GROUT II Amd 0003 W912P6-09-R-0006 .pdf
PDF 92 KB Posted
- Solicitation number
- W912P6-09-R-0006
About this file
GROUT II AMENDMENT 0003
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6690139627
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SUBJECT: REQUEST FOR PROPOSAL NUMBER W912P6-09-R-0006, CONTRACT FOR CONSTRUCTION SERVICES IN SUPPORT OF GROUT II CUP McCOOK RESERVOIR PROJECT
The government is issuing this Amendment Number 0003 to its previously issued Solicitation W912P6-09-R-0006 for the purpose of amending various areas of the Solicitation Package as delineated on the follow ing pages of this Amendment.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 43
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Aug-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-09-R-0006
X 9B. DATED (SEE ITEM 11)
06-Jul-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Aug-2009
CODE
U. S. ARMY ENGINEER DISTRICT, CHICAGO
111 NORTH CANAL STREET SUITE 600
CHICAGO IL 60606-7206
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P6-09-R-0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
A. SECTION 00010 - SOLICITATION CONTRACT FORM
The following line items have been revised. A revised Bid Schedule is enclosed herein and replaces the entire Bid Schedule that was previously issued. Therefore, offerors shall enter their bid prices on the Bid Schedule included hereunder to be considered responsive and eligible for award of the resultant Contract. The Bid Schedule must be fully completed, with no exceptions.
SUBCLIN 0009AA
The CLIN description has changed from Initial 72 LF to Initial 72 EA.
SUBCLIN 0009AB
The CLIN description has changed from Over 72 LF to Over 72 EA.
B. CONTRACTORS QUESTIONS AND RESPONSES
QUESTION 1. Item No. 0009AA and 0009AB in Section 00010 indicate “Initial 72 LF” and “Over 72 LF”, respectively for their descriptions. However, the units are “Each”. Confirm that the “Each” unit is correct and the description is in error.
RESPONSE 1: The Bid schedule has been amended to replace “LF” with “Each” for Item No. 0009AA and 0009AB.
QUESTION 2. Small Business Subcontracting Plan – Are material suppliers considered subcontractors for Small Business Subcontracting Plans?
RESPONSE 2: Material suppliers are not responsible for providing Small Business Subcontracting Plans; the successful (winning offeror) Prime Contractor, permitting its business size is large, will be responsible for providing a Plan in accordance with the requirements called out in FAR Clause 52.219-9 of the RFP. The Plan must be approved prior to the award of the contract. Note that “principal products,” as supplied by Material Suppliers, are counted towards subcontracting dollars. For more information regarding small business subcontracting plans, the contractor shall view FAR Clause 52.219-9.
QUESTION 3. Are the SDB, WOSB, SDVOSB, VOSB, and HUBZone SB percentages (26.9% additive) in addition to the 70% goal or part of it? In other words, is the total small business subcontracting goal 70% or 96.9%?
RESPONSE 3: No; the contractor will be responsible for allocating at least 70% of its intended “subcontracting dollars” to Small Businesses; of that 70%, it should allocate at least 6.2% of those dollars towards satisfying the goal for SDB’s, etc., etc.. Refer to Section 00100 of the RFP for more details.
QUESTION 4. Can a single subcontractor be used and counted in multiple categories. For example, if we subcontract 9.8% of our subcontracts to a HUBZone SB, does that also count for the 3% VOSB and 0.9% SDVOSB if they qualify in all three categories?
RESPONSE 4: Using your example, if you subcontract out 9.8% of your total subcontract dollars to a certified HubZone Small Business, and this HubZone Small Business also qualifies as VOSB and SDVOSB, yes you can count these subcontract dollars in each of the small business subcategories. Your small business subcontracting dollars would reflect the following: HubZone Small Business 9.8%, VOSB 9.8% and SDVOSB 9.8%.
Note that you would exceed USACE’s 3% VOSB and 0.9% SDVOSB Target Goals.
QUESTION 5. Work Platform – In order to increase the size of the work platform, how much lower can the concrete work platform be lowered along the alignment? If it is permissible to lower the platform, does it have to be restored at the conclusion of the contract?
RESPONSE 5: No, the work platform should be constructed at the elevation of the existing grade. This is done to maintain the 3 foot CLSM cap above the existing cutoff wall.
QUESTION 6. Sheet C-12 – The limits for the slope stabilization are unclear. Provide a detailed cross-section that shows the top and bottom of the stabilization limits with respect to the centerline.
RESPONSE 6: The information shown on the drawings is the most current available information at this time. The area of slope stabilization shown should be used for bidding purposes. A detail showing the stabilization cross-section has been provided on the drawings.
QUESTION 7. Is the existing 14’ tunnel dry or filled with water?
