CKL Approach Wall and Decommissioning_ 03282025.xlsx

XLSX spreadsheet 261 KB Posted

Attached to
Chickamauga Lock Replacement Approach Wall and Decommissioning Federal contract opportunity
Solicitation number
W912P525RA001
Issued by
Department of the Army Corps of Engineers Engineering District Nashville

About this file

This file is a comprehensive Price Schedule for the Chickamauga Lock Replacement Approach Wall and Decommissioning project, detailing a federal construction contract with a base contract and three optional pricing schedules. The contract, solicited by the U.S. Army Corps of Engineers Nashville District, involves constructing downstream lock approach walls, decommissioning the existing lock, wet commissioning of the lock chamber, and site restoration activities in Chattanooga, Tennessee. The project scope includes building two 30-foot diameter mooring cells, installing pre-cast concrete beams fabricated in 2012, plugging portions of the existing lock chamber with concrete, and removing miscellaneous equipment and buildings.

The procurement is a full and open/unrestricted contract with an estimated price range between $250,000,000 and $500,000,000, classified under NAICS code 237990 with a $45,000,000 size standard. The contract is subject to Project Labor Agreement requirements and anticipated to be awarded in the Fourth Quarter of Fiscal Year 2025. A mandatory pre-proposal site visit is scheduled for February 20, 2025, with strict attendance limitations (four persons per business entity) and specific personal protective equipment requirements. Proposals must be submitted through the PIEE Solicitation Module, with primary contract communication managed by Contract Specialist Andrew Roth.

View the file

Other files for this federal contract opportunity

Other files attached to Chickamauga Lock Replacement Approach Wall and Decommissioning, newest first.
File Type Posted
W912P525RA001 Amendment 0007 Changes_10JUL2025.pdf PDF
W912P525RA001 A0007 SF 30_Final_15July2025.pdf PDF
CKL Approach Wall and Decommissioning Price Schedule_11JULY2025.xlsx XLSX spreadsheet
CKL Approach Wall and Decommissioning Price Schedule_11JUNE2025.xlsx XLSX spreadsheet
Instructions to Offerors and Procedures for Submission of Offerors and Proposal Evaluation Approach_REV2.pdf PDF
W912P525RA001 A0006 SF 30_Final_17June2025.pdf PDF
W912P525RA001 Amendment 0006 Changes_11Jun2025.pdf PDF
W912P525RA001 A0005 SF 30_Final_16May2025.pdf PDF
CKL Approach Wall and Decommissioning_ 04292025.xlsx XLSX spreadsheet
W912P525RA001 Amendment 0004 Changes_29Apr2025.pdf PDF
W912P525RA001 A0004 SF30_final 13May2025.pdf PDF
02APR25 pre-proposal site visit 2 sign in sheets.pdf PDF
W912P525RA001 A0003 SF30_final 01Apr2025.pdf PDF
W912P525RA001 Amendment 0003 Changes_Updated 28MAR2025.pdf PDF
Chickamauga Lock AWD Physical Site Visit Sign-In Sheet (04Mar2025).pdf PDF
W912P525RA001 A0002 SF30_final 20 Mar 25.pdf PDF
Chickamauga Lock AWD RFP Amendment 0002 Letter_signed ssw.pdf PDF
CKL Approach Wall and Decommissioning_2025-02-13.xlsx XLSX spreadsheet
Instructions to Offerors and Procedures for Submission of Offerors and Proposal Evaluation Approach_REV1.pdf PDF
CKL Approach Wall and Decommissioning_Virtual Pre-Proposal Meeting Attendee List.xlsx XLSX spreadsheet
W912P525RA001 A0001 SF 30_final 20 Feb 25.pdf PDF
W912P525RA001 Amendment 0001 Changes_20Feb2025.pdf PDF
Watts Bar Map.pdf PDF
CKL Approach Wall and Decommissioning.xlsx XLSX spreadsheet
Instructions to Offerors and Procedures for Submission of Offerors and Proposal Evaluation Approach.pdf PDF
DBA WD TN20250145 03Jan2025 (Hamilton County TN Heavy Construction).pdf PDF
US Citizens Security Access Form.pdf PDF
W912P525RA001_final_04Feb2025.pdf PDF
Foregin National Contractor Security Access Form.pdf PDF
JA for Brand Name CKL AWD_signed ssw_Redacted.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Price Schedule

