USPFO for Maine
Pre-Proposal Conference
April 24, 2012
10:00am
Solicitation W912JD-12-R-0002 for
Project No: 230046
Design Build – Readiness Center, Bangor TS, Bangor, ME
AGENDA
- Introductions
- Opening Statement
- What is a Two Phase RFP
- RFP Highlights
- Submission Requirements and Summary of
Evaluation Criteria
- Small Business Participation Plan
- Project Intent & Overall Program
- Project Characteristics
- Project Boundary Limits Site Plan
- Closing Statement
Introductions
Lt Col Robert Crowley
Supervisory Contract Specialist (SCS)
LTC Normand Michaud
DFE – Supervisory of Design & Projects Manager
Mrs. Darlene Howes
Administrative Contracting Officer
Mr. David Everett
Jacobs Global Buildings – Project Manager
Opening Statement
Any changes to this Request for Proposal (RFP) will be made in writing and an Amendment will be posted on the https://www.FBO.gov website. * Check regularly
The attendance sheet, slides and minutes of this meeting will be published on the FBO.gov web-site.
A firm-fixed price contract will be awarded.
Total completion of the project is 720 Calendar days after Notice to
Proceed.
52.211-12 – Liquidated Damages - $942.76 per calendar day, with
$153.00 Legal and administrative fees.
What is a Two Phase RFP
This procurement uses the two-phase design-build selection procedures and consists of one solicitation covering both phases.
Phase One of the solicitation is in accordance with FAR
36.3. Phase One evaluation will result in a determination
of the most highly qualified Offerors. The Government intends to select three (3) but not less than two (2) and not to exceed five (5) of the highest rated contractors to receive a Phase Two request for proposal.
RFP Highlights
This procurement is being advertised as unrestricted basis inviting full and open competition.
NAICS: 236220 Size Standard: $33.5 Million
DFARS – Disclosure of magnitude
Between $10,000,000 and $25,000,000
Cost Objective: $13,100,000.00
Exhibit F – Proposal Inquiry Form
Submit all RFI’s - 7 calendar days before the proposal receipt date shown in the solicitation.
Submission Requirements
SF 1442, Block 13a
Phase One proposals are due no later than 2:00p.m. local time on May 15, 2012
1 Original, 5 hard copies and 1 electronic copy.
Section 00110, Submission Requirements
Read this entire section carefully!
In Phase One proposal consist of 3 volumes
Vol 1 – Pro Form Documents
Vol 2 – Past Performance
Vol 3 – Technical
Volume 1 – Contracting Documents
Reminder: SF 1442 blocks 14 – 20c completed.
Section 00600 – Complete on-line ORCA
Non-Disclosure Agreement
Volume 2 – Past Performance
Reminder: Exhibits A, B, SF 330, Exhibits C must be submitted to Mrs. Darlene Howes, NLT Closing Date
Volume 3 – Technical Capability
Reminder: Management/team Approach Narrative
Volume 2 – Past Performance:
• Construction Contractor (Prime-Lead) and (A&E) Subcontractor performing the design service. The Prime will submit Exhibit A’s and
C’s. The A&E will do Exhibit B’s the SF 330’s and three Exhibit C’s.
Other construction subcontractors are not required or desired in
Phase One.
• A&E Firm (Prime-Lead) and the Construction Contractor as the
Subcontractor building the facility. Prime will do a SF 330 or Exhibit A for design build projects and Exhibit C’s. The Construction Contractor will do Exhibit A’s, B’s and C’s.
Volume 3 – Technical Capability
Demonstrate that all lead design personnel have experience and required qualifications in assigned roles on projects of similar complexity, size and scope. ~ Section 5.1.2.2 & 5.1.2.3. pg.13
Demonstrate that all lead construction personnel have experience and required qualifications in assigned roles on projects of similar complexity, size and scope. Discuss as a minimum the project manager; the quality control manager; and the construction manager and/or project superintendent. ~ Section 5.1.2.4. pg.13.
Summary of Evaluation Criteria
Section 00120, Basis of Award & Evaluation factors
Phase One Evaluation Factors:
Past Performance is approximately equal to the Technical Capability factor in Phase One.
Past/Present Performance – Substantially complete to less than
75%.
Past Performance Sub-Factors (6)
Quality Control
Timely Performance
Management Effectiveness
Compliance with Federal Laws and Regulations
Compliance with Safety Standards
Small Business Concerns
Pages 22 thru 26.
Summary of Evaluation Criteria
Section 00120, Basis of Award & Evaluation factors
Technical Capability:
Technical Approach Narrative Sub-factor
Team Experience Sub-factor
Other Capability Sub-factor
Pages 26 thru 27.
