W912P6-15-B-0010 AMENDMENT 0005 FT SHERIDAN RAVINE COASTAL RESTORATION
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SUBJECT: REVISED BID SCHEDULE AND RESPONSES TO CONTRACTOR’S INQUIRIES; RE: INVITATION FOR BIDS W912P6-15-B-0010, “FT
SHERIDAN RAVINE & COASTAL RESTORATION SECTION 506”
A. BID DUE DATE: The bid opening date is hereby extended by this Amendment. The new Bid Opening date is September 22, 2015.
Therefore, all bids shall be furnished to this Agency by 3:00p.m. (CST) on September 22, 2015. Detailed information regarding the submission of bids is located at Section 00100 of the Solicitation document.
THIS AMENDMENT CONTINUES ON THE NEXT PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 70
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Sep-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-15-B-0010
X 9B. DATED (SEE ITEM 11)
21-Aug-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Sep-2015
CODE
U. S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P6-15-B-0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
B. AMENDED SPECIFICATION SECTION: The below Specification Section has been amended as delineated below; therefore, bidders shall replace the affected sheet with the respective sheet attached hereto.
1) SECTION 32 92 19.10, NATIVE PLANTS, Seed List – The seed quantity for dunes in Project Area #3 revised from 90.75 to 99.75 oz.
C. AMENDED SECTION 00100 – BIDDING SCHEDULE: The entire Bid Schedule shall be replaced with the enclosed REVISED Bid Schedule; therefore, Contractor’s shall provide their bid prices on the Revised Bid Schedule enclosed hereunder. Note: Corrections were made as indicated by the USACE’s responses to the below Contractor inquiries, specifically, the below clerical corrections and one quanitity change has been made (thus, no radical changes were made to the schedule).
1) CLIN 0083AF DUNES, Quantity changed from 90 Ounce‐Av to 100 Ounce‐Av
2) CLIN 0111, 12‐MONTH WARRANTY FOR PLANTS, Desription corrected to state: “ FOR BID
ITEMS 0088 THROUGH 0090”
3) CLIN 0122, 12‐MONTH WARRANTY FOR PLANTS, Description corrected to state: “FOR BID
ITEMS 0108 THROUGH 0110”
D. USACE RESPONSES TO CONTRACTOR’S QUESTIONS: In response to the Contractor’s inquires, the USACE provides the following responses:
Question 1: This project contains four CLINS for site management and stewardship activities. Our understanding of these CLINS is as follows:
The Base Bid items Area 2 has a CLIN 0017 for SITE PREPARATION, INVASIVE SPECIES CONTROL, & ESTABLISHMENT. We believe this is for all the cleared, seeded & planted areas within Area 2 and consists of site stewardship required to meet the performance standards for the 5 year duration of the contract.
The Primary Options Area 1 items has a CLIN 0039 for SITE PREPARATION, INVASIVE SPECIES CONTROL, & ESTABLISHMENT. We believe this is for all the cleared, seeded & planted areas within Area 1 and consists of site stewardship required to meet the performance standards for the 5 year duration of the contract.
The Secondary Options Area 1 items do not have a CLIN for SITE PREPARATION, INVASIVE SPECIES CONTROL, & ESTABLISHMENT because these physical areas are all included in CLIN 0039 as the secondary option work only consists of supplementing the work in the Primary Option Area 1 section.
The Primary Options in Area 3 have a CLIN 0091 SITE PREPARATION, INVASIVE SPECIES CONTROL AND ESTABLISHMENT ACTIVITIES ‐ YEAR 1. We believe this is for all the cleared, seeded & planted areas within Area 3 and consists of site stewardship required to meet the first year standards for the contract.
The Secondary Options in Area 3 have a CLIN 0114 SITE PREPARATION, INVASIVE SPECIES CONTROL & ESTABLISHMENT ACTIVITIES ‐ YEARS 2 THROUGH 5. We believe this is for all the cleared, seeded & planted areas within Area 3 and consists of site stewardship required to meet the full performance standards for the contract.
Our question is this: The Optional Items Area 2 do not appear to have a CLIN for SITE PREPARATION, INVASIVE SPECIES CONTROL, & ESTABLISHMENT. This is confusing because it is our understanding that the Optional Items in Area 2 consist of additional acreage around Hutchinson Ravine that will need to be managed under this contract should the options in CLINS 0067 through 0079 be exercised. Correct?
