Amendment No. 0008 - Drawings
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers
A
B
C
D
1 2 3 4 5
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
Japan Engineer District
AM#8
G E
N E
R A
L
G-001
G E
N E
R A
L
J O
E
N H
J
J O
E
N H
J T
L
J F
A
M E
N D
M E
N T
C
O V
E R
S
H E
E T
J O
A
M E
N D
M E
V
E
E T
J O
JAPAN DISTRICT U.S. ARMY CORPS OF ENGINEERS
AM#8 - OKA001 (P801) 30 NOV 2015
OKINAWA, JAPAN
REF.
NUM.
SHEET TITLESHT
REF.
NUM.
SHEET TITLESHT
REF.
NUM.
SHEET TITLESHT
REF.
NUM.
SHEET TITLESHT
A
B
C
D
1 2 3 4 5
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
Japan Engineer District
AM#8
G E
N E
R A
L
G-002
I N
D E
X
S
H E
E T
G E
N E
R A
L
J O
E
N H
J
J O
E
N H
J T
L
J F
R
E P
L A
C E
D
E
N T
I R
E
S
H E
E T
J O
R
E P
L A
C E
D
E
N T
I R
E
S
H E
E T
J O
N
T
A
I
N
E
R
C
O
N
T
A
I
N
E
R
C
O
N
T
A
I
N
E
R
C
O
N
T
A
I
N
E
R
C
O
N
T
A
I
N
E
R
C
O
N
T
A
I
N
E
R
C
O
N
T
A
I
N
E
R
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EXISTING TRANSFORMER
RELOCATE PER ELECTRICAL PLANS
EXISTING LHD
EXISTING ACCESS ROAD
EXISTING ACCESS ROAD, TO BE ABANDONED
EXISTING ACCESS ROAD THIS PORTION TO BE ABANDON
EXISTING ACCESS ROAD
EXISTING TOWER
EXISTING ACCESS ROAD
CO
I
N
C
P
I
N
O
U
T
C
P
C
P
I
N
I
N
O
U
T
O
U
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
LIGHT
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
TL
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
LIGHT
L
I
G
H
T
LIGHT
LIGHT
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
LIGHT
L
I
G
H
T
LIGHT
LIGHT
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
CO
CO
E
B
O
X
E
B
O
X
C
P
C
P
C
P
C
P
CO
C
P
E
B
O
X
O
U
T
O
U
T
I N
I N
O
U
T
I
N
O
U
T
I
N
O
U
T
I
N
L
I
G
H
T
L
I
G
H
T
LIGHT
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
LIGHT
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
LIGHT
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
LIGHT
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
LIGHT
L
I
G
H
T
LIGHT
LIGHT
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
LIGHT
LIGHT
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
LIGHT
LIGHT
LIGHT
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
LIGHT
L
I
G
H
T
L
I
G
H
T
LIGHT
LIGHT
LIGHT
L
I
G
H
T
LIGHT
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
EL=23.81
B-1
EL=23.93
B-2
EL=19.34
BS-13
EL=18.73
BS-4
EL=20.85
BS-12
EL=22.62
BS-23
EL=23.07
BS-11
EL=22.57
BS-3
EL=23.97
BS-22
EL=23.97
BS-21
EL=25.15
BS-28
EL=24.54
BS-20
EL=25.10
BS-27
EL=28.02
BR-1
EL=30.53
BR-2
EL=29.90
BR-3
EL=25.02
BS-26
EL=24.55
BS-18
EL=23.85
BS-19
EL=23.20
BS-10
EL=22.68
BS-2
EL=21.38
BS-1
EL=23.10
BS-9
EL=23.86
BS-17
EL=23.36
BS-8
EL=24.51
BS-16
EL=25.11
BS-25
EL=24.15
BS-15
EL=21.43
BS-14
EL=20.71
BS-7
E
B
O
X
P a p p r o x
O
U
T
EXISTING 600 CP CULVERT
AND HEADWALLS TO BE
DEMOLISHED
TWO EXISTING 450 CP
CULVERT AND HEADWALLS
TO BE DEMOLISHED
EXISTING ACCESS ROAD,
TO BE ABANDONED
PROTECT EXISTING POWER MANHOLE
SEE ELECTRICAL PLANS
EXISTING EARTHEN FUEL BERMS & PARKING TO BE
DEMOLISHED
EXISTING 850mm CP CULVERT
TO REMAIN, PROTECT FROM DAMAGE
AM2 MATTING AND LIGHTING
EXISTING 900mm CP CULVERT
TO REMAIN
COBBLE/ROCK MATERIAL
US Army Corps of Engineers
A
B
C
D
1 2 3 4 5
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
Japan Engineer District
AM#8
10 2020 40 60
SCALE: 1:1000
SITE DEMOLITION
A1
P L
A N
S
G-102
S I T
E
D
E M
O L
I T
I O
N
G E
N E
R A
L
J O
J O
T L
J F
M
O V
D
A L L O
U T
J O
A
D D
I
F O
R M
A T
I O
N
T
O
E
N V
T
E
J O
A
D D
X C
A V
A T
I O
N
N
O T
E S
J O
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
TTT
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
PROJECT LIMITS
WITH FLAGGING, SEE NOTE 2
WATER SUPPLY POINT
US Army Corps of Engineers
A
B
C
D
1 2 3 4 5
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
Japan Engineer District
AM#8
40 8080 160 240
P L
A N
S
G-103
P R
O J E
L
M
I T
S
G E
N E
R A
L
J O
J O
T L
J F
SCALE: 1:4000
PROJECT LIMITS
A1
A
D D
M
M
A T
T I N
G
L O
C A
T I O
N J O
M
O V
E
N
O R
R
W
A
L O
W E
R
R
I G
H T
J O
C
O R
R E
C T
A
L E
A
B
C
D
1 2 3 4 5
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
Japan Engineer District
AM#8
15 3030 60 90
SCALE: 1:1500
LHD AIRFIELD LAYOUT
A1
P L
A N
S
CS102
L H
D
A
I R
F I E
Y
O U
T
C I V
T
E
J O
J O
T L
J F
A
D D
A
L E
J O
5 1010 20 40
A
D D
B E
L
F
R
K I N
G
J O
8 8
C
O R
R E
C T
A
L E
J
A
B
C
D
1 2 3 4 5
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
Japan Engineer District
AM#8
NOTES:
1. STRIPING BASED ON CENTER OF STRIPE.
2. SEE CI DRAWINGS FOR MARKING DETAILS.
3. GROUND ROD WITH PITS TYPICAL, SEE E-150.
SCALE: 1:500
APRON LAYOUT
A1
P L
A N
S
CS103
A P
R O
N
L
A Y
O U
T
C I V
T
E
J O
J O
T L
J F
M
O V
E
N
O R
R
A
L O
W E
R
R
I G
H T
J O
5 1010 20 40
A
D D
G E
N D
J O
300 MM
TYP.
300 MM MIN. CLASSIFIED
MATERIAL 95% COMPACTION
PREPARE AND COMPACT TOP 150 MM OF
EXISTING SUBGRADE TO 90 % COMPACTION
UNCLASSIFIED
MAT'L, 85% COMP.
1200 MM
100 MM P.C.C. W/ 6x6
W2.0 X W2.0
CENTERED IN SLAB
VARIES
SEE PLANS
50 MM MINIMUM
3000 MM
14000 MM
10400 MM
1800 MM
30700 MM
51600 MM
1800 MM
900 MM
10400 MM
1800 MM
3000 MM
900 MM
1800 MM
10400 MM
1800 MM
900 MM
3000 MM
5200 MM
10400 MM
1800 MM
NOTE:
1. ALL FILL SHALL BE CLASSIFIED MATERIAL COMPACTED TO 95% PER SPECIFICATIONS
2. DAYLIGHT DRAINS. ENSURE BALL VALVES ARE ACCESSIBLE.
MANHOLE DEPTHS
VARY WITH INVERT
ELEVATIONS
D 13 @ 150mm
D 13 @ 150mm
D 13 @ 150mm
D 13 @ 150mm
D 19 CONT @ 200mm
D 19 @ 200mm
SEE PLANS FOR
INVERT ELEVATIONS
NOTES
1. PRECAST TRENCHES AND GRATING ARE ALLOWED PROVIDED IT MEETS THE AIRFIELD LOADING
CRITIERIA BELOW AND THE SAME FLOW CAPACITY. PRECAST SYSTEMS MUST BE APPROVED BY
COR. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2. ALL REINFORCING STEEL SHALL BE ASTM A615 GRADE 60 AND THE CONCRETE SHALL BE 28MPa.