Small Business Participation Plan
Phase Two Only:
Other than Small Business must provide a Small Business
Subcontracting Plan – Volume 1
Exhibit H – Small Business Participation Plan
Both large and small business
Volume 2 - Sub-factor 2-3
Mr. Keith Waye
Small Business Administration
Procurement Center Representative (PCR)
Project Intent & Overall Program
MAINE ARNG AVIATION READINESS CENTER (RC)
Program Summary FY2012
NO. UNITS
REQUIRED
SQUARE FEET
A1.0 NSF 15,070
A2.0 NSF 23,256
NSF 38,327
Facility Maintenance and Storage 3% NSF 1,150
Mechanical/Electrical 5% NSF 1,917
Telecommunications 1% NSF 384
41,778
Circulation (15% or 22%) 15% NSF 6,267
48,045
Structural 10% NSF 4,805
GSF 52,850TOTAL PRIMARY FACILITY
SCHEDULE I
subtotal
FACILITY INFORMATION
SCHEDULE II
subtotal
Subtotal Schedule I and Schedule II
Aviation Readiness Center (AvnRC) ‘Design’ and ‘Construct’ a new Aviation Readiness Center at the Bangor
International Airport Training Site supporting the126th, 142nd, and 224th
Aviation Companies for the Maine Army National Guard (MEARNG)
Overall Program
Project Program Detail
MAINE ARNG AVIATION READINESS CENTER (RC)
SCHEDULE II
NO.
REQUIRED
SQUARE FEET
NSF
B.0
B.1
B.1.a Basic Space 4,000
B.1.b General Space 650
B.2
B.2.d Heated Storage 8,800 B.2.d.1 Units with Required Strength >=55 2,700
B.2.d.2 Units with Required Strength <=55 6,100
B.2.e Unheated Storage 3,500
B.3
B.3.a Basic Space (one per RC) 200
B.3.b Space per each individual auth in RC 3,258
B.4
B.4.m Unit Level Maintenance Training Workbays 2,848
B.4.n Workbays 2,048
B.4.o Office Space 800
23,256
Components
FACILITY SPACE LIST
ADMINISTRATIVE OFFICE SPACE
SCHEDULE II
UNIT STORAGE SPACE (INCL ARMS VAULT)
LOCKER ROOM SPACE
SPECIAL FUNCTIONS
Total Net Component Area (NSF)
MAINE ARNG AVIATION READINESS CENTER (RC)
SCHEDULE I
NO.
REQUIRED
SQUARE FEET
A1.0 SCHEDULE I
A1.1 Assembly Hall 6,300
A1.2 Classrooms 3,310
A1.3 Library/Classroom 300
A1.4 Learning Center 300
A1.8 Training Aid Storage 140
A1.9 Kitchen 1,300
A1.10 Break Area 400
A1.12 Toilets & Showers 1,920
A1.13 Flammable Materials Storage 150
A1.14 Family Readiness Office 250
A1.17 Audio Visual Storage 150
A1.18 Table & Chair Storage 550
15,070Total Schedule I (NSF)
NSF
Components
FACILITY SPACE LIST
Project Characteristics
Unusual Project Characteristics:
• Existing Army Aviation Support Facility (AASF) – Bldg. #260 and its associated Flight
Operations Apron is fully functional. Any interruptions shall be coordinated with
MEARNG to minimize operational disturbances; ‘access’ to the AASF shall be maintained during the duration of the project;
• Contaminated Soil was confirmed east of AASF. Site Investigation Report (which will be included within the Phase 2 RFP) states estimated extent is 4,700 cy. All available data is for information only and is not guaranteed to fully represent all environmental conditions; government shall not be responsible for any interpretations by the D/B from available information; it shall be the D/B’s responsibility to remediate the extent of contaminated soils that are disturbed by the final location / construction of the AvnRC.
• Buildings #250 and #255 are located within Project Site Area and are in active use.
Any interruptions shall be coordinated with MEARNG to minimize operational disturbances;
• Building #254 has been deemed historical and shall not be considered for demolition.
Additionally, a 20’-0” min. buffer shall be maintained between Bldg #254 and the final determined AvnRC project site;
• D/B shall be responsible for all required Permits, to include the completion, issuance, and approval of Site Location of Development Act (SLODA) permit amendment;
Project Characteristics
Unusual Project Characteristics:
• Project Site Area is within Federal Aviation Administration (FAA), Transportation
Security Administration (TSA), and Bangor International Airport (BIA) jurisdiction.
D/B shall comply with all rules, regulations, requirements affecting the project (i.e.
temporary and permanent obstructions [cranes, etc], lighting, security, fencing, gates construction barricades, access, etc)
• BIA’s Flight Line Security Fencing is located within Project Site area. The fence line and existing access points shall be maintained during the duration of the project;
• Existing Geotechnical Data from previous projects will be included within the RFP.
All sub-surface data will be issued for information only, and is not guaranteed to fully represent all geotechnical conditions applicable to ‘final’ location (determined by D/B) of AvnRC project. Government shall not be responsible for any interpretations by the
D/B from available information; it shall be the D/B’s responsibility to perform any additional subsurface investigations based the final location of the AvnRC.
Project Aerial Image
Project Boundary Limits Site Plan
Bangor International Airport (BIA)
Training Site
Bangor, Maine
#254
#260
#250
#255
FLORIDA Avenue
H A
Y E
S S tr e e t
N
Project Site Image
View looking East toward existing Access Control Point (ACP) & Static Display – Note Bldg. #254 on right side of image
Closing Statement
Overnight package – USPFO for Maine, Building #39, Camp
Keyes, Augusta, Maine 04333-0032. Attn: Darlene Howes
Hand carried proposals – 194 Winthrop Ave, Building #7, Annex, Augusta, Maine.
Offerors are cautioned that approval is required for hand delivery one calendar day prior to the closing date.
Phase One Proposals due – 2:00pm on Tue, May 15, 2012