Text version
Ft. Sheridan Ravine and Coastal Restoration, Section 506 W912P6-15-B-0010
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 LOT or JOB PAYMENT ITEMS
1.1.1 Mobilization (Bid Item 0001)
1.1.1.1 Payment
1.1.1.2 Unit of Measure
1.1.2 Demobilization (Bid Item 0002)
1.1.2.1 Payment
1.1.2.2 Unit of Measure
1.1.3 Temporary Construction Facilities (Bid Item 0003)
1.1.3.1 Payment
1.1.3.2 Unit of Measure
1.1.4 Maintenance Of Traffic (Bid Item 0004)
1.1.4.1 Payment
1.1.4.2 Unit of Measure
1.1.5 Performance and Payment Bond (Bid Item 0005, 0049, 0066, 0080, 0104, & 0116)
1.1.5.1 Payment
1.1.5.2 Unit of Measure
1.1.6 Demolition and Removal (Bid Items 0006, 0040 and 0063)
1.1.6.1 Payment
1.1.6.2 Unit of Measure
1.1.7 Earthwork (Bid Items 0018, 0024, 0042, & 0092)
1.1.7.1 Payment
1.1.7.2 Unit of Measure
1.1.8 Clearing and Grubbing (Bid Items 0019, 0025, 0041, & 0093)
1.1.8.1 Payment
1.1.8.2 Unit of Measure
1.1.9 McCormick Ravine Pipe Outfalls (Bid Items 0043)
1.1.9.1 Payment
1.1.10 Unit of Measure
1.1.11 McCormick Ravine Slope Repair (Bid Items 0044)
1.1.11.1 Payment
1.1.11.2 Unit of Measure
1.1.12 Selective Tree and Shrub Removal (Bid Items 0007, 0032, 0061, 0062, 0075, 0076, 0077, and 0081)
1.1.12.1 Payment
1.1.12.2 Unit of Measure
1.1.13 Site Preparation, Invasive Species Control, and Establishment
Activities (Bid Items 0017, 0039, 0091, & 0114)
1.1.13.1 Payment
1.1.13.2 Unit of Measure
1.1.14 12-Month Warranty for Plants (Bid Items 0058, 0059, 0072, 0073, 0111, & 0112)
1.1.14.1 Payment
1.1.14.2 Unit of Measure
SECTION 01 22 00 Page 1
AMD-0002
1.1.15 Rework Existing Materials for 24" Outfall (Bid Item 0102)
1.1.15.1 Payment
1.1.15.2 Unit of Measure
1.1.16 Armor Stone Revetment for Retaining Wall (Bid Item 0101)
1.1.16.1 Payment
1.1.16.2 Unit of Measure
1.1.17 Boardwalk and Pedestrian Foot Bridge (Bid Item 0064)
1.1.17.1 Payment
1.1.17.2 Unit of Measure
1.1.18 Predator Control Fencing (Bid Items 0065, 0079, & 0115)
1.1.18.1 Payment
1.1.18.2 Unit of Measure
1.2 UNIT PRICE PAYMENT ITEMS
1.2.1 Sand Placement Dune Habitat (Bid Items 0074 and 0113)
1.2.1.1 Payment
1.2.1.2 Measurement
1.2.1.3 Unit of Measurement
1.2.2 Step Stones (Bid Items 0020, 0026, 0045, & 0094)
1.2.2.1 Payment
1.2.2.2 Measurement
1.2.2.3 Unit of Measure
1.2.3 MSE Soil Bag Wall (Bid Items 0027 & 0095)
1.2.3.1 Payment
1.2.3.2 Measurement
1.2.3.3 Unit of Measure
1.2.4 Flagstone Walls (Bid Items 0021 and 0046)
1.2.4.1 Payment
1.2.4.2 Measurement
1.2.4.3 Unit of Measure
1.2.5 CA-7 Bedding Stones and Fill (Bid Items 0022, 0030, 0047, &
0096)
1.2.5.1 Payment
1.2.5.2 Measurement
1.2.5.3 Unit of Measure
1.2.6 6" Perforated Pipe (Bid Items 0023, 0031, 0048, & 0097)
1.2.6.1 Payment
1.2.6.2 Measurement
1.2.6.3 Unit of Measure
1.2.7 Prescribed Burn (Bid Items 0008, 0033, 0060, 0078, 0082, & 0107)
1.2.7.1 Payment
1.2.7.2 Measurement
1.2.7.3 Unit of Measure
1.2.8 Seeding (Bid Items 0009, 0034, 0051, 0068, 0083, & 0105)
1.2.8.1 Payment
1.2.8.2 Measurement
1.2.8.3 Unit of Measure
1.2.9 [Enter Appropriate Subpart Title Here]
WARNING: Text in tags exceeds the maximum length of 300 characters
1.2.9.1 Payment
1.2.9.2 Measurement
1.2.9.3 Unit of Measure
1.2.10 Plunge Pool Stones (Bid Item 0098)
1.2.10.1 Payment
1.2.10.2 Measurement
1.2.10.3 Unit of Measure
1.2.11 Retaining Wall and Elevated Curb (Bid Item 0099)
1.2.11.1 Payment
SECTION 01 22 00 Page 2
1.2.11.2 Measurement
1.2.11.3 Unit of Measure
1.2.12 Precast Concrete Trench with Grates (Bid Item 0100)
1.2.12.1 Payment
1.2.12.2 Measurement
1.2.12.3 Unit of Measure
1.2.13 Cobble Chute for Concrete Trench (Bid Item 0103)
1.2.13.1 Payment
1.2.13.2 Measurement
1.2.13.3 Unit of Measure
1.2.14 Limestone Blocks (Bid Items 0029)
1.2.14.1 Payment
1.2.14.2 Measurement
1.2.14.3 Unit of Measure
1.2.15 Angular Armor Stones (Bid Items 0028)
1.2.15.1 Payment
1.2.15.2 Measurement
1.2.15.3 Unit of Measure
1.2.16 [Enter Appropriate Subpart Title Here]
WARNING: Text in tags exceeds the maximum length of 300 characters
1.2.16.1 Payment
1.2.16.2 Measurement
1.2.16.3 Unit of Measure
1.2.17 1" and 1.5" Caliper Trees (Bid Items 0013, 0054 and 0087)
1.2.17.1 Payment
1.2.17.2 Measurement
1.2.17.3 Unit of Measure
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 22 00 Page 3
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 LOT or JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract cost and job payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular cost, job, or unit price payment item, shall be included in the listed item most closely associated with the work involved. The price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1.1 Mobilization (Bid Item 0001)
1.1.1.1 Payment
Payment will be made at the applicable lumlump sum price for mobilization of all the Contractor's plant and equipment to complete the work. Payment constitutes full compensation for all plant, labor, equipment, and incidentals associated with mobilization. Costs associated with daily mobilization will not be included in this cost. Daily mobilization will be included in the unit prices of materials being provided.
