Amendment 0004 to Solicitation W912P6-14-B-0011

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6641567706

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SUBJECT: W912P6-14-B-0011, "Permanent Barrier I Building"

CONTINUED ON NEXT PAGE

1. CONTRACT ID CODE PAGE OF PAGES

J 1 11

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Sep-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-14-B-0011

X 9B. DATED (SEE ITEM 11)

12-Aug-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Sep-2014

CODE

U. S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604-1437

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P6-14-B-0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

1. AMENDED PROJECT SPECIFICATION SECTIONS: Please see the list of USACE responses to Contractor Inquiries for more information on these amended specification sections:

a. Section 01 52 02 TEMPORARY CONSTRUCTION FACILITIES

i. Paragraph 1.4.2 additional language added (From Amendment0003)

b. Section 03 45 3

i. Paragraph 2.2.4.4 Acrylic Bonding Agent added

ii. Paragraph 3.9 Concrete Topping was revised

c. Section 03 20 00.10 CONCRETE REINFORCING

i. Paragraph 2.5 Wire Ties was revised

d. Section 21 22 00 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS

i. Edited paragraph 1.2.3, Performance Requirements, per contractor question.

ii. Edited paragraph 2.5, MANUAL ACTUATION STATION, per contractor question.

e. Section 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST

SYSTEMS

i. 3.2.6 Control and Security Room Exposed Ductwork: Deleted continuous welding requirement.

f. Section 23 08 00 COMMISSIONING OF HVAC SYSTEM

i. Commissioning of HVAC Systems, Deleted all LEED certification language.

g. Section 26 23 00 SWITCHBOARD AND SWITCHGEAR

i. Revised para 3.4 Foundation for Equipment Assemblies

h. Section 26 12 19.10 THREE PHASE PAD-MOUNTED TRANSFORMER

i. Added para 3.6 Foundation for Equipment Assemblies

i. Section 26 20 00 Interior Distribution System

i. Added para 2.3 Cable Trays

ii. Revised para 3.1.3 Wiring Methods

2. AMENDED PROJECT DRAWING SHEETS: Please see the list of USACE responses to Contractor Inquiries for more information on these amended drawing sections:

a. G-001-LOCATION AND VICINITY MAP

b. G-002-SHEET INDEX, LEGEND, ABBREVIATIONS AND GENERAL NOTES

c. S-304-STRUCTURAL SECTIONS SHEET 4

d. S-501-STRUCTURAL DETAILS SHEET 1

e. A-001-GENERAL NOTES, GUARDRAIL AND GRATING REQUIREMENTS

f. A-101-BUILDING FLOOR PLANS

g. A-103-FIRST FLOOR PLAN BAY 2-3 CONFERENCE-BRIEFING ROOM

h. A-106-FIRST FLOOR PLAN BAYS 12-13 13-14 14-15

i. A-107-SECOND FLOOR PLAN BAYS 1-2 2-3 3-4

j. A-302-TYPICAL SECTION BAY 4-5 5-6 6-7 7-8

k. A-307-TYPICAL PRODUCTION WING WALL SECTIONS SHEET 3

l. A-308-TYPICAL PRODUCTION WING WALL SECTIONS SHEET 1

m. A-502-ROOF DETAILS

n. M-001-MECHANICAL, HVAC, AND PIPING LEGEND

o. M-104-ADMINISTRATION WING FIRST FLOOR SUPPLY AIR DUCTWORK LAYOUT

p. M-105- ADMINISTRATION WING FIRST FLOOR EXHAUST AND RETURN AIR

DUCTWORK LAYOUT

q. M-305-HVAC SOUTH MECHANICAL ROOM LONGITUDINAL SECTIONS

r. M-603-MECHANICAL SCHEDULES

s. M-607-MECHANICAL SCHEDULES

t. E-113-ELECTRICAL UNDERGROUND PLAN

u. E-114-ELECTRICAL UNDERGROUND PLAN

v. FA-101-FIRE ALARM PROTECTION FIRST FLOOR PLAN

w. FA-102-FIRE ALARM PROTECTION SECOND FLOOR PLAN

x. FA-602-FIRE ALARM SYSTEM ONE LINE DIAGRAM

y. FP-101-FIRST FLOOR FIRE SUPPRESSION SYSTEM

z. FP-102-SECOND FLOOR FIRE SUPPRESSION SYSTEM

3. ADDED PROJECT DRAWING SHEETS: Please see the list of USACE responses to Contractor Inquiries for more information on these amended drawing sections:

