Q&A_Dated_26JUL2019_LOCRF.pdf

PDF 149 KB Posted

Attached to
KNMD189008 F-22 COMPOSITE REPAIR FACILITY JOINT BASE PEARL HARBOR HICKAM (JBPHH) HI
Solicitation number
W912J6-19-R-5000
Issued by

About this file

This document contains questions and answers related to a solicitation for a composite repair facility at Joint Base Pearl Harbor Hickam in Hawaii. The solicitation seeks construction of a new facility including installation of a roof-mounted photovoltaic system. A pre-proposal conference was held and presentation slides were made available. A second site visit is scheduled for July 31, 2019 and access credentials must be requested in advance. Bidders must submit a minimum of three and maximum of five past project examples using Exhibit A forms. CPARS evaluations may be used in lieu of reference questionnaires. The solicitation is seeking bids from qualified contractors and is available through the Federal Business Opportunities website.

View the file

Other files

File Type Posted
Q&A_Dated_16AUG2019_LOCRF.pdf PDF
Q&A_Dated_14AUG2019_LOCRF_1445_hours.pdf PDF
Q&A_Dated_14AUG2019_LOCRF_0500_hours.pdf PDF
Wage_Determination.pdf PDF
07_05_23.pdf PDF
W912J6-19-R-5000-0002.pdf PDF
Q&A_Dated_12AUG2019_LOCRF.pdf PDF
W912J6-19-R-5000-0001.pdf PDF
Subsurface_Info_Doc_KNMD189008.pdf PDF
Addendum_01_Cover_Sheet.pdf PDF
Addendum_01_Specifications.pdf PDF
Addendum_01_Drawings.pdf PDF
Q&A_Dated_07AUG2019_LOCRF.pdf PDF
PreProposal_Meeting_SLIDES_31Jul2019.pdf PDF
Sign_In_Sheet_31Jul2019.pdf PDF
Q&A_Dated_03AUG2019_LOCRF.pdf PDF
Q&A_Dated_01AUG2019_LOCRF.pdf PDF
Q&A_Dated_23JUL2019_LOCRF.pdf PDF
PreProposal_Meeting_SLIDES_12Jul2019.pdf PDF
Sign_In_Sheet_12Jul2019.pdf PDF
Q&A_Dated_10JUL2019_LOCRF.pdf PDF
A.02_19-0001_JA_189008_Redacted.pdf PDF
A.02_19-0005_KNMD162546_Redacted.pdf PDF
A.02_19-0002_189008_Redacted.pdf PDF
A.02_19-0003_189008_Redacted.pdf PDF
A.02_19-0004_KNMD162546_Redacted.pdf PDF
EXHIBIT_A-KNMD189008.doc DOC document
W912J6-19-R-5000.pdf PDF
EXHIBIT_C_Reference_Questionnaire_Package-KNMD189008.docx DOCX document
EXHIBIT_B-KNMD189008.doc DOC document
EXHIBIT_D-JB2_0-180_and_SECNAV.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS RELATED TO:

SOLICITATION W912J6-19-R-5000

Dated 26 Jul 2019

Make Sure You Have the Latest Version of this Web Page “Refresh” or “Reload”

Dated 10 Jul 2019 2017

Q1. How do I access the files/documents for the Project?

A1. See, Sections 4.4, 4.5 & 4.7 of the FBO Vendor Guide available for download in PDF format via the Federal Business Opportunities / FBO Home Page. See also, Section 00100 of the Solicitation.

Additionally, to view and/or download Export Controlled Materials, a company must be certified (via an approved DD Form 2345) by the Joint Certification Program (JCP) administered by the DLA Logistic Information Service (DLIS). This certification establishes that a company is a U.S. or Canadian contractor eligible to receive unclassified technical data that is under the control of the U.S. Department of Defense (DoD) or the Canadian Department of National Defense (DND). Questions about this program or DD Form 2345 should be addressed to U.S./Canada Joint Certification Office, DLA Logistics Information Services (DLIS), Federal Center, 74 Washington Avenue North, Battle Creek, MI 49017-3084. The Joint Certification Office may be contacted by telephone at: 1-(800) 352-3572; or email: jcp-admin@.dla.mil.

Q2. I am trying to access the [export controlled] packages and have a number as assigned on DD Form 2345 but cannot get the packages to open. Our DD 2345 Number is ####### expiration ##/##/2018.

