Quote Schedule_Rev 18 May 2026.docx

DOCX document 14 KB Posted

Attached to
Motor Vessel SAMA Aluminum Hull Repair, Electrical Upgrades, and Vessel Improvements
Solicitation number
W912P526Q1BKG
Issued by

About this file

This is a Quote Schedule template for the U.S. Army Corps of Engineers (USACE) Motor Vessel SAMA Aluminum Hull Repair, Electrical Upgrades, and Vessel Improvements solicitation (W912P526Q1BKG). The schedule itemizes cost line items for contractors to complete pricing for the following work: aluminum hull structural repairs, surface preparation using aluminum-safe methods, hull coating system application, captain's chair removal and replacement, 7,000W pure sine wave inverter installation, electrical panel upgrade, and electrical system testing and acceptance. Contractors must provide pricing for each line item, with a total contract price field for the complete scope of work.

Quote submission is required by Thursday, 21 May 2026 at 1:00 PM Central Time via email to Jamie Lynn Barnes (Contract Specialist) at Jamie.L.Barnes@usace.army.mil and Alison T. Abernathy (Contracting Officer) at alison.t.abernathy@usace.army.mil. Questions regarding the solicitation must be submitted by Thursday, 16 April 2026 at 2:00 PM to the same contacts. The solicitation has been amended twice, with Amendment 0002 extending the quote deadline to 21 May 2026, revising the Performance Work Statement to remove marine radio and speaker installation requirements, clarifying coating system specifications, and updating wage determinations. The work involves repairs and upgrades to a USACE floating plant vessel operating in freshwater environments.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USACE Floating Plant – M/V SAMA Aluminum Hull Repair, Electrical Upgrades, and Vessel Improvements Quote Schedule

Aluminum Hull Structural Repairs Amount: $ _______________ Surface Preparation (aluminum-safe methods) Amount: $ _______________ Coating System – Hull Amount: $ _______________ Captain’s Chair – Remove and Replace Amount: $ _______________ Inverter Installation – 7,000W Pure Sine Wave Amount: $ _______________ Electrical Panel Upgrade Amount: $ _______________ Electrical System Testing and Acceptance Amount: $_______________

Total Contract Price: $____________________

File details come from the government source that posted it. Updated .