1.1.1.2 Unit of Measure
Unit of measure: Job
1.1.2 Demobilization (Bid Item 0002)
1.1.2.1 Payment
Payment will be made at the applicable lump sum price for demobilization of all the Contractor's plant and equipment to complete the work. Payment constitutes full compensation for all plant, labor, equipment, and incidentals associated with demobilization. Costs associated with daily demobilization will not be included in this cost. Daily demobilization will be included in the unit prices of materials being removed.
1.1.2.2 Unit of Measure
Unit of measure: Job
1.1.3 Temporary Construction Facilities (Bid Item 0003)
1.1.3.1 Payment
Payment will be made at the contract lump sum price for all labor, SECTION 01 22 00 Page 4 equipment and materials for the contractor's temporary field office, temporary fencing and gates, traffic, project, and safety and other incidental items as described in SECTION 01 52 02, TEMPORARY CONSTRUCTION FACILITIES, SECTION 01 55 26.00 03 MAINTENANCE OF TRAFFIC, and SECTION
01 58 00, PROJECT SIGN AND SAFETY SIGN.
1.1.3.2 Unit of Measure
Unit of measure: Job
1.1.4 Maintenance Of Traffic (Bid Item 0004)
1.1.4.1 Payment
Payment will be made at the contract lump sum price for the maintenance of traffic and all associated costs as described in SECTION 01 52 02 TEMPORARY CONSTRUCTION FACILITIES. Payment constitutes full compensation for all plant, labor, equipment, materials, and incidentals necessary to complete the work.
1.1.4.2 Unit of Measure
Unit of measure: Job.
1.1.5 Performance and Payment Bond (Bid Item 0005, 005949, 007066, 0080, 0104, & 01160100, 0101, & 0102)
1.1.5.1 Payment
Payment will be made for the performance and payment bonds that are required as part of this contract. The Government will pay the actual cost of the bonds or the Contractor's bid price, whichever is less, after receiving evidence of payment (paid invoice) from the bonding company or agency.
1.1.5.2 Unit of Measure
Unit of measure: Lot
1.1.6 Demolition and Removal (Bid Items 0006, 0040 and 005763)
1.1.6.1 Payment
Payment will be made at the contract lump sum price for the demolition and removal of existing concrete walls, clay pipes, chain-link fence, metal and wood posts in the lake, pier remnants in the lake, and other items shown for demolition and removal in the contract drawings and as described in SECTION 02 41 00 DEMOLITION, including handling, transporting, and placement along the toe of bluff or off-site disposal. Payment for pluging or disabling buried clay pipes will also be paid under this bid item.
Payment constitutes full compensation for all plant, labor, materials, equipment, tools, and incidentals necessary to complete the work. Payment for pulling back displaced stones along the shoreline as described in the drawings will also be paid under this bid item.
SECTION 01 22 00 Page 5
Payment will be made at the contract lump sum price for the demolition and removal of existing concrete walls, clay pipes, chain-link fence storm drain structures, metal posts, pier remnants, and other items shown for demolition and removal in the contract drawings and as described in SECTION 02 41 00 DEMOLITION, including handling, transporting, and placement at toe of bluff or off-site disposal. Payment for pluging or disabling buried clay pipes will also be paid under this bid item. Payment constitutes full compensation for all plant, labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.1.6.2 Unit of Measure
Unit of measure: Job
1.1.7 Earthwork (Bid Items 001718, 002224, 0042, & 008292)
1.1.7.1 Payment
Payment will be made at the contract lump sum price for excavating, stockpiling and placement of material in order to construct the site features as shown on the drawings. Payment will also be made for any haul-off of excess material at the locations shown on the contract drawing.
All work shall be in accordance with SECTION 31 00 00 EARTHWORK. Payment constitutes full compensation for furnishing all labor, materials, equipment, tools, and incidentals necessary to complete the work.Payment will be made at the contract lump sum price for excavating, stockpiling and placement of material in order to construct the site features as shown on the drawings. Payment will also be made for any haul-off of excess material at the location shown on the contract drawing. All work shall be in accordance with SECTION 31 00 00 EARTHWORK. Payment constitutes full compensation for furnishing all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.1.7.2 Unit of Measure
Unit of measure: Job
1.1.8 Clearing and Grubbing (Bid Items 0019, 0025, 0041, & 0093)
1.1.8.1 Payment
Payment will be made at the contract lump sum price for clearing and grubbing the grading areas and areas for proposed improvements within the ravines, including handling, transporting, and on-site stockpiling and in accordance to Section 31 13 13 SELECTIVE TREE AND SHRUB CLEARING AND REMOVAL. Payment constitutes full compensation for all plant, labor, materials, equipment, tools, and incidentals necessary to complete the work. The refilling of holes resulting from clearing and grubbing operations will not be measured for payment but will be considered as a subsidiary obligation under the above item.
