E-001_Electrical_Details___BHJ.pdf

PDF 767 KB Posted

Attached to
Taxiway Bravo, Hotel, Juliet - Asphalt Paving and Lights
Solicitation number
W912JB-19-B-5000
Issued by

About this file

Plans - Electrical

View the file

Other files

File Type Posted
Bid_Opening_Abstract__Taxiway_B,H,_and_J_W912JB19B5000.pdf PDF
Bid_Opening___Sign_In_Sheet___22Aug2019.pdf PDF
RFI_Responses___Taxiway_BHJ_-3.pdf PDF
RFI_Responses___Taxiway_B,H,J_-_2.pdf PDF
WAGE_Determination_MI20190001_08_09_2019.pdf PDF
Amendment__9___wCONFORMED_DOCUMENT___Taxiway_B,H,_and_J.pdf PDF
C-303.pdf PDF
C-302.pdf PDF
Amendment__9___Taxiway_B,H,_and_J.pdf PDF
Amendment__8___Taxiway_B,H,_and_J.pdf PDF
Amendment__7___Taxiway_B,H,_and_J___W912JB19B5000.pdf PDF
Amendment__6___Taxiway_B,H,_and_J___W912JB19B5000.pdf PDF
Amendment__5___Taxiway_B,H,_and_J.pdf PDF
Amendment__4___Taxiway_B,H,_and_J.pdf PDF
Amendment__3___Taxiway_B,H,_and_J.pdf PDF
Airfield_construction_map_FY19.pdf PDF
RFI_Responses___Taxiway_B,H,J.pdf PDF
Addendum__1__Taxiway_B,H,_and_J.pdf PDF
20190524-Site_Plan-C-102_PAVEMENT_DETAILS_Bulletin__1.pdf PDF
Amendment_2___Taxiway_B,H,_and_J.pdf PDF
Amendment_01___Taxiway_B,H,_and_J___Selfridge_ANGB.pdf PDF
Site_Visit___Sign_In_Sheet___Taxiway_BHJ_W912JB19B5000.pdf PDF
Site_Visit_Minutes_Taxiway_B,H,_and_J.pdf PDF
Solicitation___Taxiway_B,H,_and_J___Selfridge_ANGB_MI.pdf PDF
E-002_Taxiway_Electrical_Lighting___BHJ.pdf PDF
COMPLETE_SPEC_100__Design_07-13-18___Project_Manual.pdf PDF
Brand_Name_Justification___Taxiway_BHJ__R.pdf PDF
C-100_-_ALL_Civil_Plans___BHJ.pdf PDF
TS-01_TitleSheet___BHJ.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N O

R T

H -S

O U

T H

IN

S

T R

U M

E N

T R

U N

W A

Y N

O R

T H

-S O

U T

H

IN

S T

R U

M E

N T

R U

N W

A Y

TAXIWAY "A"

SHEET NO:

SHEET TITLE:

PROJECT NUMBER:

COPYRIGHT © 2017

DATE ISSUE

26913 NORTHWESTERN HWY

SUITE 200

SOUTHFIELD, MICHIGAN

48033 | USA

(T) 248 262 1500

WWW.HED.DESIGN

2017-02893-000

Selfridge Air

National Guard

Base

Design and Repair of Bravo, Hotel, and Joliet Taxiways

Harrison Township, MI 48045

SANG Project No.: 162040

10-20-17 35% Preliminary Design

02-26-18 95% Preliminary Design

05-11-18 Pre-Construction Progress

07-13-18 100% Design

E-001

Electrical Symbols, Details, General Notes, Overall Site

Plan & Elec. Sheet Index

PROJECT GENERAL NOTES:

1. ALL WORK TO CONFORM TO THE REQUIREMENTS OF THE LOCAL, STATE CODES, GOVERNMENT BASE CODES AND

STANDARDS. COORDINATE WITH SPECIFICATIONS, DIVISION 1.

2. ALL NEW EQUIPMENT PROVIDED FOR THIS PROJECT MUST BE IN ACCORDANCE WITH THE "BUY AMERICA ACT"

REFER TO DIVISION 1 SPECIFICATIONS FOR ADDITIONAL INFORMATION.