a. A-111 - HOLLOW CORE PRECAST PLANKS PLANS

b. A-112 - ROOF PLANS BAY 2-3

c. S-001 - GENERAL NOTES STRUCTURAL

d. S-705 - GRATING PLAN SECTIONS AND DETAILS

e. R-003 - DELTABEAM REFERENCE SHEET

4. SECTION 00700 – DFAR CLAUSE 252.236-7001 has been revised to include an updated, comprehensive list of Project Drawing Sheets.

5. CONTRACTOR INQUIRIES: Enclosed in this amendment are the USACE responses to Contractor Inquiries. Please refer to these answers for more detailed information on the modified specifications and drawings listed above.

6. BID OPENING: The Bid Opening date and time remain unchanged at 17 September 2014 at 2:00PM CST.

7. POINT OF CONTACT: The POC for this amendment is Alex Heinzel at (312) 846-5368 or alex.heinzel@usace.army.mil.

(End of Summary of Changes)

Permanent Fish Barrier Building 1 Contractor Inquires

AMD 0004

1. Q: Building drawings typically include a roof plan to show extent of roofing materials, slopes, drains, special conditions and details. Will a roof plan be provided?

A: Per Amendment 0004, drawing sheet A-111 HOLLOW CORE PRECASTS PLANKS PLANS and A- 112 ROOF PLANS BAY 2-3 have been added to the set.

2. Q: Where are details indicating method of attaching the hollow core planks to the cast-in-place concrete beams?

A: Per Amendment 0004, drawing sheet S-502 has been revised to add connection details.

3. Q: Drawing S-201 – Where is design criteria for D-beam “sized and installed per mfr.”?

A: Per Amendment 0004, drawing sheet S-001 GENERAL NOTES STRUCTURAL has been added to the set and Specification Section 05 12 00 STRUCUTRAL STEEL, paragraph 2.8 D-BEAMS and paragraph

3.9 D-BEAM INSTALLATION have been added.

4. Q: Will railings be required at balconies and if so, where are they detailed?

A: Yes, per Amendment 0004 drawing Sheet A-001 GENERAL NOTES and Sheet A-101 BUILDING FLOOR PLANS have been revised. Also see Specification Section 6 82 14 FIBERGLASS REINFORCED

PLASTIC (FRP) PIPE AND TUBE RAILINGS.

5. Q: Where are ceilings specified?

A: The ceilings are constructed from steel studs and drywall. Please see Specification Sections 05 40 00

COLD-FORMED METAL FRAMING, 09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD,

and 09 29 00 GYPSUM BOARD.

6. Q: Drawing A-108 - where are details for grating supports and railings?

A: Per Amendment 0004, drawing sheet S-705 GRATING PLAN SECTIONS AND DETAILS has been added to the set. Drawing sheet A-001 GENERAL NOTES has also been updated.

7. Q: The window manufacturers are requesting the following information:

a. Blast Criteria

b. Charge Weight

c. Stand-Off Distance

A: Per Amendment 0004, drawing sheet A-001 GENERAL NOTES has been revised to show the window requirements.

a. UFC 04-010-01

b. 55 lbs

c. 10 ft.

8. Q: Please provide an Interior Partition Wall Schedule with Details on Wall Types.

A: Per Amendment 0004, drawing sheet A-001 GENERAL NOTES has been revised to state all Interior Walls are Steel Studs with 5/8” High Impact Drywall unless otherwise indicated as CMU or Concrete.

