E-001_Electrical_Details___BHJ.pdf
PDF 767 KB Posted
- Solicitation number
- W912JB-19-B-5000
About this file
Plans - Electrical
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N O
R T
H -S
O U
T H
IN
S
T R
U M
E N
T R
U N
W A
Y N
O R
T H
-S O
U T
H
IN
S T
R U
M E
N T
R U
N W
A Y
TAXIWAY "A"
SHEET NO:
SHEET TITLE:
PROJECT NUMBER:
COPYRIGHT © 2017
DATE ISSUE
26913 NORTHWESTERN HWY
SUITE 200
SOUTHFIELD, MICHIGAN
48033 | USA
(T) 248 262 1500
WWW.HED.DESIGN
2017-02893-000
Selfridge Air
National Guard
Base
Design and Repair of Bravo, Hotel, and Joliet Taxiways
Harrison Township, MI 48045
SANG Project No.: 162040
10-20-17 35% Preliminary Design
02-26-18 95% Preliminary Design
05-11-18 Pre-Construction Progress
07-13-18 100% Design
E-001
Electrical Symbols, Details, General Notes, Overall Site
Plan & Elec. Sheet Index
PROJECT GENERAL NOTES:
1. ALL WORK TO CONFORM TO THE REQUIREMENTS OF THE LOCAL, STATE CODES, GOVERNMENT BASE CODES AND
STANDARDS. COORDINATE WITH SPECIFICATIONS, DIVISION 1.
2. ALL NEW EQUIPMENT PROVIDED FOR THIS PROJECT MUST BE IN ACCORDANCE WITH THE "BUY AMERICA ACT"
REFER TO DIVISION 1 SPECIFICATIONS FOR ADDITIONAL INFORMATION.
3. THE ELECTRICAL CONTRACTOR MUST COORDINATE ALL EXCAVATION WITH GOVERNMENT UTILITIES GROUP AND
OBTAIN A "DIG" PERMIT / SOIL EROSION PLAN AND PERMIT PRIOR TO ANY EXCAVATION.
4. FOR WORK REQUIRED IN THE AIRFIELD / TAXIWAY THE CONTRACTOR MUST PROVIDE A NON-DISTRUCTIVE FORM
OF EXCAVATION AND COORDINATE WITH THE BASE UTILITIES AND "DIG" PERMIT FOR LOCATIONS OF EXISTING
UNDERGROUND UTILITIES INCLUDING AIRFIELD DRAINAGE SYSTEM. PERFORM EXCAVATION AS REQUIRED TO
AVOID DAMAGE TO UTILITIES AND AIRFIELD DRAINAGE SYSTEM. WHERE THE DRAINAGE SYSTEM OR OTHER
UTILITIES ARE DAMAGED THEY MUST BE REPAIRED TO THEIR ORIGINAL CONDITION WITHOUT ADDITIONAL COST
TO THE PROJECT, WHERE RE-WORK IS REQUIRED TO ACCOMMODATE THE NEW INSTALLATION THE CONTRACTOR
MUST RE-ROUT AND RE-CONNECT WITH LIKE MATERIALS TO MAINTAIN THE INTEGRITY OF THE SYSTEMS BEING
RE-ROUTED.
5. WHERE REQUIRED THE E.C. MUST PROVIDE ALL EQUIPMENT NECESSARY TO REMOVE [PUMP] WATER FROM
EXISTING MANHOLES AS REQUIRED TO COMPLETE THE WORK INDICATED ON THE DOCUMENTS AND IN THE
SPECIFICATIONS. COORDINATE WORK [MANHOLE PUMP /DRAIN, ETC.] WITH GOVERNMENT PRIOR TO THE START
OF WORK.
6. WHERE REQUIRED THE CONTRACTOR MUST PROVIDE TEMPORARY SUPPORT FOR EXISTING UTILITIES REQUIRED
TO REMAIN IN SERVICE THOUGHT THE PROJECT / SCOPE OF WORK TO ACCOMMODATE THE NEW UNDERGROUND
INSTALLATIONS. COORDINATE SUPPORT TYPE / METHOD WITH THE TYPE AND SIZE OF SERVICE AS REQUIRED.
