MATOC_B223_BID_RFIs_(2_April_17).xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Construction MATOC -- Washington and Oregon National Guard
Solicitation number
W912K3-17-R-0003
Issued by

About this file

Updated B223 RFI as of 05 April

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID PHASE RFIs

Project NumberRFI #RFI TitleQuestionAnswerDateQuestionDateAnswerCompleteOPRItem TypeComment
KJAQ 1524511LEED REQUIREMENTSLEED requirements are not specified in the RFP for this seed project. However, LEED requirements are seen throughout several specification sections. Are there any LEED requirements for the KFANG seed project? If so, what are they.
Pond Response - There are no formal LEED requirements for this project.3/23/173/23/17TRUEAEItem
KJAQ 1524512QC Representative - 01 30 00Specification section 01 30 00 - Part 1, Paragraph 1.6.1 mentions a Quality Control representative. The RFP for this seed project does not specify the need for a separate QC representative. Can you please clarify whether or not a separate QC person is needed? Or can the QC and site superintendent be a combined role?
Pond Response - Pond takes no exception to a combined QC / Superintendent role as long as they meet the qualifications for both disciplines3/23/173/23/17TRUEAEItem
KJAQ 1524513Job TrailerWill there be a place on base for a job trailer? If yes, will we be able to connect temp power?Govern Response -Yes on both. Contractor is responsible for all platt (hook-ups)3/23/173/23/17TRUEBCEItem
KJAQ 1524514Fire Alarm SystemWill you provide the Part # of the Fire Alarm Panel? Horn/Stobes, pull stations?
Govern Response - Monaco M-2 w/NAC Silent Night(conventional) = #227-991-01. Horn Strobes - wheellock MT24LS / Pull Station - FCI - MS-63/23/173/23/17TRUEBCEItem
KJAQ 1524515Fire Alarm SystemWill you provide a Part # of heat/smoke detectors so we can match new to existing?Govern Response - Heat= Monaco 721126-00 / Smoke = sys sensor 24513/23/173/24/17TRUEBCEItem
KJAQ 1524516Fire Alarm SystemWill you verify if the existing fire alarm system is conventional or addressable?Govern Response - Conventional3/23/173/24/17TRUEBCEItem
KJAQ 1524517Fire Alarm System/ Sheet E-603:Per NOTE #5 on page E-603: Will the entire existing fire alarm system be

required to be tested and re-certified or just the existing circuits we are adding devices to?

Govern - Response - It is the governments intent to test the entire system for proper function. Only areas that have been altered or added will be recertified.3/23/173/23/17TRUEBCEItem
KJAQ 1524518Fire Alarm SystemIf the entire fire alarm system is required to be tested and

re-certified, will you provide device counts so we can have an idea of the size of the system to be tested and re-certified?

Govern Response - It is the governments intent to test the entire system for proper function. Only areas that have been altered or added will be recertified.3/23/173/23/17TRUEBCEItem
KJAQ 1524519RoofingSpec section 07 22 00 para 1.4.3 & 2.1.3 are calling for R-30 insulation. Sheet AD-151 note 2 states we are to remove existing EPDM roofing down to the roof insulation, repair existing insulation to receive the new roof system. Sheet A-151 note 16 says to install black EPDM roof membrane over ¼” roof cover board. Details C1 & C3 on sheet A521 show R-30 polyiso insulation (no designation if it is new or existing). Detail A4 on the same sheet states that the, “existing roof insulation to remain”. So what are we supposed to do? Are we adding insulation to get to R30? Are we only adding the recover board?
Pond Response - Existing roof insulation to remain. No additional insulation required unless the existing insulation is damaged and needs repair. Install cover board and roof membrane over existing insulation.3/24/173/27/17TRUEAEItem
KJAQ 15245110Blast Rating WindowsWe were unable to locate any blast rating information for the windows and doors on the drawings indicated in the specs under Section 08 11 13 Page 7, 2.13 Provisions for glazing. Please provide us with the design criteria. Criteria: . 1. Level of Protection: See structural drawings. 2. Design Standoff distance: See structural drawings. 3. Applicable Explosive Weight: II 4. Door Category III per ASTM F2247-11 5. Blast load: As indicated on Structural drawings. We are also wondering if the glass adjacent to the new exterior doors will have to be tempered?
Pond Response - See S-001, Section F. ANTI-TERRORISM FORCE PROTECTION, Note 5. New doors and windows must meet these requirements.3/24/173/27/17TRUEAEItem
KJAQ 15245111Flooring Comm Room 134Please clarify flooring type at room 134 comm rm. Finish calls for SPT-1, Finish ledger calls for SDT-1. Please clarify floor covering type for comm room.Pond Response - Flooring type shall be Static Dissipative Tile (SDT-1)3/24/173/27/17TRUEAEItem
KJAQ 15245112Vault DoorsPlease provide vault door and Day gate manufacturer and phone number.Pond Response - Cannot sole source manufacturer. Contractor may use any manufacturer that meets the specifications3/24/174/3/17
13Hardware A-601Please clarify which doors require a card reader. A-601 door schedule indicates