3. THE ELECTRICAL CONTRACTOR MUST COORDINATE ALL EXCAVATION WITH GOVERNMENT UTILITIES GROUP AND

OBTAIN A "DIG" PERMIT / SOIL EROSION PLAN AND PERMIT PRIOR TO ANY EXCAVATION.

4. FOR WORK REQUIRED IN THE AIRFIELD / TAXIWAY THE CONTRACTOR MUST PROVIDE A NON-DISTRUCTIVE FORM

OF EXCAVATION AND COORDINATE WITH THE BASE UTILITIES AND "DIG" PERMIT FOR LOCATIONS OF EXISTING

UNDERGROUND UTILITIES INCLUDING AIRFIELD DRAINAGE SYSTEM. PERFORM EXCAVATION AS REQUIRED TO

AVOID DAMAGE TO UTILITIES AND AIRFIELD DRAINAGE SYSTEM. WHERE THE DRAINAGE SYSTEM OR OTHER

UTILITIES ARE DAMAGED THEY MUST BE REPAIRED TO THEIR ORIGINAL CONDITION WITHOUT ADDITIONAL COST

TO THE PROJECT, WHERE RE-WORK IS REQUIRED TO ACCOMMODATE THE NEW INSTALLATION THE CONTRACTOR

MUST RE-ROUT AND RE-CONNECT WITH LIKE MATERIALS TO MAINTAIN THE INTEGRITY OF THE SYSTEMS BEING

RE-ROUTED.

5. WHERE REQUIRED THE E.C. MUST PROVIDE ALL EQUIPMENT NECESSARY TO REMOVE [PUMP] WATER FROM

EXISTING MANHOLES AS REQUIRED TO COMPLETE THE WORK INDICATED ON THE DOCUMENTS AND IN THE

SPECIFICATIONS. COORDINATE WORK [MANHOLE PUMP /DRAIN, ETC.] WITH GOVERNMENT PRIOR TO THE START

OF WORK.

6. WHERE REQUIRED THE CONTRACTOR MUST PROVIDE TEMPORARY SUPPORT FOR EXISTING UTILITIES REQUIRED

TO REMAIN IN SERVICE THOUGHT THE PROJECT / SCOPE OF WORK TO ACCOMMODATE THE NEW UNDERGROUND

INSTALLATIONS. COORDINATE SUPPORT TYPE / METHOD WITH THE TYPE AND SIZE OF SERVICE AS REQUIRED.

7. THE OWNER'S NORMAL OPERATIONS WILL BE CONTINUED DURING CONSTRUCTION. THE CONSTRUCTION MUST

NOT INTERFERE WITH THESE OPERATIONS IN ANY WAY WITHOUT THE OWNER'S CONSENT. ANY SHUTDOWNS

REQUIRED MUST BE COORDINATED WITH THE OWNERS REPRESENTATIVE PRIOR TO THE INTERRUPTION OF THE

SERVICE, AND MUST BE SUBMITTED IN WRITING MIN. TWO [2] WEEKS IN ADVANCE. THE REQUEST MUST

INCLUDING THE SERVICE BEING INTERPRETED, AND THE EXPECTED DURATION OF THE OUTAGE. THE

CONTRACTOR MUST COMPLY WITH ALL OF THE GOVERNMENTS REQUIREMENTS AT NO ADDITIONAL COST TO THE

PROJECT.

8. IT IS THE CONTRACTORS RESPONSIBILITY TO VISIT THE SITE AND FAMILIARIZE THEMSELVES WITH ALL EXISTING

CONDITIONS. THE CONTRACTOR MUST TAKE ALL NECESSARY FIELD MEASUREMENTS AND OTHERWISE VERIFY

ALL DIMENSIONS AND EXISTING CONSTRUCTION CONDITIONS INDICATED AND/OR SHOWN ON THE DRAWINGS.

SHOULD ANY ERROR OR INCONSISTENCE EXIST, THE CONTRACTOR MUST NOT PROCEED WITH THE WORK

AFFECTED THEREBY UNTIL REPORTING THE SAME TO THE GOVERNMENT AND THE OWNERS REPRESENTATIVE

FOR CLARIFICATION AND/OR CORRECTION. THE CONTRACTOR MUST VERIFY THE EXISTENCE, LOCATION AND

ELEVATION OF ALL UNDERGROUND UTILITIES IN WORK AREAS PRIOR TO PROCEEDING WITH CONSTRUCTION.