Response 1: CLIN 0017 SITE PREPARATION, INVASIVE SPECIES CONTROL, & ESTABLISHMENT ACTIVITIES is for all areas within the work limits of Project Area 2 for the entire duration of the contract.
CLIN 0039 SITE PREPARATION, INVASIVE SPECIES CONTROL, & ESTABLISHMENT ACTIVITIES is for all areas within the work limits of Project Area 1 for the entire duration of the contract.
CLIN 0091 SITE PREPARATION, INVASIVE SPECIES CONTROL, & ESTABLISHMENT ACTIVITIES‐ YEAR 1 is for all areas within the work limits of Project Area 3 for YEAR 1.
CLIN 0116 SITE PREPARATION, INVASIVE SPECIES CONTROL, AND ESTABLISHMENT ACTIVITIES ‐ YEARS 2 THROUGH 5 is for all areas within the work limits of Project Area 3 for YEARS 2 THROUGH
The areas delineated on Sheets CE106, CE111, and CE112 as SELECTIVE TREE AND SHRUB CLEARING AND REMOVAL (OPTION) only refer to CLIN0075 SELECTIVE TREE AND SHRUB
REMOVAL
Question 2: Just as a clarification I’m basing our assumption that the eastern portion of Hutchinson Ravine is not included in the base bid on the notes on sheet CE112 that depict the areas as optional.
Response 2: The areas delineated on Sheets CE106, CE111, and CE112 as SELECTIVE TREE AND SHRUB CLEARING AND REMOVAL (OPTION) only refer to CLIN0075 SELECTIVE TREE AND SHRUB REMOVAL. These areas are included in CLIN 0017 SITE PREPARATION, INVASIVE SPECIES
CONTROL, & ESTABLISHMENT ACTIVITIES .
Question 3: Can you use water from Lake Michigan to water the plants?
Response 3: Yes, Lake Michigan water can be used to water the plantings. NOTE: Lake Michigan water may NOT be taken off site.
Question 4: All the seed and planting specs call for specific months to plant/seed. If the earthwork is completed at a time when you cannot plant/seed, will oats and erosion control blanket be installed until you can plant/seed to reduce erosion?
Response 4: The Contractor is responsibility to provide all sediment and erosion controls that may be necessary on the site in accordance with Section 01 57 20.01 of the specifications, and General NPDES Permit ILR10.
Question 5: Is there a place that lists the acreage for each area (ex. wooded plateau, ravine, etc)?
Response 5: Acreages for each area are not listed in the contract.
Question 6: What areas are specifically in the base for the seeding/planting? Based on the CLINs it appears that Project Area 2 is the only area in the base. Or is it parts of all of the Project Areas?
Response 6: All areas within the work limits of Project Area 2 are in the base for seeding/planting except for the Open Plateau II area shown on Sheet CE111 which will be seeded only if option CLIN0068AD is awarded; however, areas in the base will be refined in the Planting Plan submittal through a coordinated effort between the Contractor, USACE, and landowners as discussed in Section 32 92 19.10 ‐ NATIVE PLANTS. While only Project Area 2 seeding/planting CLINs are in the base, Project Area 1 Primary Options, CLIN 0032 to 0049 and Project Area 3 Primary Options, CLIN 0081 to 0104 are highly probable to be exercised at the time of award as described in a special note added to Amendment 0004.
Question 7: Do the same geographic restrictions (meaning what county it is collected from) apply to seed, plant, and tree material?
Response 7: Per Specification Section 32 92 19.10 “The genotypic origins of plant material shall be from the following counties (documented as county and state):…” which then lists all of the acceptable counties of genotypic origins; however, Specification Section 32 92 19.10 also states “The COR will consider any plant material that does not meet the distance criteria…” and “If plant material collection is necessary, the Government will indicate locations for plant material collection within Lake County, IL.” Per Spec Section 32 01 90.45 'Plant Material' “…refers to seed, containerized plants, bare roots, shrubs, and trees.”
Question 8: For the prescribed burning, is the plan to only have one prescribed burn per area? Or are the prescribed burns in the options for the same areas just for subsequent years? The specs only say "as frequently as needed to meet performance standards".