1.1.8.2 Unit of Measure
Unit of measure: Job
SECTION 01 22 00 Page 6
1.1.9 McCormick Ravine Pipe Outfalls (Bid Items 0043)
1.1.9.1 Payment
Payment will be made at the contract lump sum price for the design and implementation plan to repair erosion occuring at the two pipe outfalls located in McCormick Ravine and as described in Section 35 31 19.50, RAVINE
STREAM RESTORATION.
1.1.10 Unit of Measure
Unit of measure: Job
1.1.11 McCormick Ravine Slope Repair (Bid Items 0044)
1.1.11.1 Payment
Payment will be made at the contract lump sum price for the design and implementation plan to repair erosion gullies at McCormick Ravine slopes as shown on the drawings and in accordance with Section 35 31 19.50, RAVINE
STREAM RESTORATION.
1.1.11.2 Unit of Measure
Unit of measure: Job
1.1.12 Selective Tree and Shrub Removal (Bid Items 0007, 002932, 005561, 00 5662, 006675, 006776, 006877, and 007181)
1.1.12.1 Payment
Payment will be made at the contract lump sum price for selective clearing and shrub removal as described in SECTION 31 13 13 SELECTIVE TREE AND SHRUB CLEARING AND REMOVAL. Payment constitutes full compensation for furnishing all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.1.12.2 Unit of Measure
Unit of measure: Job
1.1.13 Site Preparation, Invasive Species Control, and Establishment Activities (Bid Items 001617, 0039, & 00810091, & 0114)
1.1.13.1 Payment
Payment will be made for all costs associated with site preparation, invasive species control, andestablishment of seeded and planted areas including herbiciding, mowing, inspections, watering, any necessary predator control, and other activities as described in Sections 31 31 19.13
CHEMICAL VEGETATION CONTROL, 32 01 90.45 ESTABLISHMENT OF NATIVE LANDSCAPE,
and 32 92 19.10 NATIVE PLANTS.
Payments shallwill be made yearly, for 5 years, and based on the
SECTION 01 22 00 Page 7 performance criteria described in the above sections; however, monthly progress payments will be allowed with prior approval by the COR and after a monthly Invasive Control Report has been approved as described in Section 32 01 90.45 ESTABLISHMENT OF NATIVE LANDSCAPE. The Contractor shall be paid 20% of the lump sum price for years 1,2,3,4, and 5. If the Contractor fails to establish the performance criteria in any year, none of the payment percentage will be paid to the contractor. The balance withheld from the previous year will then be paid the following year, if the performance criteria is met.
1.1.13.2 Unit of Measure
Unit of measure: Job.
1.1.14 12-Month Warranty for Plants (Bid Items 0058, 0059, 0072, 0073, 0111, & 0112)
1.1.14.1 Payment
Payment for plant warranty will be made for contract grown plant species as described in Section 32 92 19.10, NATIVE PLANTS and Section 32 01 90.45, ESTABLISHMENT OF NATIVE LANDSCAPE.
1.1.14.2 Unit of Measure
Unit of measure: Job
1.1.15 Rework Existing Materials for 24" Outfall (Bid Item 00910102)
1.1.15.1 Payment
Payment will be made at the contract lump sum price for the wall placed at the rework of existing material to expose the existing 24" outfall located at Bartlett ravine for proper drainage the location as shown on the drawings and shall constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.1.15.2 Unit of Measure
Unit of Measure: JOB
1.1.16 Armor Stone Revetment for Retaining Wall (Bid Item 00900101)
1.1.16.1 Payment
Payment will be made at the contract lump sum price for Armor Stones placed atalong the gravity retaining wall located at Bartlett ravine, within the lines and dimensions indicated on the drawings, and as described in SECTION 35 31 19.50 RAVINE STREAM RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.1.16.2 Unit of Measure
Unit of measure: JOB
SECTION 01 22 00 Page 8
1.1.17 Boardwalk and Pedestrian Foot Bridge (Bid Item 005864)
1.1.17.1 Payment
Payment will be made at the contract lump sum price for the boardwalk and pedestrian foot bridge placed at the locations shown on the drawings and in accordance with Section 06 73 13.03 COMPOSITE DECKING AND PERFORMANCE SPEC and shall constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.1.17.2 Unit of Measure
Unit of measure: JOB
1.1.18 Predator Control Fencing (Bid Items 0065, 0079, & 0115)
1.1.18.1 Payment
Payment will be made at the contract lump sum price for predator control fencing necessary for shrubs and trees as described in Section 32 01 90.45, ESTABLISHMENT OF NATIVE LANDSCAPE. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.1.18.2 Unit of Measure
Unit of measure: JOB
1.2 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
Notwithstanding the requirements of any other specification, drawing, or clause in this Contract, the Government will only pay for the actual quantities of the unit price items incorporated into the work, up to the estimated Contract Quantities listed on the BIDDING SCHEDULE. Any quantity placed in excess of the Contract Quantity without first receiving a Contract Modification increasing the estimated quantity of that unit price item shall be at the Contractor's expense. The Contractor is responsible for notifying the Government of the need to increase the contract quantity of a line item at least seven calendar days before the item is needed.
If contractor chooses to use marine based equipment for river bankshoreline work, the cost for the marine based equipment and any required permitting shall be incidental to these bid items.