133A, 137C; T-101 indicates 130B & 132; Specification 087100 indicates 133B,137C, & 133C.

Pond Response - Sprinkler work is limited to relocation of heads as impacted by renovation3/24/174/3/17TRUEAEItem
14Sprinkler F-100/101Please clarify intent of drawings F-100/101 regarding sprinkler work for the project

as no scope of work was provided, no division 21 specifications were provided, and no listing of sprinkler associated work was included on MATOC Proposal form nor Detailed Offer Spread sheet.

Pond Response - Sprinkler work is limited to relocation of heads as impacted by renovation3/24/174/3/17TRUEAEItem
15Sprinkler F-100/101Is there a current fire suppression system which requires modification? If so will
location of sprinkler riser, piping distribution, and sprinkler locations be provided.Pond Response - There is an existing fire suppression system3/24/174/3/17TRUEAEItem
16Sprinkler F-100/101If no system exists and a new system is required to cover only the area indicated,

will site drawings of existing fire main be provided to define route and size to

building?Pond Response - There is an existing fire suppression system3/24/174/3/17TRUEAEItem
17Wall Types A-102Please confirm that partition type H is the correct type for Secure Storage A west

wall and Secure Storage B East and west wall as these wall butt against existing

precast concrete panels.Pond Response - Partition type H is correct.3/24/174/3/17FALSEAEItem
18Exit Signns E-101Please confirm that new exits signs for doors 108B, 133A, and 133B are wall
mounted as they are consistintly depicted on G-003 and A-132.Pond Response - As shown on E-101 exit signs for doors 108B, 133A, and 133B are wall mounted3/24/174/3/17FALSEAEItem
19Signage I-791Please provide quantity of B1 (workstations NIC) and B2 (Fire evacuation plans)
required.Pond Response - Number of B1 workstations: 16. Number of fire evacuations plans: 33/24/174/3/17FALSEAEItem
20Structual S-103Please clarify intent of reinforcement of area indicated north of column 2 between

columns B and E as no new MEP equipment is indicated on the existing metal

canopy to remain.Pond Response - This one air roof hood (just north of line 2 between lines B&E) is in error and shall be removed.3/24/174/3/17FALSEAEItem
21Lighting E-101Clarify is switch is required for Secure Storage B.Pond Response - Provide wall mounted occupancy switch.3/24/174/3/17TRUEAEItem
22FA E-603What is the Monaco part number for the existing panel?SEE RFI #43/24/173/29/17FALSEBCEItem
23FA E-603Will part numbers or model numbers for Existing To Remain devices be provided to
allow new devices being added to the system to more closely match?SEE RFI #4/53/24/173/29/17TRUEBCEItem
24FA E-603Will the new Notification devices be added to an existing NAC circuit?Yes/RFI #43/24/173/29/17TRUEBCEItem
25FA E-603Is there a NAC extender already existing in the systems?Yes, RFI #43/24/173/29/17TRUEBCEItem
26FA 283100.001Specification 283100.0010 Section 2 Products, part 2.4 Manual Fire Alarm

Stations: reads to “connect manual stations into Signal Line Circuit.” Is the new Initiating Device in room 108 to be added to the system on an SLC (Signaling Line Circuit NFPA72 3.3.259) or an IDC (Initiating Device Circuit NFPA72 3.3.133) from

the panel?Added on a IDC (Panel in conventional NOT addressable)3/24/173/29/17TRUEBCEItem
27FA E-603How many IDC’s are there in the current system?10 Class Bs, 2 spares3/24/174/3/17TRUEBCEItem
28FA E-603If a new IDC is needed, are there available circuits in the current panel?Yes, 22 class B available or 2 class Bs and 10 class As.3/24/174/3/17TRUEBCEItem
29FA 283100.001Specification 283100.0010 Section 2.2.1 reads: provide a looped conduit system.
In the case a new IDC or SLC is needed will it be Class A?Yes, class A3/24/173/29/17TRUEBCEItem
30FA E-121In the case Room 108’s new Pull Station is to be addressable and the current panel

is an M2 Conventional which does not have SLC availability, will the current IDC’s be required to report as a zone on a new addressable panel or can a Monitor