Response 8: The Government’s intent is to burn the ravine and bluff areas once and plateau areas at least twice; however, the Government may want to burn ravine and bluff areas more than once if leftover fund are available in CLINs or if secondary options for prescribed burns are awarded and where vegetative fuel is acceptable to carry a fire.
Question 9: In the revised plant list (from amendment 2), the Project Area 3 table has an error for the Dune section for year 2 total seed (page 69). It says the total quantity is 90.75 but based on the quantities shown on the table, it should be 99.75.
Response 9: CLIN0083AF has been changed to 100oz and the total seed quantity for the Dunes in Project Area 3 has been changed to 99.75 via this Amendment.
Question 10: I think there is an error with Clins 0013‐0016. I think the quantity for Clin 0013 should be 27,370 (which is listed for Clin 0014), the quantity for Clin 0014 should be 6,525 (which is listed for Clin 0015), etc.
Response 10: These CLINS were corrected in Amendment 0004.
Question 11: I just reviewed the newest amendment (#4) and noticed a few things that hadn't been changed with the updated bid schedule:
‐CLIN 0084AD says it should be 9,250 but the native plant list shows the total to be 5,250 ‐CLIN 0084AH says it should be 7,200 but the native plant list shows the total to be 6,700 ‐CLIN 0111 says the warranty is for bid items 109 through 112, but I think it should be 108 to 110
Response 11: CLIN0084AD is correct ‐‐ there are 5,250 herbaceous plugs and 4000 shrub plugs which totals 9,250 plugs.
CLIN0084AH is correct ‐‐ there are 6,700 herbaceous plugs and 500 shrub plugs which totals 7,200 CLIN0111 has been corrected to state "FOR BID ITEMS 0088 THROUGH 0090" – Refer to Amendment 0005.
CLIN0112 has been corrected to state "FOR BID ITEMS 0108 THROUGH 0110" – Refer to Amendment 0005.
Question 12: I would like clarification on the new bid schedule for Tree and Shrub Clearing and Site Preparation. There are 4 selective tree and shrub removal CLINS 7, 32, 75, and 81 and three for site preparation as there is a 3 or 5 year performance standard for tree and shrub clearing and establishment there will be overlap if there is one for the base and one for each of the project areas.
Specifically: Which CLIN is the initial clearing in project 1?; Which CLIN is the initial clearing in project 2?; Which CLIN is the initial clearing in project 3?; What is the 4th tree and shrub clearing intended to cover?
Response 12: CLIN0007 SELECTIVE TREE AND SHRUB REMOVAL is for all areas within the work limits of Project Area 2 except for areas delineated on Sheets CE106, CE111, and CE112 as
SELECTIVE TREE AND SHRUB CLEARING AND REMOVAL (OPTION)
CLIN0075 SELECTIVE TREE AND SHRUB REMOVAL is only for areas delineated on Sheets CE106, CE111, and CE112 as SELECTIVE TREE AND SHRUB CLEARING AND REMOVAL (OPTION)
CLIN 0032 SELECTIVE TREE AND SHRUB REMOVAL is for all areas within the work limits of Project Area 1
CLIN 0081 SELECTIVE TREE AND SHRUB REMOVAL is for all areas within the work limits of Project Area 3
Question 13: Do the Base bid items cover project 2 exclusively? Is any base work in projects 1 or 3?
Response 13: Project Area 2 CLINs are only in the base; however, Project Area 1 Primary Options, CLIN 0032 to 0049 and Project Area 3 Primary Options, CLIN 0081 to 0104 are highly probable to be exercised at the time of award as described in a special note added to Amendment 0004.
E. Point of Contact for this Amendment is Pamela Brown at email: Pamela.j.brown@usace.army.mil.
REVISED BID SCHEDULE
(AMENDMENT 0005)
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
MOBILIZATION
FFP
Under this CLIN, the contractor is required to perform mobilization activities. The contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site.
Payment Provisions:
The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
NET AMT
TEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job
DEMOBILIZATION
FFP
Under this CLIN, the contractor is required to perform demobilization activities.
The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force to the project site.
