W912P6-14-B-0011-0005.pdf
PDF 56 KB Posted
- Attached to
- Permanent Barrier I Building Federal contract opportunity
- Solicitation number
- W912P6-14-B-0011
About this file
Amendment 0005 to Solicitation W912P6-14-B-0011
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6641567706
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SUBJECT: W912P6-14-B-0011, "Chicago Sanitary Ship Canal (CSSC) Permanent Barrier I, Project-B Building"
CONTINUED ON THE NEXT PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Sep-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-14-B-0011
X 9B. DATED (SEE ITEM 11)
12-Aug-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Sep-2014
CODE
U. S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P6-14-B-0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
1. AMENDED PROJECT SPECFICIATION SECTIONS: Please see the list of USACE responses to Contractor Inquiries for more information on these amended specification sections:
a. Section 26 20 00 Interior Distribution System – revised paragraph 2.12 Panel Boards
2. ADDED PROJECT SPECIFICATION SECTIONS: Please see the list of USACE responses to Contractor Inquiries for more information on these amended specification sections:
a. Section 07 05 23 – Pressure Testing an Air Barrier System for Air Tightness
b. Section 07 27 10.00 10 – Building Air Barrier System
c. Section 09 30 13 – Ceramic Tiling
3. AMENDED PROJECT DRAWING SECTIONS: Please see the list of USACE responses to Contractor
Inquiries for more information on these amended specification sections:
a. G-001-LOCATION AND VICINITY MAP
b. G-002-SHEET INDEX, LEGEND, ABBREVIATIONS AND GENERAL NOTES
c. A-001-GENERAL NOTES
d. A-107-SECOND FLOOR PLAN BAYS 1-2 2-3 3-4
e. S-001-GENERAL NOTES STRUCTURAL
f. S-705-GRATING PLAN SECTIONS AND DETAILS
4. ADDED PROJECT DRAWING SHEETS: Please see the list of USACE responses to Contractor Inquiries for more information on these amended specification sections:
a. S-307-STRUCTURAL SECTIONS SHEET 5
b. S-706-PLAN ELEVATIONS SECTIONS AND DETAILS REMOVALBE PLANEL WALL
5. SECTION 00700 – DFAR CLAUSE 252.236-7001 has been revised to include an updated, comprehensive list of Project Drawing Sheets.
6. CONTRACTOR INQUIRIES: Enclosed in this amendment are the USACE responses to Contractor Inquiries. Please refer to these answers for more detailed information on the modified specifications and drawings listed above.
7. BID OPENING: The Bid Opening date has been changed from 17 September 2014 to 19 September 2014.
The Bid Opening time remains unchanged at 2:00PM CST.
8. POINT OF CONTACT: The POC for this amendment is Alex Heinzel at (312) 846-5368 or alex.heinzel@usace.army.mil.
(End of Summary of Changes)
Permanent Fish Barrier Building 1 Contractor Inquires
AMD 0005
1. Q: Drawing A-104 - where is the removable wall panel detailed?
A: Per Amendment 0005, drawing Sheet S-706 PLAN ELEVATION SECTIONS AND DETAILS REMOVABLE PANEL WALL, containing Removable Access Panel Details, has been added to the drawing set.
2. Q: Drawing A-106 - where is the removable wall panel detailed?
A: Per Amendment 0005, drawing Sheet S-706 PLAN ELEVATION SECTIONS AND DETAILS
1. Q: Sheet A-105 refers to a Removal Access Wall Panel in Rm P-107. Please advise if this is in the scope of work, and if so, please provide a specification.
A: Per Amendment 0005, drawing Sheet S-706 PLAN ELEVATION SECTIONS AND DETAILS
2. Q: Sheet A-104 refers to Access Wall Panels. Please confirm if this is in the current project scope of work and provide specification, as applicable.
A: Per Amendment 0005, drawing Sheet S-706 PLAN ELEVATION SECTIONS AND DETAILS
3. Q: Please add the Work Limits, existing access roads and any related easements on the C-drawings and ES drawings. Arrangements of these elements with respect to the proposed work will have a bearing on construction sequencing, traffic control, access control etc.
A: To ensure continued clarity of the drawings, please refer to drawing sheet C-101 for the work limits and how to sequence construction, traffic control and access control.
4. Q: Removed the wheel chair lift and added an elevator, there will need to be additional Fire Alarm devices, but the FA drawing was not revised.
A: Additional smoke detectors shall be installed above the elevator wall on the first and second floor, as well as a first floor elevator recall. Coordination by USACE with the Romeoville Fire Department will be required to verify elevator requirements and obtain approval.
5. Q: There are no lintels detailed or scheduled for masonry opening. Please provide detail for standard window and doorway opening.
A: Doorway openings - including lintels - are detailed on Sheets A-503 TYPICAL DOOR DETAILS SHEET 1 and A-504 TYPICAL DOOR DETAILS SHEET 2. There are no window lintels since all windows will be installed under beam elements of the building. Typical window details can be found on Sheet A-505 TYPICAL ARCHITECTURAL DETAILS WINDOWS.
6. Q: Sheet S-101 and similar: The stair case to the left of column line 1 has no section through it and no reinforcing specified. Are these concrete stairs? If so, what reinforcing is required? Are there support walls below?