RESPONSE 7: No additional information is known beyond what has been stated in the Existing Conditions Specification Section 00 31 19.01 03.
QUESTION 8. Are there AutoCAD or other computer aided drafting files of the project plans available for our use?
RESPONSE 8: No.
QUESTION 9. The reference material, as outlined in Section 00 31 32.13 03, page 3, which was supposed to have been made available on the ftp link (that was provided in Amendment 1 page 5 of 46, question 9) does not contain this information. Also, the CD provided by the Corps is missing Report b. Black & Veatch Corp., McCook Reservoir Grout Test Project, Lessons Learned Report, dated 2004).
RESPONSE 9: The ftp site automatically removes posted information after 14 days.
Referenced documents have been re-posted to the site and will be available until the proposal due date.
QUESTION 10. The grouting platform at stations 42+00 to 44+00 will be constructed upslope of a gabion wall currently under construction. Please provide the maximum load capacity of the platform along the grout curtain alignment above the gabion wall.
RESPONSE 10: Maximum load capacity has not been calculated. Historical Sheet Pile drawings have been supplied as part of Amendment 0002 Question and Answers Section. This section of the berm has supported significant equipment loads including:
earth moving and drilling equipment, sludge transportation trains, and material conveyor systems without observed distress.
QUESTION 11. …requesting the grouting data that has been recorded to date for the Contract Award Number W912P6-06-C-0009 CUP McCook Reservoir Stage I Grout Curtain project by Nicholson Construction Company.
RESPONSE 11: Final Stage I Grout Curtain data available at this time has been added to the ftp site reference materials in folder titled “McCook Stage II Grout References A-K” in sub folder “Supplemental Info Stage I”.
Section 00010 - Solicitation Contract Form
REVISED BID SCHEDULE AMENDMENT 0003
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lump Sum Mobilization and Demobilization
FIRM-FIXED-PRICE (FFP)
PURCHASE REQUEST NUMBER: W81G6690139627
NET AMT
0002 1 Lump Sum Project Signs
FFP
0003 1 Lump Sum Performance and Payment Bonds
(Line Items 0001, 0002 and 0004 Through 0022) THIS IS A COST REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payment bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.
Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.
NOT TO EXCEED
0004 1 Lump Sum Work Platform
0005 1 Lump Sum Automated Grouting Control & Data
Collection (Setup & Calibration)
0006 24 Months Automated Grouting Control & Data
Collection (Operation)
ITEM NO SUPPLIES/SERVICES
Drilling Overburden
This is an informational item; Offerors shall provide their pricing at the associated SUBCLINs for this Item No.
0007AA 74,100 Linear
Foot
Initial 74,100 LF
0007AB 49,400 Linear
Over 74,100 LF
Drilling Rock
0008AA 203,500 Linear
Initial 203,500 LF
0008AB 135,600 Linear
Over 203,500 LF
Additional Hole Setups
0009AA 72 Each Initial 72 EA
0009AB 56 Each Over 72 EA
Borehole Deviation Survey
0010AA 180 Each Initial 180 LF
0010AB 140 Each Over 180 LF
Bolehole Camera Log
0011AA 11,200 Linear
Initial 11,200 LF
0011AB 5,600 Linear
Over 11,200
Pressure Washing
0012AA 1,700 Hours Initial 1,700 Hrs
0012AB 850 Hours Over 1,700 Hrs
Pressure Testing
0013AA 860 Hours Initial 860
0013AB 430 Hours Over 860 Hrs
Type II Cement Grout
0014AA 3,825,000 Pound Initial 3,825,000 Pounds
0014AB 1,912,500 Pound Over 3,825,000 Pounds
Bentonite in Grout
0015AA 267,750 Pound Initial 267,750 Pounds
0015AB 133,875 Pound Over 267,750 Pounds
Admixtures in Grout
0016AA 188,000 Pound Initial 188,000 Pounds
0016AB 94,000 Pound Over 188,000 Pounds
Sand in Grout
0017AA 5,000 Pound Initial 5,000 Pounds
0017AB 5,000 Pound Over 5,000 Pounds
Grout Hole Connections
0018AA 2,648 Each Initial 2,648 EA
0018AB 1,324 Each Over 2,648 EA
Placing Grout
0019AA 6,800 Hours Initial 6,800 Hrs
0019AB 3,400 Hours Over 3,400 Hrs
Standby Time
0020AA 270 Hours Initial 270 Hrs
0020AB 400 Hours Over 270 Hrs
Verification Holes
0021AA 5,400 Linear
Initial 5,400 LF
0021AB 4,200 Linear
Over 5,400 LF
0022 1 Lump Sum Concrete Tunnel Plug
0023 1 Lump Sum OPTION Performance and Payment Bonds
(Line Items 0024 Through 0040) THIS IS A COST REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payment bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.
