"seed project" Q&A
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID PHASE RFIs
| Project Number | RFI # | RFI Title | Question | Answer | DateQuestion | DateAnswer | Complete | OPR | Item Type | Comment |
| KJAQ 152451 | 1 | LEED REQUIREMENTS | LEED requirements are not specified in the RFP for this seed project. However, LEED requirements are seen throughout several specification sections. Are there any LEED requirements for the KFANG seed project? If so, what are they. | |||||||
| Pond Response - There are no formal LEED requirements for this project. | 3/23/17 | 3/23/17 | TRUE | AE | Item | |||||
| KJAQ 152451 | 2 | QC Representative - 01 30 00 | Specification section 01 30 00 - Part 1, Paragraph 1.6.1 mentions a Quality Control representative. The RFP for this seed project does not specify the need for a separate QC representative. Can you please clarify whether or not a separate QC person is needed? Or can the QC and site superintendent be a combined role? | |||||||
| Pond Response - Pond takes no exception to a combined QC / Superintendent role as long as they meet the qualifications for both disciplines | 3/23/17 | 3/23/17 | TRUE | AE | Item | |||||
| KJAQ 152451 | 3 | Job Trailer | Will there be a place on base for a job trailer? If yes, will we be able to connect temp power? | Govern Response -Yes on both. Contractor is responsible for all platt (hook-ups) | 3/23/17 | 3/23/17 | TRUE | BCE | Item | |
| KJAQ 152451 | 4 | Fire Alarm System | Will you provide the Part # of the Fire Alarm Panel? Horn/Stobes, pull stations? |
| Govern Response - Monaco M-2 w/NAC Silent Night(conventional) = #227-991-01. Horn Strobes - wheellock MT24LS / Pull Station - FCI - MS-6 | 3/23/17 | 3/23/17 | TRUE | BCE | Item | ||||
| KJAQ 152451 | 5 | Fire Alarm System | Will you provide a Part # of heat/smoke detectors so we can match new to existing? | Govern Response - Heat= Monaco 721126-00 / Smoke = sys sensor 2451 | 3/23/17 | 3/24/17 | TRUE | BCE | Item |
| KJAQ 152451 | 6 | Fire Alarm System | Will you verify if the existing fire alarm system is conventional or addressable? | Govern Response - Conventional | 3/23/17 | 3/24/17 | TRUE | BCE | Item |
| KJAQ 152451 | 7 | Fire Alarm System/ Sheet E-603: | Per NOTE #5 on page E-603: Will the entire existing fire alarm system be |
required to be tested and re-certified or just the existing circuits we are adding devices to?
| Govern - Response - It is the governments intent to test the entire system for proper function. Only areas that have been altered or added will be recertified. | 3/23/17 | 3/23/17 | TRUE | BCE | Item |
| KJAQ 152451 | 8 | Fire Alarm System | If the entire fire alarm system is required to be tested and |
re-certified, will you provide device counts so we can have an idea of the size of the system to be tested and re-certified?
| Govern Response - It is the governments intent to test the entire system for proper function. Only areas that have been altered or added will be recertified. | 3/23/17 | 3/23/17 | TRUE | BCE | Item |
| KJAQ 152451 | 9 | Roofing | Spec section 07 22 00 para 1.4.3 & 2.1.3 are calling for R-30 insulation. Sheet AD-151 note 2 states we are to remove existing EPDM roofing down to the roof insulation, repair existing insulation to receive the new roof system. Sheet A-151 note 16 says to install black EPDM roof membrane over ¼” roof cover board. Details C1 & C3 on sheet A521 show R-30 polyiso insulation (no designation if it is new or existing). Detail A4 on the same sheet states that the, “existing roof insulation to remain”. So what are we supposed to do? Are we adding insulation to get to R30? Are we only adding the recover board? |
| Pond Response - Existing roof insulation to remain. No additional insulation required unless the existing insulation is damaged and needs repair. Install cover board and roof membrane over existing insulation. | 3/24/17 | 3/27/17 | TRUE | AE | Item |
