W912P6-15-B-0010_Amend0004_Plans.pdf
PDF 2 MB Posted
- Solicitation number
- W912P6-15-B-0010
About this file
W912P6-15-B-0010 AMENDMENT 0004 PLANS
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PI
C "
PI
C
PIC "03
600 600
C T-0+00
C T-1+00
M C -7
M C -8+00
M C -9
M C -1
M C -1
M C -1
M C -1
J A -8
JA
-9+
JA-10+00
JA
-11+
JA-12+00
JA-12+36
JA-12+36
B W
N -0
B W
N -0
B W
N -0
P B R -0
P B R -0
P B R -0
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
T R
A C
K
IN
G N
O
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
®of Engineers
US Army Corps of Engineers
US Army Corps
Chicago District
SHEET OF
A C
T
IO
N D
A T
E D
E S
C R
IP
T
IO
N M
A R
K T
R A
C K
IN
G N
O
A C
T
IO
N D
A T
E
/1
/2
C S .d g n
A
32 70
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C H
IC
A G
O
IL
C H
IC
A G
O D
IS
T R
IC
W
P -1
-B -0
CS102
S E
C T
IO
N
M C
C O
R M
IC
K /J
A N
E S R
A V
IN
E
S
IT
E P
L A
N /6
G A
N
IY
A T F L E
F F
L E
R P .E
A
U G
U S
T
J O
H N A
G R
O B
O S
K I, P .E
A N
S I
D
NN
40'10'0 20'
MATCH LINE TO SHEET CS102
WORK LIMITS
F T S
H E
R
ID
A N R
A V
IN
E A
N D C
O A
S T
A L R
E S
T O
R A
T
IO
N
EXISTING INV. IN=583.9
MC16
MC12
MC17
MC13
CT1
CT2
TO BE REMOVED
EXISTING 30" CIP
SLAB
REMOVE CONCRETE
LAKE MICHIGAN
(SEE NOTE 3)
CONCRETE WALL
REMOVE EXISTING
DEMOLISH AND
OF STEP STONES
PROPOSED LOCATION
JA-34
JA-33
JA-32
JA-31
JA-30
JA-28
JA-27
JA-26
JA-25
JANES RAVINE CL
CHANNEL
STONES AND
RUFFLE STEP
PROPOSED
FS22
G
T
MC13
MC14
MC15
JA-35
JA-29
JA-24
JA-23
JA-C7
JA-C6
JA-C5
JA-C4
JA-C3
MC-C3
MC10
MC-C2
MC11
JANES RAVINE CL
JA-18
JA-19
JA-C1
JA-20
JA-C2
JA-22
JA-21
B
CS30
B
CS30
FLAG STONE WALL
TOP OF PROPOSED
C C
S
C C
S
A
C S
A
C S
MC14
A
CS307
A
CS307
B C S
B C S
C
C S
C
C S
POOLS
STEP STONES
PROPOSED
OR REMOVED
BE CRUSHED IN-PLACE
EXISTING CLAY PIPES TO
P E
IC
E S , A
N D C
R U S
H E
D C
L A
Y P
IP
O
E O
F B
L U F F S
E G
M E
N T T
O P
L A C E C
O N
C R E
PROPOSED CHANNEL
CHANNEL ENDS AT STA. 12+03
STEP STONE POOLS AND
PROPOSED JANES RAVINE
CHANNEL ENDS AT STA. 8+55
STEP STONE POOLS AND
PROPOSED MCCORMICK RAVINE
BWN-3
BWN-2
BWN-1
BWN-C2
BWN-C1
PBR-2
PBR-1
PROPOSED FLAG STONE WALL
PROPOSED FLAG STONE WALL
PROPOSED FLAG STONE WALL
PROPOSED 3' WIDE FOOTPATH BRIDGE (SEE NOTE #10)
FLAGSTONES
OF PROPOSED
BRIDGE TO TOP
TIE PROPOSED
RAVINE CL
MCCORMICK
TRANSITION TO EXISTING PATH
PROPOSED 3' BOARDWALK
NOTE #1)
EXISTING 30"(SEE
BLUFF
PLACED AT TOE OF
BE REMOVED AND
CONCRETE LINER TO
CLAY PIPE WITH
PROPOSED FLAG STONE TOP AND ACCESS PATH
8+96.4
AND CHANNEL BEGIN AT STA
PROPOSED STEP STONE POOLS
TO BE REMOVED (OPTION)
EXISTING WOODED POSTS
APPROXIMATE LOCATION OF
FILL
PROPOSED DUNE WITH
BOARDWALK ARE PROVIDED ON SHEET CG001.