A2. The U.S./Canada Joint Certification Program (JCP) office reported to this office that once a company is certified with the JCP office (normally 7 to 12 business days), the company should contact FBO to have them add their JCP number to their FBO account. The FBO help desk (Federal Service Desk) reported to this office that companies need to make sure that they are registered and login as a Vendor to FBO. When the Vendor click's to open an export controlled package/document, they should be asked for their MPIN. After entering the MPIN, the export controlled package/document should be viewable/downloadable by Vendors that have gone through the JCP process. If a Vendor still has problems, the Vendor should check to make sure that their CCR registration and MPIN are valid and up-to-date. If problems still persist, the Vendor may call the FBO help desk at 866-606-8220, selection option 2 for FBO issues, and ask for troubleshooting assistance.

Q3. Please help me access the locked documents for solicitation W912J6-19-R-5000.

A3. Reference answers A1 and A2 above. After your firm contact and submits a DD Form 2345 to the Joint Certification Program (JCP) which is administered by the DLA Logistic Information (contact information provided in A1) your firm can send proof of this application and submission via a copy of the email receipt from the JCP or DLA personnel that your certification is in process to manual.llanes.mil@mail.mil.

Pending receipt of the proof that your application is pending certification the Contracting Officer may make the locked files directly available to your frim via AMRDEC SAFE. This access will not be granted if your firm does not apply for certification and follow the above mentioned instructions in A1 and A2.

Q4. We cannot download the specification and drawing documents for the subject bid with MPIN. Is there any way we can get the export controlled documents except applying JCP certification?

A4. See Item A3 Above.

mailto:jcp-admin@.dla.mil mailto:manual.llanes.mil@mail.mil

Dated 23 Jul 2019

Q5. Will there be any allowance for another site visit? Due to the RFP being posted on July 10th and the site visit being held on July 12th we were unable to attend. As a prime contractor who would like to submit a proposal for this project we feel it would be necessary to visit the site prior to submitting a proposal. Please advise if we will be permitted to visit the site prior to the proposal due date and I will immediately send in names of personnel who will attend.

A5. UPDATED 26 JUL 2019***** A SECOND SITE VISIT HAS BEEN SCHEDULED FOR

WEDNESDAY 31JUL2019 at 0900 HOURS.*********************************************** If your firm wishes to attend you are advised to immediately complete and submit the EXHIBIT D forms to the following email addresses no later than 0900 hours on 29 JUL 2019 if you do not already have access credentials to JBPHH. Submit via email to the following: manuel.llanes.mil@mail.mil, emilio.placencia@us.af.mil, douglas.pagala@us.af.mil and edward.chunfat.ctr@us.af.mil . Those with current access credentials do not need to submit EXHIBIT D, only those without current access credentials. THIS EXHIBIT MUST BE SUBMITTED IN ADVANCE OF 29 JUL 2019 at 0900

HOURS IF YOU DO NOT HAVE CURRENT ACCESS TO JBPHH. FAILURE TO SUBMIT

EXHIBIT D IN ADVANCE OF THE DEADLINE OR LATE MAY RESULT IN DENIAL OF

ACCESS TO JBPHH. You cannot attend the site visit without access credentials. A second site visit will be scheduled. Further details will be posted to www.fbo.gov.

Q6. I wanted to follow up with you on the presentation slides that were shared during the pre-proposal conference. I have not been able to locate them on the FBO site along with the sign in sheet.

Are these something you would be able to email out or upload to FBO?

A6. The presentation slides shared during the pre-proposal conference were posted to www.fbo.gov on 16Jul2019. Please download the pdf document from www.fbo.gov for a copy of the slides.

Q7. Is there any photovoltaic work for this project?

A7. Yes, a roof-mounted photovoltaic system is listed as Bid Option 2 per spec section 012300 – 3.01. The scope of work can be found in the following locations:

Sheet E-106 Keyed Note 1 Sheet E-505 (PV details) Section 481413 – Solar Energy Collectors Section 481916 – Grid-Tie Utility Interactive Inverters.

Dated 26 Jul 2019

Q8. Will the design team (engineer and/or architect) waive the air entrainment requirement?