ALL DISCREPANCIES MUST BE DOCUMENTED AND FORWARDED TO GOVERNMENT AND OWNERS

REPRESENTATIVE FOR ACTION.

9. ALL EXISTING CONSTRUCTION AND SURFACES WHICH ARE TO REMAIN BUT ARE AFFECTED BY THE WORK

UNDER THIS CONTRACT MUST BE RESTORED AND REFINISHED TO MATCH THE CONSTRUCTION, FINISH AND

ALIGNMENT OF THE EXISTING ADJACENT CONSTRUCTION AND FINISHES.

10. THE LOCATIONS AND ELEVATIONS OF EXISTING UNDERGROUND UTILITIES WHERE INDICATED ON THE DRAWINGS

ARE ONLY APPROXIMATE. NO GUARANTEE IS EITHER EXPRESSED OR IMPLIED AS TO THE COMPLETENESS OR

ACCURACY THEREOF. THE CONTRACTOR MUST BE EXCLUSIVELY RESPONSIBLE FOR DETERMINING THE EXACT

UTILITY LOCATIONS TYPE OF SERVICE (PRIMARY, COMMUNICATIONS, CCTV, STORM, ETC.) AND ELEVATIONS

PRIOR TO THE START OF CONSTRUCTION. NOTE NOT ALL UNDERGROUND UTILITIES ARE SHOWN.

11. IN LOCATIONS OF EXISTING UTILITIES THE CONTRACTOR MUST HAND DIG OR UTILIZE A NON -DESTRUCTIVE FORM

OF EXCAVATION, TO UNCOVER, BACKFILL AND DETERMINE THE EXACT LOCATION OF THE UNDERGROUND

UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGES CAUSED TO ANY EXISTING UTILITIES DURING

EXCAVATION, AND MUST RESTORE DAMAGED SERVICES AT NO ADDITIONAL COST TO THE OWNER.

12. SLOPE ALL UNDERGROUND CONDUITS AWAY FROM BUILDING PENETRATIONS TO MANHOLES / HANDHOLES.

13. THE CONTRACTOR MUST COORDINATE EXACT LOCATIONS OF OUTDOOR ENCLOSURES AND ASSOCIATED

EQUIPMENT PADS.

14. RELEVANT DIMENSIONS AND ELEVATIONS FOR EQUIPMENT INSTALLATIONS MUST BE VERIFIED AGAINST

MANUFACTURERS CERTIFIED EQUIPMENT AND INSTALLATION DRAWINGS.

15. CONTRACTOR MUST PROVIDE TEMPORARY POWER FOR EACH LOCATING AS INDICATED, OR WHERE REQUESTED

BY OWNERS' REPRESENTATIVE.

16. DO NOT SCALE DRAWINGS TO DETERMINE SIZES AND DIMENSIONS. USE FIGURED DIMENSIONS ONLY.

17. NEW WORK MUST ALIGN WITH AND MATCH EXISTING WORK UNLESS NOTED OTHERWISE.

18. COORDINATE IDENTIFICATION AND REMOVAL OF HAZARDOUS MATERIALS WITH THE GOVERNMENT.

19. COORDINATE SHUTDOWN OF AIRFIELD / TAXIWAY LIGHTING CIRCUITS WITH THE GOVERNMENT PRIOR TO THE

START OF WORK.

20. AT THE END OF EVERY SHIFT THE AIR FIELD LIGHTING SYSTEM MUST BE OPERATIONAL UNLESS OTHERWISE

DIRECTED BY THE GOVERNMENT. COORDINATE ALL WORK REQUIRED TO MAINTAIN OPERATION OF THE AIRFIELD

LIGHTING SYSTEM.

21. PROVIDE DETECTABLE UNDERGROUND WARNING TAPE ABOVE ALL REVISED / NEW DIRECT BURIED ELECTRICAL

WORK. DETECTABLE WARNING TAPE SHALL BE MIN. 6" WIDE AND READ "CAUTION BURIED ELECTRIC LINE BELOW".

INSTALL DETECTABLE WARNING TAPE NOT MORE THAN 8" BELOW FINISHED GRADE.

PROJECT DEMOLITION NOTES:

1. THE OWNER'S NORMAL OPERATIONS WILL BE CONTINUED DURING DEMOLITION. DEMOLITION CONTRACTOR

MUST NOT INTERFERE WITH THESE OPERATIONS IN ANY WAY WITHOUT THE OWNER'S CONSENT.

2. PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION TO PROTECT OWNER'S PERSONNEL, AND GENERAL PUBLIC FROM INJURY DUE TO SELECTIVE DEMOLITION AND NEW WORK INSTALLATION.

TEMPORARY BARRICADE CONSTRUCTION MUST MEET SANG SPECIFICATIONS PRIOR TO USE. COORDINATE

BARRICADE DESIGN WITH THE GOVERNMENT.

3. PROTECT FROM DAMAGE EXISTING FINISH WORK THAT IS TO REMAIN IN PLACE AND BECOME EXPOSED DURING

DEMOLITION OPERATIONS.

4. PRIOR TO CUTTING / EXCAVATION OF EXISTING CONSTRUCTION, LOCATE AND IDENTIFY SERVICES TO REMAIN IN

OPERATION, UNDOCUMENTED CONDITIONS, UTILITIES, ETC. THAT MUST REMAIN IN OPERATION DURING THE

DEMOLITION WORK.

5. MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE

DURING DEMOLITION OPERATIONS. DO NOT INTERRUPT UTILITIES SERVING TAXIWAY OR ACTIVE RUNWAY

LIGHTING, EXCEPT WHEN AUTHORIZED IN WRITING BY THE OWNER.

6. PROVIDE SHORING, BRACING AND ANY OTHER MEANS REQUIRED TO PROTECT AND MAINTAIN THE SAFETY, INTEGRITY AND STABILITY OF ALL EXISTING AND NEW CONSTRUCTION.

7. DEMOLITION OF ANY EXISTING CONSTRUCTION MUST INCLUDE WHAT IS NECESSARY AND REQUIRED TO

ACCOMMODATE THE REQUIREMENTS OF NEW CONSTRUCTION. REFER TO THE APPROPRIATE DRAWINGS AS TO

THE EXTENT OF EXISTING CONSTRUCTION TO REMAIN.

8. ALL DEMOLITION MUST COMPLY WITH APPLICABLE LOCAL CODES AND STATE CODES, ORDINANCES AND

GOVERNMENT REQUIREMENTS.

9. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

N.T.S.

KEY PLAN

N

ELECTRICAL INDEX OF DRAWINGS

DRAWING

NUMBER

DRAWING TITLE

E-001

ELECTRICAL SYMBOLS, DETAILS GENERAL NOTES, OVERALL SITE PLAN &

SHEET INDEX

E-002 TAXIWAY ELECTRICAL LIGHTING

TAXIWAY

"B" / "H" / "J"

E-002

EXISTING TAXIWAY EDGE LIGHT FIXTURE

INCLUDING COLUMN, BASE COVER, FRANGIBLE

CONNECTION, SECONDARY CONNECTOR AND

CABLE CLAMP TO BE REMOVED COMPLETE.

REMOVE EXISTING FIXTURE ISOLATION

TRANSFORMER AND MOUNTING BASE COMPLETE.

REMOVE EXISTING PRIMARY CONNECTOR

EXISTING TAXIWAY SITE LIGHTING CONDUCTOR.

REMOVE FROM PRIMARY CONDUCTOR CLEAN AND

PREP FOR NEW WORK

EXISTING TAXIWAY LIGHTING BASE &

CONCRETE RING TO REMAIN

EXISTING 5kV TAXIWAY LIGHTING CIRCUIT & GROUND

CONDUCTOR FROM EXISTING FIXTURE / GROUND

COUNTERPOISE

NEW LED ELEVATED TAXIWAY EDGE LIGHT

AS MANUFACTURED BY ADB-LIGHTS [L-861

SERIES], WITH COLUMN, BASE COVER

PLATE [L-867], FRANGIBLE COUPLING AND

DISCONNECT PLUG.

30"

NEW ANTI-CORROSION BASE COVER ON EXIST. BASE

NEW SECONDARY CONNECTOR AND

CABLE CLAMP

NEW FRANGIBLE COUPLING

NEW ISOLATION TRANSFORMER

PROVIDE NEW PRIMARY CONNECTOR FOR CONNECTION

TO EXISTING 5kV SITE LIGHTING CONDUCTOR. CLEAN

AND PREP EXISTING CONDUCTOR FOR NEW

TERMINATION AFTER INSTALLATION PROVIDE OVERALL

HEAT SHRINK OVER PRIMARY CONNECTOR

EXISTING GROUND

CONDUCTORS AND

BASE GROUND

LUG TO REMAIN

N.T.S.

