F8Y36P8299AW01 VGLZ162040
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This Amendment Extends the Bid Due Date from 31May2019 at 1:00 PM ET TO: 13June2019 at 1:00 PM ET.
*All RFI's are being review ed for comment, and w ill be posted to FBO.gov w hen they are complete.
*All RFI's are Due NLT 3June2019 -11:00AM ET.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-May-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912JB19B5000
X 9B. DATED (SEE ITEM 11)
01-May-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-May-2019
CODE
127 MSC - FA6221
43200 MAPLE ST
BLDG 105, RM 16
SELFRIDGE ANGB MI 48045-5213
W912JB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912JB19B5000
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 31-May-2019 01:00 PM to 13-Jun-2019 01:00 PM.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
INSTRUCTIONS TO BIDDERS
SECTION 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. Description of the Project: Taxiway B, H, and J - Asphalt Replacement & Taxiway Lights consists of cold milling of asphalt / concrete along the entirety of the taxiways, minimal concrete removal and patching, asphalt paving, and the replacement of approximately 150 taxiway lights along the entirety of Taxiway Bravo, Hotel, and Juliet, west of the runway. Taxiway Bravo is the primary Taxiway along the West Ramp, and services many tenants on that side of the flight line.
2. Instructions to Bidders:
2.1. You are invited to submit a bid in response to our Invitation for Bids (IFB) entitled W912JB-19-B-5000 entitled Taxiway B, H, and J – Asphalt Paving and Taxiway Light Replacement, Project Number VGLZ 162040, at Selfridge ANGB, MI.
2.2. As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.
2.3. This solicitation is set-aside 100% for 8(a) Contractors, in the Detroit, MI SBA District under NAICS
237310 which has a size standard of $36.5M.
2.4. Facsimile transmission of a bid is not authorized. Electronic submission of bids will not be accepted.
Bids must be hand carried to the bid opening or mailed.
2.5. A formatted disk (CD) shall be submitted with your bid that includes all those things required in the bid submission. The Formatted disk shall be labeled
-Solicitation # (W912JB-19-B-5000) -Name / Company Name and Address of Bidder
3. NOTICE OF PRE-BID CONFERENCE AND SITE VISIT:
3.1. A pre-bid conference will be conducted on 15May2019 at 9:30am ET for the purposes of briefing on the bid requirements and answering questions regarding this solicitation. This conference will be held at 43200 Maple Street, Bldg 105, Room 20, Selfridge ANGB, MI 48045 (Contracting- Conference Room). Interested Contractors are highly encouraged to attend the pre-bid conference. The site visit will be held following the conference.
3.2. Due to security conditions, all offerors must register to attend this conference and site visit. Email the following information for all attendees to Bradley Moehlig and Steven Stocking at the following addresses:
bradley.m.moehlig.mil@mail.mil and steven.a.stocking3.mil@mail.mil. You may call us at (586) 239-4733/4881 with questions/concerns.
Firm/Company Name and Telephone Number Visitor’s Full Name and Last 4 of Social Security #.
Driver’s License # / State Issued Date of Birth Gender Race Citizenship
3.3. This information must be provided in advance, 3 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.
3.4. Visitors must pick up their passes at the Installation’s Main Entry Gate (M-59 / Hall Road Gate) prior to arrival. You will be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Drivers License, (3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable.(5) for those who have not received a pass in the past year, may be required to show either a social security card, tax ID number, or certificate of naturalization at the time of issue. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
3.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply. All amendments will be posted to FBO.gov, and it should be noted that local ‘plan rooms’ do NOT typically distribute amendments in a timely manner. Please always refer to FBO.gov.
3.6. A record of the conference shall be made and furnished to all prospective bidders via posting at FBO.gov.
The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
4. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS:
4.1. Submit all questions in the format shown below by email to the contracting office at the addresses show below. Do NOT contact AE or Engineering personnel directly. Doing so will only delay your answer. All questions must come through the Contracting Office.