1.2.1 Sand Placement Dune Habitat (Bid Items 006574 and 00990113)
1.2.1.1 Payment
Payment will be made at the contract unit price for the placement of sand as specified on the plans and in accordance with Section 31 00 00 EARTHWORK
SECTION 01 22 00 Page 9 including excavating, loading, hauling, placing, and grading of this material. Payment constitutes full compensation for furnishing all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.2.1.2 Measurement
Sand placed for the construction of grade linesfor dune habitat will be measured for payment by the cubic yard, in-place. Quantities shall be determined by the average end area method every 10050 feet, or as directed by the Contracting Officer. Pre-placement surveys shall be taken after the necessary preparation of the area has been performed. such as clearing, grubbing, and stripping. The Contractor shall notify the Contracting Officer's representative sufficiently in advance of the start of the placing operation to afford sufficient time during which to make the necessary original measurements.
Upon completion of the finish grading operation, the Contractor will notify the Contracting Officer's representative that final surveys will be performed. The surveys shall be performed by an independent licensed surveyor. Cost of surveys is considered incidental to this bid item. No additional volume of fill shall be added to the survey quantity to account for settlement or shrinkage, but shall be incidental to the construction.
The quantity of fill computed in the aforementioned paragraphs shall constitute the total measurement quantity for payment. No other method or means of determining quantities of placed materials will be considered.
1.2.1.3 Unit of Measurement
Unit of measure: Cubic Yards (CY)
1.2.2 Step Stones (Bid Items 001820, 002326, 0045, & 008394)
1.2.2.1 Payment
Payment will be made at the contract unit price for stones placed in the step pool features within the lines and dimensions indicated on the drawings and as described in SECTION 35 31 19.50 RAVINE STREAM RESTORATION.
Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.2.2.2 Measurement
Stones will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.
1.2.2.3 Unit of Measure
Unit of measure: Ton (TN)
1.2.3 MSE Soil Bag Wall (Bid Items 002427 & 008495)
1.2.3.1 Payment
Payment will be made at the contract unit price for MSE Soil Bag Wall place placed as retaining wall along theScott and Schenck ravines at locations shown and dimensions indicated on the drawings and as described in SECTION 32 32 34 MECHANICALLY STABILIZED EARTH (MSE) WALL. Payment constitutes full
SECTION 01 22 00 Page 10 compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. Planting of the walls will be incidential to the Seeding and Plugs bid items for the respective ravines.
1.2.3.2 Measurement
MSE soil bag wall will be measured for payment by the square yard of wall placed and accepted.
1.2.3.3 Unit of Measure
Unit of measure: Square Yard (SY)
1.2.4 Flagstone Walls (Bid Items 001921 and 0046)
1.2.4.1 Payment
Payment will be made at the contract unit price for flagstones placed as retaining wall along theMcCormick and Janes ravines at locations shown and dimensions indicated on the drawings and as described in SECTION 35 31 19.50 RAVINE STREAM RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.2.4.2 Measurement
Stones will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.
1.2.4.3 Unit of Measure
Unit of measure: Ton (TN)
1.2.5 CA-7 Bedding Stones and Fill (Bid Items 000722, 002730, 0047, & 008596
1.2.5.1 Payment
Payment will be made at the contract unit price for CA-7 placed along the ravines at locations shown and dimensions indicated on the drawings and as described in SECTION 35 31 19.50 RAVINE STREAM RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.2.5.2 Measurement
Gravel stones will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.
1.2.5.3 Unit of Measure
Unit of measure: Ton (TON)
SECTION 01 22 00 Page 11
1.2.6 6" Perforated Pipe (Bid Items 002123, 002831, 0048, & 008697)
1.2.6.1 Payment
Payment will be made at the contract unit price for the 6" Perforated pipe place along the banks of the ravines and shown on the drawings and as described in SECTION 33 40 0135 31 19.50 STORM DRAINAGE SYSTEMRAVINE STREAM RESTORATION. The contract unit price shall constitute full compensation for plant, labor, materials, and incidentals required to complete work.
1.2.6.2 Measurement
6" Perforated Pipe shall be measured per the linear foot of pipe placed and accepted.
1.2.6.3 Unit of Measure
Unit of measure: Linear Foot (LF)
1.2.7 Prescribed Burn (Bid Items 0008, 003033, 005460, 006978, 007282, & 0 095107)
1.2.7.1 Payment
Payment for prescribed burns in the restoration area shall be made at the contract unit price and shall include full compensation for all plant, labor, materials, and incidentals necessary to complete the work as described in SECTION 31 31 19.16 PRESCRIPTION BURNING.
1.2.7.2 Measurement
The results of the PRESCRIBED BURN will be documented with a map of PRESCRIBED BURN to be submitted with payment invoice. The map shall be created using either GIS or CADD delineating the areas that were treated.
The areas shall be delineated with a handheld GPS unit with a minimum of three meter accuracy. The Contracting Officer's Representative will review the submittal for payment and may elect to verify the completed work in the field. Performance criteria is contained in SECTION 31 31 19.16 PRESCRIPTION BURNING. The Contractor will be paid for the actual area completed, not to exceed the quantity in the bid schedule.
1.2.7.3 Unit of Measure
Unit of measure: Acre (AC)
1.2.8 Seeding (Bid Items 0009, 00314, 00510, & 00681, 0083, & 0105)
1.2.8.1 Payment
Payment for native seeding shall be made at the contract unit price and shall include full compensation for all plant, labor, materials, and other components appropriate to complete the work as described in SECTION 32 92 19.10, NATIVE PLANTS. The Contractor shall use existing on-site topsoil for seeding in accordance with SECTION 31 00 00.