LOCATIONS SHOWN. THE HORIZONTAL AND VERTICAL ALIGNMENTS OF
DESIGN AND IMPLEMENTATION PLAN TO PLACE A BOARDWALK AT THE
PERFORMANCE SPEC, THE CONTRACTOR MUST SUBMIT FOR APPROVAL A
9. IN ACCORDANCE WITH SECTION 06 73 13.03, COMPOSITE DECKING
SHEET CS310 FOR THE TYPICAL SECTION OF THE DUNE COVER.
WASHED-INTO THE VOIDS TO AVOID ADVERSED SETTLEMENTS. REFER TO
THE CONCRETE/CLAY FILL ARE SUFFICIENTLY FILLED WITH SAND AND
PLANTING. THE CONTRACTOR MUST ENSURE THAT THE VOIDS BETWEEN
8. 6” OF SAND MUST BE PLACED OVER THE CONCRETE/CLAY FILL FOR DUNE
EXCESS MATERIAL FILL, AS DESIGNATED.
SQUARE-INCHES), AND PLACED AT THE TOE OF THE BLUFF AND OVER
RAVINE MUST BE REMOVED, CRUSHED (NO LARGER THAN 3
7. CLAY PIPES/BARRELS FOUND ALONG THE TOE AND BANKS OF MCCORMICK
PIPES.
SOIL MUST BE PLACED OVER THE CRUSHED PIPES TO BURY THE CRUSHED
WIDTH OF THE RAVINE BOTTOM. A MINIMUM OF 12 INCHES OF EXCAVATED
ENDS AND ABANDONED IN-PLACE. SPREAD THE CRUSH PIPES OVER THE
SQUARE-INCHES. THE CLAY PIPES BURIED MUST BE PLUGGED AT BOTH
RAVINE MUST BE CRUSHED IN-PLACE TO GRAVEL SIZE NO LARGER THAN 3
6. THE EXISTING CLAY PIPES EXPOSED, APPROXIMATELY 600 LF, ALONG THE
VERTICAL ALIGNMENTS ARE PROVIDED ON SHEET CG001.
CROSS-SECTIONS, AND SHEETS CS508 FOR DETAILS. THE HORIZONTAL AND
SHOWN. REFER TO SHEET CS203 FOR PROFILES, SHEETS CS306-CS309 FOR
5. PLACE THE PROPOSED STEP STONES AND CHANNEL AT THE LOCATIONS
AT THE AREA DESIGNATED.
PLACED AT THE TOE OF THE BLUFF AND OVER THE EXCESS MATERIAL FILL,
UNDER THE PROPOSED STRUCTURE MUST BE REMOVED, CRUSHED, AND
STEP STONES AND CHANNEL THAT CANNOT BE CRUSHED AND BURIED
GRADES SHOWN. EXISTING CLAY PIPES ALONG THE PROPOSED RIFFLE
4. COMPLETE GRADING OF THE RAVINES CONFLUENCE TO THE LINES AND
WHERE THE PROPOSED STEP STONES AND CHANNELS ARE TO BE PLACED.
3. CLEAR AND GRUB AREAS TO BE GRADED. ALSO CLEAR AND GRUB AREAS
DUNE PLANTING.