7. THE OWNER'S NORMAL OPERATIONS WILL BE CONTINUED DURING CONSTRUCTION. THE CONSTRUCTION MUST
NOT INTERFERE WITH THESE OPERATIONS IN ANY WAY WITHOUT THE OWNER'S CONSENT. ANY SHUTDOWNS
REQUIRED MUST BE COORDINATED WITH THE OWNERS REPRESENTATIVE PRIOR TO THE INTERRUPTION OF THE
SERVICE, AND MUST BE SUBMITTED IN WRITING MIN. TWO [2] WEEKS IN ADVANCE. THE REQUEST MUST
INCLUDING THE SERVICE BEING INTERPRETED, AND THE EXPECTED DURATION OF THE OUTAGE. THE
CONTRACTOR MUST COMPLY WITH ALL OF THE GOVERNMENTS REQUIREMENTS AT NO ADDITIONAL COST TO THE
PROJECT.
8. IT IS THE CONTRACTORS RESPONSIBILITY TO VISIT THE SITE AND FAMILIARIZE THEMSELVES WITH ALL EXISTING
CONDITIONS. THE CONTRACTOR MUST TAKE ALL NECESSARY FIELD MEASUREMENTS AND OTHERWISE VERIFY
ALL DIMENSIONS AND EXISTING CONSTRUCTION CONDITIONS INDICATED AND/OR SHOWN ON THE DRAWINGS.
SHOULD ANY ERROR OR INCONSISTENCE EXIST, THE CONTRACTOR MUST NOT PROCEED WITH THE WORK
AFFECTED THEREBY UNTIL REPORTING THE SAME TO THE GOVERNMENT AND THE OWNERS REPRESENTATIVE
FOR CLARIFICATION AND/OR CORRECTION. THE CONTRACTOR MUST VERIFY THE EXISTENCE, LOCATION AND
ELEVATION OF ALL UNDERGROUND UTILITIES IN WORK AREAS PRIOR TO PROCEEDING WITH CONSTRUCTION.
ALL DISCREPANCIES MUST BE DOCUMENTED AND FORWARDED TO GOVERNMENT AND OWNERS
REPRESENTATIVE FOR ACTION.
9. ALL EXISTING CONSTRUCTION AND SURFACES WHICH ARE TO REMAIN BUT ARE AFFECTED BY THE WORK
UNDER THIS CONTRACT MUST BE RESTORED AND REFINISHED TO MATCH THE CONSTRUCTION, FINISH AND
ALIGNMENT OF THE EXISTING ADJACENT CONSTRUCTION AND FINISHES.
10. THE LOCATIONS AND ELEVATIONS OF EXISTING UNDERGROUND UTILITIES WHERE INDICATED ON THE DRAWINGS
ARE ONLY APPROXIMATE. NO GUARANTEE IS EITHER EXPRESSED OR IMPLIED AS TO THE COMPLETENESS OR
ACCURACY THEREOF. THE CONTRACTOR MUST BE EXCLUSIVELY RESPONSIBLE FOR DETERMINING THE EXACT
UTILITY LOCATIONS TYPE OF SERVICE (PRIMARY, COMMUNICATIONS, CCTV, STORM, ETC.) AND ELEVATIONS
PRIOR TO THE START OF CONSTRUCTION. NOTE NOT ALL UNDERGROUND UTILITIES ARE SHOWN.
11. IN LOCATIONS OF EXISTING UTILITIES THE CONTRACTOR MUST HAND DIG OR UTILIZE A NON -DESTRUCTIVE FORM
OF EXCAVATION, TO UNCOVER, BACKFILL AND DETERMINE THE EXACT LOCATION OF THE UNDERGROUND
UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGES CAUSED TO ANY EXISTING UTILITIES DURING
EXCAVATION, AND MUST RESTORE DAMAGED SERVICES AT NO ADDITIONAL COST TO THE OWNER.
12. SLOPE ALL UNDERGROUND CONDUITS AWAY FROM BUILDING PENETRATIONS TO MANHOLES / HANDHOLES.
13. THE CONTRACTOR MUST COORDINATE EXACT LOCATIONS OF OUTDOOR ENCLOSURES AND ASSOCIATED
EQUIPMENT PADS.
14. RELEVANT DIMENSIONS AND ELEVATIONS FOR EQUIPMENT INSTALLATIONS MUST BE VERIFIED AGAINST
MANUFACTURERS CERTIFIED EQUIPMENT AND INSTALLATION DRAWINGS.
15. CONTRACTOR MUST PROVIDE TEMPORARY POWER FOR EACH LOCATING AS INDICATED, OR WHERE REQUESTED
BY OWNERS' REPRESENTATIVE.