3. ALL TRENCHES SHALL BE AIRCRAFT RATED AND SHALL BE PROVIDED WITH A P-5 TYPE C GRATE
(PARALLEL BAR GRATE WITH BARS AT 50 CM CENTER TO CENTER SPACING IN SHORT DIRECTION).
THE COVER SHALL BE CAST FLUSH WITH THE TOP OF THE MANHOLE SLAB. THE MANHOLE
COVERS SHALL MEET A LOADING OF 37325 KG AND 1.7 MPa. SPANS OVER 0.61 M SHALL APPLY A
28000 KG LOAD RATING.
4. THE STRUCTURES SHALL BE LOCATED AS SHOWN ON THE PLAN SHEETS.
5. PROVIDE A CLEAR COVER OF 38mm FOR BARS UNLESS NOTED OTHERWISE.
6. THE TOP OF THE STRUCTURES SHALL BE FLUSH WITH THE SURROUNDING GRADE.
7. ADJUSTMENTS MAY BE REQUIRED FOR GRATE MANUFACTURERS REQUIREMENTS.
L-150x100x6T ANGLENEEHAH R-4990 AIRPORT BOLTED
TRENCH, OR APPROVED EQUAL, SEE
NOTES FOR GRATING
US Army Corps of Engineers
A
B
C
D
1 2 3 4 5
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
Japan Engineer District
AM#8
D E
T A
I L
S
CS504
D E
T A
I L
S
C I V
T
E
J O
J O
T L
J F
Scale: NTS
WALKWAY
C4
Scale: NTS
CONCRETE BERM DETAIL
B1
Scale: NTS
CONCRETE FUEL BERMS
A3
Scale: NTS
CRACK CONTROL JOINT
A1
Scale: NTS
TRENCH DRAIN
C1
C
A
D D
F O
R M
A T
I O
N
T
O
D
E T
A I L
A
T
E S
J O
A
C
O R
R E
C T
P
E
S
I Z
E
J O
N
O T
E
E
D I T
T
I N
G
R
E Q
U I R
E M
E N
T
B
C
B
B
C
C
B
7.5 1515 30 45
US Army Corps of Engineers
A
B
C
D
1 2 3 4 5
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
Japan Engineer District
AM#8
SCALE: 1:750
SITE JOINT LAYOUT PLAN
A1
P L
A N
S
CP101
L H
D
A
R
I N
T
L
A Y
O U
T
C I V
V
I N
G
K
M
C I N
A L L Y
K M
E
N H
J R
S
H A
F E
R
J
S
A U
C E
D A
C
P
C
P
C
P
C
P
HTC NON-REINFORCED CONCRETE
HTC CONTINUOUSLY REINFORCED CONCRETE
PCC PAVEMENT
A
D D
G E
N D
K
M
2.5 55 10 15 of Engineers
A
B
C
D
1 2 3 4 5
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
Japan Engineer District
AM#8
SCALE: 1:250
LHD JOINT LAYOUT 1
A1
P L
A N
S
CP102
L H
D
J O
I N
T
L
A Y
O U
T
C I V
V
I N
G
K
M
C I N
A L L Y
K M
E
N H
J R
S
H A
F E
R
J
S
A U
C E
D A
CTJ CONTRACTION JOINT (SEE CP 501 & CP503)
DSJ DOWELED CONSTRUCTION JOINT (SEE CP503)
TEJ THICKENED EDGE EXPANSION JOINT (SEE CP502)
CSJ CONSTRUCTION JOINT (HTC ONLY, SEE CP502)
EJ EXPANSION JOINT (TOWER ONLY, SEE CP502)
R REINFORCED SLAB (SEE CP503)
HTC NON-REINFORCED CONCRETE
HTC CONTINUOUSLY REINFORCED CONCRETE
PCC PAVEMENT
A
D D
G E
N D
K
M
A
B
C
D
1 2 3 4 5
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
Japan Engineer District
AM#8
Scale: 1:250
LHD JOINT LAYOUT 2
A1
2.5 55 10 15
P L
A N
S
CP103
L H
D
J O
I N
T
L
A Y
O U
T
C I V
V
I N
G
K
M
C I N
A L L Y
K M
E
N H
J R
S
H A
F E
R
J
S
A U
C E
D A
CTJ CONTRACTION JOINT (SEE CP 501 & CP503)
DSJ DOWELED CONSTRUCTION JOINT (SEE CP503)
TEJ THICKENED EDGE EXPANSION JOINT (SEE CP502)
CSJ CONSTRUCTION JOINT (HTC ONLY, SEE CP502)
EJ EXPANSION JOINT (TOWER ONLY, SEE CP502)
R REINFORCED SLAB (SEE CP503)
S E
E
C
P
F
N
G I T
U D
I N
I N
T
D
I M
E N
S I O
N S
PCC PAVEMENT
A
D D
G E
N D
K
M
0.6 1.21.2 2.4 3.6 of Engineers
A
B
C
D
1 2 3 4 5
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
Japan Engineer District
AM#8
SCALE: 1:60
HTC REBAR AND JOINT LAYOUT
A1
P L
A N
S
CP106
H T
C
R
E B
I N
T
L
A Y
O U
T
C I V
V
I N
G
K
M
C I N
A L L Y
K M
E
N H
J R
S
H A
F E
R
J
S
A U
C E
D A
CTJ CONTRACTION JOINT (SEE CP 501 & CP503)
DSJ DOWELED CONSTRUCTION JOINT (SEE CP503)
TEJ THICKENED EDGE EXPANSION JOINT (SEE CP502)
CSJ CONSTRUCTION JOINT (HTC ONLY, SEE CP502)
EJ EXPANSION JOINT (TOWER ONLY, SEE CP502)
R REINFORCED SLAB (SEE CP503)
HTC NON-REINFORCED CONCRETE
HTC CONTINUOUSLY REINFORCED CONCRETE
PCC PAVEMENT
A
D D
G E
N D
K
M
0.6 1.21.2 2.4 3.6 of Engineers
A
B
C
D
1 2 3 4 5
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
Japan Engineer District
AM#8
SCALE: 1:60
HTC REBAR AND JOINT LAYOUT
A1
P L
A N
S
CP107
H T
C
R
E B
I N
T
L
A Y
O U
T
C I V
V
I N
G
K
M
C I N
A L L Y
K M
E
N H
J R
S
H A
F E
R
J
S
A U
C E
D A
CTJ CONTRACTION JOINT (SEE CP 501 & CP503)
DSJ DOWELED CONSTRUCTION JOINT (SEE CP503)
TEJ THICKENED EDGE EXPANSION JOINT (SEE CP502)
CSJ CONSTRUCTION JOINT (HTC ONLY, SEE CP502)
EJ EXPANSION JOINT (TOWER ONLY, SEE CP502)
R REINFORCED SLAB (SEE CP503)
HTC NON-REINFORCED CONCRETE
HTC CONTINUOUSLY REINFORCED CONCRETE
PCC PAVEMENT
A
D D
G E
N D
K
M
BLACK OUTLINE
BLACK OUTLINE
BLACK OUTLINE
SHOULDER
TAXIWAY/
APRON
V A
R I E
S
RETROREFLECTIVE YELLOW PAINT
RETROREFLECTIVE YELLOW PAINT
Scale: NTS
TAXIWAY EDGE STRIPING
C1
CS103
SOLID WHITE PAINT OUTLINED WITH BLACK
1.1 M [3.50']
1.4 M [4.50']
1.4 M [4.50']
0.8 M [2.50']
0.6 M [2.00']
1.1 M [3.50']
Scale: NTS
SHIP DECK ORIENTATION NUMBERS
C4
CI101
NOTES
1. ALL RUNWAY MARKINGS SHALL BE
WHITE RETROREFLECTIVE PAINT IN
ACCORDANCE WITH THE
SPECIFICATIONS, UNLESS
OTHERWISE NOTED.
2. ALL RUNWAY MARKINGS IN THE
CONCRETE AREA SHALL BE
OUTLINED WITH A 150 MM WIDE
BLACK NON-REFLECTIVE BORDER
UNLESS OTHERWISE NOTED.