9. Q: Please provide a Plan View/Roof Plan along with any information on roof drains gutters, and downspouts systems that may be required.

A: There are no roof drains, the roofs slope to drain. See Sheet A-111 HOLLOW CORE PRECAST PLANKS PLANS for a roof plan.

10. Q: On the West side of the building between column lines 8 and 9, on sheet S-101, a wall is shown. It appears that there is no detail or section in the structural or architectural drawings that show this wall.

Please clarify.

A: Please refer to the CONCRETE WALL SCHEDULE on Sheet S-601 STRUCTURAL SCHEDULES for wall detail information.

11. Q: Sheet A-107 indicates lockers in rooms A205 and A206:

a. Please provide a section view of these lockers

b. Please provide a locker specifications on the lockers required

A: Lockers are not part of this contract. They have been deleted from the drawing sheet A-107.

12. Q: Detail B/A-301 shows a wood truss ceiling structure above the second floor washrooms. What are the limits of the wood truss area? Which areas require drywall finish? Please provide more detail.

A: They run the extent of the Utility Loft; please see Sheet A-101 BUILDING FLOOR PLANS view UTILITY LOFT PLAN for floor area.

13. Q: Details A, B, C & D/A-301 shows some type of ceiling beneath the precast plank roof, please provide more detail.

A: The ceilings are constructed from steel studs and drywall. Please see Specification Sections 05 40 00

COLD-FORMED METAL FRAMING, 09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD,

and 09 29 00 GYPSUM BOARD.

14. Q: More information on material, sizes and detail is needed for the support system of the fiberglass grating.

A: Per Amendment 0004, please see drawing sheet S-705 GRATING PLAN SECTIONS AND DETAILS, which has been added to the set.

15. Q: Specifications 21 22 00, section 1.2.3, “Performance requirement” paragraph 4 “Main System” indicates to provide a “Keyed override operations” switch. However, Bid drawings FP-101 or FP-102 do NOT identify this switch. Is a “Keyed override operations” switch required for each clean agent system?

A: Per Amendment 0004, keyed override operations will not be required and has been removed from the specification section 21 22 00 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS.

16. Q: Specifications 21 22 00, section 1.2.3, “Performance requirement” paragraph 5 “Performance of system shall be crossed zoned for each zone that will have clean agent suppression.” The specification does not provide a sequence of operation. It does not indicate if a pre-discharged time delay is required. Please provide a sequence of operation for the clean agent systems as indicated on bid drawings FP-101 and FP- 102.

A: Please refer to drawing sheet FA-601 for the sequence of operations. Per Amendment 0004, specification section 21 22 00 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS has been revised to state a 30 second timer for discharge should be provided.

17. Q: Specifications 21 22 00, section 2.3 “RELEASING PANEL (CACP)” does not indicate an addressable or conventional type panel, however; section 2.5 “MANUAL ACTUATION STATION”, mentions to use an addressable clean agent manual actuation station. Is an addressable control panel to be assumed?

A: Yes, the panel will be addressable. Please refer to specification section 28 31 64 FIRE DETECTION

AND ALRAM SYSTEM, ADDRESSABLEY.

18. Q: Specifications 21 22 00, section 2.5 “MANUAL ACTUATION STATION” indicates to provide an Addressable clean agent manual actuation station, surface mounted finished in ORANGE. Under specification section 21 22 00, section 1.2.1 “Description of work”, indicates that “Devices and equipment for fire protection service shall be of a make and type listed by the Underwriter’s Laboratories, Inc.”.

Although the ORANGE colored station may bare a UL label for fire service it is NOT listed in the “DEVICE COMPATIBILITY DOCUMENT” published by any of the Clean Agent System manufacturers and if fails may void the manufacturer’s warranty. Could we provide an STI pull station cover with an ORANGE banner identified with “CLEAN AGENT SYSTEM” with alarm horn upon opening cover be provided in lieu of the ORANGE pull station?

A: Per Amendment 0004, specification section 21 22 00 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS, para 2.5 has been revised to match the other Fish Barrier buildings’ clean agent actuation station where the cover will be yellow and the pull station will be red.

