BID PHASE RFIs
| Project Number | RFI # | RFI Title | Question | Answer | DateQuestion | DateAnswer | Complete | OPR | Item Type | Comment |
| KJAQ 152451 | 1 | LEED REQUIREMENTS | LEED requirements are not specified in the RFP for this seed project. However, LEED requirements are seen throughout several specification sections. Are there any LEED requirements for the KFANG seed project? If so, what are they. | |||||||
| Pond Response - There are no formal LEED requirements for this project. | 3/23/17 | 3/23/17 | TRUE | AE | Item | |||||
| KJAQ 152451 | 2 | QC Representative - 01 30 00 | Specification section 01 30 00 - Part 1, Paragraph 1.6.1 mentions a Quality Control representative. The RFP for this seed project does not specify the need for a separate QC representative. Can you please clarify whether or not a separate QC person is needed? Or can the QC and site superintendent be a combined role? | |||||||
| Pond Response - Pond takes no exception to a combined QC / Superintendent role as long as they meet the qualifications for both disciplines | 3/23/17 | 3/23/17 | TRUE | AE | Item | |||||
| KJAQ 152451 | 3 | Job Trailer | Will there be a place on base for a job trailer? If yes, will we be able to connect temp power? | Govern Response -Yes on both. Contractor is responsible for all platt (hook-ups) | 3/23/17 | 3/23/17 | TRUE | BCE | Item | |
| KJAQ 152451 | 4 | Fire Alarm System | Will you provide the Part # of the Fire Alarm Panel? Horn/Stobes, pull stations? |
| Govern Response - Monaco M-2 w/NAC Silent Night(conventional) = #227-991-01. Horn Strobes - wheellock MT24LS / Pull Station - FCI - MS-6 | 3/23/17 | 3/23/17 | TRUE | BCE | Item | ||||
| KJAQ 152451 | 5 | Fire Alarm System | Will you provide a Part # of heat/smoke detectors so we can match new to existing? | Govern Response - Heat= Monaco 721126-00 / Smoke = sys sensor 2451 | 3/23/17 | 3/24/17 | TRUE | BCE | Item |
| KJAQ 152451 | 6 | Fire Alarm System | Will you verify if the existing fire alarm system is conventional or addressable? | Govern Response - Conventional | 3/23/17 | 3/24/17 | TRUE | BCE | Item |
| KJAQ 152451 | 7 | Fire Alarm System/ Sheet E-603: | Per NOTE #5 on page E-603: Will the entire existing fire alarm system be |
required to be tested and re-certified or just the existing circuits we are adding devices to?
| Govern - Response - It is the governments intent to test the entire system for proper function. Only areas that have been altered or added will be recertified. | 3/23/17 | 3/23/17 | TRUE | BCE | Item |
| KJAQ 152451 | 8 | Fire Alarm System | If the entire fire alarm system is required to be tested and |
re-certified, will you provide device counts so we can have an idea of the size of the system to be tested and re-certified?