150 MM RETROREFLECTIVE YELLOW
150 MM BLACK OUTLINE
TAXIWAY:
CENTERLINE ON PLANS
150 MM BLACK OUTLINE
150 MM WHITE
PLACE MOORING EYES AS
WHEN REBAR FOR EYE OCCURS
WITHIN APPROX 600 MM OF
BAR SHALL BE SMOOTH (PLAIN
HOT-DIPPED GALVANIZED IN
ACCORDANCE WITH ASTM A123)
UNLESS OTHERWISE NOTED.
IF DEFORMED BAR IS TO BE
USED, BARBEND R=125 MM.
BAR Ø
19 MM
25 MM
32 MM
Scale: NTS
TAXIWAY CENTERLINE AND ISLAND MARKING
C2
Scale: NTS
DECK EDGE MARKING
C3
CI101
CI101, CS103
CI501
V A
R I E
S
S
A
N
S
H E
E T
S
M
M
T
Y P
900 MM [3.00']
900 MM [3.00']
TAXIWAY
CENTERLINE
MARKING (TYP.)
300 MM [12"] WIDE
RETROREFLECTIVE
YELLOW STRIPE, TYPICAL
300 MM [12"] WIDE BLACK
STRIPE, TYPICAL
M
M
T
Y P
Scale: NTS
STOP HOLD POSITION MARKING
A4
CS103
2 EACH 100 MM SOLID YELLOW LINES
SEPARATE BY 100 MM
Scale: NTS
ROADWAY CENTERLINE MARKING
A2
CT102
150 MM WIDE X 300 MM LONG
RED
LOCATION NOTED ON PLANS
DECK
EDGE
AV-8 SAFE PARKING
LINE IN LINE WITH
DECK EDGE ONLY ON
PORT ELEVATOR
CI502
150 MM WIDE X 300 MM LONG
YELLOW
100 MM WIDE X 300 MM
LONG YELLOW AND RED
ALTERNATING,
DECK
EDGE
MARKING
200 MM WIDE X 300 MM
LONG YELLOW AND RED
ALTERNATING,
25 MM SEPARATION
50 MM SEPARATION
Scale: NTS
DECK EDGE ELEVATOR
A1
CI101
US Army Corps of Engineers
A
B
C
D
1 2 3 4 5
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
Japan Engineer District
AM#8
D E
T A
I L
S
CI501
M A
R K
I N
G
C I V
P R
O V
E M
E N
T S
J O
J O
T L
J F
A
B
A
K
U T
L I N
E
T
O
D
E T
A I L
J O
C
O R
R E
C T
F
E R
E N
C E
D
S
H E
M
B E
R S
J O
1.829 M [6.00'] 1.829 M [6.00']
WHITE STRIPERED STRIPE
T
Y P
L OF TRAMLINE STRIPE
C
1.2 M [4.00' TYP.]
0.305 M [1.00'] TYP.
YELLOW STRIPERED STRIPE
0.305 M [1.00'] TYP.
T
Y P
T
Y P
T
Y P
0.3 M [1.00' TYP.]
1.8 M [6.00' TYP.]
0.9 M [3.00' TYP.]
T
Y P
THICKNESS VARIES, SEE DETAIL 4, CI501
0.15 M BLACK
0.15 M BLACK
NON REFLECTIVE WHITE TRAMLINE
MARKING OUTLINED IN 6" BLACK
STRIPES TO THE OUTSIDE. FILL INSIDE
OF WHITE TRAMLINES WITH NON
REFLECTIVE YELLOW (SOLID FILL).
T
Y P
MAIN WHEEL SPOT
SCALE: NTS
SAFE PARKING LINE MARKING
D1
SCALE: NTS
ELEVATOR EDGE MARKING
C1
SCALE: NTS
TRAMLINE & CUTOUT FOR WHEEL STOPS
B1
CI101
CI101, CI501
CI101, CI501
NOTE:
A. HORIZONTAL CENTER OF NUMBER TO BE AT FOOTAGE INDICATED.
B. NUMBER "9" IS AN INVERTED "6".
C. EDGE OF FIRST NUMBER TO START 152 MM [6"] FROM EDGE OF
TRAMLINE MARKINGS
D. ONE SET OF WHITE NUMBERS 229 MM [9"] HIGH SHALL BE MARKED
AT 50.00' INTERVALS ON THE FLIGHT DECK AS SHOWN ON DRAWING
INTERVALS MARKED ARE 250, 300, 350, 400, 450, 500, 550, 600, 650, 700
AND 750
0.3 M [1.00']
150 MM SQUARES WHITE
0.9 M [3.00']
NUMBER 8 SHALL BE AN
ENCLOSED NUMBER 3
NUMBER 9 SHALL BE AN
INVERTED NUMBER 6
UNLESS OTHER SPECIFIED DIMENSIONS ARE IN INCHES
WHITE
0.6 M [2.00']
1-1/2" SQUARES
76.2 MM [3"] TYPICAL BETWEEN NUMBERS
C
L
SCALE: NTS
LANDING SPOT NUMBERS
C3
SCALE: NTS
TRAMLINE FOOTAGE NUMBERS
B3
SHOULDER
TAXIWAY/
APRON
1 M [3']
NONRETROREFLECTIVE
YELLOW
RETROREFLECTIVE
YELLOW
CI501
SCALE: NTS
TAXIWAY SHOULDER MARKING
A1
CI101
D r a w i n g x U
N I F
I E
D E
N T
E J o b s O
K A
D w g s C
A D
O
K A
C
I d w g l a s t s a v e d o n
P
M w a s p l o t t e d b y
O u z t s
J e r r y o n
P
M
US Army Corps of Engineers
A
B
C
D
1 2 3 4 5
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
Japan Engineer District
AM#8
D E
T A
I L
S
CI502
M A
R K
I N
G
C I V
P R
O V
E M
E N
T S
J O
J O
T L
J F
A
A
T
L I N
E
T
O
D
E T
A I L
J O
1t
1i VERTICAL ASSEMBLIES
DOOR ASSEMBLIES
GLAZING ASSEMBLIES
EQUIPMENT KEYNOTE
A101
SIM
A101
Ref
1R ef 1 R ef
Ref
Room name
ELEVATION MARKER
SECTION MARKER
NORTH ARROW
A101
SIM
DETAIL
ENLARGEMENT
ROOM CALLOUT
SPOT FLOOR ELEVATION
3,000
SHEET IDENTIFICATION
DRAWING IDENTIFICATION
DRAWING IDENTIFICATION
SHEET INDETIFICATION
0 1000500 2000
GRAPHIC SCALE BAR
VIEW TITLE
NUMERIC SCALE
VIEW NUMBER (ON SHEET)
REVISION NUMBER
REVISION CLOUD
(AROUND AFFECTED AREA)
Name Elevation
1 View Name 1/8" = 1'-0"
FLOOR LEVEL MARKER
COLUMN GRID MARKER
C-1 HORIZONTAL ASSEMBLIES
DETAIL MARKER
DRAWING IDENTIFICATION
SHEET INDETIFICATION
EARTH, UNDISTURBED
(IN SECTION)
CLASSIFIED FILL
(IN SECTION)
CONCRETE
(IN SECTION)
BASE COURSE
(IN SECTION)
SOLID SURFACE
(IN SECTION)
ALUMINUM
(IN SECTION)
STEEL
(IN SECTION)
PLYWOOD
(IN SECTION)
RIGID PLASTIC THERMAL
INSULATION BOARD
(IN SECTION)
FIBERGLASS BATT
THERMAL INSULATION
(IN SECTION)
CONCRETE
(IN ELEVATION)
GLASS
(IN ELEVATION)
FIBERGLASS BATT OR
RIGID BOARD ACOUSTIC
INSULATION
(IN SECTION)
REFER TO SHEET A-601 FOR DESCRIPTIONS OF
VERTICAL AND HORIZONTAL ASSEMBLIES
1. GOVERNMENT WILL CONSIDER SUBSTITUTE MATERIALS FOR JAPANESE PRODUCTS, WHICH CURRENTLY DO NOT NOTE JIS EQUIVALENTS IN THE CONTRACT SPECIFICATIONS. IF THE CONTRACTOR CAN PROVE IT IS AN EQUIVALENT OR SUPERIOR WITH SIGNATURE CONFIRMATION FROM THE CONTRACTOR AND MANUFACTURER. JIS EQUIVALENTS WILL NOT BE ACCEPTED FOR SPECIFIC ITEMS AS NOTED IN SECTION 01 33 00 SUBMITTAL PROCEDURES AND THAT ARE REQUIRED TO MEET UL OR FM STANDARDS AS NOTED IN THE SPECIFICATIONS. THESE ITEMS INCLUDE ALL ITEMS RELATED TO FIRE PROTECTION SYSTEMS AND LIFE SAFETY, UNLESS OTHERWISE NOTED. FOR PRODUCTS AND EQUIPMENT WHICH ARE INSTALL, CONTRACTOR IS RESPONSIBLE FOR COMPATIBILITY OF SYSTEMS BETWEEN U.S. AND JAPANESE SYSTEMS/PRODUCTS.