PRICE SCHEDULE
Approach Wall and Lock Decommissioning
Chickamauga Lock Replacement
Ready to Advertise (RTA)
New AWD Price Sheet
Base Contract
BID ITEMDESCRIPTIONSPECIFICATION NUMBEREST. QTY.UNITUNIT
PRICEESTIMATED

AMOUNT

01Div 01 GENERAL REQUIREMENTS
00-A001Formal Partnering Meeting01 00 001JB$$
00-A002Mobilization and Demobilization01 22 001JB$$
00-A003Premiums for Performance and Payment Bonds01 22 001JB$$
00-A004Railroad Flagman01 22 006DAY$$
00-A005Data Management01 31 001JB$$
00-A006Maintenance and Protection of Traffic01 50 001JB$$
00-A007Maintain QA Testing Lab and QA Field Office01 50 0036MO$$
00-A008Diversion and Care of Water01 57 241JB$$
00-A009As-Built Drawings01 78 001JB$$
00-A010Commissioning01 91 131JB$$
00-A011Commissioning - Performance Verification Testing01 91 131JB$$
00-A012Commissioning - Post Construction Endurance Testing01 91 131JB$$
02Div 02 EXISTING CONDITIONS
00-B001Overburden Drilling02 32 00200LF$$
00-B002Overburden Drilling - OVER 200 LF02 32 00100LF$$
00-B003Overburden - Split Spoon Sampling02 32 00135EA$$
00-B004Verification Core Drilling, Vertical Holes HQ02 32 0072LF$$
00-B005Core Drilling, Vertical Holes02 32 00125LF$$
00-B006Lab Testing- Direct Shear02 32 0020EA$$
00-B007Downhole Imaging02 32 00290LF$$
00-B008Downhole Imaging - OVER 290 LF02 32 00100LF$$
00-B009Segmental Cofferdam Modifications - Standard Light and Fixture Removal, and instrumentation02 41 13 and 02 41 171JB$$
00-B010Demolition of Spillway Deck and Piers02 41 171JB$$
00-B011Demolition and Disposal of Spillway Gate Set - Bay 502 41 171EA$$
00-B012Removal of Spillway Gate Sets (4) and Disposal of Gate Sets (2) to Include Salvaging Components02 41 174EA$$
00-B013Cofferdam Removal - Phase 1 (Drawing 61W510-11)02 41 181JB$$
00-B014Downstream Cofferdam Stability Berm Removal and Downstream approach material removal02 41 181JB$$
00-B015Watertightness Testing of Rock Prior to Excavation for Thrust Block02 32 001JB$$
03Div 03 CONCRETE
00-C001Waterstop03 15 141JB$$
00-C002Reinforcing Steel - Material03 20 02100Ton$$
00-C003Place Rebar03 20 02100Ton$$
00-C004Drill and Grout #11 Dowels; Monolith M1 Second Placement03 20 0225EA$$
00-C005Cement, Type II, MH - Low Alkali and Moderate Heat03 30 011200Ton$$
00-C006Class F Fly Ash03 30 01900Ton$$
00-C007Tremie Concrete (5ksi)03 31 072000CY$$
00-C008Downstream Government Directed Additional Tremie Concrete03 31 0735CY$$
00-C009Downstream Install Precast Beams and Appurtenances - Riverside Wall03 41 341JB$$
00-C010Upstream Install Precast Beams and Appurtenances03 41 341JB$$
00-C011Upstream Skirt Panels and Appurtenances03 41 341JB$$
00-C012Structural Concrete (5ksi)03 70 002000CY$$
00-C013Pier Concrete (5.5ksi)03 80 002395CY$$
00-C014Precast Beams Non-destructive Testing (Riverside and Landside walls)03 41 341JB$$_____________
00-C015Precast Beams Crack Repair - Riverside Wall03 41 341600LF$$_____________
00-C016Precast Beams Defect Repair - Riverside Wall03 41 341600SF$$_____________
00-C017Precast Beams Surface Coating - Riverside Wall03 41 3436000SF$$_____________
00-C018Block 45 Stairs - Construct Landing and Install Precast Stairs03 70 001JB$$_____________
05Div 05 METALS
00-D001Spillway Operating Deck Access Stairway05 51 001JB$$