0024 1 Lump Sum OPTION Work Platform
0025 12 Months OPTION Automated Grouting Control & Data
Collection (Operation)
OPTION Drilling Overburden
0026AA 17,000 Linear
OPTION Initial 17,000 LF
0026AB 12,000 Linear
OPTION Over 17,000 LF
OPTION Drilling Rock
0027AA 47,700 Linear
OPTION Initial 47,700 LF
0027AB 31,800 Linear
OPTION Over 47,700 LF
OPTION Additional Hole Setup
0028AA 18 Each OPTION Initial 18 EA
0028AB 14 Each OPTION Over 14 EA
OPTION Borehole Deviation Survey
0029AA 46 Each OPTION Initial 46 EA
0029AB 36 Each OPTION Over EA
OPTION Borehole Camera Log
0030AA 2,620 Linear
OPTION Initial 2,620 LF
0030AB 1,310 Linear
OPTION Over 2,620 LF
OPTION Pressure Washing
0031AA 460 Hours OPTION Initial 460 Hrs
0031AB 230 Hours OPTION Over 460 Hrs
OPTION Pressure Testing
0032AA 200 Hours OPTION Initial 200 Hrs
0032AB 100 Hours OPTION Over 200 Hrs
OPTION Type II Cement In Grout
0033AA 900,000 Pound OPTION Initial 900,000 Pounds
0033AB 450,000 Pound OPTION Over 900,000 Pounds
OPTION Bentonite In Grout
0034AA 63,000 Pound OPTION Initial 63,000 Pounds
0034AB 31,500 Pound OPTION Over 63,000 Pounds
OPTION Admixtures In Grout
0035AA 44,000 Pound OPTION Initial 44,000 Pounds
0035AB 22,000 Pound OPTION Over 44,000 Pounds
OPTION Sand In Grout
0036AA 5,000 Pound OPTION Initial 5,000 Pounds
0036AB 5,000 Pound OPTION Over 5,000 Pounds
OPTION Grout Hole Connections
0037AA 620 Each OPTION Initial 620 EA
0037AB 310 Each OPTION Over 620 EA
OPTION Placing In Grout
0038AA 1,590 Hours OPTION Initial 1,590 Hrs
0038AB 795 Hours OPTION Over 1,590 Hrs
OPTION Standby Time
0039AA 140 Hours OPTION Initial 140 Hrs
0039AB 200 Hours OPTION Over 140 Hrs
OPTION Verification Holes
0040AA 2,700 Linear
OPTION Initial 2,700 LF
0040AB 2,100 Linear
OPTION Over 2,700
0041 1 Lump Sum OPTION Option 2 Performance and Payment Bonds
(Line Items 0041 Though 0045) THIS IS A COST REIMBURSABLE LINE ITEM - The Government will reimburse the Contractor for the actual cost of acceptable performance and payment bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.
0042 1 Lump Sum OPTION Option 2 Webcams
OPTION Option 2 Grading and Slope Construction
0043AA 6,000 Cubic
Yard
OPTION Initial Quantity 6,000 Cubic Yards
0043AB 2,000 Cubic
OPTION Over Quantity 6,000 Cubic Yard
Option 2 Geotextile Fabric
0044AA 36,000 Square
OPTION Initial Quantity 36,000 Square Yards
0044AB 3,000 Square
OPTION Over Quantity 36,000 Square Yards
Option 2 Riprap
0045AA 17,200 Net Ton
(2,000 LB)
OPTION Initial Quantity 17,200 Tons
0045AB 4,300 Net Ton
(2,000 LB)
OPTION Over Quantity 17,200 Tons
TOTAL PROPOSED PRICE (ITEMS 0001 THROUGH 0045AB): $___________
EVALUATION OF OPTION ITEMS:
The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
EXERCISE OF OPTION ITEMS:
OPTION 1 WORK: At the government's discretion, the Items under “Option 1 Work” may be exercised within 540 calendar days following the contractor’s acknowledgement of the Notice to Proceed letter. If any option is exercised, it will be awarded by way of a formal Modification to the Contract. Under the Modification, the period of performance would be extended by 360 calendar days.
OPTION 2 WORK: At the government's discretion, any or all of the Items under “Option 2 Work” may be exercised no later than 825 calendar days following the award of the Base Work within 540 calendar days following the contractor’s acknowledgement of the Notice to Proceed letter. The Contractor will have a performance period of 70 calendar days to execute the work under Option 2 Work once acknowledging the Notice to Proceed. Options that are exercised will be awarded by way of a formal Modification.