Q&A_Dated_01AUG2019_LOCRF.pdf

PDF 188 KB Posted

Attached to
KNMD189008 F-22 COMPOSITE REPAIR FACILITY JOINT BASE PEARL HARBOR HICKAM (JBPHH) HI
Solicitation number
W912J6-19-R-5000
Issued by

About this file

This document contains questions and answers related to a federal solicitation for construction services. The solicitation is for Project KNMD189008 to construct an addition to the F-22 Low Observable Composite Repair Facility Bay 3408 at Joint Base Pearl Harbor Hickam in Hawaii. The work includes building additions, renovations, site work, and installation of photovoltaic systems. The solicitation was issued by the Department of the Army National Guard and the period of performance is not specified. Offerors must submit their proposals in response to requirements detailed in the solicitation, including providing information on relevant past projects and key personnel, as well as price proposals. The document includes answers to numerous questions from prospective offerors to clarify aspects of the solicitation.

View the file

Other files

File Type Posted
Q&A_Dated_16AUG2019_LOCRF.pdf PDF
Q&A_Dated_14AUG2019_LOCRF_1445_hours.pdf PDF
Q&A_Dated_14AUG2019_LOCRF_0500_hours.pdf PDF
Wage_Determination.pdf PDF
07_05_23.pdf PDF
W912J6-19-R-5000-0002.pdf PDF
Q&A_Dated_12AUG2019_LOCRF.pdf PDF
W912J6-19-R-5000-0001.pdf PDF
Subsurface_Info_Doc_KNMD189008.pdf PDF
Addendum_01_Cover_Sheet.pdf PDF
Addendum_01_Specifications.pdf PDF
Addendum_01_Drawings.pdf PDF
Q&A_Dated_07AUG2019_LOCRF.pdf PDF
PreProposal_Meeting_SLIDES_31Jul2019.pdf PDF
Sign_In_Sheet_31Jul2019.pdf PDF
Q&A_Dated_03AUG2019_LOCRF.pdf PDF
Q&A_Dated_26JUL2019_LOCRF.pdf PDF
Q&A_Dated_23JUL2019_LOCRF.pdf PDF
PreProposal_Meeting_SLIDES_12Jul2019.pdf PDF
Sign_In_Sheet_12Jul2019.pdf PDF
Q&A_Dated_10JUL2019_LOCRF.pdf PDF
A.02_19-0001_JA_189008_Redacted.pdf PDF
A.02_19-0005_KNMD162546_Redacted.pdf PDF
A.02_19-0002_189008_Redacted.pdf PDF
A.02_19-0003_189008_Redacted.pdf PDF
A.02_19-0004_KNMD162546_Redacted.pdf PDF
EXHIBIT_A-KNMD189008.doc DOC document
W912J6-19-R-5000.pdf PDF
EXHIBIT_C_Reference_Questionnaire_Package-KNMD189008.docx DOCX document
EXHIBIT_B-KNMD189008.doc DOC document
EXHIBIT_D-JB2_0-180_and_SECNAV.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS RELATED TO:

SOLICITATION W912J6-19-R-5000

Dated 01 Aug 2019

Make Sure You Have the Latest Version of this Web Page “Refresh” or “Reload”

Dated 10 Jul 2019 2017

Q1. How do I access the files/documents for the Project?

A1. See, Sections 4.4, 4.5 & 4.7 of the FBO Vendor Guide available for download in PDF format via the Federal Business Opportunities / FBO Home Page. See also, Section 00100 of the Solicitation.

Additionally, to view and/or download Export Controlled Materials, a company must be certified (via an approved DD Form 2345) by the Joint Certification Program (JCP) administered by the DLA Logistic Information Service (DLIS). This certification establishes that a company is a U.S. or Canadian contractor eligible to receive unclassified technical data that is under the control of the U.S. Department of Defense (DoD) or the Canadian Department of National Defense (DND). Questions about this program or DD Form 2345 should be addressed to U.S./Canada Joint Certification Office, DLA Logistics Information Services (DLIS), Federal Center, 74 Washington Avenue North, Battle Creek, MI 49017-3084. The Joint Certification Office may be contacted by telephone at: 1-(800) 352-3572; or email: jcp-admin@.dla.mil.

Q2. I am trying to access the [export controlled] packages and have a number as assigned on DD Form 2345 but cannot get the packages to open. Our DD 2345 Number is ####### expiration ##/##/2018.