A8. PENDING

Q9. Reference: Section 316333 – Foundation Piling (Micropiles), Drawings S-001 & S-500

a. Plans indicates three (3) different tests (compression, uplift, and shear), and the specifications indicate two (2) different tests (compression and lateral). Which tests are to be performed? Please note, lateral and shear tests are not a common practice for micropile construction. They can be proven by calculations and are generally not necessary. We recommend compression and tension only.

b. If there will be multiple tests, will there be a separate sacrificial pile installed for each test type?

c. Design loads differ between plans and specifications. Please specify which are correct.

d. Specifications reference three (3) pile types with different load capacities. The plans reference one (1) pile type with differing capacities. Please clarify.

mailto:manuel.llanes.mil@mail.mil mailto:emilio.placencia@us.af.mil mailto:douglas.pagala@us.af.mil mailto:edward.chunfat.ctr@us.af.mil http://www.fbo.gov/ http://www.fbo.gov/ http://www.fbo.gov/

e. Because of all the differing parts of the plans and specifications, would it be acceptable for micropile subcontractor to provide structural design that meets design capacities in lieu of following the micropile details in the plans/specs?

A9. PENDING

Q10. Section 1.07, Para. C Part 2 (a) states the Wind: 50mph per ASCE 7 acting in any direction or seismic forces, whichever is greater. Please confirm that this is the wind speed the door is expected to be able to operate at. Reference: Section 083022 – Swing and Plenum Type Hangar Doors

A10. PENDING

Q11. Section 2.01, Para. R Part 5 (a)

f. Will a hard rubber tire drive be acceptable in lieu of a rail system? The steel wheels on rail will not have enough weight to hold the door from sliding in a high wind circumstances. The rubber tires will function adequately. Reference: Section 083022

– Swing and Plenum Type Hangar Doors

A11. PENDING

Q12. Will the design team accept C1293 for aggregate ASR qualification in place of C1260 for this project?

A12. PENDING

Q13. Will the designers reclassify the requirements of the concrete aggregates as “Negligible Weather” (1N or 2N) as indicated by the definitions in ASTM C33?

A13. PENDING

Q14. RFP Section 00110, Para. 2.5.3.4. requires contractors to prepare not more than five (5) but no less than three (3) of Exhibit A, Part 1. Exhibit A, Part 1 instructs to prepare not more than three (3) of these documents. Are we required to submit up to three or up to five Exhibit A projects?

A14. Up to five (5) Exhibit A Projects should be submitted. A Minimum of three (3) Exhibit A projects are required.

Q15. Reference: Section 00110, Para. 2.5.3.4. (page 23 of 94)

Page 28 of 94: Section 00120, Para 2.2.6. Subfactor 4 references Exhibits B and D. RFP uses Exhibit D as a Form - 0-180 Access Request for Joint Base Pearl Harbor Hickam. Please confirm that Exhibit D is required in response to Subfactor 4.

A15. Exhibit D is NOT required in response to Subfactor 4. Exhibit D is only required for those wishing to obtain access credentials to JBPHH for the site visits.

Q16. Reference: Section 00120, Para. 2.2.6. Subfactor 4 (page 28 of 94)

Section 00110, Para. 2.5.3.11. Reference Package, Exhibit C requires contractors to e-mail Past Performance Reference/Evaluation Questionnaire to the contract references to be completed and returned directly to the Contracting Officer. In an effort to save our clients’ time and eliminate redundancy, are contractors allowed to use the previously completed Past Performance Questionnaires (PPQs) in lieu of this requirement?

A16. YES

Q17. Reference: Section 00110, Para. 2.5.3.11. Reference Package, Exhibit C (page 24 of 94) and Reference: Section 00110, Paragraphs 2.5.3.1., 2.5.3.3., and 2.5.3.11. (pages 23 and 24 of 94)

Section 00110, Para. 2.5.3.11. allows contractors to use a “Final” Performance Evaluation (Construction) (also referred to as CCASS Evaluation) in lieu of sending out reference package for the project.

a. Please clarify if a standard CPARS evaluation is admissible for this procurement.

b. And if so, would the latest evaluation available through PPIRS be acceptable for submission, considering the project meets the 70% completion criteria listed in paragraph 2.5.3.1?

A17. YES a standard CPARS evaluation is admissible for this procurement. Yes the latest evaluation available through PPIRS would be acceptable for submission as long as the project meeting the 70% completion criteria listed in paragraph 2.5.3.1.