2. FOR APPROVED SUBSTITUTIONS, CONTRACTOR IS RESPONSIBLE TO PROVIDE COMPLETE AND WORKING COMPONENT AND MUST BEAR NEW INCIDENTAL COSTS IMPACTED BY THE APPROVED SUBSTITUTION REQUEST.
3. CONTRACTOR MUST VERIFY EXISTING CONDITIONS AND DIMENSIONS AT THE JOB SITE AND IMMEDIATELY NOTIFY THE CONTRACTING OFFICER OF DISCREPANCIES BEFORE COMMENCING WITH WORK. COMMENCEMENT OF WORK
SIGNIFIES ACCEPTANCE OF EXISTING CONDITIONS.
4. REVIEW CONSTRUCTION DOCUMENTS FOR DISCREPANCIES BETWEEN THE DOCUMENTS, OR BETWEEN THE DOCUMENTS AND CONDITIONS AT THE JOBSITE PRIOR TO FABRICATION, CONSTRUCTION, AND/OR INSTALLATION.
IMMEDIATELY NOTIFY CONTRACTING OFFICER AND DOR OF DISCREPANCIES BETWEEN CIVIL, STRUCTURAL, ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, TELECOMMUNICATIONS AND FIRE CONTRACT DOCUMENTS AND ITEMS INSTALLED AT TIME OF DISCOVERY OF DISCREPANCY. CONTRACTOR IS RESPONSIBLE FOR PROVIDING WRITTEN OR GRAPHIC OPTION FOR RESOLVING DISCREPANCY WITHIN CONTRACT TO CONTRACTING OFFICER AND DOR.
5. THE CONTRACTOR IS TO FOLLOW DIRECTIONS OF ONLY THE CONTRACTING OFFICER OR THEIR AUTHORIZED REPRESENTATIVE. CONTRACTOR MUST PROVIDE COPIES OF APPROVED PERMITS TO THE CONTRACTING OFFICER PRIOR TO
BEGINNING EXCAVATION WORK.
6. DRAWINGS SHOW NEW CONSTRUCTION UNLESS NOTED (E) EXISTING CONSTRUCTION.
7. WORK MUST STRICTLY CONFORM TO APPLICABLE LOCAL AND FEDERAL CODES, STANDARDS AND REGULATIONS.
8. THE CONTRACTOR MUST BE RESPONSIBLE FOR LOSS OR DAMAGE OF EXISTING PROPERTY AND CONDITIONS TO REMAIN, RESULTING FROM CONSTRUCTION ACTIVITIES, AND MUST MAKE GOOD LOSS, DAMAGE, OR INJURY WITHOUT
COST TO THE GOVERNMENT.
9. DIMENSIONING CRITERIA:
A. STUD WALLS ARE DIMENSIONED FROM FACE-OF-STUDS.
B. STRUCTURAL WALLS AND COLUMNS ARE DIMENSIONED TO FACE OF STRUCTURAL MEMBER UNLESS NOTED OTHERWISE.
C. DIMENSIONS NOTED AS "CLEAR" ARE CRITICAL MINIMUMS AND ARE DIMENSIONED FROM FACE-OF-FINISH TO FACE-OF-FINISH.
D. CABINETRY IS DIMENSIONED FOR OVERALL DEPTH, HEIGHT AND LENGTH OF UNITS.
10. CONSTRUCTION ACTIVITIES MUST NOT DISRUPT EXISTING ONGOING OPERATIONS IN THE VICINITY.
11. CONFINE ALL OPERATIONS TO AREAS SPECIFICALLY AUTHORIZED BY THE GOVERNMENT. KEEP WORK AREAS AND ADJACENT TO THE WORK AREA FREE FROM ACCUMULATION OF TRASH AND DEBRIS.
12. CONTRACTOR TO FIELD VERIFY EQUIPMENT AND MATERIAL SIZES AND PROVIDE ADEQUATE CLEARANCE AS REQUIRED BEFORE PROCEEDING WITH THE WORK.
13. UPON COMPLETION REMOVE FOREIGN MATERIALS FROM EXPOSED SURFACES AND CLEAN THOROUGHLY.
14. FOLLOW SPEC SECTION 01 74 19 "CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT" FOR PROPER DISPOSAL OF CONSTRUCTION AND DEMOLITION DEBRIS. CONTRACTOR MUST REMOVE AND DISPOSE OF CONSTRUCTION
MATERIAL, UNLESS NOTED OTHERWISE.
15. WHERE DEMOLITION AND CUTTING WORK HAS OCCURRED OR WHERE EXISTING SURFACES, MATERIALS OR OTHER ITEMS HAVE BEEN DAMAGED OR DISTURBED AS A RESULT OF THIS CONTRACT, THE SAID SURFACES
AND AREAS MUST BE CAREFULLY CLOSED UP, PATCHED AND FINISHED AND/OR RESTORED AS REQUIRED TO BE CONTIGUOUS TO EXISTING SURROUNDING SURFACES.
16. THE GENERAL CONTRACTOR, AT THE COMPLETION OF THIS WORK, MUST LEAVE WORK AREAS AND FINISHED SPACES IN A CLEAN AND ACCEPTABLE CONDITION. FINAL CLEAN-UP INCLUDES, BUT NOT LIMITED TO: ALL INTERIOR SURFACES, LIGHT FIXTURES, PLUMBING FIXTURES, APPLIANCES, INTERIOR OF WINDOWS, SILL, ETC.
17. PROVIDE 45 DEGREE CHAMFER AT ALL OUTSIDE CORNERS OF ALL INTERIOR AND EXTERIOR CONCRETE WALLS.
18. EXTERIOR ENVELOPE (EXTERIOR WALLS, FLOORS AND ROOF; JOINTS BETWEEN WALLS, FLOORS AND ROOFS AND JOINTS AROUND FRAMES OF OPENINGS IN EXTERIOR WALLS) MUST BE AIRTIGHT IN ACCORDANCE WITH ASHRAE 189.1
WITH AN AIR LEAKAGE RATE THAT DOES NOT EXCEED 0.4 CMF/SQ. FT. UNDER A PRESSURE DIFFERENTIAL OF 0.3 INCHES OF WATER OR 1.57 LB/ SQ FT (2.0 L/S X SQ M UNDER A PRESSURE DIFFERENTIAL OF 75 Pa) OR BE WATER-TIGHT, WITH NO WATER PENETRATION, AT A PRESSURE OF 0.38 KPA OF FIXED AREA.
19. FIRE STOP ALL PENETRATIONS THROUGH FIRE RATED WALLS, PARTITIONS, FLOOR AND CEILING ASSEMBLIES WITH UL TESTED ASSEMBLIES.
AL
AS
KA
E
N G
IN
EE
R D
IS
TR
IC
T
AN
C
H O
R
AG
E, A
LA
SK
A
T H
IR
D
S
TR
EE
T
X F-
1 1 1-
-0
O
KA
(P
1)
O
KI
N
AW
A
JA
PA
N
IS
O
A
A
B
C
D
1 2 3 4 5
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
SHEET
IDENTIFICATION
D
ES
IG
N
ED
B
Y:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
C O
N
TR
AC
T
N O
PL
O
T
SC
AL
E:
SU
BM
IT
TE
D B
Y:
FI
LE
N
AM
E:
SI
ZE
SHEET
D R
AW
IN
G C
O D
E:
SHEETSHEETSHEET OF
SU
BM
IT
TA
L D
AT
E:
PL
O
T D
AT
E:
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
JA
PA
N E
N G
IN
EE
R D
IS
TR
IC
T
O
KI
N
AW
A
AR
EA
O
FF
IC
E
AP
O A
P
6-
US Army Corps of Engineers®
Japan Engineer District
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
R . C
LA
YT
O N
J.
