Hangar_1427_RFI's_Document_2.pdf

PDF 76 KB Posted

Attached to
Install Heaters in Hangar 1427 Federal contract opportunity
Solicitation number
W912JB-16-B-4000
Issued by
Department of the Army Michigan Army National Guard

About this file

RFI's Document 2

View the file

Other files for this federal contract opportunity

Other files attached to Install Heaters in Hangar 1427, newest first.
File Type Posted
1427_Heaters_Sign_In_Sheet.pdf PDF
Copy_of_BID_ABSTRACT_1427_HEATERS.pdf PDF
Government_Bid_1427_Heaters.pdf PDF
W912JB16B4000_VGLZ_162008_Sol_Amendment_10.pdf PDF
W912JB16B4000_VGLZ_162008_Sol_Amendment_9.pdf PDF
B1427_Heaters_Addendum_001.pdf PDF
B1427_Heater_Plans_Revised.pdf PDF
W912JB16B4000_VGLZ_162008_Sol_Amendment_8.pdf PDF
W912JB16B4000_VGLZ_162008_Sol_Amendment_7.pdf PDF
B1427_Elevation.pdf PDF
1427_Sign_In_Sheets.pdf PDF
Site_Visit_Minutes_1427_Install_Heaters.pdf PDF
W912JB16B4000_VGLZ_162008_Sol_Amendment_6.pdf PDF
Hangar_1427_RFI's_Document_1.pdf PDF
SELFRIDGE___VISION_2020_12May2014_Revision.pdf PDF
ADDENDUM_6_Vision_2020__12May2014.pdf PDF
W912JB16B4000_VGLZ_162008_Sol_Amendment_5.pdf PDF
W912JB-16-B-4000_Solicitation.pdf PDF
SANGB_Form_23.pdf PDF
SOW_B1427_Heaters_2.pdf PDF
Vision_2020_Doc.pdf PDF
Bid_Depository.pdf PDF
B1427_Heater_Plans.pdf PDF
W912JB-16-B-4000_Solicitation.pdf PDF
Base_Access_Form.pdf PDF
W912JB-16-B-4000_Hangar_1427_Heater.pdf PDF
Hangar_1427_Heaters_Synopsis_Rev_3.pdf PDF
Hangar_1427_Heaters_Synopsis_Rev_2.pdf PDF
Hangar_1427_Heaters_Synopsis_Rev_1.pdf PDF
Hangar_1427_Heaters_Synopsis.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912JB16B4000

VGLZ 162008 INSTALL HEATERS – HANGAR 1427

RFI’S

1. The existing gas meter, regulator and supply line is undersized according to the gas requirements specified. Has the Gas utility been contacted and contracted to replace the existing service with a larger meter and regulator?

a. Yes, they have been contacted and a contract for them to upsize the meter and regulator is in the works. The supply line from the meter into the building will need to be upsized as well and will be the responsibility of the contractor for this solicitation. An addendum stating this will be issued shortly.

2. Are there any gas utility changes to be included in this proposal?

a. NO

3. Can flexible gas lines be installed?

a. Flexible connectors at the appliances are acceptable with in 24” of the units. All other piping shall be rigid and meet the requirements of the International Fuel Gas Code.

4. For purposes of determining percentage limitations on self-performed work, is this work considered

"general construction" or "construction by special trade contractors"?

a. It will be by special trades contractors

5. For the unit heaters, is the existing flue to be reused, replaced, or left as-is?

a. Reused per paragraph 1.g. of the SOW.

6. Does the new gas line have to be painted yellow?

a. New interior gas lines do not need to be painted. Any new exterior gas piping supplied by the contractor shall be painted to match building color.

7. Are existing thermostats to be used? Are set-back thermostats required?

a. New programmable thermostats are required for the furnaces. Manufacturer specified/recommended thermostats are required for the infrared and unit heaters.

8. What height are the new radiant heaters to be installed?

a. Bottom of unit heaters shall be between 48” and 60” above mezzanine deck.

9. Is there a safety interlock between the hangar doors and radiant heaters?

a. No.