00-D002Crane Stops05 50 141JB$$
00-D003Nose Pier and Intermediate Pier Metals - Riverside Wall05 59 201JB$$
00-D004Steel Setting Piles - Riverside Wall05 50 14540LF$$
00-D005Miscellaneous Metal05 50 151JB$$
00-D006Wall Armor05 50 151JB$$
00-D007Prefabricated Guardrail Installation05 50 15450LF$$
09Div 09 FINISHES
00-E001Painting - Upstream Approach Wall Nose Pier Stripes09 97 001JB$$
10Div 10 SPECIALTIES
00-F001Permanent Exterior Signage10 14 03 and 10 14 041JB$$
00-F002Fire Sprinkler System10 44 171JB$$
00-F003Plumbing System10 44 171JB$$
00-F004Operations Building Commissioning10 44 171JB$$
00-F005Temporary pump for fire protection system1JB$
.
13Div 13 SPECIAL CONSTRUCTION
00-G001Instrumentation Installation and Commissioning13 50 001JB$$
00-G002Instrumentation Monitoring Program13 50 0036MO$___________________________$_______________
26Div 26 ELECTRICAL
00-H001Replacement Lock Upstream Approach Wall Electrical Systems26 20 001JB$$
00-H002Replacement Lock Downstream Approach Wall Electrical Systems - Riverside Wall26 20 001JB$$
00-H003Post-Spillway Demolition Grounding System Connection26 20 001JB$$
00-H004Post-Spillway Demolition Electrical Systems Repair26 20 001JB$$
00-H005Replacement Lock Exterior Lighting26 56 001JB$$
00-H006Power System Study26 05 731JB$$
28Div 28 ELECTRONIC SAFETY AND SECURITY
00-J001Security CCTV System28 23 231JB$$
31Div 31 EARTHWORK
00-K001Install Downstream Approach Wall Intermediate Piers - Riverside Wall31 32 232EA$$
00-K002Install Downstream Approach Wall Nose Piers - Riverside Wall31 32 231EA$$
00-K00348" Downstream Approach Wall Pier Guide Pipe Pile Rock Sockets - Riverside Wall31 63 28165LF$$
00-K004Furnish and Install Post Tensioned Anchors31 68 153040LF$$
00-K005Additional Performance Tests31 68 153EA$$
00-K006Additional Proof Tests31 68 153EA$$
00-K007Additional Watertightness Testing31 68 1516EA$$
00-K008Consolidation Grouting31 68 152337CF$$
00-K009Redrilling Consolidation Grout31 68 151952LF$$
00-K010Government Requested Standby - Consolidation Grouting31 68 1532HR$$
00-K011Supplementary Extended Creep Tests31 68 154EA$$
00-K012Earth Retention System for Thrust Block - Design31 23 051JB$$
32Div 32 EXTERIOR IMPROVEMENTS
00-L001Flagpole ConstructionVarious1JB$$
33Div 33 UTILITIES
00-M001Medium Voltage Distribution - Bay 5 to Lock33 71 021JB$$
00-M0022-inch Tempoary Domestic Water Line for Operations Building (routed across channel)33 11 001JB$$
00-M0038-inch Temporay Fire Protection Line for Operations Building (routed across channel)33 11 001JB$$
00-M004Temporary sanitary sewer facility for Operations Building (Contractor determined/provided)33 11 001JB$$
00-M005Temporary FDC Connection for Ops Building33 11 001EA$$
00-M006Fire Hydrant Assembly33 11 001EA$$
35Div 35 WATERWAY AND MARINE CONSTRUCTION
00-N001Tow Haulage Systems - Procurement of all tow haulage components35 01 411JB$$
00-N002Tow Haulage Installation and Acceptance Test - Upstream35 01 411JB$$
00-N003Lock Machinery35 08 401JB$$
00-N004Floating Mooring Bitts35 08 401JB$$
00-N005Compressed Air System35 08 401JB$$
00-N006Miter Gate Spray System35 08 401JB$$
00-N007Service Water System35 08 401JB$$
00-N008Lock Gallery Sump Pump System35 08 401JB$$
00-N009Downstream Pier Excavation35 20 24450CY$$