16. DO NOT SCALE DRAWINGS TO DETERMINE SIZES AND DIMENSIONS. USE FIGURED DIMENSIONS ONLY.
17. NEW WORK MUST ALIGN WITH AND MATCH EXISTING WORK UNLESS NOTED OTHERWISE.
18. COORDINATE IDENTIFICATION AND REMOVAL OF HAZARDOUS MATERIALS WITH THE GOVERNMENT.
19. COORDINATE SHUTDOWN OF AIRFIELD / TAXIWAY LIGHTING CIRCUITS WITH THE GOVERNMENT PRIOR TO THE
START OF WORK.
20. AT THE END OF EVERY SHIFT THE AIR FIELD LIGHTING SYSTEM MUST BE OPERATIONAL UNLESS OTHERWISE
DIRECTED BY THE GOVERNMENT. COORDINATE ALL WORK REQUIRED TO MAINTAIN OPERATION OF THE AIRFIELD
LIGHTING SYSTEM.
21. PROVIDE DETECTABLE UNDERGROUND WARNING TAPE ABOVE ALL REVISED / NEW DIRECT BURIED ELECTRICAL
WORK. DETECTABLE WARNING TAPE SHALL BE MIN. 6" WIDE AND READ "CAUTION BURIED ELECTRIC LINE BELOW".
INSTALL DETECTABLE WARNING TAPE NOT MORE THAN 8" BELOW FINISHED GRADE.
PROJECT DEMOLITION NOTES:
1. THE OWNER'S NORMAL OPERATIONS WILL BE CONTINUED DURING DEMOLITION. DEMOLITION CONTRACTOR
MUST NOT INTERFERE WITH THESE OPERATIONS IN ANY WAY WITHOUT THE OWNER'S CONSENT.
2. PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION TO PROTECT OWNER'S PERSONNEL, AND GENERAL PUBLIC FROM INJURY DUE TO SELECTIVE DEMOLITION AND NEW WORK INSTALLATION.
TEMPORARY BARRICADE CONSTRUCTION MUST MEET SANG SPECIFICATIONS PRIOR TO USE. COORDINATE
BARRICADE DESIGN WITH THE GOVERNMENT.
3. PROTECT FROM DAMAGE EXISTING FINISH WORK THAT IS TO REMAIN IN PLACE AND BECOME EXPOSED DURING
DEMOLITION OPERATIONS.
4. PRIOR TO CUTTING / EXCAVATION OF EXISTING CONSTRUCTION, LOCATE AND IDENTIFY SERVICES TO REMAIN IN
OPERATION, UNDOCUMENTED CONDITIONS, UTILITIES, ETC. THAT MUST REMAIN IN OPERATION DURING THE
DEMOLITION WORK.
5. MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE
DURING DEMOLITION OPERATIONS. DO NOT INTERRUPT UTILITIES SERVING TAXIWAY OR ACTIVE RUNWAY
LIGHTING, EXCEPT WHEN AUTHORIZED IN WRITING BY THE OWNER.
6. PROVIDE SHORING, BRACING AND ANY OTHER MEANS REQUIRED TO PROTECT AND MAINTAIN THE SAFETY, INTEGRITY AND STABILITY OF ALL EXISTING AND NEW CONSTRUCTION.
7. DEMOLITION OF ANY EXISTING CONSTRUCTION MUST INCLUDE WHAT IS NECESSARY AND REQUIRED TO
ACCOMMODATE THE REQUIREMENTS OF NEW CONSTRUCTION. REFER TO THE APPROPRIATE DRAWINGS AS TO
THE EXTENT OF EXISTING CONSTRUCTION TO REMAIN.
8. ALL DEMOLITION MUST COMPLY WITH APPLICABLE LOCAL CODES AND STATE CODES, ORDINANCES AND
GOVERNMENT REQUIREMENTS.
9. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
N.T.S.
KEY PLAN
N
ELECTRICAL INDEX OF DRAWINGS
DRAWING
NUMBER
DRAWING TITLE
E-001
ELECTRICAL SYMBOLS, DETAILS GENERAL NOTES, OVERALL SITE PLAN &
SHEET INDEX
E-002 TAXIWAY ELECTRICAL LIGHTING
TAXIWAY
"B" / "H" / "J"
E-002
EXISTING TAXIWAY EDGE LIGHT FIXTURE
INCLUDING COLUMN, BASE COVER, FRANGIBLE
CONNECTION, SECONDARY CONNECTOR AND
CABLE CLAMP TO BE REMOVED COMPLETE.