F
AB
R
IZ
ZI
O
M
AY
O
KA
1-
A- D
M
.rv t
1:
/1
/2
9:
:0
AM
AM#8
A-001
AB
BR
EV
IA
TI
O
N S, N O
T E S
SY
M
BO
LS
L H D
P R
AC
TI
C E
SI
TE
IM
PR
O
VE
M
EN
TS
IE
S H
IM
A
AU
XI
LI
A R
Y
FI
E L D
R ob er t W
. K ay e
R . K ay e
1 24
AR
C
H
IT
EC
TU
R
AL
AB ANCHOR BOLT
ABV ABOVE
ACT ACOUSTICAL CEILING TILE
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AGG AGGREGATE
ALUM ALUMINUM
APPROX APPROXIMATE
ARGWB ABUSE RESISTANT GWB
ASTM AMERICAN SOCIETY FOR
TESTING AND MATERIALS
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BLK(S) BLOCK(S)
BM BEAM
B.O.S. BOTTOM OF STEEL
BRG BEARING
CEN CENTER
C.I.P. CAST IN PLACE
C.J. CONTROL JOINT
CL CENTERLINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COMM COMMUNICATION
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CPT CARPET
CTR CENTER(ED)
CW COLD WATER
DBL DOUBLE
DEMO DEMOLITION
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DN DOWN
DOR DESIGNER OF RECORD
DR DOOR
DTL DETAIL
DWG(S) DRAWING(S)
E EAST
(E) EXISTING
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EJ EXPANSION JOINT
ELEV ELEVATION
ELEC ELECTRICAL
EQUIP EQUIPMENT
ENCL ENCLOSURE
EPS EXPANDED POLYSTYRENE
EQ EQUAL
EXP. JT. EXPANSION JOINT
EXT EXTERIOR
ABBREVIATIONS
CFCI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
GFCI GOVERNMENT FURNISHED/CONTRACTOR INSTALLED
GFGI GOVERNMENT FURNISHED/GOVERNMENT INSTALLED
SPECIAL ABBREVIATIONS
GENERAL NOTES MATERIAL LEGEND
GRAPHIC SYMBOLS
FA FIRE ALARM
FD FLOOR DRAIN
FDN FOUNDATION
F.F. FINISH FLOOR
FIG FIGURE
FIN FINISH/FINISHED
FLG FLANGE
FLR FLOOR
FLUOR FLUORESCENT
FOC FACE OF CONCRETE
FOF FACE OF FRAMING
FOS FACE OF STUDS
FOW FACE OF WALL
F.P. FIRE PROOF
F.R. FIRE RESISTANT
FRP FIBREGLASS REINFORCED
PANEL
FRT FIRE RETARDENT TREATED
FT FOOT
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GFCI GROUND FAULT
CIRCUIT INTERUPTER
GL GLASS
GLZ GLAZING
GOV, GOV'T GOVERNMENT
GND GROUND
GWB GYPSUM WALL BOARD
H HIGH
HAZMAT HAZARDOUS MATERIALS
HB HOSE BIBB
H.C. HANDICAPPED
H.D. HEAVY DUTY
HDWR HARDWARE
HGT HEIGHT
HM HOLLOW METAL
HORZ HORIZONTAL
HR HOUR
HW HOT WATER
IBC INTERNATIONAL BUILDING CODE
ICC INTERNATIONAL CODE COUNCIL
ID INSIDE DIAMETER
IDENT IDENTIFICATION
I.F. INSIDE FACE
IHM INSULATED HOLLOW METAL
IMP INSULATED METAL PANEL
IN INCH
INCL INCLUDE, INCLUDING
INSUL INSULATE
INT INTERIOR
IRGWB IMPACT RESISTANT GWB
JBOX JUNCTION BOX
JIS JAPANESE INDUSTRY STANDARD
Kg KILOGRAM
KL KILOLITER
ANGLE
L LENGTH
DOUBLE ANGLE
LAT LATERAL
LB(S) POUND(S)
LED LIGHT EMITTING DIODE
LOC LOCATION
LONG LONGITUDINAL
LVL LEVEL
LGT LIGHT
M, m METER
MAX MAXIMUM
MB MACHINE BOLT
MECH MECHANICAL
MFG MANUFACTURING
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MM, mm MILLIMETER
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULT MULTIPLE
N NORTH
(N) NEW
NEC NATIONAL ELECTRICAL CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OAG OUTSIDE AIR GRILLE
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
O.F. OUTSIDE FACE
O.H. OPPOSITE HAND
OPG OPENING
OPP OPPOSITE
O/S OFFSET
OSA OUTSIDE AIR
ORIG ORIGINAL
OVHD OVERHEAD
OVHG OVERHANG
PC PORTLAND CEMENT
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLMB PLUMB
PLYWD PLYWOOD
PNL PANEL
PNLBD PANEL BOARD
PR PAIR
PREFAB PREFABRICATED
PREFIN PREFINISHED
PSI PER SQUARE INCH
PT PAINT
PTD PAINTED
T TOP
TAN TANGENT
TBD TO BE DETERMINED
T&B TOP AND BOTTOM
TEL TELEPHONE
TELECOMM TELECOMMUNICATION
TEMP TEMPERATURE
TEMP TEMPORARY
T&G TONGUE AND GROOVE
TG TRANSFER GRILLE
THK THICK
THRU THROUGH
TMB TELEPHONE MOUNTING BOARD
T.O.C. TOP OF CONCRETE
T.O.F. TOP OF FOOTING
T.O.S. TOP OF STEEL
T.O.W. TOP OF WALL
TRANS TRANSVERSE
TYP TYPICAL
U/C UNDER COUNTER
U/G UNDER GROUND
U/S UNDER SLAB/ UNDERSIDE
U.O.N. UNLESS OTHERWISE NOTED
VAR VARIES
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
W WEST
W WIDE, WIDTH
WD WOOD
WDO WINDOW
WTR WATER
W/ WITH
W.C. WATER CLOSET
W.F. WIDE FLANGE
WGT WEIGHT
W.H. WATER HEATER
W.J. WALL JOINT
WO WHERE OCCURS
W/O WITHOUT
W.P. WATER PROOF
W.R. WATER RESISTANT
WWF WELDED WIRE FABRIC
XFR TRANSFER
XFMR TRANSFORMER
RA RETURN AIR
RAD RADIUS
RAR RETURN AIR REGISTER
RCP REFLECTED CEILING PLAN
RDY READY
REC RECESSED
REF REFERENCE
REINF REINFORCED
REQ'D REQUIRED
RESIL RESILIENT
RM ROOM
R.O. ROUGH OPENING
RT RUBBER TILE
S SOUTH
SA SUPPLY AIR
SAD SUPPLY AIR DIFFUSER
SAM SELF-ADHERING MEMBRANE
(BITUMINOUS FLEXIBLE
FLASHING)
S.C. SOLID CORE
SCHED SCHEDULE
S.C.T STATIC CONDUCTIVE TILE
S.D.T. STATIC DISSIPATIVE TILE
SECT SECTION
SERV SERVICE
S.E.S. SERVICE ENTRANCE SECTION
SLG SINGLE
SHT SHEET
SIM SIMILAR
SL SLIDING
SM SQUARE METER
SOG SLAB ON GRADE
SP SPACE
SPEC(S) SPECIFICATION(S)
SQ SQUARE
SST STAINLESS STEEL
STA STATION
STD STANDARD
STL STEEL
STOR STORAGE
STRL STRUCTURAL
SURF SURFACE
SUSP SUSPEND, SUSPENDED
@ AT
& AND
CENTERLINE
DIAMETER
% PERCENT, PERCENTAGE
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
2.