TOTAL ESTIMATED AMOUNT $

Page &P of &N

Option 1 Price Schedule

PRICE SCHEDULE
Approach Wall and Lock Decommissioning
Chickamauga Lock Replacement
Ready to Advertise (RTA)
New AWD Price Sheet
Option 1
BID ITEMDESCRIPTIONSPECIFICATION NUMBEREST. QTY.UNITUNIT
PRICEESTIMATED

AMOUNT

01Div 01 GENERAL REQUIREMENTS
01-P001Formal Partnering Meeting01 00 001JB$$
01-P002Mobilization and Demobilization01 22 001JB$$
01-P003Premiums for Performance and Payment Bonds01 22 001JB$$
01-P004Railroad Flagman01 22 006DAY$$
01-P005Data Management01 31 001JB$$
01-P006Maintenance and Protection of Traffic01 50 001JB$$
01-P007Maintain QA Testing Lab and QA Field Office01 50 0018MO$$
01-P008As-Built Drawings01 78 001JB$$
01-P009Commissioning01 91 131JB$$
01-P010Helper Boat01 00 0024MO$$
02Div 02 EXISTING CONDITIONS
01-Q001Verification Core Drilling, Vertical Holes HQ02 32 00168LF$$
01-Q002Lab Testing- Direct Shear02 32 0020EA$$
01-Q003Protection Cell Removal02 41 181JB$$
03Div 03 CONCRETE
01-R001Reinforcing Steel - Material03 20 02115Ton$$
01-R002Place Rebar03 20 02115Ton$$
01-R003Cement, Type II, MH - Low Alkali and Moderate Heat03 30 011500Ton$$
01-R004Class F Fly Ash03 30 011250Ton$$
01-R005Tremie Concrete (5ksi)03 31 074000CY$$
01-R006Downstream Government Directed Additional Tremie Concrete03 31 0765CY$$
01-R007Downstream Install Precast Beams and Appurtenances - Landside Wall03 41 341JB$$
01-R008Pier Concrete (5.5ksi)03 80 004100CY$$
01-R009Precast Beams Crack Repair - Landside Wall03 41 342400LF$$
01-R010Precast Beams Defect Repair - Landside Wall03 41 342400SF$$
01-R011Precast Beams Surface Coating - Landside Wall03 41 3454000SF$$
05Div 05 METALS
01-S001Nose Pier and Intermediate Pier Metals - Landside Wall05 59 201JB$$
01-S002Steel Setting Piles - Landside Wall05 50 141260LF$$
01-S003Miscellaneous Metal05 50 151JB$$
01-S004Wall Armor05 50 151JB$$
10Div 10 SPECIALTIES
01-T001Permanent Exterior Signage10 14 03 and 10 14 041JB$$
13Div 13 SPECIAL CONSTRUCTION
01-U001Instrumentation Monitoring Program13 50 0018MO$$
01-U002Instrumentation Installation13 50 501JB$___________________________$_______________
26Div 26 ELECTRICAL
01-V001Replacement Lock Downstream Approach Wall Electrical Systems - Landside Wall26 20 001JB$$
01-V002Replacement Lock Exterior Lighting26 56 001JB$$
28Div 28 ELECTRONIC SAFETY AND SECURITY
01-W001Lock Operations CCTV System28 23 231JB$$
31Div 31 EARTHWORK
01-X001Install Downstream Approach Wall Intermediate Piers - Landside Wall31 32 236EA$$
01-X002Install Downstream Approach Wall Nose Piers - Landside Wall31 32 231EA$$
01-X00348" Downstream Approach Wall Pier Guide Pipe Pile Rock Sockets - Landside Wall31 63 28380LF$$
35Div 35 WATERWAY AND MARINE CONSTRUCTION
01-Y001Tow Haulage Installation and Acceptance Test - Downstream35 01 411JB$$
01-Y002Downstream Pier Excavation35 20 24915CY$$
01-Y003Service Water System - Downstream Approach Wall35 08 401JB$$

TOTAL ESTIMATED AMOUNT $

Option 2 Price Schedule

PRICE SCHEDULE
Approach Wall and Lock Decommissioning
Chickamauga Lock Replacement
Ready to Advertise (RTA)
New AWD Price Sheet
Option 2
BID ITEMDESCRIPTIONSPECIFICATION NUMBEREST. QTY.UNITUNIT
PRICEESTIMATED