REMOVE EXISTING FIXTURE ISOLATION
TRANSFORMER AND MOUNTING BASE COMPLETE.
REMOVE EXISTING PRIMARY CONNECTOR
EXISTING TAXIWAY SITE LIGHTING CONDUCTOR.
REMOVE FROM PRIMARY CONDUCTOR CLEAN AND
PREP FOR NEW WORK
EXISTING TAXIWAY LIGHTING BASE &
CONCRETE RING TO REMAIN
EXISTING 5kV TAXIWAY LIGHTING CIRCUIT & GROUND
CONDUCTOR FROM EXISTING FIXTURE / GROUND
COUNTERPOISE
NEW LED ELEVATED TAXIWAY EDGE LIGHT
AS MANUFACTURED BY ADB-LIGHTS [L-861
SERIES], WITH COLUMN, BASE COVER
PLATE [L-867], FRANGIBLE COUPLING AND
DISCONNECT PLUG.
30"
NEW ANTI-CORROSION BASE COVER ON EXIST. BASE
NEW SECONDARY CONNECTOR AND
CABLE CLAMP
NEW FRANGIBLE COUPLING
NEW ISOLATION TRANSFORMER
PROVIDE NEW PRIMARY CONNECTOR FOR CONNECTION
TO EXISTING 5kV SITE LIGHTING CONDUCTOR. CLEAN
AND PREP EXISTING CONDUCTOR FOR NEW
TERMINATION AFTER INSTALLATION PROVIDE OVERALL
HEAT SHRINK OVER PRIMARY CONNECTOR
EXISTING GROUND
CONDUCTORS AND
BASE GROUND
LUG TO REMAIN
N.T.S.
TAXIWAY EXISTING EDGE LIGHT REPLACEMENT DETAIL
E-001
X
X
X
EXISTING FIXTURE
IDENTIFICATION TO BE
REMOVE AND RE-INSTALLED
ON NEW FIXTURE COLUMN
X
X
X
RE-INSTALL EXISTING
FIXTURE IDENTIFICATION
ON NEW COLUMN
NOTES:
1. E.C. TO APPLY ANTI-SIEZE COMPOUND TO THREADS OF FLANGIBLE COUPLINGS DURING
INSTALLATION.
2. PROVIDE COLOR CODED CONDUCTOR IDENTIFICATION FOR EACH PRIMARY LINE / LOAD
CONDUCTORS PER THE GOVERNMENTS STANDARDS.
GROUND LUG ON BASE PLATE / COVER [TYP. FOR 3]
600V-GREEN INSULATED #6GRD. CONDUCTOR [XHHW-2]
CONNECTED TO EXISTING GROUND TERMINATION
EXISTING CONCRETE & FIXTURE BASE
TO REMAIN
N.T.S.
NEW TAXIWAY EDGE LIGHT DETAIL
E-001
NEW LED ELEVATED TAXIWAY EDGE LIGHT AS MANUFACTURED BY
ADB-LIGHTS [L-861 SERIES] WITH COLUMN FOR 30" MAX. HEIGHT.
WITH FRANGIBLE CONNECTION.
NEW ANTI-CORROSION BASE PLATE WITH SECONDARY
CONNECTOR CLAMP, NEOPRENE GASKET AND GROUND
LUGS SECURED TO NEW FIXTURE BASE.
NEW 12"DIA. x 24" DEEP BASE
42"
GROUND LUG ON BASE PLATE /
COVER [TYP. FOR 3]
PROVIDE 2" RIGID METAL CONDUIT [RGS] TO 5'
BEYOND FIXTURE BASE [TYP.]
RGS TO PVC COUPLING [TYP.]
2" SCHED. 40 PVC [TYP.]
FROM PREVIOUS FIXTURETO NEXT FIXTURE
NEW ISOLATION TRANSFORMER WITH LINE / LOAD PRIMARY AND SECONDARY
CONNECTORS CONNECT TO EXISTING LIGHTING CIRCUIT CONDUCTORS
PRIMARY CONNECTOR FOR CONNECTION TO EXISTING SITE LIGHTING
CONDUCTOR. AFTER INSTALLATION PROVIDE OVERALL HEAT SHRINK
OVER PRIMARY CONNECTOR
NOTES:
1. PROVIDE NEW FIXTURE AND BASE TO REPLACE EXISTING. REMOVE BRANCH CIRCUIT AND
GROUND CONDUCTORS TO A SUITABLE LOCATION FOR RE-CONNECTION TO NEW FIXTURE.
