W912P525RA001 Amendment 0003 Changes_Updated 28MAR2025.pdf

PDF 141 KB Posted

Attached to
Chickamauga Lock Replacement Approach Wall and Decommissioning Federal contract opportunity
Solicitation number
W912P525RA001
Issued by
Department of the Army Corps of Engineers Engineering District Nashville

About this file

This document is Amendment 0003 for the Chickamauga Lock Approach Wall and Decommissioning contract (W912P525RA001), issued by the U.S. Army Corps of Engineers Nashville District. The amendment includes comprehensive updates to technical specifications across multiple sections, contract drawings, and contract line items. Key changes involve revisions to sections related to concrete materials, placement requirements, excavation, approach wall piers, and installation of government-furnished precast concrete beams. The price breakout schedule was updated with corrected quantities for steel setting piles and downstream approach wall pier guide pipe pile rock sockets for both base contract and optional work.

The amendment also modifies Federal Acquisition Regulation (FAR) clauses, removing several standard provisions and adding updated versions with class deviations. Significant changes include updating Annual Representations and Certifications, removing equal opportunity and affirmative action clauses, and revising provisions related to subcontracts and apprentices. Additionally, contract line items were adjusted, such as renaming the "Site and Existing Lock Light Pole Removal" item and adding a new line item for "Demolition of Remaining Existing Lock Features" with a quantity of one job.

View the file

Other files for this federal contract opportunity

Other files attached to Chickamauga Lock Replacement Approach Wall and Decommissioning, newest first.
File Type Posted
W912P525RA001 Amendment 0007 Changes_10JUL2025.pdf PDF
W912P525RA001 A0007 SF 30_Final_15July2025.pdf PDF
CKL Approach Wall and Decommissioning Price Schedule_11JULY2025.xlsx XLSX spreadsheet
CKL Approach Wall and Decommissioning Price Schedule_11JUNE2025.xlsx XLSX spreadsheet
W912P525RA001 A0006 SF 30_Final_17June2025.pdf PDF
W912P525RA001 Amendment 0006 Changes_11Jun2025.pdf PDF
Instructions to Offerors and Procedures for Submission of Offerors and Proposal Evaluation Approach_REV2.pdf PDF
W912P525RA001 A0005 SF 30_Final_16May2025.pdf PDF
CKL Approach Wall and Decommissioning_ 04292025.xlsx XLSX spreadsheet
W912P525RA001 Amendment 0004 Changes_29Apr2025.pdf PDF
W912P525RA001 A0004 SF30_final 13May2025.pdf PDF
02APR25 pre-proposal site visit 2 sign in sheets.pdf PDF
W912P525RA001 A0003 SF30_final 01Apr2025.pdf PDF
CKL Approach Wall and Decommissioning_ 03282025.xlsx XLSX spreadsheet
Chickamauga Lock AWD Physical Site Visit Sign-In Sheet (04Mar2025).pdf PDF
W912P525RA001 A0002 SF30_final 20 Mar 25.pdf PDF
Chickamauga Lock AWD RFP Amendment 0002 Letter_signed ssw.pdf PDF
CKL Approach Wall and Decommissioning_2025-02-13.xlsx XLSX spreadsheet
Instructions to Offerors and Procedures for Submission of Offerors and Proposal Evaluation Approach_REV1.pdf PDF
CKL Approach Wall and Decommissioning_Virtual Pre-Proposal Meeting Attendee List.xlsx XLSX spreadsheet
W912P525RA001 A0001 SF 30_final 20 Feb 25.pdf PDF
W912P525RA001 Amendment 0001 Changes_20Feb2025.pdf PDF
CKL Approach Wall and Decommissioning.xlsx XLSX spreadsheet
Watts Bar Map.pdf PDF
Foregin National Contractor Security Access Form.pdf PDF
JA for Brand Name CKL AWD_signed ssw_Redacted.pdf PDF
Instructions to Offerors and Procedures for Submission of Offerors and Proposal Evaluation Approach.pdf PDF
DBA WD TN20250145 03Jan2025 (Hamilton County TN Heavy Construction).pdf PDF
US Citizens Security Access Form.pdf PDF
W912P525RA001_final_04Feb2025.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912P525RA001