TAXIWAY EXISTING EDGE LIGHT REPLACEMENT DETAIL

E-001

X

X

X

EXISTING FIXTURE

IDENTIFICATION TO BE

REMOVE AND RE-INSTALLED

ON NEW FIXTURE COLUMN

X

X

X

RE-INSTALL EXISTING

FIXTURE IDENTIFICATION

ON NEW COLUMN

NOTES:

1. E.C. TO APPLY ANTI-SIEZE COMPOUND TO THREADS OF FLANGIBLE COUPLINGS DURING

INSTALLATION.

2. PROVIDE COLOR CODED CONDUCTOR IDENTIFICATION FOR EACH PRIMARY LINE / LOAD

CONDUCTORS PER THE GOVERNMENTS STANDARDS.

GROUND LUG ON BASE PLATE / COVER [TYP. FOR 3]

600V-GREEN INSULATED #6GRD. CONDUCTOR [XHHW-2]

CONNECTED TO EXISTING GROUND TERMINATION

EXISTING CONCRETE & FIXTURE BASE

TO REMAIN

N.T.S.

NEW TAXIWAY EDGE LIGHT DETAIL

E-001

NEW LED ELEVATED TAXIWAY EDGE LIGHT AS MANUFACTURED BY

ADB-LIGHTS [L-861 SERIES] WITH COLUMN FOR 30" MAX. HEIGHT.

WITH FRANGIBLE CONNECTION.

NEW ANTI-CORROSION BASE PLATE WITH SECONDARY

CONNECTOR CLAMP, NEOPRENE GASKET AND GROUND

LUGS SECURED TO NEW FIXTURE BASE.

NEW 12"DIA. x 24" DEEP BASE

42"

GROUND LUG ON BASE PLATE /

COVER [TYP. FOR 3]

PROVIDE 2" RIGID METAL CONDUIT [RGS] TO 5'

BEYOND FIXTURE BASE [TYP.]

RGS TO PVC COUPLING [TYP.]

2" SCHED. 40 PVC [TYP.]

FROM PREVIOUS FIXTURETO NEXT FIXTURE

NEW ISOLATION TRANSFORMER WITH LINE / LOAD PRIMARY AND SECONDARY

CONNECTORS CONNECT TO EXISTING LIGHTING CIRCUIT CONDUCTORS

PRIMARY CONNECTOR FOR CONNECTION TO EXISTING SITE LIGHTING

CONDUCTOR. AFTER INSTALLATION PROVIDE OVERALL HEAT SHRINK

OVER PRIMARY CONNECTOR

NOTES:

1. PROVIDE NEW FIXTURE AND BASE TO REPLACE EXISTING. REMOVE BRANCH CIRCUIT AND

GROUND CONDUCTORS TO A SUITABLE LOCATION FOR RE-CONNECTION TO NEW FIXTURE.

2. E.C. TO APPLY ANTI-SIEZE COMPOUND TO THREADS OF FLANGIBLE COUPLINGS DURING

INSTALLATION.

3. PROVIDE COLOR CODED CONDUCTOR IDENTIFICATION FOR EACH PRIMARY LINE / LOAD

CONDUCTORS PER THE GOVERNMENTS STANDARDS.

4. COORDINATE FINAL GRADE WITH CIVIL TRADES AND ALIGN TOP OF NEW CONCRETE BASE AND

OVERALL FIXTURE HEIGHT WITH ADJACENT EXISTING TAXIWAY LIGHT FIXTURES.

X

X

X

FIXTURE IDENTIFICATION SECURED TO NEW FIXTURE COLUMN

NEW CONCRETE BASE RING 24"O.D.X42" DEEP MIN.

24" [DIA.]

30"

600V-GREEN INSULATED #6GRD. CONDUCTOR [XHHW-2]

CONNECT TO NEW GROUND LUG / EXISTING GROUND CONDUCTOR

RUBBER GROMMET

SEAL CONDUITS AFTER CABLE INSTALLATION AND

TESTING IS COMPLETE [TYP.]