A2. The U.S./Canada Joint Certification Program (JCP) office reported to this office that once a company is certified with the JCP office (normally 7 to 12 business days), the company should contact FBO to have them add their JCP number to their FBO account. The FBO help desk (Federal Service Desk) reported to this office that companies need to make sure that they are registered and login as a Vendor to FBO. When the Vendor click's to open an export controlled package/document, they should be asked for their MPIN. After entering the MPIN, the export controlled package/document should be viewable/downloadable by Vendors that have gone through the JCP process. If a Vendor still has problems, the Vendor should check to make sure that their CCR registration and MPIN are valid and up-to-date. If problems still persist, the Vendor may call the FBO help desk at 866-606-8220, selection option 2 for FBO issues, and ask for troubleshooting assistance.

Q3. Please help me access the locked documents for solicitation W912J6-19-R-5000.

A3. Reference answers A1 and A2 above. After your firm contact and submits a DD Form 2345 to the Joint Certification Program (JCP) which is administered by the DLA Logistic Information (contact information provided in A1) your firm can send proof of this application and submission via a copy of the email receipt from the JCP or DLA personnel that your certification is in process to manual.llanes.mil@mail.mil.

Pending receipt of the proof that your application is pending certification the Contracting Officer may make the locked files directly available to your frim via AMRDEC SAFE. This access will not be granted if your firm does not apply for certification and follow the above mentioned instructions in A1 and A2.

Q4. We cannot download the specification and drawing documents for the subject bid with MPIN. Is there any way we can get the export controlled documents except applying JCP certification?

A4. See Item A3 Above.

mailto:jcp-admin@.dla.mil mailto:manual.llanes.mil@mail.mil

Dated 23 Jul 2019

Q5. Will there be any allowance for another site visit? Due to the RFP being posted on July 10th and the site visit being held on July 12th we were unable to attend. As a prime contractor who would like to submit a proposal for this project we feel it would be necessary to visit the site prior to submitting a proposal. Please advise if we will be permitted to visit the site prior to the proposal due date and I will immediately send in names of personnel who will attend.

A5. UPDATED 26 JUL 2019***** A SECOND SITE VISIT HAS BEEN SCHEDULED FOR

WEDNESDAY 31JUL2019 at 0900 HOURS.*********************************************** If your firm wishes to attend you are advised to immediately complete and submit the EXHIBIT D forms to the following email addresses no later than 0900 hours on 29 JUL 2019 if you do not already have access credentials to JBPHH. Submit via email to the following: manuel.llanes.mil@mail.mil, emilio.placencia@us.af.mil, douglas.pagala@us.af.mil and edward.chunfat.ctr@us.af.mil . Those with current access credentials do not need to submit EXHIBIT D, only those without current access credentials. THIS EXHIBIT MUST BE SUBMITTED IN ADVANCE OF 29 JUL 2019 at 0900

HOURS IF YOU DO NOT HAVE CURRENT ACCESS TO JBPHH. FAILURE TO SUBMIT

EXHIBIT D IN ADVANCE OF THE DEADLINE OR LATE MAY RESULT IN DENIAL OF

ACCESS TO JBPHH. You cannot attend the site visit without access credentials. A second site visit will be scheduled. Further details will be posted to www.fbo.gov.

Q6. I wanted to follow up with you on the presentation slides that were shared during the pre-proposal conference. I have not been able to locate them on the FBO site along with the sign in sheet.

Are these something you would be able to email out or upload to FBO?

A6. The presentation slides shared during the pre-proposal conference were posted to www.fbo.gov on 16Jul2019. Please download the pdf document from www.fbo.gov for a copy of the slides.

Q7. Is there any photovoltaic work for this project?

A7. Yes, a roof-mounted photovoltaic system is listed as Bid Option 2 per spec section 012300 – 3.01. The scope of work can be found in the following locations:

Sheet E-106 Keyed Note 1 Sheet E-505 (PV details) Section 481413 – Solar Energy Collectors Section 481916 – Grid-Tie Utility Interactive Inverters.

Dated 26 Jul 2019

Q8. Will the design team (engineer and/or architect) waive the air entrainment requirement?