Subject Line: Reference No. SOLICITATION W912JB-19-B-5000 Email: Contracting Officer Steven A. Stocking – steven.a.stocking3.mil@mail.mil and Contract Specialist Bradley M. Moehlig – bradley.m.moehlig.mil@mail.mil
PRE-BID INQUIRY FORMAT
Date of Bid Inquiry: _______________
From: ______________________________ Company Name: ________________________________
Address:_____________________________________________________________________________
Phone Number: _____________________________ Fax Number:______________________________
Email address: ________________________________________________________________________
Bid Inquiry: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document.)
4.1. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach bidders before the submission of their bid.
4.2. All questions and requests for information (RFI) must be received NOT LATER THAN the fifth working day prior to bid opening. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS
EARLY IN THIS PROCESS.
4.3. Any changes to the drawings, specifications, etc. will be issued in the form of an amendment.
However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment but rather as a response to the RFI on FBO at http://www.fbo.gov
4.4. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of bids.
4.5. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Federal Business Opportunities (FedBizOpps.gov or fbo.gov) system. Plans and specifications are locked on FBO and require Contractors to request explicit access from the Contracting Officer OR export controlled access through DLA. See complete instructions on FBO. FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system.
4.5.1. Amendments, if/when issued will be posted to FBO.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons.
5. BID REPOSITORY AND BID OPENING:
5.1. A bid repository is provided for hand carried bids and is located at 43200 Maple Street, Bldg 105, Contracting Front Office (Directly across from Room 20), Selfridge ANGB, MI 48045. Hand carried bids must be deposited in the repository prior to the time established for opening of bids. Bidders are cautioned that they will be required to sign-in and obtain a visitor’s pass to enter the facility and should allow time to accomplish this. See instructions to obtain access to the base in the Site Visit instruction. Follow the same instruction for obtaining entry to hand carry bid. Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304.
5.2. The bid opening will occur at the time and date specified in Block 13 of the SF1442 see block 13 of this
1442 All interested offerors and their major subcontractors are encouraged to attend the bid opening. www.time.gov will be referenced for Eastern Time at the bid repository location.
6. WAGE DETERMINATION:
6.1. Construction Wage Rates are applicable to this project are MI190001 03/08/2019 MI1 as shown in Section
00800.
7. BID PREPARATION EXPENSES AND PRE-CONTRACT COSTS: This IFB does not commit the Government to pay costs incurred in preparation and submission of bids or for other costs incurred prior to award of a formal contract.
8. CLAUSES:
8.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
9. DISPOSITION OF UNSUCCESSFUL BIDS:
In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful bids including the bid bond.
10. OFFERORS QUALIFICATIONS:
To establish its responsibility, the apparent low bidder may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work. This action may be requested to determine if the contractor is responsible.
11. BRAND NAME JUSTIFICATION: A Brand Name Justification for the use of ADB LED Taxiway Lights (ADB-L-861 Series). See Brand Name Justification attached to solicitation and posted to FBO.gov.
Summary:
The Airfield Lighting SGRS Electrical Power Source Regulators have been recently contracted, and are currently being upgraded with an ADB Safegate CCR Airfield lighting power distribution system. The ADB Safegate CCR Airfield lighting power distribution system was previously chosen as it’s the only known system that is backwards compatible to currently installed ADB Air Field Lighting Electrical Vault System at Selfridge ANGB.
The existing Airfield Lighting fixtures are at their end of their service life, with spare components difficult to obtain.
The lack of spare components and their dwindling availability, gravely jeopardizes the safe and effective flight line operations of Selfridge Air National Guard Base. The existing lighting fixtures need to be replaced with ADB fixtures to maintain system compatibility with the current ADB Safegate Constant Current Regulator Airfield lighting power distribution system. Compatibility will be an issue for a NON ADB product attached to our current lighting system.
End of Section 00100