AMENDMENT 0003

Chickamauga Lock Approach Wall and Decommissioning

DESCRIPTION OF CHANGES

TECHNICAL SPECIFICATIONS

All revised Specifications, new specifications, revised appendices, and new appendices have been merged into a single document (W912P5-25-R-A001_Am3_Contract Specifications)

1. SECTION 01 00 00 – GENERAL REQUIREMENTS

a. Section 01 00 00 General Requirements has been removed in its entirety and replaced with a revised

Section 01 00 00.

i. Paragraph 1.17.2 has been revised.

2. SECTION 01 22 00 – PRICE AND PAYMENT PROCEDURES

a. Section 01 22 00 Price and Payment Procedures has been removed in its entirety and replaced with a revised Section 01 22 00.

i. Renamed and revised the light pole demolition measurement and payment paragraph.

ii. Added paragraph to address the added “Demolition of remaining existing lock features” bid item.

iii. Paragraph 1.4.13.14 has been revised.

3. SECTION 02 32 00 – SUBSURFACE DRILLING, SAMPLING, AND TESTING

a. Section 02 32 00 has been removed in its entirety and replaced with a revised Section 02 32 00.

i. Paragraph 1.1 has been revised.

ii. Paragraph 3.2.10 has been revised.

4. SECTION 03 30 01 – CONRETE: MATERIALS

a. Section 03 30 01 has been removed in its entirety and replaced with a revised Section 03 30 01.

i. Paragraph 2.10 has been revised.

5. SECTION 03 30 04 – CONCRETE PLACEMENT REQUIREMENTS

a. Section 03 30 04 has been removed in its entirety and replaced with a revised Section 03 30 04.

i. Paragraph 3.3.3 has been revised.

ii. Paragraph 3.8 has been revised.

6. SECTION 03 30 04 – CONCERETE PLACEMENT

a. Section 03 30 04 has been removed in its entirety and replaced with a revised Section 03 30 04.

i. Paragraph 1.3 has been revised.

ii. Paragraph 3.13.3 has been revised.

7. SECTION 03 41 34 – INSTALLATION OF GOVERNMENT FURNSIHED PRECAST CONCRETE

BEAMS

a. Section 03 41 34 has been removed in its entirety and replaced with a revised Section 03 41 34.

i. Paragraph 1.3 has been revised.

ii. Paragraph 1.4 has been revised.

iii. Paragraph 2.1.3 has been revised.

iv. Paragraph 3.1.2.1 has been revised.

v. Paragraph 3.1.2.2.1 has been revised.

8. SECTION 03 81 19 – WIRE SAW CUTTING

a. Section 03 81 19 has been removed in its entirety and replaced with a revised Section 03 81 19.

i. Paragraph 3.1 has been revised.

9. SECTION 31 23 05 – LOCK AND DECOMMISSIONING EXCAVATION

a. Section 31 23 05 has been removed in its entirety and replaced with a revised Section 31 23 05.

i. Paragraph 1.1 has been revised.

10. SECTION 31 63 28 – DOWNSTREAM APPROACH WALL PIERS

a. Section 31 63 28 has been removed in its entirety and replaced with a revised Section 31 63 28.

i. Paragraph 1.4, SD-07 has been revised.

CONTRACT DRAWINGS

The following contract drawing sheets were removed and replaced with revised contract drawing sheets:

1. Folio No. 2

a. 61W525-13-AWD “Operations Building Proposed/Final”

b. 61W525-14-AWD “Operations Parking Lot Proposed/Final”

c. 61W525-15-AWD “Maintenance Shop Proposed/Final”

d. 61W525-16AWD “Trailhead Drive Parking Lot and Contractor Laydown Area Proposed Final”

e. 61W525-19-AWD “Contractor Parking Area Proposed Final”

f. 61W525-33-AWD “Temporary Waterline Profiles”

g. 61W525-34-AWD “Temporary FDC Profiles”