2. E.C. TO APPLY ANTI-SIEZE COMPOUND TO THREADS OF FLANGIBLE COUPLINGS DURING
INSTALLATION.
3. PROVIDE COLOR CODED CONDUCTOR IDENTIFICATION FOR EACH PRIMARY LINE / LOAD
CONDUCTORS PER THE GOVERNMENTS STANDARDS.
4. COORDINATE FINAL GRADE WITH CIVIL TRADES AND ALIGN TOP OF NEW CONCRETE BASE AND
OVERALL FIXTURE HEIGHT WITH ADJACENT EXISTING TAXIWAY LIGHT FIXTURES.
X
X
X
FIXTURE IDENTIFICATION SECURED TO NEW FIXTURE COLUMN
NEW CONCRETE BASE RING 24"O.D.X42" DEEP MIN.
24" [DIA.]
30"
600V-GREEN INSULATED #6GRD. CONDUCTOR [XHHW-2]
CONNECT TO NEW GROUND LUG / EXISTING GROUND CONDUCTOR
RUBBER GROMMET
SEAL CONDUITS AFTER CABLE INSTALLATION AND
TESTING IS COMPLETE [TYP.]
EXISTING GROUND CONDUCTORS TO BE
RE-CONNECTED AFTER NEW BASE INSTALLATION
BASE GROUND LUG
ELECTRICAL SYMBOL LIST;
Xxxx
NEW TAXIWAY EDGE LIGHT FIXTURE TO REPLACE EXISTING IN PLACE SEE
DETAIL 1/E-001 THIS SHEET
TAXIWAY EDGE LIGHT FIXTURE IDENTIFICATION
EXISTING TAXIWAY EDGE LIGHT FIXTURE TO REMAIN
EXISTING TAXIWAY EDGE LIGHT FIXTURE TO BE REMOVED
DETECTABLE WARNING TAPE [TYP.]
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
EASEMENT
AutoCAD SHX Text
EASEMENT
AutoCAD SHX Text E
AutoCAD SHX Text
EASEMENT
AutoCAD SHX Text
AutoCAD SHX Text
RANGE
AutoCAD SHX Text
DRIVING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PAPI
AutoCAD SHX Text
LOCALIZER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text w
AutoCAD SHX Text
SOUTH PERIMETER RD
AutoCAD SHX Text
IRWIN ROAD
AutoCAD SHX Text
IRWIN ROAD
AutoCAD SHX Text
NORTH RIVER ROAD
AutoCAD SHX Text
SOUTH PERIMETER RD
AutoCAD SHX Text
SCHOOLHOUSE RD
AutoCAD SHX Text
E. JOY BLVD
AutoCAD SHX Text
BUNKER RD
AutoCAD SHX Text
NORTH PERIMETER ROAD
AutoCAD SHX Text
SUGARBUSH RD
AutoCAD SHX Text
SCHILLING ST.
AutoCAD SHX Text
DOOLITTLE DR
AutoCAD SHX Text
MULBERRY ST.
AutoCAD SHX Text
AMMO RD
AutoCAD SHX Text
NORTH PERIMETER ROAD
AutoCAD SHX Text
ANDERSEN
AutoCAD SHX Text
ELLSWORTH ST.
AutoCAD SHX Text
ALTUS ST.
AutoCAD SHX Text
CARSWELL ST.
AutoCAD SHX Text
CASTLE AVE.
AutoCAD SHX Text
PLATTSBURG ST.
AutoCAD SHX Text
CASTLE AVE
AutoCAD SHX Text
WEST
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
STABLES RD.
AutoCAD SHX Text
TO AND FROM
AutoCAD SHX Text
I-94 & GRATIOT
AutoCAD SHX Text
ROSSO HWY
AutoCAD SHX Text
ROSSO HWY
AutoCAD SHX Text
FALCON DR.
AutoCAD SHX Text
DOOLITTLE DR
AutoCAD SHX Text
DOOLITTLE DR.
AutoCAD SHX Text
NIKE ROAD
AutoCAD SHX Text
ANCHOR BAY / LAKE ST CLAIR
AutoCAD SHX Text
EAST RAMP
AutoCAD SHX Text
WOOTEN ST
AutoCAD SHX Text
ROULOTT
AutoCAD SHX Text
MITCHELL ST
AutoCAD SHX Text
SELFRIDGE AVE
AutoCAD SHX Text
ASH ST
AutoCAD SHX Text
WILLOW ST
AutoCAD SHX Text
RAILROAD AVE
AutoCAD SHX Text
MAPLE ST
AutoCAD SHX Text
OAK ST
AutoCAD SHX Text
SUPPLY ST
AutoCAD SHX Text
GEORGE AVE
AutoCAD SHX Text
WAKE ST
AutoCAD SHX Text
BIRCH ST
AutoCAD SHX Text
WAGNER ST
AutoCAD SHX Text
MITCHELL ST.