C
H
AN
G
ED
D U
E
TO
R
EV
IE
W
C O
M M
EN
TS
G
O
X
E
B
O
X
MATCH LINE
NEW CONCRETE MANHOLE
N: 80772.5
E: 25694.1
POINT OF INTERCEPT
NEW & EXISTING DUCT BANK
N: 80746.5
E: 25718.1
EXISTING MV
SECTIONALIZING CABINET
N: 80678.5
E: 25721.6
N03° 13' 34.37"W
67.762
L=7.713, R=10.000
N47° 24' 57.26"W
27.700
N47° 24' 57.26"W
103.202
B1/E-120
B2/E-120
POWER PEDESTAL
SEE E-501
N: 80778.7
E: 25772.8
HANDHOLE
N: 80786.6
E: 25711.2
E
B
O
X
MATCH LINE
NEW
SECTIONALIZING CABINET
N: 80843.3
E: 25617.1
NEW 100KVA
PADMOUNT TRANSFORMER
N: 80993.0
E: 25643.5
N47° 24' 57.26"W
N10° 11' 48.43"E
151.334
B1/E-120
B2/E-120
CONNECT TO BUCK-BOOST
TRANSFORMER IN ELECTRICAL
ROOM
POWER PED CKT
HANDHOLE
N: 80982.1
E: 25644.7
HANDHOLE
N: 80909.7
E: 25582.2
N46° 33' 37.27"W
13.631
TXWY EDGE LT CKT
HANDHOLE
N: 80980.2
E: 25642.9
SPARE MANHOLE
N: 80981.5
E: 25652.3
FLT DECK LT
MANHOLE
N: 80997.8
E: 25635.2
COMM DUCT
CROSSING
N: 80972.7
E: 25639.8
TXWY CKT
CROSSING
N: 80970.5
E: 25639.4
POWER PED CKT
CROSSING
N: 80969.1
E: 25639.2
SPARE DUCT
CROSSING
N: 80964.6
E: 25638.4
COMM DUCT
CROSSING
N: 80961.1
E: 25637.7
END OF SPARE
DUCT
N: 80904.6
E: 25578.4
TXWY EDGE LT CKT
CROSSING
N: 80878.1
E: 25622.8
POWER PED CKT
CROSSING
N: 80872.0
E: 25621.7
S43° 47' 33.23"W
105.078
S46° 33' 06.53"E
22.032
S43° 41' 59.14"W
88.999
L=4.713, R=3.000
L=4.712, R=3.000
S46° 33' 06.53"E
14.550
CONNECT TO CCR IN
ELECTRICAL ROOM
COMM DUCT
CROSSING
N: 80851.9
E: 25618.1
DECK EDGE LT CKT
CROSSING
N: 80983.0
E: 25640.0
DECK EDGE LT CKT
CROSSING
N: 80984.9
E: 25641.8
DECK EDGE LT CKT
CROSSING
N: 80988.4
E: 25645.2
0 25 50
METER
GRID COORDINATE:
JAPAN GEODETIC DATUM 2011, ZONE 15
US Army Corps of Engineers
A
B
C
D
1 2 3 4 5
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
Japan Engineer District
AM#8
B1
ELECTRICAL SITE PLAN
SHEET NOTES:
A. ANY REQUIRED POWER INTERRUPTION ON EXISTING ELECTRIC UTILITY & ANY NEEDED ACCESS INTO EXISTING EQUIPMENT
SHALL HAVE PRIOR COORDINATION AND APPROVAL FROM MARINE CORPS FACILITIES ENGINEERING ELECTRICAL SHOP. THE
CONTRACTOR SHALL SUBMIT REQUEST, WORK PLAN AND SCHEDULE THRU COR (MIN.14 WORKING DAYS) PRIOR TO THE
REQUIRED DATE.
B. DUE TO SIZE, QUANTITY, AND LENGTH OF CABLE TO BE PULLED, CABLE MAY BE SUBJECTED TO SIGNIFICANT TENSION. WHEN
PULLING THE MV CABLE, CONTRACTOR SHALL ENSURE THAT ALL REQUIREMENTS WITH REGARDS TO CONDUIT PREPARATION
AND CABLE PULLING IN PART 3 OF SPEC 33 71 02 IS STRICTLY FOLLOWED. THE FOLLOWING SHALL ALSO BE IMPLEMENTED:
B.1. ALL MANUFACTURER RECOMMENDATIONS SHALL BE FOLLOWED. NOTIFY COR IMMEDIATELY IF THERE ARE CONFLICTS
BETWEEN THIS PLAN, THE SPECS AND THE MANUFACTURER RECOMMENDATION.
B.2. USE CABLE FEEDING AND PULLING EQUIPMENT, AND CABLE GUIDES THAT WILL HELP MINIMIZE STRESS ON THE CABLE.
B.3. MONITOR PULL TENSION USING A DYNAMOMETER AND ENSURE CABLE MANUFACTURER RECOMMENDED PULL TENSION
ON THE CABLE IS NOT EXCEEDED.
B.4. INSTALL PULLING EYES ON EACH CABLE CONDUCTOR TO DISTRIBUTE THE TOTAL TENSION AMONG THE CONDUCTORS
EVENLY.
C. AT AREAS WHERE PRIMARY UNDERGROUND DISTRIBUTION LINE CROSSES OTHER UNDERGROUND LINES (SECONDARY LINE, TAXIWAY EDGE LIGHT CIRCUIT, TELECOMM LINE), ADJUST BURIAL DEPTH SO THAT PRIMARY DISTRIBUTION LINE WILL BE AT
LEAST 300MM UNDERNEATH THE OTHER LINES EXCEPT AT LOCATION NEAR THE TOWER WHERE THE OTHER LINES ARE GOING
INTO THE BUILDING. LINES GOING INTO THE BUILDING WILL NEED TO BE BURIED AT SUFFICIENT DEPTH SO THAT LINES WILL
RUN UNDERNEATH THE TOWER FOOTINGS. COORDINATES FOR POINTS WHERE UNDERGROUND PRIMARY DISTRIBUTION
LINES WILL BE CROSSING OTHER UNDERGROUND LINES ARE SHOWN IN THIS SHEET.
D. COORDINATES SHOWN ARE TENTATIVE. CONTRACTOR MAY MAKE MINOR FIELD ADJUSTMENT IF NEED.
5A
5A
5A
5B
KEYNOTE LEGEND ELEC SITE PLAN
KEYNOTE # DESCRIPTION
FOR SAFETY, PRIOR TO PERFORMING ANY WORK IN THE SECTIONALIZING CABINET ENSURE THAT THE
CABINET HAS BEEN DE-ENERGIZED AND PROPER LOCKOUT/TAGOUT PROCEDURES HAS BEEN
IMPLEMENTED. TERMINATE NEW MV CABLE WITH SEPARABLE INSULATED CONNECTOR AND CONNECT
TO EXISTING SECTIONALIZING CABINET. VERIFY COMPATIBILITY OF NEW CONNECTORS WITH EXISTING
BUSHINGS IN THE CABINET. SPEC 33 71 02
PORTION OF EXISTING DUCT BANK. IF ONLY ONE CONDUIT EXISTS, EXTEND THE SPARE CONDUIT
THAT WILL BE INSTALLED IN THE NEW DUCT BANK ALL THE WAY TO THE EXISTING SECTIONALIZING
CABINET IN KEYNOTE 1.
CONNECT NEW AND OLD DUCT BANK AT APPROXIMATE LOCATION SHOWN. REFER TO KEYNOTE 2
WITH REGARDS TO SPARE CONDUIT.
4 PROVIDE LONG SWEEP BEND AT LOCATION SHOWN. SPEC 33 71 02
NEW DUCT BANK, 2-WAY 103MM SCHED 40 PVC CONDUIT. "5A" = DIRECT BURIED CONDUIT SEE DETAIL
1/E-501; "5B" = WHOLE SPAN CONCRETE ENCASED FROM SECTIONALIZING CABINET TO TRANSFORMER
SEE DETAIL 2/E-501, 3/E-501 & 4/E-501. SPEC 33 71 02.
NEW MV-90 CABLE, 15KV, THREE 1C-2/0. SPEC 33 71 02
NEW CONCRETE MANHOLE, PRE-CAST OR CAST IN PLACE. MIN INTERNAL DIMENSIONS 1.3M WIDTH X
1.5M LENGTH X 2M DEPTH.
NEW SECTIONALIZING CABINET-4-WAY, 15KV, 200A. PROVIDE CONCRETE PAD. SEE DETAIL 5/E-501.
TERMINATE NEW INCOMING AND OUTGOING MV CABLES USING 15KV CLASS, 200A LOAD BREAK
SEPARABLE INSULATED CONNECTORS. PROVIDE AND INSTALL LIGHTNING ARRESTER IN THE CABINET.