AMOUNT

01Div 01 GENERAL REQUIREMENTS
02-Z001Mobilization and Demobilization01 22 001JB$$
02-Z002Premiums for Performance and Payment Bonds01 22 001JB$$
02-Z003Data Management01 31 001JB$$
02-Z004Maintenance and Protection of Traffic01 50 001JB$$
02-Z005Maintain QA Testing Lab and QA Field Office01 50 0012MO$$
02-Z006As-Built Drawings01 78 001JB$$
02Div 02 EXISTING CONDITIONS
02-AA01Demolition of Mooring Cells02 41 174EA$$
02-AA02Cofferdam Removal - Phase 2 (Drawing 61W510-11)02 41 181JB$$
03Div 03 CONCRETE
02-AB01Cement, Type II, MH - Low Alkali and Moderate Heat03 30 0120Ton$$
02-AB02Class F Fly Ash03 30 0120Ton$$
02-AB03Tremie Concrete (5ksi)03 31 0790CY$$
09Div 09 FINISHES
02-AC01Painting - Mooring Cells09 97 001JB$$
10Div 10 SPECIALTIES
02-AD01Permanent Exterior Signage10 14 03 and 10 14 041JB$$
13Div 13 SPECIAL CONSTRUCTION
02-AE01Instrumentation Monitoring Program13 50 0012MO$$
31Div 31 EARTHWORK
02-AF01Mooring Cell Aggregate Fill31 00 001JB$$
02-AF02Redrilling Grouted Holes31 32 23575LF$$Remove from Price Schedule
02-AF03Metal Sheet Piling31 41 161JB$$
02-AF04Construction of Mooring Cells31 41 162EA$$

TOTAL ESTIMATED AMOUNT $

Option 3 Price Schedule

PRICE SCHEDULE
Approach Wall and Lock Decommissioning
Chickamauga Lock Replacement
Ready to Advertise (RTA)
New AWD Price Sheet
Option 3
BID ITEMDESCRIPTIONSPECIFICATION NUMBEREST. QTY.UNITUNIT
PRICEESTIMATED

