About this file
This addendum modifies a solicitation for the construction of an addition to a LO/CRF facility at Joint Base Pearl Harbor Hickam in Hawaii. The addendum updates specifications and drawings related to site demolition, concrete pavement, foundation pilings including micropiles, fire suppression notes and details, structural notes and details. It revises information for soil unit weight, micropile capacity and lengths, and removes a paragraph on pavement. The solicitation is issued by the Department of the Army National Guard for contract number W912J6-19-R-5000 to construct an addition to the F-22 Composite Repair Facility at Joint Base Pearl Harbor Hickam, with modifications to specifications and drawings as outlined in the addendum.
Addendum 01 Cover Sheet
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. #01 DATED: 6 August 2019
FOR PROJECT:
TITLE: CONSTRUCT ADDITIONAL TO LO/CRF, B3408
NUMBER: KNMD189008
LOCATION: HIANG, Joint Base Pearl Harbor Hickam
ADDENDUM MADE TO:
(X) Specifications
01 11 00 SUMMARY OF WORK
08 90 00 LOUVERS AND VENTS (Added) 10 26 00 WALL AND DOOR PROTECTION (Added)
31 09 16.23 PILE LOAD TEST – STATIC AXIAL COMPRESSION
31 09 16.24 PILE LOAD TEST (LATERAL)
31 63 33 FOUNDATION PILING (MICROPILES)
32 13 11 CONCRETE PAVEMENT FOR AIRFIELDS
(X) Drawings
CD100 OVERALL SITE DEMOLITION PLAN
CD101 ENLARGED DEMOLITION PLAN
CS401 PAVEMENT JOINTING PLAN
CS500 PAVEMENT DETAILS
E601 POWER ONE LINE
FX001 FIRE SUPPRESSION NOTES, LEGEND
S-001 STRUCTURAL GENERAL NOTES
S-500 FABRICATION DETAILS
S-610 STRUCTURAL COLUMN SCHEDULE
( ) Scope of Work
Addendum #01 made changes to the following specifications:
01 11 00: Updated references to project number.
31 09 16.23: Updated pile loading information.
31 09 16.24: Updated pile loading information.
31 63 33: Updated pile loading information and updated requirements.
32 13 11: Removed paragraph 2.08.
Addendum #01 made changes to the following drawings:
FX001: Option 7 (Repair Fire) FX001 Detail A1: Revised scale to NTS.
CD100: Revised concrete demolition directly south of LO Bay 2, to match all other site and jointing plans.
See attached plans under separate cover.
CD101: Revised concrete demolition directly south of LO Bay 2, to match all other site and jointing plans.
See attached plans under separate cover.
CS401: Revised notes 5, 6, and 7 to update with jointing information. See attached plans under separate cover.
CS500: Revised title of detail N2. See attached plans under separate cover.
E-601: Revised PV arrays sizes from 40KW to 20 KW.
S-001: Updated Soil Unit Weight.
S-500: Update micropile capacity and lengths.
S-610 Added Bid Option Micropile Schedule
END OF ADDENDUM NO. #01