2. Folio No. 3

a. 64W537-AWD “Tow Haulage Mach. – Approach Walls – Sections and Details”

b. 67W480-AWD “LIFT STATION EXISTING CONDITIONS AND DEMO”

c. 67W481-AWD “PROPOSED LIFT STATION PLAN VIEW”

d. 67W482-AWD “LIFT STATION DETAILS”

3. Folio No. 4

a. 65W877-AWD “Top of Dam Electrical Plans – Lock Feeders/Bay 5”

4. For Information Only Drawings – Index Sheet

a. 61W20-26-AWD “For Information Only Drawings – Index Sheet”

FOR INFORMATION ONLY (FIO) DRAWINGS

1. ARCADIS GBR and DRILL LOGS

a. ARCADIS GBR and DRILL LOGS have been provided for information only.

2. The Chickamauga Report (1942)

a. The Chickamauga Report (1942) has been provided for information only.

3. MV Photos

a. “MV_Photos” has been provided for information only to depict the medium voltage cables.

PRICE BREAKOUT SCHEDULE

1. Base Contract:

a. Contract Line Item 00-D004 "Steel Setting Piles -Riverside Wall" has been updated to reflect the correct quantity of 540 Linear Foot.

b. Contract Line Item 00-K003 “48” Downstream Approach Wall Pier Guide Pipe Pile Rock Sockets –

Riverside Wall” has been updated to reflect the correct quantity of 165 Linear Foot.

2. Option 1:

a. Contract Line Item 01-S002 “Steel Setting Piles – Landside Wall” has been updated to reflect the correct quantity of 1,260 Linear Foot.

b. Contract Line Item 01-X003 48” Downstream Approach Wall Pier Guide Pipe Pile Rock Sockets –

Landside Wall” has been updated to reflect the correct quantity of 380 Linear Foot.

3. Option 2:

a. Contract Line Item 02-AF02 “Redrilling Grouted Holes” has been removed.

4. Option 3:

a. Contract Line Item 03-AH11 has been renamed to “Site and Existing Lock Light Pole Removal” and the unit price has been updated to “each” with a quantity of 21.

b. Contract Line Item 03-AH26 “Catch Basin and Drain Removal (61W525-2-AWD)” has been updated to reflect the correct Specification Number reference of 02 41 13.

c. Contract Line Item 03-AH35 “Demolition of Remaining Existing Lock Features” has been added with a quantity of 1 “job”.

d. Contract Line Items 03-AM01 and 03-AM02 have been updated to reflect the correct Specification

Number reference of 09 90 00.

e. Contract Line Item 03-AU13 has been updated to reflect the correct Specification Number reference of

31 32 23.

FAR CLAUSES

1. FAR 52.204-8:

a. The basic version of FAR 52.204-8, Annual Representations and Certifications, has been removed.

b. FAR Provision 52.204-8, Annual Representations and Certifications (Class Deviation 2025-O0003 and

Class Deviation 2025-O0004) has been added.

2. FAR 52.222-21:

a. FAR Provision 52.222-21, Prohibition of Segregated Facilities, has been removed.

3. FAR 52.222-23:

a. FAR Clause 52.222-23, Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity in Construction, has been removed.

4. FAR 52.222-26:

a. FAR Clause 52.222-26, Equal Opportunity, has been removed.

5. FAR 52.222-27:

a. FAR Clause 52.222-27, Affirmative Action Compliance Requirements for Construction, has been removed.

6. FAR 52.222-9:

a. The basic version of FAR Clause 52.222-9, Apprentices and Trainees, has been removed.

b. FAR Clause 52.222-9, Apprentices and Trainees (Class Deviation 2025-O0003) has been added.

7. FAR 52.244-6:

a. The basic version of FAR Clause 52.244-6, Subcontracts for Commercial Products and Commercial Services, has been removed.

b. FAR Clause 52.244-6, Subcontracts for Commercial Products and Commercial Services (Class Deviation 2025-O0003), has been added.

8. DFARS 252.236-7001:

a. DFARS Clause 252.236-7001, Contract Drawings and Specifications has been revised.

9. FAR 52.252-3:

a. FAR Provision 52.252-3, Alterations in Solicitation, has been revised.

File details come from the government source that posted it. Updated .