AMOUNT

01Div 01 GENERAL REQUIREMENTS
03-AG01Formal Partnering Meeting01 00 001JB$$
03-AG02Mobilization and Demobilization01 22 001JB$$
03-AG03Premiums for Performance and Payment Bonds01 22 001JB$$
03-AG04Data Management01 31 001JB$$
03-AG05Maintenance and Protection of Traffic01 50 001JB$$
03-AG06Maintain QA Testing Lab and QA Field Office01 50 0018MO$$
03-AG07Diversion and Care of Water01 57 241JB$$
03-AG08As-Built Drawings01 78 001JB$$
03-AG09Commissioning01 91 131JB$$
02Div 02 EXISTING CONDITIONS
03-AH01Verification Core Drilling, Vertical Holes HQ02 32 00455LF$$
03-AH02Core Drilling, Vertical Holes02 32 00120LF$$
03-AH03Downhole Imaging02 32 00650LF$$
03-AH04Concrete Conduit Box Removal02 41 131JB$$
03-AH05Existing Pullbox Modifications02 41 131JB$$
03-AH06Contractor Access Ramp and Work Bench Restoration02 41 131JB$$
03-AH07Maintenance shop existing access demolition02 41 131JB$$
03-AH08Maintenance shop parking lot milling for Resurfacing02 41 131JB$$
03-AH09Existing 24 inch CMP demolition (61W525-03-AWD)02 41 131JB$$
03-AH10Toe Drain & Manhole Demolition (61W525-03-AWD)02 41 131JB$$
03-AH11Site and Existing Lock Light Pole Removal02 41 1321EA$$
03-AH12Overhead electrical line removal (61W525-04-AWD)02 41 131JB$$
03-AH13Eastern Lake Access Stripping02 41 131JB$$
03-AH14Trailhead Parking Lot Milling (61W525-06-AWD)02 41 131JB$$
03-AH15Contractor Parking lots Stripping as required (61W525-07-AWD)02 41 131JB$$
03-AH16Existing Maintenance BLDG Canopy Shed Demolition02 41 131JB$$
03-AH17Demolition of Existing Lock Machinery02 41 171JB$$
03-AH18Demolition of Existing Lock Operations Building02 41 171JB$$
03-AH19Demolition and Relocation of Existing Lock Upper Guidewall Beams and Piers Above EL 660.002 41 171JB$$
03-AH20Place Rock Fill in Existing Lock Recesses02 41 171JB$$
03-AH21Salvage of Floating Mooring Bitts02 42 911JB$$
03-AH22Salvage of the Culvert Valves02 42 911JB$$
03-AH23Remediation and Restoration of the Electrical Service RoomsVarious1JB$$
03-AH24Remediation and Restoration of the Hazmat RoomVarious1JB$$
03-AH25Strip or Cover of Operations Building and Parking Lot AreaVarious1JB$$
03-AH26Catch basin and drain removal (61W525-2-AWD)02 41 131JB$$
03-AH27Trailhead Drive Milling, Stripping and Roadbed Preparation02 42 911JB$$
03-AH28Trailhead Drive Parking Lot Milling in Preparation for Resurfacing (61W525-04-AWD)02 42 911JB$$
03-AH29Trailer Removal X 2 and Foundation Demolition (61W525-04-AWD)Various1JB$$
03-AH30Trailer Relocation x 1 and Foundation Demolition (61W525-04-AWD)Various1JB$$
03-AH31Future Greenway Area Stripping32 92 191JB$$
03-AH32Stripping of area west of Maintenance Shop32 92 191JB$$
03-AH33Resident Engineer Office Milling02 41 131JB$$
03-AH34Decommisioning and Demolition of Existing Lift StationDrawings1JB$$
03-AH35Demolition of remaining existing lock featuresDrawings1JB$$
03Div 03 CONCRETE
03-AJ01Waterstop03 15 141JB$$
03-AJ022" LDPE Foam Expansion Joint03 15 141JB$$
03-AJ03Reinforcing Steel - Material03 20 02835Ton$$
03-AJ04Place Rebar03 20 02835Ton$$
03-AJ05Drill and Grout #6 Dowels; Waterstop Recess03 20 0272EA$$
03-AJ06Drill and Grout #8 Dowels; Existing Culverts and Cable Tunnel03 20 0226EA$$
03-AJ07Cement, Type II, MH - Low Alkali and Moderate Heat03 30 018300Ton$$
03-AJ08Class F Fly Ash03 30 015600Ton$$
03-AJ09Roughen/Preparation of Concrete Surface in Culverts and Cable Tunnel03 30 048045SF$$
03-AJ10Culvert Valve and Cable Tunnel Plugs03 31 07 and 03 80 001700CY$$
03-AJ11Inspection Shafts03 41 33 and 03 80 001JB$$
03-AJ12Contact Grout for Culverts and Cable Tunnel Plugs03 61 00230CF$$
03-AJ13Structural Concrete (5ksi)03 70 0042000CY$$