Payment Provisions:
The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the lump sum price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
0003 1 Job
TEMPORARY CONSTRUCTION FACILITIES
FFP
0004 1 Job
MAINTENANCE OF TRAFFIC
0005 1 Lot
PERFORMANCE AND PAYMENT BOND
FFP
THIS IS A COST REIMBURSABLE LINE ITEM FOR BOND COVERAGE
FOR LINE ITEMS 0001 THROUGH 0004 AND LINE ITEMS 0006 THROUGH
The Government will reimburse the Contractor for the actual cost of acceptable bonds, upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this line item. If the actual bond costs are less than the line item amount, the contract will be modified to adjust the line item accordingly. Adjustment(s) to the line item will also be made for any revisions associated with contract changes.
0006 1 Job
MARINE DEMOLITION & STONE WORK
0007 1 Job
SELECTIVE TREE AND SHRUB REMOVAL
0008 80 Acre
PRESCRIBED BURN
SEEDING
FFP
Bidders shall provide their pricing at Sub-Items 0009 AA through 0009AH, as this Item 0002 identifies the information that relates directly to Sub-items 0009AA through 0009AH; therefore, this item 0009 is not to be scheduled separately for delivery, nor is it to be identified separately for shipment or performance. Further, Item 0009 is not to be priced separately for payment purposes.
0009AA 1,380 Ounce -
Av
PLATEAU
0009AB 2,059 Ounce -
RAVINE SLOPES
0009AC 4 Ounce -
RAVINE TOE OF SLOPE
0009AD 2,770 Ounce -
OPEN PLATEAU I
0009AE 493 Ounce -
OPEN BLUFF
0009AF 455 Ounce -
WOODED BLUFF
0009AG 34 Ounce -
DUNE
0009AH 16 Ounce -
RAVINE CREST
PLUGS
FFP
Bidders shall provide their pricing at Sub-Items 00010AA through 0010AH, as this Item 0010 identifies the information that relates directly to Sub-items 0010AA through 0010AH; therefore, this item 0010 is not to be scheduled separately for
Item 0010 is not to be priced separately for payment purposes.
0010AA 15,800 Each
WOODED PLATEAU
0010AB 29,500 Each
RAVINE SLOPES
0010AC 9,000 Each
RAVINE TOE OF SLOPE
0010AD 27,300 Each
OPEN PLATEAU I
0010AE 25,900 Each
OPEN BLUFF
0010AF 10,000 Each
0010AG 15,000 Each
DUNE
0010AH 3,500 Each
RAVINE CREST
0010AJ 60,000 Each
DUNE BEACH GRASS STOLONS/PLUGS
0011 3,025 Each
1 GALLON TREES AND SHRUBS
0012 385 Each
5 GALLON TREES AND SHRUBS
0013 45 Each
1" CALIPER TREES
CONTROL & ESTABLISHMENT ACTIVITIES
0014 27,370 Each
CONTRACT GROWN PLUGS
FROM GOVERNMENT PROVIDED PROPAGATIVE PLANT MATERIAL
0015 6,525 Each
CONTRACT GROWN 1 GALLON
0016 70 Each
CONTRACT GROWN 5 GALLON
0017 1 Job
SITE PREPARATION, INVASIVE SPECIES
CONTROL, AND ESTABLISHMENT ACTIVITIES
0018 1 Job
EARTHWORK
0019 1 Job
CLEARING & GRUBBING
0020 190 Net Ton
(2,000 LB)
STEP STONES
ITEM NO
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
FLAGSTONE WALL
FFP
Bidders shall provide their pricing at Sub-Items 0021AA through 0021AB, as this Item 0021 identifies the information that relates directly to Sub-items 0021AA through 0021AB; therefore, this item 0009 is not to be scheduled separately for
Item 0021 is not to be priced separately for payment purposes.