AutoCAD SHX Text
GEORGE AVE
AutoCAD SHX Text
WILBUR WRIGHT BLVD
AutoCAD SHX Text
SUPERIOR ST.
AutoCAD SHX Text
HURON ST.
AutoCAD SHX Text
LAKE ST
AutoCAD SHX Text
HURON ST.
AutoCAD SHX Text
LAKE ST.
AutoCAD SHX Text
LUFBERRY ST
AutoCAD SHX Text
TAXIWAY 'A'
AutoCAD SHX Text NORTH-SOUTH INSTRUMENT RUNWAY 9000'x150' N 1%%D 29' 10" E
AutoCAD SHX Text
CLINTON
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
PAPI
AutoCAD SHX Text
TAXIWAY 'D'
AutoCAD SHX Text
TAXIWAY 'C'
AutoCAD SHX Text
TAXIWAY 'C'
AutoCAD SHX Text
TAXIWAY 'B'
AutoCAD SHX Text
TAXIWAY 'B'
AutoCAD SHX Text
TAXIWAY 'H'
AutoCAD SHX Text
TAXIWAY 'C'
AutoCAD SHX Text
TAXIWAY 'J'
AutoCAD SHX Text
CONTROL TOWER
AutoCAD SHX Text
TAXIWAY 'G'
AutoCAD SHX Text
TAXIWAY 'M'
AutoCAD SHX Text
TAXIWAY 'L'
AutoCAD SHX Text
TAXIWAY 'B'
AutoCAD SHX Text
TAXIWAY 'K'
AutoCAD SHX Text
TAXIWAY 'A'
AutoCAD SHX Text W
AutoCAD SHX Text
TAXIWAY 'F'
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
SOUTH PERIMETER RD
AutoCAD SHX Text
CLINTON
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
TAXIWAY 'A'
AutoCAD SHX Text W
AutoCAD SHX Text
FISH POND ROAD
AutoCAD SHX Text
JOHNSON ST.
AutoCAD SHX Text
JEFFERSON AVE.
AutoCAD SHX Text
RECREATION DR
AutoCAD SHX Text
MAIN GATE
AutoCAD SHX Text
WILLOW ST
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text H.C.
AutoCAD SHX Text H.C.
AutoCAD SHX Text
16 SPACES @ 9'-0"
AutoCAD SHX Text
7 SPACES @ 9'-0", 2 H.C. @ 12'-0"
AutoCAD SHX Text
4 SPACES @ 9'-0"
AutoCAD SHX Text
N. PERIMETER RD
AutoCAD SHX Text
ASHAU VALLEY DR
AutoCAD SHX Text
PARTRIDGE CT
AutoCAD SHX Text
WURTSMITH
AutoCAD SHX Text
SPAATZ CT
AutoCAD SHX Text
WHITEHEAD CT
AutoCAD SHX Text
BRETT DR
AutoCAD SHX Text
ARNOLD CIRCLE
AutoCAD SHX Text
ARNOLD CIRCLE
AutoCAD SHX Text
SPAATZ CT
AutoCAD SHX Text
COPYRIGHT 1999 - FIREHOUSE DESIGNS
AutoCAD SHX Text
JEFFERSON AVE
AutoCAD SHX Text
DOOLITTLE DR
AutoCAD SHX Text
SUPPLY ST
AutoCAD SHX Text
MITCHELL ST
AutoCAD SHX Text
LUKE AVE
AutoCAD SHX Text
GEORGE AVE
AutoCAD SHX Text
JP8
AutoCAD SHX Text
JP8
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text 2+00
AutoCAD SHX Text 4+00
AutoCAD SHX Text 6+00
AutoCAD SHX Text 2+00
AutoCAD SHX Text 4+00
AutoCAD SHX Text 6+00
AutoCAD SHX Text 8+00
AutoCAD SHX Text 10+00
AutoCAD SHX Text 8+00
AutoCAD SHX Text 6+00
AutoCAD SHX Text 4+00
AutoCAD SHX Text 2+00
AutoCAD SHX Text 10+00
File details come from the government source that posted it.