A02-Appendix_H_Vegetation_Control_Chart.pdf
PDF 26 KB Posted
- Attached to
- Mark Twain Mowing Federal contract opportunity
- Solicitation number
- W912P9-17-R-0001
About this file
APPENDIX H
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix H
Vegetation Control Area Chart (Appendix H)
For Level 1, Level 2, and Level 3
Level 1 Control. Level I control shall consist of non-selective or selective spot or band application to kill all live herbaceous and/or woody vegetation within the specified areas with pre- and/or post emergent herbicides or entire removal of live vegetation entirely including root systems and removal of dead vegetative material.
1. Riprap areas
a. Clarence Cannon Dam Stilling Basin
b. John Spalding Boat Ramp Area and High Water Boat Ramp Area
c. Ray Behrens Boat Ramp Area
d. Indian Creek East Boat Ramp Area, West Boat Ramp Area and Henderson Lake Dam Area. NOTE:
See map in Appendix B for exact limits of Level 1 Control at West Boat Ramp Area
e. Robert Allen Boat Ramp Area and High Water Boat Ramp Area
f. South Fork Boat Ramp Area
h. Stoutsville Boat Ramp Area and High Water Boat Ramp Area
i. Bluffview Recreation Area
j. M.W. Boudreaux Visitor Center Dry Creek Bed NOTE: See map in Appendix B for location of dry creek bed
2. Sand Beach Areas
a. John Spalding Beach, sanded areas and sidewalks
b. Indian Creek Beach and sanded areas
Level 2 Control. Level II control shall consist of selective spot applications and removal to kill all existing live woody vegetation within the areas listed and shown in Appendix B with post-emergent herbicides. Removal shall consist of cutting the plant no more than six (6) inches above the exposed surface and disposal. Post-emergent herbicide shall be applied to the remainder of the plant immediately after removal to insure a continued kill of the plant.
Riprap Areas
a. Clarence Cannon Dam Face and Exit Channel
b. Indian Creek West Boat Ramp Area. NOTE: See map in Appendix B for exact limits of Level 2 Control
c. Hunter/Fisherman Access Areas 11, 15, 20, 30, 61 and 70
Level 3 Control. Level III control shall consist of selective spot application to kill and /or inhibit all live herbaceous vegetation around all facility structures and improvements with pre- and /or post-emergent herbicides or entire removal of live vegetation including root systems and removal of dead vegetative material. Level III control limits shall overlap or be adjacent to the trimming limits as stated in Paragraph 5.1.2 contained herein. Note: The maximum allowable application bandwidth around objects within the Level III Control limits shall be 12 inches.
Post and/or Pre-emergent Herbicide
a. Paved, aggregated or bark chip sidewalks and trails
b. Paved or aggregate parking lots, Hunter/Fisherman Lots and associated gravel roads, boat launches, turn-around and pull-out areas (this includes control of vegetation Three (3) feet from outside of cable on Hunter/Fisherman parking lots that are not included in mowing limits)
c. Paved or aggregate roads and guardrails
d. Aggregate or bark chip shrub beds NOTE: Bark chip herbaceous plant beds located in the M.W.
Boudeaux Visitor Center shall not be treated.
e. Riprap
f. Chain link fences
g. Landscape trees and shrubs
h. Concrete and aggregate campsites, playgrounds and concrete play courts
Appendix H
i. Comfort stations, showing buildings, vault toilets, dumpster pads, project administration buildings, amphitheaters and picnic shelters
j. Entrance signs and signposts
File details come from the government source that posted it. Updated .