1.2.8.2 Measurement
A bill of material delivery must accompany the seeds to verify and substantiate the quantity of seeds delivered to the site. Copies of the
SECTION 01 22 00 Page 12 bills of delivery shall be submitted to the COR and a USACE, Chicago District botanist or ecologist.
Seed plantings will be measured by the ounce of seed installed and accepted by the COR. 20% of the payment will be retained. After the second growing season, the retention will be paid if all areas meet the performance criteria. Performance criteria is contained in SECTION 32 01 90.45 ESTABLISHMENT OF NATIVE LANDSCAPE. If the Contractor fails to establish the performance criteria in any year, none of the payment percentage will be paid to the contractor. The balance withheld from the previous year will then be paid the following year, if the performance criteria is met.However, not withstanding this or any other contract requirement, the contractor shall not be paid for any quantity of native seeds that exceeds the quantity listed in the bid schedule. The contractor shall bear the cost of any native seeds installed in excess of the quantity listed in the bid schedule.
1.2.8.3 Unit of Measure
Unit of Measure: Ounce (OZ)
1.2.9 [Enter Appropriate Subpart Title Here]1.2.9 Plugs (Bid Items 0010, 00143, 00352, 0036, 004950, 005155, 006067, 006269, 007484, 007888, 00920106, & 00960108)
1.2.9.1 Payment
Payment will be made at the contract unit price for plugs planted in the areas shown on the drawings and as described in SECTION 32 92 19.10 NATIVE PLANTS to include handling, storing,loading, hauling, placing, watering, etc., as well as labor, materials, equipment, tools, and incidentals necessary to complete the work.
After all plantings have been installed, the Contractor shall notify the COR and request an inspection. As soon as practicable thereafter, at least one month after all plantings have been installed for that particular year, the COR will make an inspection, at which time all areas planted in accordance with SECTION 32 92 19.10 03 NATIVE PLANTS will be accepted.
1.2.9.2 Measurement
A bill of material delivery must accompany the material to verify and substantiate the quantity of plugs delivered to the site. Copies of the bills of delivery shall be submitted to the COR and a USACE, Chicago District botanist or ecologist.
Planting will be measured by the number of plugs installed and accepted by the COR at least one month after all plantings have been installed for that particular year. Performance criteria is contained in 32 01 90.45 ESTABLISHMENT OF NATIVE LANDSCAPE. The Contractor will be paid for the actual quantity of native plugs installed and accepted. However, not withstanding this or any other contract requirement, the Contractor shall not be paid for any quantity of native plugs that exceeds the quantity listed in the bid schedule. The Contractor shall bear the cost of any native plugs installed in excess of the quantity listed in the bid schedule.
1.2.9.3 Unit of Measure
Unit of measure: Each (EA)
SECTION 01 22 00 Page 13
1.2.10 Plunge Pool Stones (Bid Item 00870098)
1.2.10.1 Payment
Payment will be made at the contract unit price for stones placed in the plunge pool features located at Schenck Ravine within the lines and dimensions indicated on the drawings and as described in SECTION 35 31 19.50 RAVINE STREAM RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.2.10.2 Measurement
Stones will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.
1.2.10.3 Unit of Measure
Unit of measure: Ton (TN)
1.2.11 Retaining Wall and Elevated Curb (Bid Item 00880099)
1.2.11.1 Payment
Payment will be made at the contract unit price for the freestanding and gravity walls placed at the locationBartlett Ravine as shown on the drawings and in accordance to Section 03 30 00, CAST IN-PLACE CONCRETE and shall constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. Pavement repairs shall be in accordance to Section 32 10 00, HOT MIX ASPHALT (HMA)and are incidential to this bid item.
1.2.11.2 Measurement
The wall/curb will be measured per linear foot of wall placed and accepted.
1.2.11.3 Unit of Measure
Unit of Measure: Linear Foot (FT)
1.2.12 Precast Concrete Trench with Grates (Bid Item 0100)
1.2.12.1 Payment
Payment will be made at the contract unit price for the precast concrete trench and grates located at Bartlett Ravine, as shown on the drawings and in accordance with Section 03 30 00, CAST IN-PLACE CONCRETE. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. Payment for shop drawings and construction details submittals for these features will be incidential to this bid item.
1.2.12.2 Measurement
Precast concrete trench with grate will be measured per each trench installed and accepted.
SECTION 01 22 00 Page 14
1.2.12.3 Unit of Measure
Unit of Measure: Each (EA)
1.2.13 Cobble Chute for Concrete Trench (Bid Item 00920103)
1.2.13.1 Payment
Payment will be made at the contract unit price for the cobble stones placed for the Bartlett ravine concrete trench at the location shown on the drawings and as described in SECTION 35 31 19.50 RAVINE STREAM RESTORATION.
Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.2.13.2 Measurement
Stones will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.
1.2.13.3 Unit of Measure
Unit of Measure: TN (TN)
1.2.14 Limestone Blocks (Bid Items 002629)
1.2.14.1 Payment
Payment will be made at the contract unit price for limestone blocks placed as a retaining wall at Scott Ravine at locations shown on the drawings and as described in SECTION 35 31 19.50 RAVINE STREAM RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
1.2.14.2 Measurement
Stones will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.
1.2.14.3 Unit of Measure
Unit of Measure: Ton (TN)
1.2.15 Angular Armor Stones (Bid Items 002528)
1.2.15.1 Payment
Payment will be made at the contract unit price for angular armor stones placed for the step stone pools at Scott Ravine within the lines and dimensions indicated on the drawings and as described in SECTION 35 31 19.50 RAVINE STREAM RESTORATION. Payment constitutes full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work.