INCHES OF SAND MUST BE PLACED OVER THE CONCRETE PIECES FOR
SURFACE PRIOR TO PLACEMENT ALONG THE BLUFF TOE. A MINIMUM OF SIX
FROM THE CONCRETE PIECES MUST BE CUT FLUSH WITH THE CONCRETE
STONES FOR THE LARGE CONCRETE PIECES. STEEL REBARS PROTRUDING
SMALLER CONCRETE PIECES (LESS THAN 12”) CAN BE USED AS BEDDING
AT THE TOE OF THE BLUFF AND OVER THE EXCESS MATERIAL FILL.
CONCRETE PIECES (12” – 24” SLABS) FROM DEMOLITION MUST BE PLACED
2. DEMOLISH AND REMOVE EXISTING CONCRETE FEATURES AS SHOWN. LARGE
THE BLUFF WITHIN THE LIMITS OF THE PROPOSED DUNE WITH FILL SHOWN.
1. EXCESS MATERIAL FROM RAVINE GRADING MUST BE PLACED AT THE TOE OF
NOTES:
SLOPES.
APPROVAL FOR THE FLAGSTONE WALLS TIE-IN TO EXISTING RAVINE
THE ENDS OF THE WALL. THE CONTRACTOR MUST SUBMIT DETAILS FOR
13. THE FLAGSTONE WALLS MUST TIE-IN TO THE EXISTING RAVINE SLOPES AT
OF LAKE MICHIGAN.
PROTECTION FOR ILLINOIS. THE POSTS MAY BE CUT FLUSHED WITH THE BOTTOM
SHOWN IN ACCORDANCE WITH SECTION 01 57 20.01 ENVIRONMENTAL
REMOVE AND DISPOSE OF WOODED POSTS AT THE APPROXIMATE LOCATION 12.
FLUSHED WITH THE EXISTING BANK GRADE.
11. THE EXISTING 30” CIPs (2) PROTRUDING INTO THE CHANNEL MUST BE CUT
PROVIDED ON SHEET CG001.
HORIZONTAL AND VERTICAL ALIGNMENTS OF PROPOSED BRIDGE ARE
SECTION 06 73 13.03, COMPOSITE DECKING PERFORMANCE SPEC. THE
THE INSTALLATION OF THE NEW BRIDGE IN ACCORDANCE WITH SECTION
CONTRACTOR MUST PROVIDE A DESIGN AND IMPLEMENTATION PLAN FOR
MUST BE REPLACED WITH A NEW BRIDGE AT THE LOCATION SHOWN. THE
20.01 ENVIRONMENTAL PROTECTION FOR ILLINOIS. THE EXISTING BRIDGE
REMOVED AND DISPOSED OFFSITE IN ACCORDANCE WITH SECTION 01 57
10. THE EXISTING PEDESTRIAN BRIDGE OVER MCCORMICK RAVINE MUST BE
N
O T
E S A
D D
E D
/1
C T -1
C T -1
C T -1
C T -1
C T -2
C T -2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
T R
A C
K
IN
G N
O
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
®of Engineers
US Army Corps of Engineers
US Army Corps
Chicago District
SHEET OF
A C
T
IO
N D
A T
E D
E S
C R
IP
T
IO
N M
A R
K T
R A
C K
IN
G N
O
A C
T
IO
N D
A
/2
C S .d
41 70
.S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C H
IC
A G
O
IL
C H
IC
A G
O D
IS
T R
P -1
-B -0
CS111
E
C T
IO
N
G A
N
IY
A T F L E
F F
L E
R P .E
A
U G
U S
T
J O
H N A
G R
O B
O S
K I, P .E
A N
S I
D
NN
40'10'0 20'
M A
T C
H L
IN
E T
O S
H E
E T C
S
WORK LIMITS
LAKE MICHIGAN
M A
T C
H L
IN
E T
O S
H E
E T C
S
F T S
H E
R
ID
A N R
A V
IN
E A
N D C
O A
S T
A L R
E S
T O
R A
T
IO
N
CT4
C O
A S
T S
IT
E P
L A
N /1
EXISTING GROIN
TO BE CONSTRUCTED BY OTHERS
PROPOSED STONE AND TIMBER REEFS
EXISTING GROIN
#4)
(SEE NOTE
METAL POST
EXISTING
A G
T
CONSTRUCTED BY OTHERS
REVETMENT TO BE
PROPOSED STONE AND TIMBER
PROPOSED DUNE (OPTION)
EXISTING METAL PIER REMNANTS TO BE REMOVED (SEE NOTE #3)
BREM
PROPOSED
N
O T
E S A
D D
E D
/1
/1
MICHIGAN OR TOP OF EXISTING GROIN WHERE THE POSTS ARE CONNECTED TO THE GROIN.