A8. PENDING

Q9. Reference: Section 316333 – Foundation Piling (Micropiles), Drawings S-001 & S-500

a. Plans indicates three (3) different tests (compression, uplift, and shear), and the specifications indicate two (2) different tests (compression and lateral). Which tests are to be performed? Please note, lateral and shear tests are not a common practice for micropile construction. They can be proven by calculations and are generally not necessary. We recommend compression and tension only.

b. If there will be multiple tests, will there be a separate sacrificial pile installed for each test type?

c. Design loads differ between plans and specifications. Please specify which are correct.

d. Specifications reference three (3) pile types with different load capacities. The plans reference one (1) pile type with differing capacities. Please clarify.

mailto:manuel.llanes.mil@mail.mil mailto:emilio.placencia@us.af.mil mailto:douglas.pagala@us.af.mil mailto:edward.chunfat.ctr@us.af.mil http://www.fbo.gov/ http://www.fbo.gov/

e. Because of all the differing parts of the plans and specifications, would it be acceptable for micropile subcontractor to provide structural design that meets design capacities in lieu of following the micropile details in the plans/specs?

A9. PENDING

Q10. Section 1.07, Para. C Part 2 (a) states the Wind: 50mph per ASCE 7 acting in any direction or seismic forces, whichever is greater. Please confirm that this is the wind speed the door is expected to be able to operate at. Reference: Section 083022 – Swing and Plenum Type Hangar Doors

A10. PENDING

Q11. Section 2.01, Para. R Part 5 (a)

f. Will a hard rubber tire drive be acceptable in lieu of a rail system? The steel wheels on rail will not have enough weight to hold the door from sliding in a high wind circumstances. The rubber tires will function adequately. Reference: Section 083022

– Swing and Plenum Type Hangar Doors

A11. PENDING

Q12. Will the design team accept C1293 for aggregate ASR qualification in place of C1260 for this project?

A12. PENDING

Q13. Will the designers reclassify the requirements of the concrete aggregates as “Negligible Weather” (1N or 2N) as indicated by the definitions in ASTM C33?

A13. PENDING

Q14. RFP Section 00110, Para. 2.5.3.4. requires contractors to prepare not more than five (5) but no less than three (3) of Exhibit A, Part 1. Exhibit A, Part 1 instructs to prepare not more than three (3) of these documents. Are we required to submit up to three or up to five Exhibit A projects?

A14. Up to five (5) Exhibit A Projects should be submitted. A Minimum of three (3) Exhibit A projects are required.

Q15. Reference: Section 00110, Para. 2.5.3.4. (page 23 of 94)

Page 28 of 94: Section 00120, Para 2.2.6. Subfactor 4 references Exhibits B and D. RFP uses Exhibit D as a Form - 0-180 Access Request for Joint Base Pearl Harbor Hickam. Please confirm that Exhibit D is required in response to Subfactor 4.

A15. Exhibit D is NOT required in response to Subfactor 4. Exhibit D is only required for those wishing to obtain access credentials to JBPHH for the site visits.

Q16. Reference: Section 00120, Para. 2.2.6. Subfactor 4 (page 28 of 94)

Section 00110, Para. 2.5.3.11. Reference Package, Exhibit C requires contractors to e-mail Past Performance Reference/Evaluation Questionnaire to the contract references to be completed and returned directly to the Contracting Officer. In an effort to save our clients’ time and eliminate redundancy, are contractors allowed to use the previously completed Past Performance Questionnaires (PPQs) in lieu of this requirement?

A16. YES

Q17. Reference: Section 00110, Para. 2.5.3.11. Reference Package, Exhibit C (page 24 of 94) and Reference: Section 00110, Paragraphs 2.5.3.1., 2.5.3.3., and 2.5.3.11. (pages 23 and 24 of 94)

Section 00110, Para. 2.5.3.11. allows contractors to use a “Final” Performance Evaluation (Construction) (also referred to as CCASS Evaluation) in lieu of sending out reference package for the project.

a. Please clarify if a standard CPARS evaluation is admissible for this procurement.

b. And if so, would the latest evaluation available through PPIRS be acceptable for submission, considering the project meets the 70% completion criteria listed in paragraph 2.5.3.1?

A17. YES a standard CPARS evaluation is admissible for this procurement. Yes the latest evaluation available through PPIRS would be acceptable for submission as long as the project meeting the 70% completion criteria listed in paragraph 2.5.3.1.

Dated 01 Aug 2019

Q18. Between the drawings and specifications there is reference to two different project numbers, KNMD189008 & KNMD159060. Please verify that KNMD189008 is correct? Example: cover page of specifications and cover sheet of drawings list KNMD189008. The very next page of the specifications lists KNMD159060 as does the project description in section 011100.

A18. KNMD189008 is the correct project number. Disregard any reference to KNMD159060 this is typographical error. Any reference to KNMD159060 should be replaced with the correct project number

KNMD189008.

Q19. Structural drawings in the pdf on the CD given out at the walk thru are 8.5"x11" and are illegible. Is it possible to get these properly scaled?