SECTION 01 22 00 Page 15
1.2.15.2 Measurement
Stones will be measured for payment by the ton. Quantities will be computed to the nearest tenth of Ton. The Contractor shall submit weight certificates along with payment invoice for payment.
1.2.15.3 Unit of Measure
Unit of Measure: Ton (TN)
1.2.16 [Enter Appropriate Subpart Title Here]1.2.16 1 and 5 Gallon Trees and Shrubs (Bid Items 0011, 0012, 0014, 0015, 0016, 0033, 0034, 0037, 0038, 0052, 0053, 0056, 0057, 0063, 0064,0070, 0071, 0074, 0076, 0079, 0080,0085, 0086, 0089, 0090, 0097, & 00980109, & 0110)
1.2.16.1 Payment
Payment for planting larger containerized shrubs and trees shall be made at the contract unit price and shall constitute full compensation for all plant, labor, products/materials, equipment, tools, and incidentals necessary to complete the work as specified in Section32 92 19.10 NATIVE PLANTS and SECTION 32 01 90.45 ESTABLISHMENT OF NATIVE LANDSCAPE. After all larger containerized shrubs and trees have been installed, the Contractor shall notify the COR and request an inspection. As soon as practicable thereafter, the COR will make an inspection, at which time all areas planted in accordance with Section 32 92 19.10 NATIVE PLANTS and SECTION 32 01 90.45 ESTABLISHMENT OF NATIVE LANDSCAPE will be accepted for payment.
1.2.16.2 Measurement
A bill of material delivery must accompany the material to verify and substantiate the quantity of larger containerized shrubs and trees delivered to the site. Copies of the bills of delivery shall be submitted to the COR and a USACE, Chicago District botanist or ecologist.
Planting will be measured by the number of larger containerized shrubs and trees installed and accepted by the COR. Performance criteria is contained in 32 01 90.45 ESTABLISHMENT OF NATIVE PLANTS. The Contractor will be paid for the actual quantity of larger containerized shrubs and trees installed and accepted. However, not withstanding this or any other contract requirement, the Contractor shall not be paid for any quantity of larger containerized shrubs and trees that exceeds the quantity listed in the bid schedule. The Contractor shall bear the cost of any larger containerized shrubs and trees installed in excess of the quantity listed in the bid schedule.
1.2.16.3 Unit of Measure
Unit of Measure: Each (EA)
1.2.17 1" and 1.5" Caliper Trees (Bid Items 0013, 003554 and 007787)
1.2.17.1 Payment
Payment for planting 1" and 1.5" caliper trees shall be made at the contract unit price and shall constitute full compensation for all plant, labor, products/materials, equipment, tools, and incidentals necessary to complete the work as specified in Section 32 92 19.10 NATIVE PLANTS and SECTION 32 01 90.45 ESTABLISHMENT OF NATIVE PLANTS. After all 1" and 1.5"
SECTION 01 22 00 Page 16 caliper trees have been installed, the Contractor shall notify the COR and request an inspection. As soon as practicable thereafter, the COR will make an inspection, at which time all areas planted in accordance with Section 32 92 19.10 NATIVE PLANTS and SECTION 32 01 90.45 ESTABLISHMENT OF NATIVE PLANTS will be accepted for payment.
1.2.17.2 Measurement
A bill of material delivery must accompany the material to verify and substantiate the quantity of 1.5"the caliper trees delivered to the site.
Copies of the bills of delivery shall be submitted to the COR and a USACE, Chicago District botanist or ecologist.
Planting will be measured by the number of 1.5" caliper trees installed and accepted by the COR. Performance criteria is contained in SECTION 32 01 90.45 ESTABLISHMENT OF NATIVE PLANTS. The Contractor will be paid for the actual quantity of 1.5" caliper trees installed and accepted. However, not withstanding this or any other contract requirement, the Contractor shall not be paid for any quantity of 1.5" caliper trees that exceeds the quantity listed in the bid schedule. The Contractor shall bear the cost of any 1.5" caliper trees installed in excess of the quantity listed in the bid schedule.
1.2.17.3 Unit of Measure
Unit of measure: Each (EA)
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --
SECTION 01 22 00 Page 17
DIVISION 31 - EARTHWORK
SECTION 31 13 13
SELECTIVE TREE AND SHRUB CLEARING AND REMOVAL
PART 1 GENERAL
1.1 REFERENCES
1.2 SCOPE
1.3 ENVIRONMENTAL PROTECTION
1.4 CLEARING LIMITS
1.5 SUBMITTALS
1.6 Definitions
1.7 EQUIPMENT STORAGE
1.8 QUALITY CONTROL
PART 2 PRODUCTS
2.1 STOCKPILED TREES
PART 3 EXECUTION
3.1 PROTECTION
3.1.1 Roads and Walks
3.1.2 Trees, Shrubs, and Existing Facilities
3.1.3 Utility Lines
3.2 CLEARING
3.3 Girdling
3.4 Forestry Mowing
3.5 Grubbing
3.6 DISPOSAL OF MATERIALS
3.7 Access
3.8 FINAL ACCEPTANCE
-- End of Section Table of Contents --
SECTION 31 13 13 Page 1
SECTION 31 13 13
SELECTIVE TREE AND SHRUB CLEARING AND REMOVAL
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE A10.6 (2006) Safety Requirements for Demolition Operations
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.2 SCOPE
The project goal is to restore native plant communities that are biologically diverse and self-sustaining within the project site requiring woody species clearing and removal, and which does not negatively impact the existing high quality natural areas within the project site. Work consists of providing all labor, equipment, and material for the operations of tree and shrub clearing and removal, and follow-up herbiciding of cut stumps and resprouts from all areas within project limits.
1.3 ENVIRONMENTAL PROTECTION
All work and Contractor operations shall comply with the requirements of Section 01 57 20.01, ENVIRONMENTAL PROTECTION FOR ILLINOIS.