| Govern Response - It is the governments intent to test the entire system for proper function. Only areas that have been altered or added will be recertified. | 3/23/17 | 3/23/17 | TRUE | BCE | Item |
| KJAQ 152451 | 9 | Roofing | Spec section 07 22 00 para 1.4.3 & 2.1.3 are calling for R-30 insulation. Sheet AD-151 note 2 states we are to remove existing EPDM roofing down to the roof insulation, repair existing insulation to receive the new roof system. Sheet A-151 note 16 says to install black EPDM roof membrane over ¼” roof cover board. Details C1 & C3 on sheet A521 show R-30 polyiso insulation (no designation if it is new or existing). Detail A4 on the same sheet states that the, “existing roof insulation to remain”. So what are we supposed to do? Are we adding insulation to get to R30? Are we only adding the recover board? |
| Pond Response - Existing roof insulation to remain. No additional insulation required unless the existing insulation is damaged and needs repair. Install cover board and roof membrane over existing insulation. | 3/24/17 | 3/27/17 | TRUE | AE | Item |
| KJAQ 152451 | 10 | Blast Rating Windows | We were unable to locate any blast rating information for the windows and doors on the drawings indicated in the specs under Section 08 11 13 Page 7, 2.13 Provisions for glazing. Please provide us with the design criteria. Criteria: . 1. Level of Protection: See structural drawings. 2. Design Standoff distance: See structural drawings. 3. Applicable Explosive Weight: II 4. Door Category III per ASTM F2247-11 5. Blast load: As indicated on Structural drawings. We are also wondering if the glass adjacent to the new exterior doors will have to be tempered? |
| Pond Response - See S-001, Section F. ANTI-TERRORISM FORCE PROTECTION, Note 5. New doors and windows must meet these requirements. | 3/24/17 | 3/27/17 | TRUE | AE | Item | ||||
| KJAQ 152451 | 11 | Flooring Comm Room 134 | Please clarify flooring type at room 134 comm rm. Finish calls for SPT-1, Finish ledger calls for SDT-1. Please clarify floor covering type for comm room. | Pond Response - Flooring type shall be Static Dissipative Tile (SDT-1) | 3/24/17 | 3/27/17 | TRUE | AE | Item |
| KJAQ 152451 | 12 | Vault Doors | Please provide vault door and Day gate manufacturer and phone number. | Pond Response - Cannot sole source manufacturer. Contractor may use any manufacturer that meets the specifications | 3/24/17 | 4/3/17 | |||
| 13 | Hardware A-601 | Please clarify which doors require a card reader. A-601 door schedule indicates |
133A, 137C; T-101 indicates 130B & 132; Specification 087100 indicates 133B,137C, & 133C.
| Pond Response - Sprinkler work is limited to relocation of heads as impacted by renovation | 3/24/17 | 4/3/17 | TRUE | AE | Item |
| 14 | Sprinkler F-100/101 | Please clarify intent of drawings F-100/101 regarding sprinkler work for the project |
as no scope of work was provided, no division 21 specifications were provided, and no listing of sprinkler associated work was included on MATOC Proposal form nor Detailed Offer Spread sheet.
| Pond Response - Sprinkler work is limited to relocation of heads as impacted by renovation | 3/24/17 | 4/3/17 | TRUE | AE | Item | |
| 15 | Sprinkler F-100/101 | Is there a current fire suppression system which requires modification? If so will | ||||
| location of sprinkler riser, piping distribution, and sprinkler locations be provided. | Pond Response - There is an existing fire suppression system | 3/24/17 | 4/3/17 | TRUE | AE | Item |
| 16 | Sprinkler F-100/101 | If no system exists and a new system is required to cover only the area indicated, |
will site drawings of existing fire main be provided to define route and size to
| building? | Pond Response - There is an existing fire suppression system | 3/24/17 | 4/3/17 | TRUE | AE | Item |
| 17 | Wall Types A-102 | Please confirm that partition type H is the correct type for Secure Storage A west |
wall and Secure Storage B East and west wall as these wall butt against existing
| precast concrete panels. | Pond Response - Partition type H is correct. | 3/24/17 | 4/3/17 | FALSE | AE | Item |
| 18 | Exit Signns E-101 | Please confirm that new exits signs for doors 108B, 133A, and 133B are wall | ||||