| KJAQ 152451 | 10 | Blast Rating Windows | We were unable to locate any blast rating information for the windows and doors on the drawings indicated in the specs under Section 08 11 13 Page 7, 2.13 Provisions for glazing. Please provide us with the design criteria. Criteria: . 1. Level of Protection: See structural drawings. 2. Design Standoff distance: See structural drawings. 3. Applicable Explosive Weight: II 4. Door Category III per ASTM F2247-11 5. Blast load: As indicated on Structural drawings. We are also wondering if the glass adjacent to the new exterior doors will have to be tempered? |
| Pond Response - See S-001, Section F. ANTI-TERRORISM FORCE PROTECTION, Note 5. New doors and windows must meet these requirements. | 3/24/17 | 3/27/17 | TRUE | AE | Item | ||||
| KJAQ 152451 | 11 | Flooring Comm Room 134 | Please clarify flooring type at room 134 comm rm. Finish calls for SPT-1, Finish ledger calls for SDT-1. Please clarify floor covering type for comm room. | Pond Response - Flooring type shall be Static Dissipative Tile (SDT-1) | 3/24/17 | 3/27/17 | TRUE | AE | Item |
| KJAQ 152451 | 12 | Vault Doors | Please provide vault door and Day gate manufacturer and phone number. | 3/24/17 | |||||
| 13 | TRUE | BCE | Item | ||||||
| 14 | TRUE | AE | Item | ||||||
| 15 | TRUE | AE | Item | ||||||
| 16 | TRUE | AE | Item | ||||||
| 17 | FALSE | KO | Item | ||||||
| 18 | FALSE | KO | Item | ||||||
| 19 | FALSE | KO | Item | ||||||
| 20 | FALSE | BCE | Item | ||||||
| 21 | TRUE | BCE | Item | ||||||
| 22 | FALSE | KO | Item | ||||||
| 23 | TRUE | BCE | Item | ||||||
| 24 | TRUE | BCE | Item | ||||||
| 25 | TRUE | BCE | Item | ||||||
| 26 | TRUE | BCE | Item | ||||||
| 27 | TRUE | BCE | Item | ||||||
| 28 | TRUE | AE | Item | ||||||
| 29 | TRUE | BCE | Item | ||||||
| 30 | TRUE | AE | Item | ||||||
| 31 | TRUE | AE | Item | ||||||
| 32 | TRUE | AE | Item | ||||||
| 33 | TRUE | AE | Item | ||||||
| 34 | FALSE | BCE | Item | ||||||
| 35 | FALSE | KO | Item | ||||||
| 36 | TRUE | AE | Item | ||||||
| 37 | TRUE | AE | Item | ||||||
| 38 | FALSE | BCE | Item | ||||||
| 39 | TRUE | AE | Item | ||||||
| 40 | TRUE | AE | Item | ||||||
| 41 | TRUE | AE | Item | ||||||
| 42 | TRUE | AE | Item | ||||||
| 43 | FALSE | KO | Item | ||||||
| 44 | TRUE | AE | Item | ||||||
| 45 | TRUE | AE | Item | ||||||
| 46 | TRUE | AE | Item | ||||||
| 47 | FALSE | BCE | Item | ||||||
| 48 | FALSE | KO | Item | ||||||
| 49 | TRUE | AE | Item | ||||||
| 50 | TRUE | AE | Item | ||||||
| 51 | TRUE | AE | Item | ||||||
| 52 | TRUE | AE | Item | ||||||
| 53 | TRUE | AE | Item | ||||||
| 54 | TRUE | AE | Item | ||||||
| 55 | TRUE | AE | Item | ||||||
| 56 | TRUE | AE | Item | ||||||
| 57 | FALSE | KO | Item | ||||||
| 58 | FALSE | KO | Item | ||||||
| 59 | TRUE | AE | Item | ||||||
| 60 | FALSE | BCE | Item | ||||||
| 60 | TRUE | AE | Item | ||||||
| 62 | TRUE | AE | Item | ||||||
| 63 | TRUE | AE | Item | ||||||
| 64 | TRUE | AE | Item | ||||||
| 65 | TRUE | AE | Item | ||||||
| 66 | FALSE | KO | Item | ||||||
| 67 | FALSE | BCE | Item | ||||||
| 68 | TRUE | AE | Item | ||||||
| 69 | TRUE | AE | Item | ||||||
| 70 | TRUE | AE | Item | ||||||
| 71 | TRUE | AE | Item | ||||||
| 72 | TRUE | AE | Item | ||||||
| 73 | TRUE | AE | Item | ||||||
| 74 | TRUE | AE | Item | ||||||
| 75 | FALSE | KO | Item | ||||||
| 76 | FALSE | KO | Item | ||||||
| 77 | TRUE | AE | Item | ||||||
| 78 | TRUE | AE | Item | ||||||
| 79 | TRUE | AE | Item | ||||||
| 80 | TRUE | AE | Item | ||||||
| 81 | TRUE | AE | Item | ||||||
| 82 | TRUE | AE | Item | ||||||
| 83 | TRUE | AE | Item | ||||||
| 84 | |||||||||
| 85 | |||||||||
| 86 | |||||||||
| 87 | |||||||||
| 88 | |||||||||
| 89 | |||||||||
| 90 | |||||||||
| 91 | |||||||||
| 92 | |||||||||
| 93 | |||||||||
| 94 | |||||||||
| 95 | |||||||||
| 96 | |||||||||
| 97 | |||||||||
| 98 | |||||||||
| 99 | |||||||||
| 100 | |||||||||
| 101 | |||||||||
| 102 | |||||||||
| 103 | |||||||||
| 104 | |||||||||
| 105 | |||||||||
| 106 | |||||||||
| 107 | |||||||||
| 108 | |||||||||
| 109 | |||||||||
| 110 |
File details come from the government source that posted it. Updated .