A19. Please download the drawings from www.fbo.gov

Q20. Page 81 of the RFP (section 010000) lists normal base hours for construction as 7:00 am to 4:30

pm. Section 011100 p1.10.A.1 lists 0600 to 1600 hours. Please clarify.

A20. Normal Base hours for construction are 0700 to 1630 hours. The government will consider requests to perform work beginning at 0600 hours if the contractor would prefer an earlier start time. This will be handled during the pre-construction phase of the project.

Q21. Section 00120 p2.2.3.4 of the RFP states to "See Division 01 Section 014100 of the specification, paragraph 1.04, for additional minimum qualification requirements for key personnel." Please confirm that this should read "…Section 014000…".

A21. Confirmed.

Q22. On Exhibit A, Page 1, Part 1, the instructions state, "Prepare not more than three (3) of these documents." Yet, the page 23 of 94 of the RFP, Section2.5.3.4. states "Offerors shall discuss their performance using the Performance Relevancy Questionnaire format, Exhibit A, Part 1. Prepare not more than five (5) but no less than three (3) of these documents." Should we follow the instructions per the RFP or Exhibit A regarding the amount of Exhibit A forms to submit?

A22. Reference A14 above. Up to five (5) Exhibit A Projects should be submitted. A Minimum of three (3) Exhibit A projects are required.

Q23. Exhibit A, Page 1, A. requests the offeror to include, "Offeror (Your) Name (Company/Division)." If our company is pursuing this proposal as a joint venture, but the project we would like to highlight was completed under a party of the JV, should we include the Name of the Company/Division for the project or the offeror listed under 14. of the SF 1442 form?

A23. Yes.

Q24. Is this project going for a LEED Certification or is the intent simply to build to LEED standards?

A24. Currently the project will not be seeking LEED Certification, the current intent is to build to the LEED standards as designed.

Q25. Drawing AN101 calls out 48" high 20 ga. Stainless steel corner guards. Please provide a detail and specification.

A25. PENDING

Q26. Reference Sheet CD101. Please confirm that the area of demolition should include the concrete towards the top of the plan where the 8" storm drain line is to be removed.

A26. PENDING

Q27. Reference Sheet S-610. The column schedule on drawing S-610 does not provide information for the three new columns required under Bid Option 1 and shown on drawing S-101. Please provide column information.

A27. PENDING

Q28. Please confirm that detail D5/S-008 correspoinds to Pipe Support 1 and detail B5/S-006 corresponds to Pipe Support 2 as shown on drawing M-300.

A28. PENDING

Q29. Reference Sheet AN612. Details A4, C4 and D4 state that steel channel is per stud manufacturer. Usually steel channels are detailed in the structural drawings. Please clarify.

A29. PENDING

Q30. In Section 2.5.3.3., the RFP states "If the offeror represents the combining of two or more companies, joint venture or formal teaming agreement, for the purpose of this RFP, each company shall complete Exhibit As and obtain C references." Section 2.5.3.4 states."Offerors shall discuss their performance using the Performance Relevancy Questionnaire format, Exhibit A, Part 1.

Prepare not more than five (5) but no less than three (3) of these documents." Please clarify if partners of joint ventures have a minimum of three Exhibit As and a maximum of five Exhibit As combined or if each partner of the joint venture must turn in a minimum three and maximum of five Exhibit As.

A30. The total number of Exhibit A documents submitted shall be no less than three (3) total and not more than five (5) total. These can be any combination from the partners of the JV.

Q31. In Section 2.5.3.11., the RFP states that "a 'Final' Performance Evaluation (Construction) (also referred to as CCASS Evaluation) issued for a project may be included in lieu of sending out reference package for the project. Please verify if CPARS evlautations will also be accepted in addition to CCASS evaluations.

A31. Yes. See A17 above.

Q32. In Section 2.5.2.5., the RFP states "(Resumes or experience cut sheets are limited to two (2) pages each and are not part of the page count.)…This subfactor is limited to five "5" pages excluding the table of contents, dividers, tabs, indexes, experience cut-sheets and resumes. Please clarify if the offeror is supposed to prepare separate resumes for the key personnel with LEED projects for this section. Subfactor 1 Experience and Capability already includes resumes for key personnel.

A32. Offerors shall not prepare separate resumes for key personnel for this section. Please ensure that the resumes submitted for Subfactor 1 include easily identifiable LEED designations for personnel and projects so the resumes may be referenced in regard to Subfactor 4.