ENVIRONMENTAL PROTECTION FOR ILLINOIS. THE POSTS MAY BE CUT FLUSHED WITH THE BOTTOM OF LAKE
4. REMOVE AND DISPOSE OF THE EXISTING METAL POST SHOWN IN ACCORDANCE WITH SECTION 01 57 20.01
MICHIGAN.
20.01 ENVIRONMENTAL PROTECTION FOR ILLINOIS. POSTS MAY BE CUT FLUSHED WITH THE BOTTOM OF LAKE
3. REMOVE AND DISPOSE OF REMNANTS OF EXISTING METAL PIER SHOWN IN ACCORDANCE WITH SECTION 01 57
CONSTRUCTION.
CONSTRUCTED BY OTHERS. CONTRACTOR MUST COORDINATE WITH OTHER CONTRACTORS DURING
2. STONE AND TIMBER REEFS AND STONE AND TIMBER REVETMENTS ALONG THE EXISTING GROINS WILL BE
COVER.
SAND TO AVOID ADVERSED SETTLEMENTS. REFER TO SHEET CS310 FOR THE TYPICAL SECTION OF THE DUNE
ENSURE THAT THE VOIDS BETWEEN THE STONES ARE SUFFICIENTLY FILLED AND WASHED INTO THE VOIDS WITH
1. 6”OF SAND MUST BE PLACED OVER THE EXISTING STONES FOR DUNE PLANTING. THE CONTRACTOR MUST
NOTES:
590590
C T -2
C T -2
C T -2
C T -2
C T -2
C T -2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
T R
A C
K
IN
G N
O
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
®of Engineers
US Army Corps of Engineers
US Army Corps
Chicago District
SHEET OF
A C
T
IO
N D
A T
E D
E S
C R
IP
T
IO
N M
A R
K T
R A
C K
IN
G N
O
A C
T
IO
N D
A
/2
C S .d
42 70
.S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C H
IC
A G
O
IL
C H
IC
A G
O D
IS
T R
P -1
-B -0
CS112
E
C T
IO
N
G A
N
IY
A T F L E
F F
L E
R P .E
A
U G
U S
T
J O
H N A
G R
O B
O S
K I, P .E
A N
S I
D
NN
40'10'0 20'
M A
T C
H L
IN
E T
O S
H E
E T C
S
M A
T C
H L
IN
E T
O S
H E
E T C
S
F T S
H E
R
ID
A N R
A V
IN
E A
N D C
O A
S T
A L R
E S
T O
R A
T
IO
N
C O
A S
T S
IT
E P
L A
N /1
EXISTING METAL POST (SEE NOTE #4)
A G
T
(AECOM)
SB-02
(AECOM)
SB-03
CONSTRUCTED BY OTHERS
REVETMENT TO BE
PROPOSED STONE AND TIMBER
PROPOSED DUNE (OPTION)
PROPOSED BERM (OPTION)
EXISTING SSP GROIN #4
WORK LIMITS
APPROXIMATE LOCATION OF EXISTING STONE REVETMENT (SEE NOTE #5)
5. DISPLACED STONES IN THE LAKE MUST BE PULLED BACK TO THE EXISTING STONE REVETMENT.
MAY BE CUT FLUSHED WITH THE BOTTOM OF LAKE MICHIGAN OR TOP OF EXISTING GROIN WHERE THE POSTS ARE CONNECTED TO THE GROIN.