03-AJ1410in. Paved Portland cement pavement (4 ksi) with dowels03 70 014050SY$$
03-AJ15Culvert Valve Display Slab (4 ksi)03 70 011JB$$
03-AJ16Operations Lot 30 x 50 ft Concrete Slab (4 ksi)03 70 011JB$$
03-AJ17Miscellaneous Concrete (3ksi)03 70 011100CY$$
03-AJ18Pier Concrete (5.5ksi)03 80 005CY$$
03-AJ19Concrete Slot Cutting03 81 191JB$$
03-AJ20Tremie Concrete (5ksi)03 31 07450CY$$
05Div 05 METALS
03-AK01Miscellaneous Metal05 50 151JB$$
03-AK02Prefabricated Guardrail Installation05 50 15450LF$$
07Div 07 THERMAL AND MOISTURE PROTECTION
03-AL01Operations Building - Waterproofing07 13 531JB$$
09Div 09 FINISHES
03-AM01Painting - Hazmat Room09 90 001JB$$
03-AM02Painting - Electrical Service Rooms09 90 001JB$$
10Div 10 SPECIALTIES
03-AN01Permanent Exterior Signage10 14 03 and 10 14 041JB$$
03-AN02Fire Sprinkler System10 44 171JB$$
03-AN03Plumbing System10 44 171JB$$
03-AN04Operations Building Commissioning10 44 171JB$$
13Div 13 SPECIAL CONSTRUCTION
03-AP01Instrumentation Monitoring Program13 50 0012MO$$
03-AP02Instrumentation Installation13 50 001JB$$
03-AP03Instrumentation Maintenance and Modifications - Existing Lock13 50 001JB
03-AP04Cylinder Storage Building13 34 19.06 and others1JB$$
03-AP05Crane Storage Shed Construction (61W525-24-AWD)Various1JB$$
23Div 23 HEATING, VENTILATIONS, AND AIR CONDITIONING (HVAC)
03-AQ01Testing, Adjusting, and Balancing (TAB)23 05 951JB$$
03-AQ02Heating and Ventilation Equipment - Cylinder Storage BuildingDivision 23, Section 08 91 001JB$$
03-AQ03Heating and Ventilation Equipment - Hazmat RoomDivision 23, Section 08 91 001JB$$
03-AQ04Heating and Ventilation Equipment - Electrical Service RoomsDivision 23, Section 08 91 001JB$$
26Div 26 ELECTRICAL
03-AR01HAZMAT Room Electrical Systems/Lighting26 20 00/26 51 001JB$$
03-AR02Site Exterior Lighting26 56 001JB$$
03-AR03Landside Electrical Room Systems/Lighting26 20 00/26 51 001JB$$
03-AR04Riverside Electrical Room Systems/Lighting26 20 00/26 51 001JB$$
03-AR05Existing Maintenance Building Interior Electrical Systems26 20 001JB$$
03-AR06Cylinder Storage Building Interior Electrical Systems/Lighting/Lightning Protection26 20 00/26 41 00/26 51 001JB$$
03-AR07Relocation of Miscellaneous Electrical Systems On Existing Lock26 20 00/33 71 021JB$$
03-AR08Repair of Existing Lock Grounding System Post Slot Cutting26 20 00/33 71 021JB
27Div 27 COMMUNICATIONS
03-AS01Fiber Optic Data Transmission System - Maintenance Building27 21 101JB$$
03-AS02Fiber Optic Data Transmission System - Cylinder Storage Building27 21 101JB$$
03-AS03Fiber Optic Data Transmission System - Site ESS27 21 101JB$$
03-AS04Telecom Cabling System - Maintenance Building27 21 101JB$$
03-AS05Telecom Cabling System - Cylinder Storage Building27 21 101JB$$
28Div 28 ELECTRONIC SAFETY AND SECURITY
03-AT01ESS/Access Control - Site Perimeter and Buildings28 20 011JB$$
03-AT02Security CCTV System948381JB$$
03-AT03Fire Detection System - HAZMAT Room28 31 00 / 28 31 641JB$$
03-AT04Fire Detection System - Maintenance Building28 31 00 / 28 31 641JB$$
03-AT05Fire Detection System - Cylinder Storage Building28 31 00 / 28 31 641JB$$
31Div 31 EARTHWORK
03-AU01Manage, and Place Material for New Maintenance Shop Ramp31 00 001JB$$
03-AU02Earthwork for Operations Parking Lot Area31 00 001JB$$
03-AU03Manage, and Place Material for Maint. Shop lot and Thrust Block access31 00 001JB$$
03-AU04Manage, and Place Material for New Operations Building Ramp31 00 001JB$$
03-AU05Maintenance Ramp Retaining Wall Construction (61W525-15-AWD)31 00 001JB$$
03-AU06Manage, and Place Downstream Lock Chamber Fill31 00 001JB$$