Q33. Reference Solicitation Page 23 of 94 Section 2.5.2.5. of the RFP requests resumes or experience cut sheets. Please explain what a cut sheet refers to? Are there any requirements for the cut sheets?

A33. There no requirements for cut sheets. It is the experience of the Government that some offerors may utilize resumes while other utilize cut sheets during their proposal preparation. Both are acceptable, hence the utilization of the word “or”. Offerors shall submit resumes or cut sheets in order to provide the information requested in Section 2.5.2.5.

Q34. Section 2.4.5. Binding requests the cover and spine to clearly identify the, "offeror's name, Project number, RFP number, RFP title and copy number." Can you please clarify the correct RFP title? Different titles are included on different documents. For instance, Exhibit A identifies the project as KNMD189008 Construct Add to F-22 LOCRF B3408 W912J6-19-R-5000, whereas the SF1442 names the project as "Purchase Request # F7C31A9094AW01, LOCRF 3RD BAY, F-22 Composite Repair Facility" AND "Project KNMD189008 F-22 Composite Repair Facility for the Haw aii Air National Guard on Joint Base Pearl Harbor Hickam (JBPHH), Haw aii."

A34. Offerors shall utilize the following RFP title: KNMD189008 Construct Add to F-22 LOCRF B3408 W912J6-19-R-5000.

Q35. Page CS401 calls out on note 5 and 7 to refer to CS502 for information on joint sealants (details A1-3 and B1-3). However, all 6 of those details are not present. Please provide the necessary information for the joint sealants on the concrete joints.

A35. PENDING

Q36. This solicitation has included three Q & A responses dated July 10, 2019; July 23, 2019; and July 26, 2019. Are these Q & A responses considered Amendments that need to be included in 19.

Acknowledgement of Amendments of the SF 1442 form or should we just acknowledge all Q & A responses in the cover letter?

A36. Q&A responses are not considered Amendments. Offerors shall simply acknowledge all Q&A responses in the cover letter. It is the sole responsibility of the offerors to ensure they have received and reviewed the latest version of the Q&A document posted to www.fbo.gov prior to the submission of their proposal.

Q37. Reference Sheet AN601. The drawings include Louvers located 7 times around the building.

However, there is no spec for louvers. Please include a specification for louvers.

A37. PENDING

Q38. A bid guarantee (bid bond) is required, but instructions as to where the bid bond should be place are not included in Section 2.5.1 Volume 1, Price/Cost Information and Pro Forma Documents.

Where would you like the bid bond to be placed in Volume 1?

A38. The Bid Bond shall be placed after the cover letter in Volume 1.

Q39. Is a soils report available?

A39. PEDING

Q40. Reference Sheet E-106 and E-601. Note #10 and Keynote 1 on Sheet E-106 states Photoviltaic (PV) System for Bid Option 2 is 20kW. Drawing E-601 shows 40kW for Bid Option 2. What is the correct size of the PV System and what is the output (AC or DC)?

A40. PENDING

Q41. Reference Option 7 FX001. Please verify the scale shown as 3/16" is incorrect and it should be 1"=40'.

A41. PENDING

Q42. Paragraph 1.05 of section 011100 states that the Construction sequence shall be determined by the contractor subject to the fact the Government will need continuous operation of the existing facilities and shutdowns shall be held to a minimum length of time and the Government shall have control over the timing and schedules of such shutdowns. How long in advance do shutdowns need to be scheduled and what is the maximum amount of time a shutdown can occur? Does the facility run 7 days per week all weeks of a month or are there some weekends that could be used for shutdowns?

A42. See Section 01000 Paragraphs 24.1, 24.2 and 24.3 regarding coordination of work with the Government. The maximum amount of time a shutdown can occur is five business days. Some weekends may be utilized for shutdowns if requested far enough in advance with the Government. Further discussion of coordination and requests for any special allowances or considerations may be made during the pre construction phase of the project.

Q43. Sheet AN105 appears to indicate three fall protection rails are required. One continuous rail from nose to tail. Two individual rails, one over each wing. If all three rails are at the same elevation as indicated on elevation detail C2/AN504, the wing rails will need to stop short of the nose/tail rail.

Sheet S-132 shows the wing rail systems are continuous through the nose/tail rail and designed drop support locations are shown. If the wing rails do stop short of the nose/tail rail, the cantilever from the closest drop support to the end of the wing rail closest to the nose/tail rail will exceed the maximum allowed cantilever. Please advise if the structure above will allow for added drop supports to support the wing rail ends close to the nose/tail rail within the allowable maximum rail cantilever?

A43. PENDING