19. Q: Specifications 21 22 00, section 2.6 through 2.6.2.1 “FIRE DETECTION DEVICES”- NO Detection devices are shown on bid drawings FP-101 and FP-102. Should these sections be disregarded and eliminated from section 1.3 Submittals?

A: Please refer to drawing sheet FA-602 which shows the intent of how the initiating devices are to be connected to the CACP and the FACP.

20. Q: Specifications 21 22 00, section 2.7 “ALARM SIGNALING DEVICES” indicates to provide “a separate and distinct audible and visual pre-discharge alarm” which are identified on the bid drawings FP- 101 & FP-102 as “Clean Agent System Audible Alarm Bell” and Clean Agent system visual Alarm Strobe”. What is the sequence for these devices?

A: Please refer to drawing sheet FA-601 shows the sequence of operation.

21. Q: Specifications 21 22 00, section 2.7.3 “Combination Audible/visual notification Appliances” are indicated in the specifications and not on the FP-101 and FP-102 bid drawings. Should item 2.7.3 be disregarded or be provided in lieu of item 2.7.1 and 2.7.2?

A: Per specification section 21 22 00 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS, the combination notification can be provided in lieu of the audible and visual alarms.

22. Q: Bid drawing FA-602 “Fire Alarm System One Line Diagram” indicates that the heat detectors installed within the clean agent protected spaces be wired directly to the CACP panels, however; the FP-101 and FP- 102 drawings do NOT show smoke or heat detection wired directly to the CACP. Please clarify the detection wiring.

A: Please follow FA-602 as it shows what devices are connected to the clean agent control panels.

23. Q: Bid drawing FA-602 “Fire Alarm System One Line Diagram” indicates 13 devices indicated by a box (�) with the letter “R” in it. This symbol does NOT appear on any of the Fire Protection Legend list. Please indicate the device and its use.

A: Per Amendment 0004, drawing sheet FA-602 has been revised to show the device as a releasing circuit to release the clean agent.

24. Q: Bid drawing FA-602 “Fire Alarm System One Line Diagram” indicates devices indicated by a box (�) with the letters “ADT” in it. This symbol does NOT appear on any of the Fire Protection Legend list.

Please indicate the device and its use.

A: Please refer to specification section 28 31 64 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLEY, para 2.10 which states the device is ADT radio transmitter. The drawing sheet FA- 602 has also been revised, per Amendment 0004, to better clarify the requirements.

25. Q: Bid drawing FA-602 “Fire Alarm System One Line Diagram” indicates devices indicated by a box (�) with the letters “TVSS” in it. This symbol does NOT appear on any of the Fire Protection Legend list.

Please indicate the device and its use.

A: Per Amendment 0004, drawing sheet FA-602 legend has been revised to show the Transient Voltage Surge Suppression (TVSS) device.

26. Q: Please verify the scope of commissioning as there appear to be conflicting requirements. There is only a commissioning specification for HVAC. However, in the commissioning specification it states "Formal LEED NC certification is not required; however, the Contractor is required to provide documentation that meets the LEED NC Energy & Atmosphere (EA) Prerequisite 1, Fundamental Commissioning. For New Construction and Major Revisions provide, also, documentation that meets EA Credit 3; Enhanced Commissioning." LEED commissioning does require commissioning of the HVAC, lighting control, and domestic hot water. Please advise whether we are to include commissioning of the HVAC only, or to also include lighting control and domestic hot water.

A: Per Amendment 0004, specification section 23 08 00 COMMISSIONING OF HVAC SYSTEMS has been revised by deleting all LEED certification language.

27. Q: With the volume of information just released as Amendment 0002 and still many unanswered RFI’s; is there consideration to extending the bid date? Contractors need sufficient time to review and distribute information. Subcontractors need time to review and solicit pricing from vendors. We urge the USACE to consider extending the bid date to allow sufficient time address open RFI’s and for contractors a reasonable amount of time to react to the new information.