0021AA 100 Net Ton
FIRST 100 TONS
0021AB 30 Net Ton
OVER 100 TONS
0022 110 Net Ton
CA-7 BEDDING STONES AND FILL
0023 130 Linear
Foot
6" PERFORATED PIPE
0024 1 Job
EARTHWORK
0025 1 Job
CLEARING & GRUBBING
0026 200 Net Ton
0027 310 Square
Yard
MSE SOIL BAG WALL
0028 380 Net Ton
AUGULAR ARMOR STONES
0029 210 Net Ton
LIMESTONE BLOCKS
0030 860 Net Ton
CA-7 BEDDING STONES AND FILL
0031 390 Linear
6" PERFORATED PIPE
0032 1 Job
OPTION SELECTIVE TREE AND SHRUB REMOVAL
0033 60 Acre
OPTION PRESCRIBED BURN
OPTION SEEDING
FFP
Bidders shall provide their pricing at Sub-Items 0034A through 0034AE, as this Item 0034 identifies the information that relates directly to Sub-Items 0034AA through 0034AE; therefore, this item 0034 is not to be scheduled separately for
Item 0034 is not to be priced separately for payment purposes.
0034AA 329 Ounce -
OPTION WOODED PLATEAU
0034AB 2,650 Ounce -
OPTION RAVINE SLOPES
0034AC 3 Ounce -
OPTION RAVINE TOE ZONE
0034AD 74 Ounce -
OPTION WOODED BLUFF
0034AE 16 Ounce -
OPTION RAVINE CREST
OPTION PLUGS
FFP
Bidders shall provide their pricing at Sub-Items 0035AA through 0035AF, as this Item 0035 identifies the information that relates directly to Sub-Items 0035AA through 0035AF; therefore, this item 0035 is not to be scheduled separately for
Item 0035 is not to be priced separately for payment purposes.
0035AA 5,000 Each
0035AB 50,000 Each
0035AC 7,500 Each
0035AD 200 Each
OPTION DUNE BEACH GRASS STOLONS/PLUGS
0035AE 5,000 Each
0035AF 1,000 Each
0036 15,105 Each
OPTION CONTRACT GROWN PLUGS
0037 150 Each
OPTION CONTRACT GROWN 1 GALLON
0038 2 Each
OPTION CONTRACT GROWN 5 GALLON
0039 1 Job
OPTION SITE PREPARATION, INVASIVE SPECIES
CONTROL & ESTABLISHMENT ACTIVITIES
0040 1 Job
OPTION DEMOLITION AND REMOVAL
0041 1 Job
OPTION CLEARING AND GRUBBING
0042 1 Job
OPTION EARTHWORK
0043 1 Job
OPTION MCCORMICK RAVINE PIPE OUTFALLS
0044 1 Job
OPTION MCCORMICK RAVINE SLOPE REPAIR
0045 630 Net Ton
OPTION STEP STONES
OPTION FLAGSTONE WALL
FFP
Bidders shall provide their pricing at Sub-Items 0046 AA through 0046AB, as this Item 0046 identifies the information that relates directly to Sub-items 0046AA through 0046AB; therefore, this item 0046 is not to be scheduled separately for
Item 0046 is not to be priced separately for payment purposes.
0046AA 540 Net Ton
OPTION FIRST 540 TONS
0046AB 170 Net Ton
OPTION OVER 540 TONS
0047 540 Net Ton
OPTION CA-7 BEDDING STONES AND FILL
0048 270 Linear
OPTION 6" PERFORATED PIPE
0049 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
BONDs FOR PROJECT AREA 1 PRIMARY OPTIONS - OPTION ITEMS
0032 THROUGH 0048
THIS IS A COST REIMBURSABLE LINE ITEM
The Government will reimburse the Contractor for the actual cost of acceptable bonds, upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this line item. If the actual bond costs are less than the line item amount, the contract will be modified to
OPTION PLUGS
FFP
Bidders shall provide their pricing at Sub-Items 0050AA through 0050AE, as this Item 0050 identifies the information that relates directly to Sub-Items 0050AA through 0050AE; therefore, this item 0050 is not to be scheduled separately for
Item 0050 is not to be priced separately for payment purposes.
0050AA 29,500 Each
0050AB 32,000 Each
0050AC 9,300 Each
OPTION RAVINE TOE OF SLOPE
0050AD 1,000 Each
0050AE 6,000 Each
TEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
OPTION SEEDING
FFP
Bidders shall provide their pricing at Sub-Items 0051AA through 0051AC, as this Item 0051 identifies the information that relates directly to Sub-items 0051AA through 0051AC; therefore, this item 0051 is not to be scheduled separately for
Item 0051 is not to be priced separately for payment purposes.
