Text version
Barrier IIA Power Quality Improvements List of Site Safety Documents to be Provided to Potential Bidders
U.S. Army Corps of Engineers (USACE), Engineering Research and Development Center Construction Engineering Research Laboratory (ERDC-CERL). Engineering Analyses of the Chicago Sanitary and Ship Canal Electric Fish Barrier: Electrical Effects on Barges and Tow Vessels. May 2005.
USACE, ERDC-CERL. Engineering Analyses of the Chicago Sanitary and Ship Canal Electric Fish Barrier: Electrical Effects on Personnel in the Waster. February 2006
USACE, ERDC-CERL. 2011 In-Water Testing of Aquatic Nuisance Species Dispersal Barriers IIA and IIB with Increased Voltage and Frequency Operating Parameters. August 2011.
USACE, Chicago District. Summary of Safety Studies Completed at Chicago Sanitary and Ship Canal Dispersal Barrier IIA. December 2008.
USACE, ERDC-CERL. Dispersal Barrier IIA Electric Field Strength and Sparking Potential Testing. 24 October 2006.
USACE, ERDC-CERL. Dispersal Barrier IIA Sparking Potential and Electric Field Strength Testing to Determine the Optimal Operating Configuration. 11 June 2007.
USACE, ERDC-CERL. Demonstration Dispersal Barrier and Dispersal Barrier IIA Sparking Potential and Long Tow Testing to Determine Safety Considerations. 12 May 2008.
USACE, ERDC-CERL. Sept 2009 Electric Field Strength Analysis of the Chicago Sanitary and Ship Canal Electric Barrier System. January 2011.
U.S. Coast Guard Research and Development Center, CSSC Fish Barrier Simulated Rescuer Touch Point Results, Operating Guidance, and Recommendations for Rescuer Safety – Final Report. September 2011.
U.S Navy Experimental Diving Unit. Evaluation of Risk That Electric Fish Barriers Pose to Human Immersion in the Chicago Sanitary and Ship Canal. June 2008.
USACE, ERDC-CERL. 2012 In-Water Electrical Performance Testing of the Aquatic Nuisance Species Dispersal Barriers. March 2013.
Black & Veatch. Currents Investigation Final Report. September 2010.
Black & Veatch. TAR-24 – Safety Testing Final Report. May 2011.
Black & Veatch. Safety Testing Trip Report. June 2011.
Electric Power Research Institute. Phase 1 and Phase 2 Assessments of Magnetic Fields at the Chicago Sanitary Ship Canal Fish Barrier in Romeoville, IL. August 2013.
SSC Fish Barrier Simulat