| mounted as they are consistintly depicted on G-003 and A-132. | Pond Response - As shown on E-101 exit signs for doors 108B, 133A, and 133B are wall mounted | 3/24/17 | 4/3/17 | FALSE | AE | Item |
| 19 | Signage I-791 | Please provide quantity of B1 (workstations NIC) and B2 (Fire evacuation plans) | ||||
| required. | Pond Response - Number of B1 workstations: 16. Number of fire evacuations plans: 3 | 3/24/17 | 4/3/17 | FALSE | AE | Item |
| 20 | Structual S-103 | Please clarify intent of reinforcement of area indicated north of column 2 between |
columns B and E as no new MEP equipment is indicated on the existing metal
| canopy to remain. | Pond Response - This one air roof hood (just north of line 2 between lines B&E) is in error and shall be removed. | 3/24/17 | 4/3/17 | FALSE | AE | Item | ||||
| 21 | Lighting E-101 | Clarify is switch is required for Secure Storage B. | Pond Response - Provide wall mounted occupancy switch. | 3/24/17 | 4/3/17 | TRUE | AE | Item | ||
| 22 | FA E-603 | What is the Monaco part number for the existing panel? | SEE RFI #4 | 3/24/17 | 3/29/17 | FALSE | BCE | Item | ||
| 23 | FA E-603 | Will part numbers or model numbers for Existing To Remain devices be provided to | ||||||||
| allow new devices being added to the system to more closely match? | SEE RFI #4/5 | 3/24/17 | 3/29/17 | TRUE | BCE | Item | ||||
| 24 | FA E-603 | Will the new Notification devices be added to an existing NAC circuit? | Yes/RFI #4 | 3/24/17 | 3/29/17 | TRUE | BCE | Item | ||
| 25 | FA E-603 | Is there a NAC extender already existing in the systems? | Yes, RFI #4 | 3/24/17 | 3/29/17 | TRUE | BCE | Item | ||
| 26 | FA 283100.001 | Specification 283100.0010 Section 2 Products, part 2.4 Manual Fire Alarm |
Stations: reads to “connect manual stations into Signal Line Circuit.” Is the new Initiating Device in room 108 to be added to the system on an SLC (Signaling Line Circuit NFPA72 3.3.259) or an IDC (Initiating Device Circuit NFPA72 3.3.133) from
| the panel? | Added on a IDC (Panel in conventional NOT addressable) | 3/24/17 | 3/29/17 | TRUE | BCE | Item | ||||
| 27 | FA E-603 | How many IDC’s are there in the current system? | 10 Class Bs, 2 spares | 3/24/17 | 4/3/17 | TRUE | BCE | Item | ||
| 28 | FA E-603 | If a new IDC is needed, are there available circuits in the current panel? | Yes, 22 class B available or 2 class Bs and 10 class As. | 3/24/17 | 4/3/17 | TRUE | BCE | Item | ||
| 29 | FA 283100.001 | Specification 283100.0010 Section 2.2.1 reads: provide a looped conduit system. | ||||||||
| In the case a new IDC or SLC is needed will it be Class A? | Yes, class A | 3/24/17 | 3/29/17 | TRUE | BCE | Item | ||||
| 30 | FA E-121 | In the case Room 108’s new Pull Station is to be addressable and the current panel |
is an M2 Conventional which does not have SLC availability, will the current IDC’s be required to report as a zone on a new addressable panel or can a Monitor
| Modules be placed on an SLC to monitor the existing IDC’s? | Pull station should be conventional | 3/24/17 | 3/29/17 | TRUE | BCE | Item | ||||
| 31 | FA 283100.001 | Will the Preliminary Tests (3.5.1) require presence by a Monaco rep. or just | ||||||||
| Acceptance test? | Govern - Response - It is the governments intent to test the entire system for proper function. Only areas that have been altered or added will be recertified. We are just adding or extending circuits so a Monaco Rep will not be required, however contractor will still perform test on new or extended circuits, and perform acceptance test with govern representative. | 3/24/17 | 3/29/17 | TRUE | BCE | Item | ||||
| 32 | FA 283100.001 | In the case a Monaco. Rep. is required for Preliminary and Acceptance test, will | ||||||||
| testing occur in consecutive days? | See RFI #31 | 3/24/17 | 3/29/17 | TRUE | BCE | Item | ||||
| 33 | FA 283100.001 | Will testing include the entire system or just the new additional devices and circuits | ||||||||
| to the panel? | SEE RFI #31 | 3/24/17 | 3/29/17 | TRUE | BCE | Item | ||||
| 34 | FA 283100.001 | Is system training required to be by a Monaco Rep.? | SEE RFI #31 | 3/24/17 | 3/29/17 | FALSE | BCE | Item | ||
| 35 | Flooring Comm Room 134 | Comm room 134 - the floor finish listed as SPT-1 however this floor |
finish is not listed in the Finish Schedule. Could the government please confirm the finish for Comm room 134 and provide this information in the Finish Schedule?