0051AA 368 Ounce -
0051AB 1,499 Ounce -
0051AC 50 Ounce -
0052 705 Each
OPTION 1 GALLON TREES AND SHRUBS
0053 240 Each
OPTION 5 GALLON TREES AND SHRUBS
0054 15 Each
OPTION 1" CALIPER TREES
0055 29,400 Each
OPTION CONTRACT GROWN PLUGS
0056 2,830 Each
OPTION CONTRACT GROWN 1 GALLON
0057 200 Each
OPTION CONTRACT GROWN 5 GALLON
0058 1 Job
OPTION 12-MONTH WARRANTY FOR PLANTS
FOR BID ITEMS 0036 TRHOUGH 0038
0059 1 Job
OPTION 12-MONTH WARANTY FOR PLANTS
FOR BID ITEMS 0055 TRHOUGH 0057
0060 60 Acre
0061 1 Job
OPTION ADDITIONAL SELECTIVE TREE& SHRUB REMOVAL
100 TREES
0062 1 Job
OPTION ADDITIONAL SELECTIVE TREE &SHRUB REMOVAL
FFP
100 TREES ONCE THE CONTRACTOR HAS EXHAUSTED THE QUANTITY
OF LINE ITEM 0061
0063 1 Job
OPTION DEMOLITION AND REMOVAL
(CHAIN-LINK FENCES & WOODEN POSTS)
0064 1 Job
OPTION BOARDWALK & PEDESTRAIN FOOT BRIDGE
0065 1 Job
OPTION PREDATOR CONTROL FENCING
0066 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
BONDs FOR PROJECT AREA 1 SECONDARY OPTIONS - OPTION ITEMS
0050 THROUGH 0065
THIS IS A COST REIMBURSABLE LINE ITEM
The Government will reimburse the Contractor for the actual cost of acceptable bonds, upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this line item. If the actual bond costs are less than the line item amount, the contract will be modified to
OPTION PLUGS
FFP
Bidders shall provide their pricing at Sub-Items 0067AA through 0067AH, as this Item 0067 identifies the information that relates directly to Sub-items 0067AA through 0067AH; therefore, this item 0067 is not to be scheduled separately for
Item 0067 is not to be priced separately for payment purposes.
0067AA 10,400 Each
0067AB 12,300 Each
0067AC 1,300 Each
0067AD 12,000 Each
OPTION OPEN PLATEAU
0067AE 16,400 Each
OPTION OPEN BLUFF
0067AF 4,000 Each
0067AG 10,000 Each
0067AH 3,000 Each
OPTION SEEDING
FFP
Bidders shall provide their pricing at Sub-Items 0068AA through 0068AF, as this Item 0068 identifies the information that relates directly to Sub-items 0068AA through 0068AF; therefore, this item 0068 is not to be scheduled separately for
Item 0068 is not to be priced separately for payment purposes.
0068AA 875 Ounce -
0068AB 770 Ounce -
0068AC 1,110 Ounce -
OPTION OPEN PLATEAU I
0068AD 1,034 Ounce -
OPTION OPEN PLATEAU II
0068AE 192 Ounce -
0068AF 393 Ounce -
0069 10,650 Each
OPTION CONTRACT GROWN PLUGS
0070 800 Each
OPTION CONTRACT GROWN 1 GALLON
0071 20 Each
OPTION CONTRACT GROWN 5 GALLON
0072 1 Job
OPTION 12-MONTH WARRANTY FOR PLANTS
FOR BID ITEMS 0014 THROUGH 0016
0073 1 Job
12-MONTH WARRANTY FOR PLANTS
FOR BID ITEMS 0069 THROUGH 0071
OPTION SAND PLACEMENT DUNE HABITAT
FFP
This Item identifies information that relates directly to Sub-Items 0074AA through 0074AB; it is not to be scheduled separately for delivery, identified separately for shipment or performance, or priced separately for payment purposes. In that regard, Offerors shall set forth its pricing at Sub-Items 0074AA through 0074AB.