1.4 CLEARING LIMITS
The objectives are to remove from all areas within project limits 100% of all invasive woody species listed within Section 31 31 19.13 CHEMICAL VEGETATION CONTROL and the following species that are 6" DBH (Diameter at Breast Height) and less except in locations identified by the COR or trees and shrubs flagged green to remain: Sugar Maple (Acer Ssaccharum), American Basswood (Tilia americana), Black Walnut (Juglans nigra), Black Cherry ( Prunus serotina), Red Oak (Quercus rubra), Sumac (Rhus spp.), Gray Dogwood ( Cornus racemosa), Atlantic Ninebark (Physocarpus opulifolius), Cottonwood ( Populus deltoides) Quaking Aspen (Populus tremuloides), willow (Salix spp.), and Raspberry (Rubus spp.). All woody species flagged orange by the Government must also be removed including trees, shrubs, and their resprouts. The Government will flag no more than 300 native trees in Project Area 1, 300 native trees in Project Area 2, and 150 native trees in Project Area 3, all of which will be greater than 6" DBH and no more than 25" DBH (these quantities do not include Ostrya virginiana, Carpinus caroliniana, and Hamamelis virginiana which must be removed in addition to
SECTION 31 13 13 Page 2 these quantities only if flagged orange by the Government). The Government may award up to 200 additional trees for removal in Project Area 1 and/or Project Area 2, all of which will be greater than 6" DBH and no more than 25" DBH. The Government will flag orange up to 30 native trees greater than 25" DBH in Project Area 2 that must be removed.
Flagging of any invasive woody species by the Government is only meant to aid in the proper identification of trees and shrubs and it is ultimately the responsibility of the Contractor to accurately identify all trees and shrubs before clearing of said trees and shrubs to ensure they are listed as invasive within Section 31 31 19.13 CHEMICAL VEGETATION CONTROL.
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Contractor and Site Crew Qualifications; G, PL
Contractor Experience
Contractors shall provide a minimum of three references that reflect all the following conditions and experience:
Hand clearing of trees and shrubs, brush pile burning, stump herbicide via wick application and foliar wick application during the growing season to resprouts and small stems within Illinois Natural Area Inventory Sites or native communities of high floristic quality (FQI 25 or higher) that were successfully completed and which avoided reasonable negative impact to the native vegetation that co-occurred with the target invasive plant species.
Mechanical clearing of trees and shrubs using skidsteers and or tracked excavators with sheer, fellar buncher, and mower attachments that included stump herbicide via wick application and foliar wick application during the growing season to resprouts and small stems within Natural Areas that were successfully completed and which avoided reasonable negative impact to the native vegetation that co-occurred with the target invasive plant species.
Projects must be at least 30 acres of treatment within a 30-acre or larger project area.
All Project references shall demonstrate the contractor's ability to initiate or accelerate the recovery of an ecosystem or natural landscape with respect to its ecological health, integrity and sustainability. This includes:
o Ability to identify native trees, shrubs, vines and herbaceous plants o Knowledgeable of wick herbicide application methods and how to implement them
SECTION 31 13 13 Page 3 o Experience with hand clearing of woody species o Experience with implementation of brush pile burning, monitoring of fire weather and fire behavior, and selection of appropriate burn pile locations.
o Experienced in the preparation of herbicide mixes including mix ratios to achieve desired active ingredient concentrations, addition of surfactants, water conditioners and dyes o Experience with suitable site conditions for access o Experience with the various herbicides and their appropriate applications o Experience with project management for restoration projects Reference projects shall be projects that are conducted on and are restoring or enhancing a natural landscape. This includes native communities, such as: prairies, wetlands, woodlands, savannas, forest, ravines, flatwoods, streams, fens, bogs, rivers, and lakes.
Areas that are cultural landscapes shall not be considered as reference projects. This includes: landscaping and/or maintenance for such projects as roadsides, ditches, golf courses, native gardens, native landscaping, wetland creation, cultural fields/pastures, business, commercial campuses and residential properties. Also excluded are non-selective clearing projects where sites have been made ready for development.
Experience and Education - On-site Supervisor
Minimum of 3 years in natural areas restoration in the lower Lake Michigan region (within IL,IN, and WI)(pastures, CRP, landscaping, utility, highway and similar projects do not qualify)
Minimum of 3 years of experience overseeing invasive woody clearing projects and must have experience on at least two projects where selective thinning of mature canopy trees was a component of the project. These projects should include native plant identification of Midwest flora; herbicide application using a wick or sponge method; selective hand clearing.
Demonstrated expertise in native and invasive plant species identification of the Northeast IL/Northwest IN region when woody species removal activities are occurring, such as tree clearing or herbiciding of cut stumps, resprouts and seedlings., ability to field ID 90% of species in wetlands, prairies, savannas and woodlands
Licensed in the state of IL to apply herbicides
Experience and Education - Field Crew
Minimum 2 years in natural areas restoration (pastures, CRP, highway and similar projects do not qualify)
At least 50% of the clearing crew must have at least 3 years' experience conducting tree and shrub clearing projects in a natural areas setting.
At least 50% of the members of the field crew who apply herbicide for stump treatment and follow-up for resprouts and small stems
SECTION 31 13 13 Page 4 must have at least 3 years' licensed experience applying herbicide in natural area settings. Crew members with lesser experience shall be paired with a crew member that has 3 or more years of experience working in natural areas.
Demonstrated experience in native and invasive plant species identification of the Northeast IL/Northwest IN region
Licensed in the state of IL to apply herbicides
Contractor can provide at least one employee who has successfully completed the National Wildfire Coordinating Group S-130 Firefighter Training and S-190 Introduction to Fire Behavior or successfully completed the Midwest Ecological Prescription Burn Crew Member Training and can be designated as a Brushpile Burn Boss.