A: As issued in Amendment 0003, the bid date was revised to September 17, 2014.

28. Q: Please advise where wall types are called out. Need to determine wall dimensions, stud gauge, gypsum board type & thickness, insulation, fire rating etc. for every wall.

A: There are no fire rated stud partitions. Please See Sheet A-001 GENERAL NOTES, INTERIOR STUD

WALL PARTITION REQUIREMENTS.

29. Q: The Masonry Specification 04 20 00 specifies Architectural Units in paragraph 2.2.2.1 as having a burnished face. However, Architectural Units are not identified on the plan. Is Architectural CMU with a burnished face intended as the exterior masonry product?

A: An Architectural CMU is required for exterior masonry elevations. Please see Specification Section 04 20 00 paragraph 2.2.2 of Amendment 0003. Also please see Sheets A-301 TYPICAL SECTIONS BAYS 1-2 2-3 3-4, A-302 TYPICAL SECTION BAYS 4-5 5-6 6-7 7-8, A-303 TYPICAL SECTION BAYS 8-9 9-10 10-11 11-12, and A-304 TYPICAL SECTION BAYS 12-13 13-14 14-15.

30. Q: Some interior walls appear to be exposed masonry, are Architectural Unit intended for these locations.

A: Yes. Please see Specification Section 04 20 00 paragraph 2.2.2 of Amendment 0003. Also please see Sheets A-301 TYPICAL SECTIONS BAYS 1-2 2-3 3-4, A-302 TYPICAL SECTION BAYS 4-5 5-6 6-7 7-8, A-303 TYPICAL SECTION BAYS 8-9 9-10 10-11 11-12, and A-304 TYPICAL SECTION BAYS 12-13 13-14 14-15.

31. Q: Are exposed masonry walls to be painted? This question applies to both interior and exterior.

A: No, they have an architectural finish, please see specification section 04 20 00 MASONRY.

32. Q: Resinous Flooring Specification 09 67 23.13 was added per Amendment 0002. Where is this product to be installed?

A: Please see Sheets A-301 TYPICAL SECTIONS BAYS 1-2 2-3 3-4, A-302 TYPICAL SECTION BAYS 4-5 5-6 6-7 7-8, A-303 TYPICAL SECTION BAYS 8-9 9-10 10-11 11-12, and A-304 TYPICAL SECTION BAYS 12-13 13-14 14-15. Please also see Sheet A-001 GENERAL NOTES, RESINOUS FLOOR REQUIREMENTS notes.

33. Q: Access Floor specification 09 69 13 was added per Amendment 0002. Where is this product to be installed?

A: Please see Sheets A-301 TYPICAL SECTIONS BAYS 1-2 2-3 3-4, A-302 TYPICAL SECTION BAYS 4-5 5-6 6-7 7-8, A-303 TYPICAL SECTION BAYS 8-9 9-10 10-11 11-12, and A-304 TYPICAL

SECTION BAYS 12-13 13-14 14-15.

34. Q: Are the use of explosives permissible on this site for rock excavation?

A: Explosives shall not be utilized per EM385-1-1, Section 29.

35. Q: Section 31 60 00 for foundation preparation discusses preparation of the bedrock surface and use of dental mortar. Is it the designer's intention to excavate all existing overburden to the bedrock, perform "preliminary cleanup,” and dental mortar prior to placement of aggregate base course beneath the mat foundation of the building? If this is the case, will the Government consider the use of an allowance to compensate the Contractor for preliminary cleanup and dental mortar work directed by the COR since this is an unknown condition?

A: The preparation of the site was performed under a separate contract.

36. Q: The Government COR/QA at the Fish Barrier site currently utilizes offsite warehouse and office space for their personnel, but the drawings indicate that the Contractor should provide field trailer(s) for the Government. Please advise if the Contractor should include the cost of office space for the Government on this project.

A: The contractor shall provide costs for the field trailer per specification section 01 52 02 TEMPORARY CONSTRUCTION FACILITIES. The cost for the existing USACE offsite office/warehouse should not be included in those costs.