A: Per Amendment 0005, drawing Sheet S-307 STRUCTURAL SECTIONS SHEET 5, containing Exterior South Stair Details, has been added to the drawing set.
7. Q: The structural frame elevations have various labels for the different columns and beams, but there is not a column or beam schedule shown. Is there a column and beam schedule somewhere that presents the relevant data?
A: There are no column and beam schedules. For Column an Beam details Please see Sheets S-305
STRUCTURAL SECTIONS BEAMS AND COLUMNS SHEET 1, S-306 STRUCTURAL SECTIONS
BEAMS AND COLUMNS SHEET 2, S-401 TYPICAL STRUCTURAL SECTIONS BEAMS TO
COLUMNS SHEET 1, S-402 TYPICAL STRUCTURAL SECTIONS BEAMS TO COLUMNS SHEET 2,
S-403 TYPICAL STRUCTURAL SECTIONS BEAMS TO COLUMNS SHEET 3, S-404 TYPICAL
STRUCTURAL SECTIONS BEAMS TO COLUMNS SHEET 4, S-405 TYPICAL STRUCTURAL
SECTIONS BEAMS TO COLUMNS SHEET 5, and S-501 STRUCTURAL DETAILS SHEET 1.
8. Q: Specification Section 26 20 00 paragraph 2.8.3 ‐ calls for disconnect switches to be NEMA 3r indoor and NEMA 4x outdoor. Paragraph 2.11.1 (Section 26 20 00) calls for outdoor Panel Board Enclosures to be NEMA 4x but nothing for the interior panel boards. Please clarify if NEMA 1 or NEMA 3r is required for the interior Panel Boards.
A: Provide Panel boards in NEMA 3R enclosure for indoor use and in NEMA 4X enclosure for outdoor use. Per Amendment 0005, specification Section 26 20 00 Interior Distribution paragraph 2.12 Panel Boards, has been revised.
9. Q: A window supplier has some concerns about the blast criteria. Please provide some guidance: The charge weight and standoff distance, once evaluated, are outside of ASTM standard.
A: Per specification section 08 56 53 BLAST RESISTAND TEMPERED GLASS WINDOWS, para 1.2 Submittals, USACE shall review and approve Window Unit shop drawings prior to installation.
10. Q: On sheet A-302 Detail A & B it looks like there are some sort of wall panels? Is this in the current scope of work? Can you please provide specs or details in order to provide a quote if this is applicable to our current bid.
A: Yes, it is. The 3/16" Aluminum Wainscot please see Sheet A-308 TYPICAL PRODUCTION WING WALL SECTIONS SHEET 1, Section A-A104/A-308 and Sheet S-706 PLAN ELEVATION SECTIONS AND DETAILS REMOVABLE PANEL WALL, Section A-S706/S706.
11. Q: Drawing A-301 (Amendment 0003) indicates Tile Flooring. What is the type of Tile and what Rooms receive Tile Flooring?
A: The tile shall be ceramic tile, as indicated on drawing sheet A-301 TYPICAL SECTIONS BAY 1-2 2-3 3-4.
12. Q: Bid drawing FP-101 and 102, Note #2 States “Quantity of Clean Agent shall be verified based on actual constructed room volumes”. In attempting to calculate the room volumes using the architectural drawings A-301 thru A-304 a scale is given 3/16” = 1’-0” but no Bar scale is shown. The NOVEC 1230 agent quantities are given on bid drawing FP106. With no Bar scale I calculate different agent quantities.
Will the agent quantities shown on Bid drawing FP-106 be accepted as gospel without the ability to recalculate the agent quantities?
A: Per note #2 on drawing sheets FP-101 and FP-102 the volumes of the rooms will be able to be adjusted, based on the final constructed room volumes.
13. Q: Bid drawing A-302, Section Bay 4-5 and Section Bay 5-6 is the elevation for Spang and Pulser Room 1, P-101 And Bid drawing A-303, Section Bay 9-10 and Section Bay 10-11 is the elevation for Spang and Pulser Room 2, P-107 show them to have a Raised access floor. Should the raised floor volume be considered in the clean agent volume? Is so, are discharge nozzles required under the raised floor? What is the elevation of the raised floor?
A: To clarify, the total room volume shall be taken from the floor slab to the ceiling.
14. Q: Bid drawing FA-602 is our reference for the clean agent and FA wiring. There is confect of information between the FP and FA bid drawings. All of the smoke, heat and duct detection are shown on the FA 101 and 102 drawings yet the riser diagram show the detectors wired directly to the clean agent panels. If this is the case please provide a sequence of operation for the clean agent panel separate from the FA (fire alarm) drawings.
A: Please refer to drawing sheet FA-601 for the sequence of operations.
15. Q: The mechanical Bid drawing indicate “FD” (fire dampers) to be installed in the duct work passing into the clean agent protected areas. There are no indications of “SD” (smoke dampers) to isolate the airflow within these areas. Who is providing smoke dampers for the clean agent protected areas? Who is providing the 120VAC energized open, spring closed operators?
A: Fire/Smoke dampers are a part of the overall fire suppression system and installation shall be coordinated with the Electrical and HVAC contractors per the drawing and specifications.