EXISTING GROUND CONDUCTORS TO BE

RE-CONNECTED AFTER NEW BASE INSTALLATION

BASE GROUND LUG

ELECTRICAL SYMBOL LIST;

Xxxx

NEW TAXIWAY EDGE LIGHT FIXTURE TO REPLACE EXISTING IN PLACE SEE

DETAIL 1/E-001 THIS SHEET

TAXIWAY EDGE LIGHT FIXTURE IDENTIFICATION

EXISTING TAXIWAY EDGE LIGHT FIXTURE TO REMAIN

EXISTING TAXIWAY EDGE LIGHT FIXTURE TO BE REMOVED

DETECTABLE WARNING TAPE [TYP.]

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

EASEMENT

AutoCAD SHX Text

EASEMENT

AutoCAD SHX Text E

AutoCAD SHX Text

EASEMENT

AutoCAD SHX Text

AutoCAD SHX Text

RANGE

AutoCAD SHX Text

DRIVING

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PAPI

AutoCAD SHX Text

LOCALIZER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text w

AutoCAD SHX Text

SOUTH PERIMETER RD

AutoCAD SHX Text

IRWIN ROAD

AutoCAD SHX Text

IRWIN ROAD

AutoCAD SHX Text

NORTH RIVER ROAD

AutoCAD SHX Text

SOUTH PERIMETER RD

AutoCAD SHX Text

SCHOOLHOUSE RD

AutoCAD SHX Text

E. JOY BLVD

AutoCAD SHX Text

BUNKER RD

AutoCAD SHX Text

NORTH PERIMETER ROAD

AutoCAD SHX Text

SUGARBUSH RD

AutoCAD SHX Text

SCHILLING ST.

AutoCAD SHX Text

DOOLITTLE DR

AutoCAD SHX Text

MULBERRY ST.

AutoCAD SHX Text

AMMO RD

AutoCAD SHX Text

NORTH PERIMETER ROAD

AutoCAD SHX Text

ANDERSEN

AutoCAD SHX Text

ELLSWORTH ST.

AutoCAD SHX Text

ALTUS ST.

AutoCAD SHX Text

CARSWELL ST.

AutoCAD SHX Text

CASTLE AVE.

AutoCAD SHX Text

PLATTSBURG ST.

AutoCAD SHX Text

CASTLE AVE

AutoCAD SHX Text

WEST

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

STABLES RD.

AutoCAD SHX Text

TO AND FROM

AutoCAD SHX Text

I-94 & GRATIOT

AutoCAD SHX Text

ROSSO HWY

AutoCAD SHX Text

ROSSO HWY

AutoCAD SHX Text

FALCON DR.

AutoCAD SHX Text

DOOLITTLE DR

AutoCAD SHX Text

DOOLITTLE DR.

AutoCAD SHX Text

NIKE ROAD

AutoCAD SHX Text

ANCHOR BAY / LAKE ST CLAIR

AutoCAD SHX Text

EAST RAMP

AutoCAD SHX Text

WOOTEN ST

AutoCAD SHX Text

ROULOTT

AutoCAD SHX Text

MITCHELL ST

AutoCAD SHX Text

SELFRIDGE AVE

AutoCAD SHX Text

ASH ST

AutoCAD SHX Text

WILLOW ST

AutoCAD SHX Text

RAILROAD AVE

AutoCAD SHX Text

MAPLE ST

AutoCAD SHX Text

OAK ST

AutoCAD SHX Text

SUPPLY ST

AutoCAD SHX Text

GEORGE AVE

AutoCAD SHX Text

WAKE ST

AutoCAD SHX Text

BIRCH ST

AutoCAD SHX Text

WAGNER ST

AutoCAD SHX Text

MITCHELL ST.

AutoCAD SHX Text

GEORGE AVE

AutoCAD SHX Text

WILBUR WRIGHT BLVD

AutoCAD SHX Text

SUPERIOR ST.

AutoCAD SHX Text

HURON ST.

AutoCAD SHX Text

LAKE ST

AutoCAD SHX Text

HURON ST.

AutoCAD SHX Text

LAKE ST.