| SEE RFI # 12 Flooring type shall be Static Dissipative Tile (SDT-1) | 3/29/17 | 3/30/17 | FALSE | BCE | Item |
| 36 | Devices G-003 Note 1 | Sheet G-003 Note 1 - Devices have been shown but the contractor |
shall ensure the installation of all life safety devices indicated on the engineering drawings. Could the government provide the number of safety devices that are currently installed?
| Pond Response - It is believed all devices are shown. However, it is the contractor's responsibility to field verify and provide as needed | 3/29/17 | 4/3/17 | TRUE | AE | Item |
| 37 | DTC-2 Sheet A-401 | Sheet A-401 Detail A2 shows accessory DTC-2. This accessory is not |
listed on the Accessories Schedule. Could the government confirm whether or not accessory DTC-2 will be installed? If so, could the government add this information to the Accessories Schedule?
| Pond Response: Disregard note DTC-2 on detail A2/A-401 | 4/3/17 | 4/3/17 | TRUE | AE | Item | |||
| 38 | Toilet Partitions - I-601 | On drawing I-601 the finish schedule item TP requests the toilet partitions to be Phenolic Color-Thru material. When you read specification section 10 21 13, they refer to steel type dimensions for the partitions. The spec's ask for 1" (p2.2) panels and 1.25" (p.2.3) thick pilasters. The Global Partitions Phenolic standard toilet compartments come in 1/2" panels and 3/4" pilasters. Please clarify the dimensions of the toilet partitions for this project. | ||||||
| Pond Response - Toilet partitions shall be phenolic standard toilet compartments with 1/2" panels and 3/4" pilasters | 3/31/17 | 4/3/17 | FALSE | AE | Item | |||
| 39 | ACM survey - roofing components | Has an ACM survey been conducted on the existing roofing components? If not, who is responsible for the survey? Are we to assume the existing roofing has ACM? If there is ACM, are we to assume “friable” of “non-friable” materials? | Per the site visit. Bldg does NOT have ACM. This facility was built in 1995. | TRUE | AE | Item | ||
| 40 | Roof Insulation | Government response to previous RFI questions 9 says the existing roof insulation is to remain, unless the existing insulation is damaged and needs repair. This is impossible to quantify until the existing insulation is exposed. We recommend the government require a square footage allowance in the bid to cover the cost of potentially deteriorated existing insulation. Being the RFP requires a 20-year NDL warranty, this means our roofing manufacturer will require all deteriorated (wet / damaged) insulation be replaced to make the warranty valid. Please advise | We do not believe the existing insulation has any problems. Assume 10% replacement of existing insulation for your bid | TRUE | AE | Item | ||
| 41 | Roof System | The as-built drawings do not show the exact components of the existing roof system. Has the government or others taken a core sample? We need to know if the existing roof system has an existing cover board, and if the existing membrane is mechanically fastened or adhered. The thickness of the existing insulation is also of major importance to know being the new ¼” cover board will have to be mechanically attached through the existing insulation and into the existing metal deck | Existing Roof is EDPM, fully adhered. Bid as shown | TRUE | BCE | Item | ||
| 42 | Roof membrane | Does the government require that the existing membrane and insulation crickets be removed, or are they to remain? | Existing roof membrane to be removed. | TRUE | AE | Item | ||
| 43 | Roof Size | The as-built drawings show that the roof is 28,500 square feet. However, when measured during the site visit, the roof size measured 38,500. Confirm the size of the roof? | Contractor is responsible for verifying size of roof. As-built drawings are assumed correct | FALSE | BCE | Item | ||
| 44 | Window Blinds | On sheet A- 102 Window Tags are shown on Customer Service Open Area only. It does not say anything on Customer Service 137 location so, do you need Window Blinds in these area or just the Customer Service Open area ? | ||||||
| The windows in Customer Service 137 are existing and have existing blinds. | TRUE | AE | Item | |||||
| 45 | Window Blinds | On sheet I-601 FINISH LEGEND it says Window Blinds for all exterior Windows (Option 3). |
Could you please tell us what does the option 3 indicates?