ARRESTER MCOV RATING SHALL BE COMPATIBLE WITH THE SYSTEM NOMINAL LINE-TO-LINE VOLTAGE
SPEC 33 71 20
NEW 100KVA, 60HZ, 6.6 KV DELTA PRIMARY, 208V/120V WYE SECONDARY.
MANUAL TRANSFER SWITCH & GENERATOR POWER INLET RECEPTACLE. MOUNTED OUTSIDE OF
STAIRWELL WALL, NEAR SOUTHEAST CORNER OF TOWER. SEE DETAIL 7/E-501 & 8/E-501
2-22MM² XHHW & 1-22MM² EQUIPMENT GRND IN 53MMØ SCHED 40 PVC CONDUIT. "11A" = DIRECT
BURIED CONDUIT, "11B" = CONCRETE ENCASED
CONDUIT GOING INTO THE TOWER SHALL BE BURIED AT SUFFICIENT DEPTH THAT WILL ENABLE THE
CONDUIT TO BE RUN UNDERNEATH THE TOWER FOOTINGS.
300MM WIDTH X 300MM LENGTH X 600MM DEEP (INTERNAL DIMENSION) CAST IN PLACE OR PRECAST
CONCRETE HANDHOLE WITH REMOVABLE STEEL OR CONCRETE COVER. FOR POWER PEDESTAL CKT.
PROVIDE HANDHOLE SIMILAR TO KEYNOTE #13 ADJACENT TO THE POWER PEDESTAL, TO BE USED AS
SPLICE POINT TO TRANSITION CONDUCTORS FROM 22MM² TO 2MM² GOING INTO THE POWER
PEDESTAL.
PROVIDE HANDHOLE (AFLD LT BASE CAN W/ BLANK COVER) FOR THE TXWY EDGE LT CKT GOING INTO
THE ELECTRICAL ROOM AT LOCATION SHOWN. SEE DETAIL D2 / E-502.
16 TXWY EDGE LT CKT. FOR ADDITIONAL INFO REFER TO E-410
PROVIDE S3 MANHOLE AT LOCATION SHOW FOR THE FLT DECK LT CKTS GOING INTO THE ELECTRICAL
ROOM. COORDINATE MH INSTALLATION WITH PAVING. FIELD ADJUST MH LOCATION AS NEEDED TO
DE-CONFLICT W/ PAVEMENT JOINTS. REFER TO E-407 & B4/E-502FOR ADDITIONAL INFO.
PROVIDE SPARE L3 MANHOLE AT LOCATION SHOWN. MANHOLE EXTENDS SPARE CONDUITS FROM FLT
DECK LT MANHOLE TO UNPAVED AREA.
19 PROVIDE 6-WAY DUCT WITH 53MMØ SCHED 40 PVC CONDUIT
20 PROVIDE CONCRETE MARKER ABOVE LOCATION WHERE 6-WAY SPARE DUCT ENDS.
P L
A N
S
E-120
E L
E C
T R
I C
T
E
P
L A
N
E L
E C
T R
I C
A L
R
S
I N
G S
O N
R
S
I N
G S
O N
R
B
O L T
O N
J
F
A B
R I Z
Z I O
A2
ELECTRICAL SITE PLAN
11A
11A
11A
11A
11B
11B
N O
I T
E D
R E
V I S
Y
N O
I N
D I C
A T
E
M
A N
H O
L E
R E
V I S
B E
L
T
O
I N
D I C
A T
E
M
A N
H O
L E
250A, 3P
20A, 1P, GFI
15A, 1P
15A, 1P
K
A
S P
D
GND BUS
OBSTRUCTION
LIGHTS
V/STOL OLS EQUIPMENT
A
P
A
P
VARIAC- ATHWARTSHIP LTS
A
P
VARIAC-TRAMLINE LTS
A
P
A
P
A
P
A
P
A
P
A
P
VARIAC-STBD/PORT EDGE LTS
FWD PORT EDGE LTS
SAFE PARKING LINE LTS
NOZZLE ROTATION LINE LTS
DECK EDGE LTS
LANDING SPOT LTS
PENCIL LINE LTS
A
P
A
P
A
P
A
P
DECK LIGHT CONTROL PNL
TAXIWAY/APRON EDGE LIGHT CCR
LIGHTS - ELEC ROOM
LIGHTS -
STRAIRWAY/ENTRY
DOORS/OLS AREA
RECEP - ELEC ROOM/OUTDOOR GFCI
A
P
A
P
A
P
A
P
WAVE-OFF/CUT CONTROL PANEL
HPI CONTROL PANEL
LIGHTS - LSO CAB
RECEP - LSO CAB
A
P
A
P
A
P
A
P
A
P
G
F I
AC-1-C/AC-1-E
AC-2-C/AC-2-E
AC-3-C/AC-3-E
LIGHTS - TOWER FLOOD LIGHT
LIGHTS - TELECOMM RM/STORE ROOM AREA
RECEP, TELECOMM RM WALL
RECEP A, DEDICATED - TELECOMM CABINET
A
P
A
P
E L
E C
T R
I C
O
M
L
E V
E L
E X
T E
R I O
R
T E
L E
C O
O
M
L E
V E
L
U P
P E
R L
O W
E R
O L
S
L
E V
E L
L S
O
C
V
E L
P
P
S
S
S3
F
F
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
K V
P
H A
S E
H
Z
V
V
P
H A
S E
H Z
120 VAC
132 VAC
BUCK-BOOST
TRANSFORMER
A
P
RECEPTACLE OUTLET
AT FUEL BERM AREA
250VA
F
F
ROOF TOP
LSO CAB
DEHUMIDIFIER
TELECOMM ROOM DEHUMIDIFIER
ELECTRICAL ROOM DEHUMIDIFIER
LSO CAB SMOKE
DETECTOR/ ALARM
AUDIBLE/VISUAL
TELECOMM ROOM
SMOKE DETECTOR/
ALARM AUDIBLE
STORE ROOM
DETECTOR/ ALARM
AUDIBLE
ELECTRICAL ROOM
SMOKE DETECTOR/
ALARM AUDIBLE &
RELAY FOR
OUTDOOR
HORN/STROBE
B
RECEP B, DEDICATED - TELECOMM CABINET
RECEPTACLE STORAGE/MINI KITCHEN AREA
RECEPTACLE UPPER/LOWER
OLS LEVEL AREA
B
B
B
B
A
P
A
P
A
P
B7
A
P
G
F I
A
P
G
F I
F1
300A, 3P
G1
ELBOW
ARRESTER
NOTES:
1. PROVIDE SELF-ADHESIVE VINYL LABEL TO AFFIX TO ELECTRICAL
EQUIPMENT TO WARN OF ARC FLASH HAZARDS.
2. LABEL FORMAT AND TEXT SHALL BE IN ACCORDANCE WITH THE FIGURE
SHOWN.
3. LABEL SHALL BE ATTACHED ON THE EQUIPMENT AT A LOCATION THAT IS
CLEARLY VISIBLE TO MAINTENANCE PERSONNEL BEFORE THEY ARE ABLE
TO PERFORM ANY EXAMINATION, ADJUSTMENT, SERVICING, OR ANY
MAINTENANCE WORK ON THE EQUIPMENT.
4. MINIMUM LABEL SIZE SHALL BE:
HEIGHT WIDTH
50MM 75MM
75MM 110MM
EQUIPMENT LOCATION
INDOOR
OUTDOOR
H E
I G
H T
WIDTH
B1
ELEC 1-LINE DIAGRAM
1-LINE KEYNOTE LEGEND
KEYNOTE
NO.
REMARKS
1 EXISTING SECTIONALIZING CABINET, PROVIDE WITH ARC FLASH
WARNING LABEL IF NON EXISTS
2 NEW SECTIONALIZING CABINET, PROVIDE ELBOW ARRESTERS IN
CABINET. ATTACH ARC FLASH WARNING LABEL
3 NEW PADMOUNT XFORMER, 100KVA, 3-PHASE,
PRI-6.6KV DELTA, SEC-208V/120V WYE. PROVIDE WITH ARCH FLASH
WARNING STICKER LABEL. MARK TRANSFORMER ID AND RATING ON
THE TRANSFORMER ENCLOSURE DOOR. COORDINATE W/ MARINE
CORPS FACILITIES ENGINEERING FOR STANDARD MARKING. SEE
SPEC SEC 26 12 19.10 FOR ADDITIONAL REQUIREMENTS.