03-AU07Manage, and Place Upstream Lock Chamber Fill31 00 001JB$$
03-AU08Geotextile Installations31 05 2213000SY$$
03-AU09Rock Excavation31 23 056034CY$$
03-AU10Dental Excavation (15% surface area)31 23 05247CY$$
03-AU11Line Drilling (6" Spacing)31 23 05844SY$$
03-AU12Thrust Block Overburden Excavation31 23 0518325CY$$
03-AU13Redrilling Grouted Holes31 32 23575LF$$
03-AU14Drill Grout Holes in Rock31 32 238,068LF$$
03-AU15Pressure Washing (Hydraulic)31 32 2372HR$$
03-AU16Pressure Testing (Hydraulic)31 32 23884EA$$
03-AU17Grout Mixes31 32 231,195CY$$
03-AU18Placing Grout31 32 231,195CY$$
03-AU19Government Requested Standby - Grouting31 32 2324HR$$
03-AU20Dental Concrete31 60 00247CY$$
03-AU21Foundation Preparation31 60 001645SY$$
03-AU22Impervious Liner (Seepage Barrier)31 00 001JB$$
03-AU23Earth Retention System for Thrust Block - Construction31 23 051JB$$
32Div 32 EXTERIOR IMPROVEMENTS
03-AV01Aggregate Base Course Grade D32 11 233175Ton$$
03-AV02TDOT Crushed stone32 11 233000Ton$$
03-AV03TDOT #57 Stone32 11 231350Ton$$
03-AV04TDOT #2 Stone32 11 233715Ton$$
03-AV05Asphalt Pavement - Binder Course AC (PG64-22) GR "B-M2"32 12 163550Ton$$
03-AV06Asphalt Pavement - Wearing Course ACS (PG64-22) GR "D"32 12 161680Ton$$
03-AV07Pavement Markings32 17 241JB$$
03-AV08Final Security Fencing32 31 131JB$$
03-AV09Main Access Gate Installation32 31 131EA$$
03-AV106-Foot Personnel Gate Installation32 31 131EA$$
03-AV1112-Foot Personnel Gate Installation32 31 131EA$$
03-AV12Double Swing Gate Installation32 31 131EA$$
03-AV13Barrier Swing Gate Installation32 31 131EA$$
03-AV14Greenway (Contractor Laydown Area) Temp, and Perm, Seeding32 92 191JB$$
03-AV15Designated Disposal Area Temp. and Permanent Seeding32 92 191JB$$
03-AV16Operations Parking Lot Area Temp, and Permanent Seeding32 92 191JB$$
03-AV17Contractor Parking Lot North of RE Office Temp, and Permanent Seeding32 92 191JB$$
03-AV18Topsoil32 92 1919000TN$$
03-AV19Tree Plantings32 93 0030EA$$
03-AV20Shrub Plantings32 93 00400EA$$
33Div 33 UTILITIES
03-AW012-inch Domestic Water Line for Operations Building33 11 001JB$$
03-AW02FDC Connection for Ops Building33 11 001EA$$
03-AW038-inch Fire Protection Line for Operations Building33 11 001JB$$
03-AW046-inch Fire Protection Line for the Operations Building33 11 001JB$$
03-AW05Fire hydrant assemblies33 11 001EA$$
03-AW068-inch Fire Protection Line for Maintenance Building33 11 001JB$$
03-AW072 in. Force Main Sewer from Operations Building33 30 001JB$$
03-AW08Site Electrical Distribution - Maintenance Building33 71 021JB$$
03-AW09Site Electrical Distribution - Cylinder Storage Building33 71 021JB$$
03-AW10Site Electrical Distribution - Landside Electrical Room33 71 021JB$$
03-AW11Site Electrical Distribution - Site ESS/Perimeter33 71 021JB$$
03-AW1230 in. Class IV RCP33 11 0070LF$$
03-AW1324 in. Class IV RCP33 11 00779LF$$
03-AW1424 in. Class III RCP33 11 00100LF$$
03-AW1512 in. Smooth Wall HDPE (toe drain)33 11 00560LF$$
03-AW16Construction and Commissioning of New Lift Station33 30 001JB$$
34Div 34 TRANSPORTATION
03-AX01Curb Construction34 71 13325LF$$
03-AX02Vehicular Guardrail Installation34 71 131200LF$$
03-AX03Parking Bumpers34 71 1335EA$$
03-AX04Bollards34 71 1320EA$$
35Div 35 WATERWAY AND MARINE CONSTRUCTION
03-AY01Furnish, Manage, and Place TDOT Class C RiprapVarious2500TN$$
03-AY02Furnish, Manage, and Place TDOT Class B RiprapVarious1600TN$$
03-AY03Furnish, Manage, and Place TDOT Class A RiprapVarious1500TN$$
03-AY04Furnish, Manage, and Place Bedding Stone for RiprapVarious1675TN$$
46Div 46 WATER AND WASTEWATER EQUIPMENT
03-AZ01Aerating Fountain Construction46 51 00.00 101JB$$

TOTAL ESTIMATED AMOUNT $