| The term "Option 3" shall be disregarded. There are no bid options on this project. Window blinds are part of the base bid. | TRUE | AE | Item | |||||
| 46 | Paints & Coatings | Specification Section 099000, Paints and Coatings, Paragraph 1.4.1.2 requires an independent third party laboratory with specialized certifications to perform testing of coating samples for compliance with specification requirements. Is 3rd party laboratory paint testing is required on this project? | A third party laboratory is NOTneeded | TRUE | BCE | Item | ||
| 47 | Vault Doors | Please clarify if the contractor have to provide daygates for the new and re used vault doors. | See RFI 12 | FALSE | BCE | Item | ||
| 48 | Roofing Termination Couterflashing | Is it acceptable to remove and replace the existing roofing counterflashings with surface mounted and caulked counterflashings or must contractors sawcut/kerf the concrete to install the counterflashing into the concrete walls as indicated? | ||||||
| bid the project as stated in the specifications. | FALSE | KO | Item | |||||
| 49 | TRUE | AE | Item | |||||
| 50 | TRUE | AE | Item | |||||
| 51 | TRUE | AE | Item | |||||
| 52 | TRUE | AE | Item | |||||
| 53 | TRUE | AE | Item | |||||
| 54 | TRUE | AE | Item | |||||
| 55 | TRUE | AE | Item | |||||
| 56 | TRUE | AE | Item | |||||
| 57 | FALSE | KO | Item | |||||
| 58 | FALSE | KO | Item | |||||
| 59 | TRUE | AE | Item | |||||
| 60 | FALSE | BCE | Item | |||||
| 60 | TRUE | AE | Item | |||||
| 62 | TRUE | AE | Item | |||||
| 63 | TRUE | AE | Item | |||||
| 64 | TRUE | AE | Item | |||||
| 65 | TRUE | AE | Item | |||||
| 66 | FALSE | KO | Item | |||||
| 67 | FALSE | BCE | Item | |||||
| 68 | TRUE | AE | Item | |||||
| 69 | TRUE | AE | Item | |||||
| 70 | TRUE | AE | Item | |||||
| 71 | TRUE | AE | Item | |||||
| 72 | TRUE | AE | Item | |||||
| 73 | TRUE | AE | Item | |||||
| 74 | TRUE | AE | Item | |||||
| 75 | FALSE | KO | Item | |||||
| 76 | FALSE | KO | Item | |||||
| 77 | TRUE | AE | Item | |||||
| 78 | TRUE | AE | Item | |||||
| 79 | TRUE | AE | Item | |||||
| 80 | TRUE | AE | Item | |||||
| 81 | TRUE | AE | Item | |||||
| 82 | TRUE | AE | Item | |||||
| 83 | TRUE | AE | Item | |||||
| 84 | ||||||||
| 85 | ||||||||
| 86 | ||||||||
| 87 | ||||||||
| 88 | ||||||||
| 89 | ||||||||
| 90 | ||||||||
| 91 | ||||||||
| 92 | ||||||||
| 93 | ||||||||
| 94 | ||||||||
| 95 | ||||||||
| 96 | ||||||||
| 97 | ||||||||
| 98 | ||||||||
| 99 | ||||||||
| 100 | ||||||||
| 101 | ||||||||
| 102 | ||||||||
| 103 | ||||||||
| 104 | ||||||||
| 105 | ||||||||
| 106 | ||||||||
| 107 | ||||||||
| 108 | ||||||||
| 109 | ||||||||
| 110 |