About this file

The document is a Standard Form 30 (SF-30) Amendment of Solicitation/Modification of Contract for the Chickamauga Lock Approach Wall and Decommissioning project. Amendment 0004, dated 13 May 2025, includes several key modifications: updating technical plans, specifications, and price schedule; providing government answers to industry questions; sharing the attendance list from a second physical site visit on 02 April 2025; and updating DFARS and FAR provisions. The amendment modifies certain contract line items (CLINs), specifically reducing the quantity for some items and adding a new Option Line Item P011 for Diversion and Care of Water.

The amendment is part of a larger solicitation (W912P525RA001) by the U.S. Army Corps of Engineers Nashville District for a construction contract valued between $250 million and $500 million. The project involves constructing downstream approach walls, decommissioning the existing lock, wet commissioning of a new lock chamber, and site restoration activities at the Chickamauga Lock in Chattanooga, Tennessee. The contract is anticipated to be awarded in the Fourth Quarter of Fiscal Year 2025 and is subject to Project Labor Agreement (PLA) requirements. The solicitation is unrestricted, with a NAICS code of 237990 and an SBA size standard of $45 million.

View the file

Other files for this federal contract opportunity

Other files attached to Chickamauga Lock Replacement Approach Wall and Decommissioning, newest first.
File Type Posted
W912P525RA001 Amendment 0007 Changes_10JUL2025.pdf PDF
W912P525RA001 A0007 SF 30_Final_15July2025.pdf PDF
CKL Approach Wall and Decommissioning Price Schedule_11JULY2025.xlsx XLSX spreadsheet
W912P525RA001 A0006 SF 30_Final_17June2025.pdf PDF
W912P525RA001 Amendment 0006 Changes_11Jun2025.pdf PDF
CKL Approach Wall and Decommissioning Price Schedule_11JUNE2025.xlsx XLSX spreadsheet
Instructions to Offerors and Procedures for Submission of Offerors and Proposal Evaluation Approach_REV2.pdf PDF
W912P525RA001 A0005 SF 30_Final_16May2025.pdf PDF
CKL Approach Wall and Decommissioning_ 04292025.xlsx XLSX spreadsheet
W912P525RA001 Amendment 0004 Changes_29Apr2025.pdf PDF
02APR25 pre-proposal site visit 2 sign in sheets.pdf PDF
W912P525RA001 A0003 SF30_final 01Apr2025.pdf PDF
W912P525RA001 Amendment 0003 Changes_Updated 28MAR2025.pdf PDF
CKL Approach Wall and Decommissioning_ 03282025.xlsx XLSX spreadsheet
Chickamauga Lock AWD Physical Site Visit Sign-In Sheet (04Mar2025).pdf PDF
W912P525RA001 A0002 SF30_final 20 Mar 25.pdf PDF
Chickamauga Lock AWD RFP Amendment 0002 Letter_signed ssw.pdf PDF
CKL Approach Wall and Decommissioning_2025-02-13.xlsx XLSX spreadsheet
Instructions to Offerors and Procedures for Submission of Offerors and Proposal Evaluation Approach_REV1.pdf PDF
CKL Approach Wall and Decommissioning_Virtual Pre-Proposal Meeting Attendee List.xlsx XLSX spreadsheet
W912P525RA001 A0001 SF 30_final 20 Feb 25.pdf PDF
W912P525RA001 Amendment 0001 Changes_20Feb2025.pdf PDF
CKL Approach Wall and Decommissioning.xlsx XLSX spreadsheet
Watts Bar Map.pdf PDF
Foregin National Contractor Security Access Form.pdf PDF
JA for Brand Name CKL AWD_signed ssw_Redacted.pdf PDF
Instructions to Offerors and Procedures for Submission of Offerors and Proposal Evaluation Approach.pdf PDF
DBA WD TN20250145 03Jan2025 (Hamilton County TN Heavy Construction).pdf PDF
US Citizens Security Access Form.pdf PDF
W912P525RA001_final_04Feb2025.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

PROJECT: Chickamauga Lock Approach Wall Block 14 (Description of Amendment/Modification):

and Decommissioning PURPOSE: The purpose of this Amendment is to:

1) Provide update Technical Plans, Technical Specifications, and Price Schedule.