4 EMERGENCY POWER (USER PROVIDED), MEP-806 TRAILER MOUNTED
GENERATOR OR SIMILAR
5 GENERATOR POWER INLET CONNECTOR, HEAVY DUTY, MIL-DTL-22992,
CLASS L, 200A. WALL MOUNT PLUG (MS90558), SHELL FINISH C, SHELL
SIZE 52, KEYWAY POSITION 4, INSERT ARRANGEMENT 13, CONTACT
TYPE P (PLUG), W/ PROTECTIVE CAP.
6 4-POLE HEAVY DUTY DOUBLE THROW SWITCH OR EQUIVALENT
MANUAL TRANSFER SWITCH, SERVICE ENTRANCE RATED, 240V, 400A,
22KAIR, NEMA 4X STAINLESS STEEL. PROVIDE ARC FLASH WARNING
LABEL
7 MAIN PANEL, 208Y/120VAC, 3-PHASE, 4-WIRE, 400A RATING, 22KAIR, W/
300A MCB & INTEGRAL SPD; SPD SHALL HAVE SEPARATE CB
PROTECTION SIZED PER MANUFACTURER;PROVIDE ARC FLASH
WARNING LABEL.
8 POWER DISTRIBUTION PANEL "LHD"; SEE PANEL SCHEDULE. PROVIDE
ARC FLASH WARNING LABEL.
10 AMI COMPATIBLE ENERGY METER W/ CT AS NEEDED. TYPICAL CT
100:5, RATING FACTOR 3, CL20 OR THE APPROPRIATE CT FOR A 300A
SERVICE RECOMMENDED BY THE MANUFACTURER OF THE METER
BEING PROPOSED.. PROVIDE DATA CABLING FOR CONNECTION TO
FUTURE AMI EQUIPMENT
11 3-POLE HEAVY DUTY DISCONNECT SWITCH, NON-FUSIBLE, 240V, 400A,
22KAIR, NEMA 4X STAINLESS STEEL. PROVIDE ARC FLASH WARNING
LABEL
CABLE/CONDUIT SCHEDULE
CABLE NO. CONDUCTOR CONDUIT REMARKS
B1 4-1/C #10AWG
(5.5MM²), 1-1/C
#10AWG(5.5MM²)
27MM EMT (E31) XHHW; GRND W/ GREEN
INSULATION
B2 2-1/C #10AWG
(5.5MM²), 1-1/C
#10AWG(5.5MM²)
21MM EMT (E25) XHHW; GRND W/ GREEN
INSULATION; SEE SHEETS
E-406 TO E-410
B3 2-1/C #4AWG
(22MM²), 1-1/C
#4AWG(22MM²)
27MM EMT (E31) XHHW; GRND W/ GREEN
INSULATION; SEE SHEETS
E-406 TO E-410
B4 2-1/C #8AWG
(8MM²), 1-1/C
#8AWG(8MM²)
21MM EMT (E25) XHHW; GRND W/ GREEN
INSULATION; SEE SHEETS
E-406 TO E-410
B5 2-1/C #6AWG
(14MM²), 1-1/C
#6AWG(14MM²)
27MM EMT (E31) XHHW; GRND W/ GREEN
INSULATION; SEE SHEETS
E-406 TO E-410
B6 2-1/C #12AWG
(3.5MM²), 1-1/C
#12AWG(3.5MM²)
16MM EMT (E19) XHHW; GRND W/ GREEN
INSULATION
B7 2-1/C #4AWG
(22MM²), 1-1/C
#4AWG(22MM²)
27MM EMT (E19)
TRANSITION TO SCHED
40 PVC UNDERGROUND
OUTSIDE OF BLDG
XHHW; GRND W/ GREEN
INSULATION
F1 4-1/C 300KCMIL
(150MM²), 1-1/C
#4AWG(22MM²)
78MM RMC (G82) XHHW; GRND W/ GREEN
INSULATION
F2 2-1/C #12AWG
(3.5MM²), 1-1/C
#12AWG(3.5MM²)
16MM EMT (E19) XHHW; GRND W/ GREEN
INSULATION
G1 #1/0 (60MM²) W/
GREEN
INSULATION
SCHED 80, 16MMØ PVC
IF EXPOSED ABOVE
GROUND OTHERWISE
DIRECT BURIED
GROUND ELECTRODE
CONDUCTOR
P1 3-1/C #2/0AWG
(60MM²)
103MM SCHED 40 PVC MV-90, 15KV CABLE, XLP,
TAPE SHIELD
S1 4-1/C 350KCMIL
(200MM²)
103MM SCHED 40 PVC,
RMC(G92) IF ABOVE
GROUND
XHHW
S2 CO-04 HDE,
(4/0000-4/4R) 2380
PER MIL-DTL-3432
200A GENERATOR CABLE,
MIN. LENGHT 7.6M (25FT).
HEAVY DUTY MIL-DTL-22992,
CLASS L CABLE
CONNECTING RECEPTACLE
AT ONE END (MS90557),
SHELL FINISH C, SHELL SIZE
52, KEY POSITION 4, INSERT
ARRANGEMENT 13,
CONTACT TYPE S (SOCKET),
W/ PROTECTIVE CAP. OTHER
END NO CONNECTOR BUT AT
LEAST 300MM (1 FT) OF
OUTER JACKET STRIPPED
TO EXPOSE INNER
CONDUCTORS, TIP OF
CONDUCTORS SHALL HAVE
40MM (1.5 INC) OF
INUSLATION STRIPPED AND
TINNED TO PROTECT AND
PREVENT STRANDS FROM
RAVELING. PROVIDE WALL
MOUNTED RACK OR HOOK
TO STORE CABLE IN ELEC
ROOM
S3 4-1/C 350KCMIL
(200MM²), 1-1/C
#4AWG(22MM²)
EQPT GRND
103MM PVC
UNDERGROUND,
RMC(G92) ABOVE
GROUND
XHHW; GRND W/ GREEN
INSULATION
NOTE:
1. CONDUIT SIZE FOR FLIGHT DECK LIGHTS & TAXIWAY LIGHTS INDICATED IN THE
SCHEDULE ARE FOR WIRINGS INSIDE THE ELECTRICAL ROOM ONLY. CONDUIT
FROM THE ELECTRICAL ROOM TO THE OUTSIDE MANHOLE AND TO THE LIGHT
FIXTURES ARE ALL SCHED 40, 53MM (2 INC) PVC AS INDICATED IN SHEETS E-406 TO
E-410
2. CONDUCTOR SIZE FOR FLIGHT DECK LIGHT CIRCUITS SHOWN IN THE TABLE
ABOVE ARE FOR THE CONDUCTORS FROM THE PANELBOARD "LHD" TO THE
DIMMER VARIACS SHOWN IN THE POWER DIAGRAM IN SHEET E-603. THE
CONDUCTOR SIZES FROM THE POWER RELAY CONTACTS (SEE SHEET E-603) IN
THE ELECTRICAL ROOM TO THE LIGHT FIXTURES AT THE FLIGHT DECK WILL BE AS
INDICATED IN SHEETS E-406 TO E- 409.
US Army Corps of Engineers
A
B
C
D
1 2 3 4 5
SIGNED
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
Japan Engineer District
AM#8
S C
H E
D U
L E
S
A
A
G R
A M
S
E-601
E L
E C
T R
I C
S
T R
I B
U T
I O
N
S
Y S
T E
M
E L
E C
T R
I C
A L
R
S
I N
G S
O N
R
S
I N
G S
O N
R
B
O L T
O N
J
F
A B
R I Z
Z I O
K E
Y N
O T
E
D
E S
C R
I P
T I O
N
E
D I T
E D
A D
D E
D
N
O T
E
T
O
C
L A
R I F
Y
C
O N
D U
C T
Z
E S
K E
Y N
O T
I T
E D
| G-001 |
| G-002 |
| G-102 |
| G-103 |
| CS102 |
| CS103 |
| CS504 |
| CP101 |
| CP102 |
| CP103 |
| CP106 |
| CP107 |
| CI501 |
| CI502 |
| A-001 |
| E-120 |
| E-601 |
File details come from the government source that posted it. Updated .