B1427_Heaters_Addendum_001.pdf

PDF 122 KB Posted

Attached to
Install Heaters in Hangar 1427 Federal contract opportunity
Solicitation number
W912JB-16-B-4000
Issued by
Department of the Army Michigan Army National Guard

About this file

Addendum 001

View the file

Other files for this federal contract opportunity

Other files attached to Install Heaters in Hangar 1427, newest first.
File Type Posted
1427_Heaters_Sign_In_Sheet.pdf PDF
Copy_of_BID_ABSTRACT_1427_HEATERS.pdf PDF
Government_Bid_1427_Heaters.pdf PDF
W912JB16B4000_VGLZ_162008_Sol_Amendment_10.pdf PDF
W912JB16B4000_VGLZ_162008_Sol_Amendment_9.pdf PDF
B1427_Heater_Plans_Revised.pdf PDF
W912JB16B4000_VGLZ_162008_Sol_Amendment_8.pdf PDF
Hangar_1427_RFI's_Document_2.pdf PDF
W912JB16B4000_VGLZ_162008_Sol_Amendment_7.pdf PDF
B1427_Elevation.pdf PDF
1427_Sign_In_Sheets.pdf PDF
Site_Visit_Minutes_1427_Install_Heaters.pdf PDF
W912JB16B4000_VGLZ_162008_Sol_Amendment_6.pdf PDF
Hangar_1427_RFI's_Document_1.pdf PDF
SELFRIDGE___VISION_2020_12May2014_Revision.pdf PDF
ADDENDUM_6_Vision_2020__12May2014.pdf PDF
W912JB16B4000_VGLZ_162008_Sol_Amendment_5.pdf PDF
W912JB-16-B-4000_Solicitation.pdf PDF
SANGB_Form_23.pdf PDF
SOW_B1427_Heaters_2.pdf PDF
Vision_2020_Doc.pdf PDF
Bid_Depository.pdf PDF
B1427_Heater_Plans.pdf PDF
W912JB-16-B-4000_Solicitation.pdf PDF
Base_Access_Form.pdf PDF
W912JB-16-B-4000_Hangar_1427_Heater.pdf PDF
Hangar_1427_Heaters_Synopsis_Rev_3.pdf PDF
Hangar_1427_Heaters_Synopsis_Rev_2.pdf PDF
Hangar_1427_Heaters_Synopsis_Rev_1.pdf PDF
Hangar_1427_Heaters_Synopsis.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VGLZ 162008, INSTALL HEATERS – B1427 SELFRIDGE ANGB, MI

ADDENDUM NO. 001 12 May 2016

This addendum applies to the following documents:

( X ) Statement of Work (SOW), dated 20 Jan 2016

( X ) Bldg. 1427 Heater Plans Sheet M-1 dated 20 Nov 2015

Description of Addendum:

1. SOW (Bldg. 129)

A. Page 2, Section 1, paragraph “a” Delete the following; While following the roofline.

B. Page 2, Section 1, paragraph “d” add the following; The natural gas line size will need to be increased to 3” from the gas meter to inside the building as shown on the plans. All exterior gas piping shall be painted to match building exterior. Interior gas piping does not need to be painted.

2. Bldg. 1427 Heater Plans Sheet M-1

A. Replace B1427 Heater Plans sheet M-1 dated 20 Nov 2015 with the new plan that is attached and is dated 12 May 2016. The only thing that changed is the gas supply line from the meter to inside the building needs to be increased to 3”.

END OF ADDENDUM NO. 001