelters

j. Entrance signs and signposts

File details come from the government source that posted it. Updated .