SANGB_Form_23.pdf
PDF 66 KB Posted
- Attached to
- Install Heaters in Hangar 1427 Federal contract opportunity
- Solicitation number
- W912JB-16-B-4000
About this file
SANG Form 23
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Hazardous Material Identification Part I
To be completed by Contractor prior to start date and shall be maintained on the job site.
Date: ______________________________
Contractor Company: __________________________________________________________________________
Proposed Work Term: _________________________________ to ____________________________________
Contractor Point of Contact: ___________________________________________________________________
Phone: _________________________
HM to be Used:
MFG. / Product
M.S.D.S.
Attached
QTY
Used
Disposal Procedures Comments
NOTE: This form is to be submitted to the HMPT for initial construction. All Hazardous Material (HM) used thereafter will be identified to Contracting Officer representative and tracked by the HMPT. See Part II for contractor closeout procedures. HMPT phone number is (586) 307-6104.
HMPT Tracking Signatures
CEV: __________________________________________ SGPB: _________________________________________________
HMPT: ________________________________________ CEF: __________________________________________________
Project Name: __________________________________________________
SANGB Form 23, Mar 2003 PREVIOUS EDITION IS OBSOLETE
Contractor Hazardous Material Identification Part II
Closeout Procedures
Contractors will accompany Base Environmental on closeout inspection to ensure all used / unused HM was removed from the Base.
Date: ____________________________________________
Closeout Signatures:
CEV: ________________________________________________________________________________________________________
Contracting Officers Representatve: ___________________________________________________________________________
Contractor: __________________________________________________________________________________________________
SANGB Form 23, Mar 2003 (Reverse)
Project Name:
HM to be used:
MFG/Product
Used/Unused Material Removed from Selfridge
Comments
| Text56: |
| Text57: |
| Text58: |
| Text59: |
| Text60: |
| Text61: |
| Text62: |
| Text63: |
| Text64: |
| Text65: |
| Text66: |
| Text67: |
| Text68: |
| Text69: |
| Text70: |
| Text71: |
| Text72: |
| Text73: |
| Text74: |
| Text75: |
| Text76: |
| Text77: |
| Text78: |
| 0: |
| 1: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 10: |
| 11: |
| 12: |
| 13: |
| 14: |
| 15: |
| Text1: |
| Text2: |
| Text3: |
| Text4: |
| Text5: |
| Text6: |
| Text7: |
| Text8: |
| Text9: |
| Text10: |
| Text11: |
| Text12: |
| Text13: |
| Text14: |
| Text15: |
| Text16: |
| Text17: |
| Text18: |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
| Text24: |
| 0: |
| 0: |
| 1: |
| 0: |
| 2: |
| 0: |
| 3: |
| 0: |
| 4: |
| 0: |
| 5: |
| 0: |
| 6: |
| 0: |
| 7: |
| 0: |
| 8: |
| 0: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| Text25: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 10: |
| 11: |
| 12: |
| Text23: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 10: |
| 11: |
| 12: |
| 13: |
| Text26: |
| Text27: |
File details come from the government source that posted it. Updated .