Modules be placed on an SLC to monitor the existing IDC’s?Pull station should be conventional3/24/173/29/17TRUEBCEItem
31FA 283100.001Will the Preliminary Tests (3.5.1) require presence by a Monaco rep. or just
Acceptance test?Govern - Response - It is the governments intent to test the entire system for proper function. Only areas that have been altered or added will be recertified. We are just adding or extending circuits so a Monaco Rep will not be required, however contractor will still perform test on new or extended circuits, and perform acceptance test with govern representative.3/24/173/29/17TRUEBCEItem
32FA 283100.001In the case a Monaco. Rep. is required for Preliminary and Acceptance test, will
testing occur in consecutive days?See RFI #313/24/173/29/17TRUEBCEItem
33FA 283100.001Will testing include the entire system or just the new additional devices and circuits
to the panel?SEE RFI #313/24/173/29/17TRUEBCEItem
34FA 283100.001Is system training required to be by a Monaco Rep.?SEE RFI #313/24/173/29/17FALSEBCEItem
35Flooring Comm Room 134Comm room 134 - the floor finish listed as SPT-1 however this floor

finish is not listed in the Finish Schedule. Could the government please confirm the finish for Comm room 134 and provide this information in the Finish Schedule?

SEE RFI # 12 Flooring type shall be Static Dissipative Tile (SDT-1)3/29/173/30/17FALSEBCEItem
36Devices G-003 Note 1Sheet G-003 Note 1 - Devices have been shown but the contractor

shall ensure the installation of all life safety devices indicated on the engineering drawings. Could the government provide the number of safety devices that are currently installed?

Pond Response - It is believed all devices are shown. However, it is the contractor's responsibility to field verify and provide as needed3/29/174/3/17TRUEAEItem
37DTC-2 Sheet A-401Sheet A-401 Detail A2 shows accessory DTC-2. This accessory is not

listed on the Accessories Schedule. Could the government confirm whether or not accessory DTC-2 will be installed? If so, could the government add this information to the Accessories Schedule?

Pond Response: Disregard note DTC-2 on detail A2/A-4014/3/174/3/17TRUEAEItem
38Toilet Partitions - I-601On drawing I-601 the finish schedule item TP requests the toilet partitions to be Phenolic Color-Thru material. When you read specification section 10 21 13, they refer to steel type dimensions for the partitions. The spec's ask for 1" (p2.2) panels and 1.25" (p.2.3) thick pilasters. The Global Partitions Phenolic standard toilet compartments come in 1/2" panels and 3/4" pilasters. Please clarify the dimensions of the toilet partitions for this project.
Pond Response - Toilet partitions shall be phenolic standard toilet compartments with 1/2" panels and 3/4" pilasters3/31/174/3/17FALSEAEItem
39TRUEAEItem
40TRUEAEItem
41TRUEAEItem
42TRUEAEItem
43FALSEKOItem
44TRUEAEItem
45TRUEAEItem
46TRUEAEItem
47FALSEBCEItem
48FALSEKOItem
49TRUEAEItem
50TRUEAEItem
51TRUEAEItem
52TRUEAEItem
53TRUEAEItem
54TRUEAEItem
55TRUEAEItem
56TRUEAEItem
57FALSEKOItem
58FALSEKOItem
59TRUEAEItem
60FALSEBCEItem
60TRUEAEItem
62TRUEAEItem
63TRUEAEItem
64TRUEAEItem
65TRUEAEItem
66FALSEKOItem
67FALSEBCEItem
68TRUEAEItem
69TRUEAEItem
70TRUEAEItem
71TRUEAEItem
72TRUEAEItem
73TRUEAEItem
74TRUEAEItem
75FALSEKOItem
76FALSEKOItem
77TRUEAEItem
78TRUEAEItem
79TRUEAEItem
80TRUEAEItem
81TRUEAEItem
82TRUEAEItem
83TRUEAEItem
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110

File details come from the government source that posted it. Updated .