0074AA 700 Cubic
OPTION FIRST 700 CY
0074AB 300 Cubic
OPTION OVER 700 CY
0075 1 Job
0076 1 Job
OPTION ADDITIONAL SELECTIVE TREE& SHRUB REMOVAL
100 TREES
0077 1 Job
OPTION ADDITIONAL SELECTIVE TREE& SHRUB REMOVAL
FFP
100 TREES AFTER THE CONTRACTOR HAS EXHAUSTED THE 100 TREES
UNDER ITEM 0076
0078 80 Acre
0079 1 Job
0080 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
BONDs FOR PROJECT AREA 2 OPTIONS - OPTION ITEMS 0067 THROUGH
THIS IS A COST REIMBURSABLE LINE ITEM
The Government will reimburse the Contractor for the actual cost of acceptable bonds, upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this line item. If the actual bond costs are less than the line item amount, the contract will be modified to
0081 30 Acre
0082 30 Acre
OPTION SEEDS
FFP
Bidders shall provide their pricing at Sub-Items 0083AA through 0083AH, as this Item 0083 identifies the information that relates directly to Sub-items 0083AA through 0083AH; therefore, this item 0073 is not to be scheduled separately for
Item 0083 is not to be priced separately for payment purposes.
0083AA 185 Ounce -
0083AB 275 Ounce -
0083AC 2 Ounce -
0083AD 1,095 Ounce -
0083AE 387 Ounce -
0083AF 100 Ounce -
OPTION DUNES
0083AG 181 Ounce -
0083AH 8 Ounce -
OPTION PLUGS
FFP
Bidders shall provide their pricing at Sub-Items 0084AA through 0084AJ, as this Item 0084 identifies the information that relates directly to Sub-items 0084AA through 0084AJ; therefore, this item 0074 is not to be scheduled separately for
Item 0084 is not to be priced separately for payment purposes.
0084AA 10,000 Each
0084AB 36,500 Each
0084AC 7,000 Each
0084AD 9,250 Each
0084AE 30,000 Each
0084AF 15,000 Each
OPTION DUNE
0084AG 1,600 Each
0084AH 7,200 Each
0084AJ 30,000 Each
0085 1,430 Each
OPTION 1 GALLON TREES AND SHRUBS
0086 445 Each
OPTION 5 GALLON TREES AND SHRUBS
0087 23 Each
OPTION 1.5" CALIPER TREES
0088 7,465 Each
OPTION CONTRACT GROWN PLUGS
0089 3,525 Each
OPTION CONTRACT GROWN 1 GALLON
0090 25 Each
OPTION CONTRACT GROWN 5 GALLON
0091 1 Job
OPTION SITE PREPARATION, INVASIVE SPECIES
CONTROL AND ESTABLISHMENT ACTIVITIES - YEAR 1
0092 1 Job
OPTION EARTHWORK
0093 1 Job
OPTION CLEARING AND GRUBBING
0094 460 Net Ton
0095 320 Square
OPTION MSE SOIL BAG WALL
0096 730 Net Ton
OPTION CA-7 BEDDING STONES AND FILL
0097 510 Linear
OPTION 6" PERFORATED PIPE
0098 25 Net Ton
OPTION PLUNGE POOL STONES
0099 344 Linear
OPTION RETAINING WALL AND ELEVATED CURB
0100 2 Each
OPTION PRECAST CONCRETE TRENCH WITH GRATES
0101 1 Job
OPTION ARMOR STONE REVETMENT FOR RETAINING WALL
0102 1 Job
OPTION REWORK EXISTING MATERIALS FOR 24" OUTFAL
0103 25 Net Ton
OPTION COBBLE CHUTE FOR CONCRETE TRENCH
0104 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
BONDs FOR PROJECT AREA 3 PRIMARY OPTIONS - OPTION ITEMS 0081
THROUGH 0103
THIS IS A COST REIMBURSABLE LINE ITEM
The Government will reimburse the Contractor for the actual cost of acceptable bonds, upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this line item. If the actual bond costs are less than the line item amount, the contract will be modified to
OPTION SEEDS
FFP
Bidders shall provide their pricing at Sub-Items 0105AA Athrough 0105AE, as this Item 0105 identifies the information that relates directly to Sub-items 0105AA through 0105AE; therefore, this item 0105 is not to be scheduled separately for
Item 0105 is not to be priced separately for payment purposes.
