MATOC_B223_BID_RFIs.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Construction MATOC -- Washington and Oregon National Guard
Solicitation number
W912K3-17-R-0003
Issued by

About this file

"seed project" Q&A

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID PHASE RFIs

Project NumberRFI #RFI TitleQuestionAnswerDateQuestionDateAnswerCompleteOPRItem TypeComment
KJAQ 1524511LEED REQUIREMENTSLEED requirements are not specified in the RFP for this seed project. However, LEED requirements are seen throughout several specification sections. Are there any LEED requirements for the KFANG seed project? If so, what are they.
Pond Response - There are no formal LEED requirements for this project.3/23/173/23/17TRUEAEItem
KJAQ 1524512QC Representative - 01 30 00Specification section 01 30 00 - Part 1, Paragraph 1.6.1 mentions a Quality Control representative. The RFP for this seed project does not specify the need for a separate QC representative. Can you please clarify whether or not a separate QC person is needed? Or can the QC and site superintendent be a combined role?
Pond Response - Pond takes no exception to a combined QC / Superintendent role as long as they meet the qualifications for both disciplines3/23/173/23/17TRUEAEItem
KJAQ 1524513Job TrailerWill there be a place on base for a job trailer? If yes, will we be able to connect temp power?Govern Response -Yes on both. Contractor is responsible for all platt (hook-ups)3/23/173/23/17TRUEBCEItem
KJAQ 1524514Fire Alarm SystemWill you provide the Part # of the Fire Alarm Panel? Horn/Stobes, pull stations?
Govern Response - Monaco M-2 w/NAC Silent Night(conventional) = #227-991-01. Horn Strobes - wheellock MT24LS / Pull Station - FCI - MS-63/23/173/23/17TRUEBCEItem
KJAQ 1524515Fire Alarm SystemWill you provide a Part # of heat/smoke detectors so we can match new to existing?Govern Response - Heat= Monaco 721126-00 / Smoke = sys sensor 24513/23/173/24/17TRUEBCEItem
KJAQ 1524516Fire Alarm SystemWill you verify if the existing fire alarm system is conventional or addressable?Govern Response - Conventional3/23/173/24/17TRUEBCEItem
KJAQ 1524517Fire Alarm System/ Sheet E-603:Per NOTE #5 on page E-603: Will the entire existing fire alarm system be

required to be tested and re-certified or just the existing circuits we are adding devices to?

Govern - Response - It is the governments intent to test the entire system for proper function. Only areas that have been altered or added will be recertified.3/23/173/23/17TRUEBCEItem
KJAQ 1524518Fire Alarm SystemIf the entire fire alarm system is required to be tested and

re-certified, will you provide device counts so we can have an idea of the size of the system to be tested and re-certified?

Govern Response - It is the governments intent to test the entire system for proper function. Only areas that have been altered or added will be recertified.3/23/173/23/17TRUEBCEItem
KJAQ 1524519RoofingSpec section 07 22 00 para 1.4.3 & 2.1.3 are calling for R-30 insulation. Sheet AD-151 note 2 states we are to remove existing EPDM roofing down to the roof insulation, repair existing insulation to receive the new roof system. Sheet A-151 note 16 says to install black EPDM roof membrane over ¼” roof cover board. Details C1 & C3 on sheet A521 show R-30 polyiso insulation (no designation if it is new or existing). Detail A4 on the same sheet states that the, “existing roof insulation to remain”. So what are we supposed to do? Are we adding insulation to get to R30? Are we only adding the recover board?
Pond Response - Existing roof insulation to remain. No additional insulation required unless the existing insulation is damaged and needs repair. Install cover board and roof membrane over existing insulation.3/24/173/27/17TRUEAEItem
KJAQ 15245110Blast Rating WindowsWe were unable to locate any blast rating information for the windows and doors on the drawings indicated in the specs under Section 08 11 13 Page 7, 2.13 Provisions for glazing. Please provide us with the design criteria. Criteria: . 1. Level of Protection: See structural drawings. 2. Design Standoff distance: See structural drawings. 3. Applicable Explosive Weight: II 4. Door Category III per ASTM F2247-11 5. Blast load: As indicated on Structural drawings. We are also wondering if the glass adjacent to the new exterior doors will have to be tempered?
Pond Response - See S-001, Section F. ANTI-TERRORISM FORCE PROTECTION, Note 5. New doors and windows must meet these requirements.3/24/173/27/17TRUEAEItem
KJAQ 15245111Flooring Comm Room 134Please clarify flooring type at room 134 comm rm. Finish calls for SPT-1, Finish ledger calls for SDT-1. Please clarify floor covering type for comm room.Pond Response - Flooring type shall be Static Dissipative Tile (SDT-1)3/24/173/27/17TRUEAEItem
KJAQ 15245112Vault DoorsPlease provide vault door and Day gate manufacturer and phone number.3/24/17
13TRUEBCEItem
14TRUEAEItem
15TRUEAEItem
16TRUEAEItem
17FALSEKOItem
18FALSEKOItem
19FALSEKOItem
20FALSEBCEItem
21TRUEBCEItem
22FALSEKOItem
23TRUEBCEItem
24TRUEBCEItem
25TRUEBCEItem
26TRUEBCEItem
27TRUEBCEItem
28TRUEAEItem
29TRUEBCEItem
30TRUEAEItem
31TRUEAEItem
32TRUEAEItem
33TRUEAEItem
34FALSEBCEItem
35FALSEKOItem
36TRUEAEItem
37TRUEAEItem
38FALSEBCEItem
39TRUEAEItem
40TRUEAEItem
41TRUEAEItem
42TRUEAEItem
43FALSEKOItem
44TRUEAEItem
45TRUEAEItem
46TRUEAEItem
47FALSEBCEItem
48FALSEKOItem
49TRUEAEItem
50TRUEAEItem
51TRUEAEItem
52TRUEAEItem
53TRUEAEItem
54TRUEAEItem
55TRUEAEItem
56TRUEAEItem
57FALSEKOItem
58FALSEKOItem
59TRUEAEItem
60FALSEBCEItem
60TRUEAEItem
62TRUEAEItem
63TRUEAEItem
64TRUEAEItem
65TRUEAEItem
66FALSEKOItem
67FALSEBCEItem
68TRUEAEItem
69TRUEAEItem
70TRUEAEItem
71TRUEAEItem
72TRUEAEItem
73TRUEAEItem
74TRUEAEItem
75FALSEKOItem
76FALSEKOItem
77TRUEAEItem
78TRUEAEItem
79TRUEAEItem
80TRUEAEItem
81TRUEAEItem
82TRUEAEItem
83TRUEAEItem
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110

File details come from the government source that posted it. Updated .