Experience and Education - Equipment Operators
For every employee operating equipment used to cut or haul logs, brush, or bucked material, list the years of experience your employee has operating the equipment and type of equipment operated.
All Equipment Operators must have at least 5 years of experience using standard tree clearing or logging equipment, such as feller bunchers, in forested or woodland communities. Forestry mowers will have extremely limited use in this project; therefore, experience should reflect the operation of equipment other than forestry mowers.
Selected Herbicide and Tree Clearing Plan; G, PL
Prior to tree and shrub clearing activities, submit the brand(s) and active ingredient(s) of all herbicides to be applied in the execution of this work, including the rates of application and equipment to be used for the application. Submit a list of surfactants, water conditioners, dyes, pH balancers, and othe chemicals and adjuvants to be used in the execution of this work.
Submit a list of equipment, including all potential equipment that will be utilized for the duration of this work, such as all mechanized and hand held equipment. Mechanical equipment exclusion zones for sensitive areas must be coordinated with the landowner and COR and mapped for approval.
1.6 Definitions
Clearing will consist of the removal within project limits of all invasive woody species listed within Section 31 31 19.13 CHEMICAL VEGETATION CONTROL and the following species that are 6" DBH (Diameter at Breast Height) and less except in zones identified by the COR or trees and shrubs flagged green to remain: Sugar Maple (Acer Ssaccharum), American Basswood (Tilia americana), Black Walnut (Juglans nigra), Black Cherry (Prunus serotina), Red Oak (Quercus rubra), Sumac (Rhus spp.), Gray Dogwood (Cornus racemosa), Atlantic Ninebark (Physocarpus opulifolius), Cottonwood (Populus deltoides ), Quaking Aspen (Populus tremuloides), willow (Salix spp.), and Raspberry ( Rubus spp.). All woody species flagged orange within project limits by the Government must also be removed including trees, shrubs, and their
SECTION 31 13 13 Page 5 resprouts. Clearing also includes the removal of woody debris resulting from clearing activities in all areas to be cleared.
Hand cutting is the physical cutting, by hand, of trees or shrubs using chain saws, brush clearing saws, handsaws and loppers.
Mechanical equipment refers to any tractor or vehicle mounted equipment used for the removal of trees and shrubs above the ground surface, including but not limited to: shears, feller buncher, and forestry mower attached to rubber-tracked skid-steers or tracked excavators. Alternatives to this equipment may be considered at the pre-coordination site meeting.
Equipment shall be approved by the Contracting Officers Representative (COR). All mechanical equipment shall be rubber tracked unless otherwise approved by the COR and shall have a ground pressure rating of less than
9.0 psi.
Stockpiled trees are those that are removed from upland portions of the ravines, bluff, and plateau and stockpiled at the location designated on the drawings. Trees for this purpose must only consist of the whole trunk and large limbs. In the case that rootwads become available, these must be used as well.
Grubbing consists of the removal and disposal of stumps, roots larger than 3 inches in diameter and matted roots from the designated grubbing areas.
All stumps and exposed roots, as well as any trash, debris and other obstructions, must be removed from within the limits of all grading areas under this contract, and as indicated on the plan documents. Grubbing also entails the filling of grubbing holes.
1.7 EQUIPMENT STORAGE
All vehicles, equipment and supplies may be stored at staging areas at the sole discretion and risk of the Contractor. Any damage or losses to Contractor vehicles, equipment or supplies during use, storage or transport shall be the sole responsibility of the Contractor.
1.8 QUALITY CONTROL
The Contractor shall establish and maintain a quality control system for the work under this section to ensure compliance with the contract requirements and Section 01 45 00.00 QUALITY CONTROL
PART 2 PRODUCTS
2.1 STOCKPILED TREES
Trees for stockpile must be taken from those that are removed from upland portions of the ravines, bluff, and plateau. A total of 150 trees must be stockpiled at the location shown on the drawings. Trees for this purpose must only consist of the whole trunk and large limbs. In the case that rootwads become available, these must be used as well. Trees must be large, with a minimum acceptable DBH of 24" and no maximum size. The trees must be stripped of small branches and leaves; branches must not be smaller than 8" in diameter, all branches smaller than this must be removed from utilized tree. If a tree with a root wad becomes available, the whole tree must be cut in half, so that both the rootwad and branches can be used as protrusion habitat. The rootwads or short pieces of trunk must also be utilized to be completely buried under the stone, which would form small internal cavities for mudpuppy use.
SECTION 31 13 13 Page 6
PART 3 EXECUTION
3.1 PROTECTION
3.1.1 Roads and Walks
All work and Contractor operations shall comply with the requirements of Section 01 57 20.01, ENVIRONMENTAL PROTECTION FOR ILLINOIS. Contractor shall keep roads and walks free of dirt and debris. Any trails and/or roads within 200 feet of the daily work area shall be posted with Caution-Work Area, Tree Work Ahead or Construction Area signs to warn the public. Signs on public roadways shall conform to all applicable Owner and IDOT signage specifications.
Appropriate caution shall be taken when work is performed near trails, utilities, and roads. This shall include the posting of sentinels if there is the possibility of debris or brush from project activities landing in the trail or road area.
It shall be the responsibility of the Contractor to adhere to all applicable landowner and OSHA safety regulations and guidelines, while carrying out activities related to this project.
3.1.2 Trees, Shrubs, and Existing Facilities
Any trees or shrubs flagged with green tape shall be left standing and protected as described above; these trees and shrubs should be field verified by the COR the day prior…