W912P6-15-B-0010_Pre-Bid_Meet_ppt.pdf
PDF 4 MB Posted
- Solicitation number
- W912P6-15-B-0010
About this file
W912P6-15-B-0010-0003 PRE-BID MEETING PRESENTATION
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ft. Sheridan Ravine and Coastal Restoration, Section 506 F k V ldi E l i tFrank Veraldi, Ecologist
Faye Leffler, P.E., Civil Engineer
Jeff Fuller, P.E., Hydraulic Eng.
Robbie Sliwinski, Botanist 4 September 2015
US Army Corps of Engineers
BUILDING STRONG®
OverviewOverview
Project AreasProject Areas Access Routes, Staging/Storage, and
Disposal LocationDisposal Location Project Features (McCormick/Janes, S tt B tl tt & S h k)Scott, Bartlett, & Schenck) Selective Tree Clearing, Planting, and
Establishment
BUILDING STRONG®2
Project LocationProject Location
BUILDING STRONG®3
Access Route, Staging/Storage, d Di l L i (PA 3)and Disposal Location (PA 3)
BUILDING STRONG®4
Access Route, Staging/Storage, d Di l L i (PA 1 & 2)and Disposal Location (PA 1 & 2)
BUILDING STRONG®5
Typical Design Features Demolition
Ch l G di Channel Grading Step-Pools Retaining Wall Structures (Flagstone walls, Soil bags, & Limestone Blocks Pl P l Plunge Pools
Sand Placement for Dune Habitat Selective Tree Clearing, Planting, and
Establishment
BUILDING STRONG®6
McCormick/Janes RavineMcCormick/Janes Ravine
DemolitionDemolition
BUILDING STRONG®7
GradingGrading Step Stone P lPools Flagstone Walls
BUILDING STRONG®8
Step StoneStep Stone Pools
Fl t Flagstone Walls
BUILDING STRONG®9
Pipe Outlets Erosion d Sl G lliand Slope Gullies Repairs (contractor’s design(contractor s design submittal)
Boardwalk andBoardwalk and Pedestrian Bridge Replacement p (contractor’s design submittal)
BUILDING STRONG®10
Scott Ravine
Stone Dam R lRemoval
BUILDING STRONG®11
Scott Ravine Step Stone Pools
Mechanical Stabili ed Earth (MSE) Mechanical Stabilized Earth (MSE)
BUILDING STRONG®12
Bartlett Ravine Free Standing and Gravity Wall, Contractor’s Design
Submittal Stormwater Trench with Grates (Culvert Replacement), Contractor’s Design Submittal
BUILDING STRONG®13
Bartlett RavineBartlett Ravine
Existing stoneExisting stone rework
Channel Armoringg
BUILDING STRONG®14
Schenck Ravine Step Stone Pools Mechanical Stabilized Earth (MSE), Contractor’s
Design Submittal
BUILDING STRONG®15
Schenck Ravine
Plunge PoolPlunge Pool
BUILDING STRONG®16
Dunes Concrete/Clay Rubble Spoil
Sand Placement for D nes Sand Placement for Dunes
BUILDING STRONG®17
Marine DemolitionMarine Demolition
Metal and Wooden Posts RemovalMetal and Wooden Posts Removal
BUILDING STRONG®18
Project Goal Ravine ChannelProject Goal Ravine Channel
BUILDING STRONG®19
Selective Tree Clearing, Pl ti d E t bli h tPlanting, and Establishment
BUILDING STRONG®20
File details come from the government source that posted it. Updated .