37. Q: What is the minimum conduit size on this project?

A: A minimum of ¾”C per specification section 26 20 00 Interior Distribution, para 3.1.3.

38. Q: There is no conduit information on the telecom drawings. Please clarify the design criteria so we can size the conduit and needed or is the system to be based on conduit stubs with the cable being run open in the ceiling?

A: Please see the notes provided on the telecom drawing sheets. The notes state ¾” minimum from outlet back to tray or junction/pull box. There are no open runs. All conduit is rigid metallic conduit.

39. Q: Is any type of reinforcing required in the 2” lightweight concrete topping on the roof and second floor?

A: Topping for both the Roof Planks and the Floor planks will be normal weight concrete reinforced with Welded Wire Fabric. Please see Sheet A-502 ROOF DETAILS and Specification Section 03 45 3 paragraph 3.9 CONCRETE TOPPING. Also See Sheet A-111 HOLLOW CORE PRECAST PLANKS

PLANS.

40. Q: How will the topping on the roof be bonded to the precast plank?

A: With an Acrylic Bonding Agent. Please see Sheet A-502 ROOF DETAILS and Specification Section 03 45 3 paragraph s.s.4.4 Acrylic Bonding Agent. Also See Sheet A-111 HOLLOW CORE PRECAST

PLANKS PLANS.

41. Q: Are housekeeping/equipment pads required for mechanical and electrical equipment. None are shown on the drawings.

A: Per Amendment 0004, drawing sheet M-001 has been revised to show a note regarding the housekeeping pads.

42. Q: Is Railroad Protective Insurance required?

A: Per specification section 01 10 00 GENERAL PROVISIONS, para 1.11, Burlington Northern & Santa Fe Railroad Company of Romeoville shall be an additional interest insured.

43. Q: In Amendment 0002, in response to an RFI it was stated that the contractor is responsible for setting grades on the ComEd electrical distribution manholes. Would the contractor then also be required to develop engineering drawings, i.e. Plan & Profiles for ComEd and Corps review/approval?

A: The construction of the ductbank shall be documented in the As-Built drawings provided by contractor per specification section 01 78 00 CLOSEOUT SUBMITTALS. In addition, the contractor will have to work with ComEd to obtain engineering approval and is responsible for providing all information ComEd will need to see before construction starts to verify the design meets their standards. ComEd standards require underground duct runs to have specific grade and cover requirements implying they will likely require detailed plans and profiles.

44. Q: Revised Drawing C-108 issued via Amendment 0002 shows what appears to be pavement striping where curb and gutter was shown previously. Please verify if this is correct or advise otherwise.

A: Correct. In Amendment 0002, the middle curbed island was removed and pavement striping was added.

45. Q: Revised Drawing C-107 issued via Amendment 0002 and RFI response #12 states the relocated fence is shown. It is unclear whether the fence has already been relocated or if relocation is part of this contract, please advise.

A: As issued in Amendment 0003, a note was added to Sheet C-107 to state the alignment shown is the proposed relocated location.

46. Q: Precast hollow core concrete plank bidders for this project are telling us the drawings lack sufficient information to bid this element. They need a 2nd floor framing layout of the hollow core planking and there limits, span direction, sections that show what supports hollow core panels and how they attach to structure, required floor loading, do they receive a topping slab, is topping slab structural or non-composite, are there any floor openings required? They also need a roof framing plan with the same information. They cannot bid the precast without this critical information.

A: Per Amendment 0004, drawing sheet A-111 HOLLOW CORE PRECASTS PLANKS PLANS has been added to the set.

47. Q: Please confirm polyiso thermal wall insulation shown on wall sections and provide specification. Does this apply to all exterior walls?

A: Yes, it does, and it shall conform to the requirements of Specification 07 22 00 ROOF AND DECK INSULATION paragraph 2.2.2 Insulation Types.

48. Q: What is the specification for acoustic ceilings and where does it apply?

A: There are no acoustic ceilings in this project. All the ceilings are constructed from steel studs and drywall.