2) Provide Government answers to questions received from Industry.

3) Provide attendance list from second physical site visit held on 02 April 2025.

4) Update DFARS Clause 252.236-7001, Contract Drawings and Specifications.

5) Update FAR Provision 52.252-3, Alterations in Solicitation.

Section 00 01 15 - List of Drawing Sheets

The attachments table has changed from:

Identifier Document Name Document Description Reference Identifier

Date Line Item Page Numbers

Document Type

Provided Under Separate Cover

Instructions to Offerors, Procedures for Submission of Offerors & Proposal Evaluation Approach_REV1

Instructions to Offerors and Procedures for Submission of Offerors and Proposal Evaluation Approach

03 Feb 2025 30 Attachment No

DBA WD

TN20250145

03Jan2025 (Hamilton County, TN Heavy Construction)

Wage Determination 03 Jan 2025 5 Attachment No

CKL Approach Wall and Decommissioning_ 03282025

Price Breakout Schedule 28 Mar 2025 4 Attachment No

W912P525RA001

Amendment 0001 Changes_20Feb2025

Amendment 0001 Summary of Changes 14 Feb 2025 1 Attachment No

W912P525RA001

Amendment 0003 Changes_Updated

28MAR2025

Amendment 0003 Summary of Changes 28 Mar 2025 Attachment No

To:

Identifier Document Name Document Description Reference Identifier

Date Line Item Page Numbers

Document Type

Provided Under Separate Cover

Instructions to Offerors, Procedures for Submission of Offerors & Proposal Evaluation Approach_REV1

Instructions to Offerors and Procedures for Submission of Offerors and Proposal Evaluation Approach

03 Feb 2025 30 Attachment No

DBA WD

TN20250145

03Jan2025 (Hamilton County, TN Heavy Construction)

Wage Determination 03 Jan 2025 5 Attachment No

CKL Approach

W912P525RA0010004

03 Wall and Decommissioning_ 04292025

Price Breakout Schedule 29 Apr 2025 4 Attachment No

W912P525RA001

Amendment 0001 Changes_20Feb2025

Amendment 0001 Summary of Changes 14 Feb 2025 1 Attachment No

W912P525RA001

Amendment 0003 Changes_Updated

28MAR2025

Amendment 0003 Summary of Changes 28 Mar 2025 3 Attachment No

W912P525RA001

Amendment 0004 C hanges_29Apr2025

Amendment 0004 Summary of Changes 29 Apr 2025 3 Attachment No

The following contract documents were added:

CKL Approach Wall and Decommissioning_ 04292025 W912P525RA001 Amendment 0004 Changes_29Apr2025

The following contract documents were deleted:

CKL Approach Wall and Decommissioning_ 03282025

The following contract documents Page Counts were changed:

DOCUMENT PAGE COUNTS

DOCUMENT NAME FROM TO

W912P525RA001 Amendment 0004 Changes_29Apr2025 none 3

Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule

The following CLIN(s) / SLIN(s) / ELIN(s) were added:

Item Supplies / Services Quantity Unit Unit Price Amount

Option Line Item P011

Diversion and Care of Water Product Service Code: Z2KA General Specification Number:

01 57 24 Pricing Arrangement: Firm Fixed Price

1 Job

The following CLIN(s) / SLIN(s) / ELIN(s) were modified:

D004

INFORMATION FROM TO CHANGED BY

Quantity 540 470 -70

Option Line Item 0014

INFORMATION FROM TO CHANGED

BY

ELINs P001, P002, P003, P004, P005, P006, P007, P008, P009, P010

P001, P002, P003, P004, P005, P006, P007, P008, P009, P010, P011

Option Line Item S002

INFORMATION FROM TO CHANGED BY

Quantity 1,260 1,050 -210

Section 00 70 00 - Conditions of the Contract

Additional Information/Notes

The following clauses were modified:

252.236-7001Contract Drawings and Specifications.Aug 2000 hereby reads as follows:

As prescribed in 236.570(a), use the following clause:

CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall-

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title

FIO - Chick Lock Consolidation 100% Folio 1.pdf FIO - Chick Lock Consolidation 100% Folio 2.pdf FIO - Chick Lock Consolidation 100% Folio 3.pdf FIO - Chick Lock Consolidation 100% Folio 4.pdf FIO_Record Drawings Folio 1 of 2.pdf FIO_Record Drawings Folio 2 of 2.pdf FIO_Shop Drawings for DS Cross-Over Bridge and US Lock Wall Bridge Access.pdf FIO_Shop Drawings for Miter Gates_Culvert Valves_Culvert Bulkheads and Airseals.pdf FIO_W912P5-06-C-0009_As-Builts for Combined Cofferdam.pdf

FIO_W912P5-09-B-0019_AACF Plans for Miter Gates_Culvert Valves_Culvert Bulkheads and Airseals.pdf

FIO_W912P5-10-C-0008_As-Builts for Approach Wall Beams.pdf

FIO_W912P5-15-C-0021_AACF_CS_Plans for Cofferdam Stabilization.pdf

FIO_W912P5-16-C-0007_As-builts For Lock Excavation.pdf

FIO_W912P5-16-C-0007_AACF Plans for DS Cross-Over Bridge and US Lock Wall Bridge- Acess.pdf

FIO_W912P5-16-C-0007_AACF_LE_Plans.pdf

FIO_W912P5-17-C-0007_AACF_LC_Plans_Folio 1 of 4.pdf

FIO_W912P5-17-C-0007_AACF_LC_Plans_Folio 2 of 4.pdf

FIO_W912P5-17-C-0007_AACF_LC_Plans_Folio 3 of 4.pdf

FIO_W912P5-17-C-0007_AACF_LC_Plans_Folio 4 of 4.pdf

FIO_W912P5-21-C-0009_AACF_UAW_Plans.pdf

W912P525-RA-001_Price Schedule_AWD_RTA (CKL Approach Wall and Decommissioning_04292025.xlxs)

FIO - GDR Volume 1.pdf FIO - GDR Volume 2.pdf FIO - CHH instrument Inventory Report.pdf FIO - GBR.pdf FIO - MV_Photos.pdf FIO - The Chickamauga Report (1942).pdf

W912P5-25-RA001_TPlans_AWD_Folio 1 of 5.pdf

W912P5-25-RA001_TPlans_AWD_Folio 2 of 5.pdf

W912P5-25-RA001_TPlans_AWD_Folio 3 of 5.pdf

W912P5-25-RA001_TPlans_AWD_Folio 4 of 5.pdf

W912P5-25-RA001_TPlans_AWD_Folio 5 of 5.pdf

W912P5-25-RA001_TPlans_AWD_For-Information-Only-Drawings-Folio.pdf

W912P5-25-RA001_TSpecs_AWD_RTA.pdf

W912P5-25-RA001_Am3_Consolidated_Sheet_Changes.pdf

W912P5-25-R-A001_Am3_Contract Specifications_11MAR2025.pdf

W912P5-25-RA001_Am4_Consolidated_Sheet_Changes_29APR2025.pdf

W912P5-25-R-A001_Am4_Contract Specifications_29APR2025.pdf

(End of clause)

IDCode: J
Page: 1
Pages: 6
AmendNo: 0004
EffDate: 13 MAY 2025
ReqNo:
ProjNo: 118339
IssCode: W912P5
AdmCode:
IssuedBy: W072 ENDIST NASHVILLE

KO CONTRACTING DIVISION, 801 BROADWAY RM A604

NASHVILLE, TN 37203-1070

UNITED STATES

ANDREW ROTH, EMAIL: ANDREW.R.ROTH@USACE.ARMY.MIL TELEPHONE: (615) 736-7793

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912P525RA001
SolDate: 04 FEB 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: SEE SCHEDULE
ContNameTitle:
CoNameTitle: STACY S. WIGGINS
ContDate:
CODate: 13 MAY 2025