4. REMOVE AND DISPOSE OF THE EXISTING METAL POST SHOWN IN ACCORDANCE WITH SECTION 01 57 20.01 ENVIRONMENTAL PROTECTION FOR ILLINOIS. THE POSTS
SECTION OF THE BERM.
3. EXCESS EXCAVATED MATERIAL FROM GRADING ACTIVITIES MUST ALSO BE PLACED TO FORM A DUNE BERM AS SHOWN. REFER TO SHEET CS310 FOR THE TYPICAL
COORDINATE WITH OTHER CONTRACTORS DURING CONSTRUCTION.
2. STONE AND TIMBER REEFS AND STONE AND TIMBER REVETMENTS ALONG THE EXISTING GROINS WILL BE CONSTRUCTED BY OTHERS. CONTRACTOR MUST
COVER.
SUFFICIENTLY FILLED AND WASHED INTO THE VOIDS WITH SAND TO AVOID ADVERSED SETTLEMENTS. REFER TO SHEET CS310 FOR THE TYPICAL SECTION OF THE DUNE
1. 6”OF SAND MUST BE PLACED OVER THE EXISTING STONES FOR DUNE PLANTING. THE CONTRACTOR MUST ENSURE THAT THE VOIDS BETWEEN THE STONES ARE
NOTES:
N
O T
E A
D D
E D
/1
580 590
SC-2+00
SC-3+00
SC-3+04SC-3+04
C T -2
C T -2
C T -2
C T -3
C T -3
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
T R
A C
K
IN
G N
O
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
®of Engineers
US Army Corps of Engineers
US Army Corps
Chicago District
SHEET OF
A C
T
IO
N D
A T
E D
E S
C R
IP
T
IO
N M
A R
K T
R A
C K
IN
G N
O
A C
T
IO
N D
A
/2
C S .d
43 70
.S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C H
IC
A G
O
IL
C H
IC
A G
O D
IS
T R
P -1
-B -0
CS113
E
C T
IO
N
G A
N
IY
A T F L E
F F
L E
R P .E
A
U G
U S
T
J O
H N A
G R
O B
O S
K I, P .E
A N
S I
D
NN
40'10'0 20'
M A
T C
H L
IN
E T
O S
H E
E T C
S
M A
T C
H L
IN
E T
O S
H E
E T C
S
F T S
H E
R
ID
A N R
A V
IN
E A
N D C
O A
S T
A L R
E S
T O
R A
T
IO
N
CT5
C O
A S
T S
IT
E P
L A
N /1
EXISTING METAL POST (SEE NOTE #3)
A G
T
CONSTRUCTED BY OTHERS
REVETMENT TO BE
PROPOSED STONE AND TIMBER
PROPOSED DUNE (OPTION)
EXISTING SSP GROIN #5
WORK LIMITS
REVETMENT LOGS
FOR REEFS AND
STOCK PILE LOCATION
STOCKPILED AT THE LOCATION DESIGNATED.
ACTIVITIES AS DESCRIBED IN SECTION 35 31 19.50, RAVINE STREAM RESTORATION. THE TREES MUST BE
4. LOGS FOR THE REEFS AND REVETMENTS ARE THOSE THAT ARE REMOVED FROM THE TREE CLEARING
MICHIGAN OR TOP OF EXISTING GROIN WHERE THE POSTS ARE CONNECTED TO THE GROIN.
ENVIRONMENTAL PROTECTION FOR ILLINOIS. THE POSTS MAY BE CUT FLUSHED WITH THE BOTTOM OF LAKE
3. REMOVE AND DISPOSE OF THE EXISTING METAL POST SHOWN IN ACCORDANCE WITH SECTION 01 57 20.01
CONSTRUCTION.
CONSTRUCTED BY OTHERS. CONTRACTOR MUST COORDINATE WITH OTHER CONTRACTORS DURING
2. STONE AND TIMBER REEFS AND STONE AND TIMBER REVETMENTS ALONG THE EXISTING GROINS WILL BE
COVER.