49. Q: Column line 1 elevation / S-203 references further details for the elevated slabs, but does not specify the support walls. This is typical throughout sheets S-203 through S-207. Where is the information for the support walls?

A: See the CONCRETE WALL SCHEDULE on Sheet S-601 STRUCTURAL SCHEDULES for wall detail information.

50. Q: The foundation plan / S-101 show walls on the plan, that are not shown in the column line frame elevations. What is correct?

A: They are not considered part of the primary support frame. Please see the CONCRETE WALL SCHEDULE on Sheet S-601 STRUCTURAL SCHEDULES for wall detail information.

51. Q: Section 2 / S-304 does not specify the reinforcing for these stairs, or the landing slabs.

A: Per Amendment 0004, reinforcing notes have been added to Sheet S-304 STRUCTURAL SECTIONS SHEET 4 in Section 2- 207/304.

52. Q: Specification section 23 00 00 3.2.6 declares all ductwork to be continuously welded 1 ga. 304L or 316L in exposed areas. This job consists of mainly exposed duct, most of which is round. This will cost significantly more if this is the actual intent. The drawings have only the control room ductwork tagged as stainless steel and does not state it is to be welded.

A: By way of Amendment 0004, specification section 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS, para 3.2.6 has been revised by deleting the continuous welding requirement.

53. Q: Spec section 01 52 02 Temporary Construction Facilities paragraph 1.4.2 has been revised, but the revision is missing from the addendum. Can you please get the missing paragraph clarified, as this deals with the connection of the permanent power.

A: Specification section 01 52 02 TEMPORARY CONSTRUCTION FACILITIES has been provided in Amendment 0004.

54. Q: States there is not any furniture included in the contract. Note 2 on drawing T102 states to make furniture connections for Voice / Data connections; can we assume that this note can be disregarded?

A: Yes, please disregard since furniture will be awarded under a separate contract.

55. Q: Removed note to include inspection well at the hand holes on revised sheet E113, but it still remains on the revised sheet E114. Can we assume the note to include the inspection well has been removed on E114, as it has been on E113?

A: Per Amendment 0004, the note to include inspection wells on sheet E-114 has been removed.

56. Q: It appears that there are flow transducers, electric actuators, proportional control valves, temperature transmitters, and pressure transducers that the Government wants included in the electrical bid item 0006 and mechanical bid item 0007; however, these items do not appear on the electrical drawings. Please clarify.

A: Please refer to drawing sheet M600 sheets for the mechanical schedules.

57. Q: Is the raised floor just in the server room on the first floor, where the cable tray is installed, and then the cable tray transitions up the server room wall to above the ceiling in the conference room? It also appears that there is a false floor on the second floor “File and Cubicle Room A208, A201, and A202 Control and Security room” where the cable tray is installed under the raised floor. Please confirm.

A: Yes, there is a raised floor on the second floor. It is the same type as in the server room except in the bathrooms, utility room and break room, which is just a wood lagging "false floor".

58. Please provide a detail and section for fiberglass upper utility walkway. There is no information on framing/support requirements beneath the surface.

A: Per Amendment 0004, drawing sheet S-705 GRATING PLAN SECTIONS AND DETAILS has been added to the set.

59. Q: There is reference to an overhead crane on the drawings. Will a specification section for Overhead crane be issued for this project bid documents?

A: Per Amendment 0004, drawing sheets A-001 GENERAL NOTES, BRIDGE CRANE REQUIREMENTS and S-501 STRUCTURAL DETAILS SHEET 1 Detail 1-A302/S501 have been revised.

60. Q: Bridge Crane Rail Supports are referenced on Sheet A-104. Please advise if the crane is included in the current project scope of work and /or how the structural composition of the building would be coordinated along with the electrical. Specifications are needed for this crane system.

A: Per Amendment 0004, drawing sheets A-001 GENERAL NOTES, BRIDGE CRANE REQUIREMENTS and S-501 STRUCTURAL DETAILS SHEET 1 Detail 1-A302/S501 have been revised.