0105AA 92 Ounce -
0105AB 108 Ounce -
0105AC 305 Ounce -
0105AD 245 Ounce -
0105AE 42 Ounce -
OPTION PLUGS
FFP
Bidders shall provide their pricing at Sub-Items 0106AA through 0106AH, as this Item 0106 identifies the information that relates directly to Sub-items 0106AA through 0106AH; therefore, this item 0106 is not to be scheduled separately for
Item 0106 is not to be priced separately for payment purposes.
0106AA 5,850 Each
0106AB 11,600 Each
0106AC 1,050 Each
0106AD 2,200 Each
0106AE 2,000 Each
0106AF 15,000 Each
OPTION DUNE
0106AG 550 Each
0106AH 5,400 Each
0107 30 Acre
0108 5,045 Each
OPTION CONTRACT GROWN PLUGS
0109 200 Each
OPTION CONTRACT GROWN 1 GALLON
0110 20 Each
OPTION CONTRACT GROWN 5 GALLON
0111 1 Job
OPTION 12-MONTH WARRANTY FOR PLANTS
FOR BID ITEMS 0088 THROUGH 0090
0112 1 Job
OPTION 12-MONTH WARRANTY FOR PLANTS
FOR BID ITEMS 0108 THROUGH 0110
OPTION SAND PLACEMENT DUNE HABITAT
FFP
Bidders shall provide their pricing at Sub-Items 0113AA through 0113AB, as this Item 0113 identifies the information that relates directly to Sub-items 0113AA through 0113AB; therefore, this item 0113 is not to be scheduled separately for
Item 0113 is not to be priced separately for payment purposes.
0113AA 230 Cubic
OPTION FIRST 230 CY
0113AB 70 Cubic
OPTION OVER 230 CY
0114 1 Job
OPTION SITE PREPARATION, INVASIVE SPECIES
CONTROL & ESTABLISHMENT ACTIVITIES - YEARS 2 THROUGH 5
0115 1 Job
0116 1 Lot
OPTION PERFORMANCE AND PAYMENT BOND
FFP
BONDs FOR PROJECT AREA 3 SECONDARY OPTIONS - OPTION ITEMS
0105 THROUGH 0115
THIS IS A COST REIMBURSABLE LINE ITEM
The Government will reimburse the Contractor for the actual cost of acceptable bonds, upon receiving evidence of payment (i.e. paid invoice) from the bonding company or agency, not to exceed the total amount of this contract line item. The Government will not pay more than the amount bid for this line item. If the actual bond costs are less than the line item amount, the contract will be modified to
RAVINE ASSOCIATION, ITEM NO.S
JANES RAVINE: LINE ITEMS 0018 THROUGH 0023
SCOTT RAVINE: LINE ITEMS 0024 THROUGH 0031
SCHENCK RAVINE: LINE ITEMS 0090 THROUGH 0098
BARLET RAVINE: LINE ITEMS 0099 THROUGH 0104
MCCORMICK/JANE RAVINE: LINE ITEMS 0040 THROUGH 0049
SUMMATION OF BID PRICES
SPECIAL NOTE: Permitting the submittal of balanced line item pricing and the affordability of the following Option Line Items, the government intends to exercise said items at the time of award. This is the government's intention, not to be construed as an obligation.
Highly probable to be exercised at the time of award:
Project Area 1 Primary Options, CLIN 0032 to 0049 Project Area 3 Primary Options, CLIN 0081 to 0104
SUM FOR BASE BID ITEMS 0001 THROUGH 0031 (INCLUDES NON OPTION WORK IN PROJECT AREA 2):
SUM FOR PROJECT AREA 1 PRIMARY OPTIONS ITEMS 0032 THROUGH 0049:
SUM FOR PROJECT AREA 1 SECONDARY OPTIONS – ITEMS 0050 THROUGH 0066:
SUM FOR PROJECT AREA 2 OPTION ITEMS 0067 THROUGH 0080:
SUM FOR PROJECT AREA 3 PRIMARY OPTIONS ITEMS 0081 THROUGH 0104:
SUM FOR PROJECT AREA 3 SECONDARY OPTIONS ITEMS 0105 THROUGH 0099AB AND ITEM 0116:
TOTAL OVERALL BID PRICE (ITEMS 0001 THROUGH 0116): $__________________________