SAND TO AVOID ADVERSED SETTLEMENTS. REFER TO SHEET CS310 FOR THE TYPICAL SECTION OF THE DUNE
ENSURE THAT THE VOIDS BETWEEN THE STONES ARE SUFFICIENTLY FILLED AND WASHED INTO THE VOIDS WITH
1. 6”OF SAND MUST BE PLACED OVER THE EXISTING STONES FOR DUNE PLANTING. THE CONTRACTOR MUST
NOTES:
N
O T
E A
D D
E D
/1
FLOW
SCOUR DEPTH
STEP POOL STEP POOL
WEIR HEIGHT
STEP STONES POOL SYSTEM
N.T.S
PLAN VIEW
A
CS507
STEP STONE RIFFLES DETAILS
N.T.S.
TYP. CROSS SECTION
A
CS507
L1
L3
L2
POOL LENGTH (L2)
H
L1 L3
D
CHANNEL
EXISTING OR PROPOSED
TRANSITION
CHANNEL TO STEP STONE
5' - 6'
D
W
V A
R
IE
S
W
V A
R
IE
S
0.1W-0.3W 0.1W-0.3W
1.5'1'2'6.9'10.4'3.5'STA. 12+50.5 - STA. 15+04
1'1'1.3'4.67'7'2.33'STA. 11+90.2 - STA. 12+04.2
1'0.9'1.2'4.3'6.5'2.2'STA. 10+84.8 - STA. 11+10.8
1'1'1.4'4.9'7.3'2.4'STA. 6+86 - STA. 7+00.5
1'1'1.3'6.1'9.1'3'STA. 6+43.4 - STA. 6+71
DHSL3L2L1STEP STONE SECTION
/2
C S .d
O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
T R
A C
K
IN
G N
O
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
®of Engineers
US Army Corps of Engineers
US Army Corps
Chicago District
SHEET OF
A C
T
IO
N D
A T
E D
E S
C R
IP
T
IO
N M
A R
K T
R A
C K
IN
G N
O
A C
T
IO
N D
A T
E
CS507
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C H
IC
A G
O
IL
C H
IC
A G
O D
IS
T R
J O
H N A
G R
O B
O S
K I, P .E
N .T .S
A N
S I
D
W P -1
-B -0
G
G
N
IY
A T F L E
F F
L E
R P .E
A
A
U G
U S
T
F T S
H E
R
ID
A N R
A V
IN
E A
N D C
O A
S T
A L R
E S
T O
R A
T
IO
N
S E
C T
IO
N
C
H E
N C
K R
A V
IN
E S
T E
P S
T O
N
D
T A
IL
S
S
T A
T
IO
N
IN
G R
E V
IS
IO
N S
S T
E P S
T O
N E S
E C
T
IO
N
/1
DEPTH (S)
SCOUR
(H)
WEIR HEIGHT
SLOPE VARIES
CHANNEL
PROPOSED
EXISTING OR
STONE
6" CA-7 BEDDING
NOTE #3)
TYP. (SEE
D100 STONES
SLOPE VARIES
CHANNEL
PROPOSED
EXISTING OR
(SEE NOTE #2)
KEY STONE D100
KEY-IN A D100 STONE TO THE CHANNEL BANKS.
5. AT THE LAST STEP STONE (DOWNSTREAM) OF EACH STEP STONE SERIES,
CROSS-SECTIONS AND TYPICAL SECTIONS RESPECTIVELY.
4. REFER TO SHEETS CS303-CS305 FOR STEP STONE POOLS AND CHANNEL
3. AT THE STEP STONE WEIRS, KEY-IN A D100 STONE TO THE CHANNEL BANKS.
ACROSS THE WIDTH OF THE CHANNEL.
2. AT THE LAST STEP STONE (DOWNSTREAM), KEY-IN A LAYER OF D100 STONE
STONE SIZES OF THE STEP STONE POOLS.
1. REFER TO SECTION 35 31 19.50, RAVINE STREAM RESTORATION, FOR THE
NOTES:
NOTE #5)
TYP. (SEE
D100 STONES
STONES
D15-D50
File details come from the government source that posted it. Updated .