AutoCAD SHX Text

LUFBERRY ST

AutoCAD SHX Text

TAXIWAY 'A'

AutoCAD SHX Text NORTH-SOUTH INSTRUMENT RUNWAY 9000'x150' N 1%%D 29' 10" E

AutoCAD SHX Text

CLINTON

AutoCAD SHX Text

RIVER

AutoCAD SHX Text

PAPI

AutoCAD SHX Text

TAXIWAY 'D'

AutoCAD SHX Text

TAXIWAY 'C'

AutoCAD SHX Text

TAXIWAY 'C'

AutoCAD SHX Text

TAXIWAY 'B'

AutoCAD SHX Text

TAXIWAY 'B'

AutoCAD SHX Text

TAXIWAY 'H'

AutoCAD SHX Text

TAXIWAY 'C'

AutoCAD SHX Text

TAXIWAY 'J'

AutoCAD SHX Text

CONTROL TOWER

AutoCAD SHX Text

TAXIWAY 'G'

AutoCAD SHX Text

TAXIWAY 'M'

AutoCAD SHX Text

TAXIWAY 'L'

AutoCAD SHX Text

TAXIWAY 'B'

AutoCAD SHX Text

TAXIWAY 'K'

AutoCAD SHX Text

TAXIWAY 'A'

AutoCAD SHX Text W

AutoCAD SHX Text

TAXIWAY 'F'

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text

SOUTH PERIMETER RD

AutoCAD SHX Text

CLINTON

AutoCAD SHX Text

RIVER

AutoCAD SHX Text

TAXIWAY 'A'

AutoCAD SHX Text W

AutoCAD SHX Text

FISH POND ROAD

AutoCAD SHX Text

JOHNSON ST.

AutoCAD SHX Text

JEFFERSON AVE.

AutoCAD SHX Text

RECREATION DR

AutoCAD SHX Text

MAIN GATE

AutoCAD SHX Text

WILLOW ST

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text H.C.

AutoCAD SHX Text H.C.

AutoCAD SHX Text

16 SPACES @ 9'-0"

AutoCAD SHX Text

7 SPACES @ 9'-0", 2 H.C. @ 12'-0"

AutoCAD SHX Text

4 SPACES @ 9'-0"

AutoCAD SHX Text

N. PERIMETER RD

AutoCAD SHX Text

ASHAU VALLEY DR

AutoCAD SHX Text

PARTRIDGE CT

AutoCAD SHX Text

WURTSMITH

AutoCAD SHX Text

SPAATZ CT

AutoCAD SHX Text

WHITEHEAD CT

AutoCAD SHX Text

BRETT DR

AutoCAD SHX Text

ARNOLD CIRCLE

AutoCAD SHX Text

ARNOLD CIRCLE

AutoCAD SHX Text

SPAATZ CT

AutoCAD SHX Text

COPYRIGHT 1999 - FIREHOUSE DESIGNS

AutoCAD SHX Text

JEFFERSON AVE

AutoCAD SHX Text

DOOLITTLE DR

AutoCAD SHX Text

SUPPLY ST

AutoCAD SHX Text

MITCHELL ST

AutoCAD SHX Text

LUKE AVE

AutoCAD SHX Text

GEORGE AVE

AutoCAD SHX Text

JP8

AutoCAD SHX Text

JP8

AutoCAD SHX Text

CB

AutoCAD SHX Text

CB

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CB

AutoCAD SHX Text

CB

AutoCAD SHX Text

CB

AutoCAD SHX Text

CB

AutoCAD SHX Text

CB

AutoCAD SHX Text

CB

AutoCAD SHX Text

CB

AutoCAD SHX Text

CB

AutoCAD SHX Text

CB

AutoCAD SHX Text

CB

AutoCAD SHX Text

CB

AutoCAD SHX Text

CB

AutoCAD SHX Text

CB

AutoCAD SHX Text

CB

AutoCAD SHX Text

CB

AutoCAD SHX Text

CB

AutoCAD SHX Text

CB

AutoCAD SHX Text 2+00

AutoCAD SHX Text 4+00

AutoCAD SHX Text 6+00

AutoCAD SHX Text 2+00

AutoCAD SHX Text 4+00

AutoCAD SHX Text 6+00

AutoCAD SHX Text 8+00

AutoCAD SHX Text 10+00

AutoCAD SHX Text 8+00

AutoCAD SHX Text 6+00

AutoCAD SHX Text 4+00

AutoCAD SHX Text 2+00

AutoCAD SHX Text 10+00

File details come from the government source that posted it.