Amendment No. 0002

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation No. W912HV-15-R-0027, Multiple Aw ard Task Order Contract (MATOC) for Design-Bid-Build (DBB) Construction Services, Okinaw a, Japan

Revisions to specificatons and response to questions. See next page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HV-15-R-0027

X 9B. DATED (SEE ITEM 11)

27-Aug-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Sep-2015

CODE

U.S. ARMY ENGINEER DISTRICT, JAPAN

ATTN: CONTRACTING DIVISION

BLDG. 250, ROOM 147, CAMP ZAMA

ZAMA-SHI, KANAGAWA-KEN 252-8511

JAPAN

W912HV 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HV-15-R-0027

14. DESCRIPTION OF AMENDMENT (continued)

A. CHANGES TO SPECIFICATIONS – The amendment mark “(Am-0002)” is shown on each page of the amended specification section(s).

Revised Page(s) to Project Specifications. Attached hereto are the following revised page(s) to specifications. Revised page(s) will replace like-numbered page(s) in the subject specifications. Changes are indicated by blue font.

Section Page No(s).

00 21 00 Page 1 00 22 00 Page 1 and 2 00 90 01 Page 1

B. QUESTION(S) AND RESPONSE(S) – The following questions were submitted by a potential offeror (s). Answers provided below do not amend the solicitation (specifications, drawings, etc.) unless such revision is specifically noted and incorporated into the solicitation.

See attachment.

C. Proposal due date and time of October 13, 2015, 02:00 PM (Japan Standard Time), remains unchanged.

ATTACHMENT - QUESTION(S) AND RESPONSE(S) W912HV-15-R-0027

Question No.

Reference Question Response

1 SECTION 00 90

01, Item 2. TYPE

OF TASK

ORDER.

SF1442 Block 10

Seed RFP states “The Government contemplates the issuance of a firm fixed-price Design- Build (D-B) construction task order as a result of this Request For Proposal (RFP)” while the SF1442 states “Multiple Award Task Order Contract (MATOC) for Design-Bid-Build (DBB) Construction Services, Okinawa, Japan”, please clarify if Seed Project is D-B-B.

Seed project is D-B-B. See revised Section 00 90 01, Paragraph 2 attached to this amendment.

2 Item 8, SF 1442, Solicitation Page

In SF 1442, it states "Hand-carried proposals shall be delivered to Room 147, however, in SECTION 00 2100, page 10 states "For bids/offers addressed to Camp Foster" please advice which statement we should follow.

Proposals shall be delivered to Camp Zama.

See revised Section 00 21 00, Paragraph 1 attached to this amendment.

3 SECTION 00 91

01, Seed Project RFP, Page 1

It states "The Government contemplates the issuance of a firm fixed-price Design- Build (D-B) construction task order as a result of this Request For Proposal (RFP)." in this section, however, from what we see in the documents, we assume it is actually a design-bid-build project. Please clarify.

Seed project is D-B-B. See revised Section 00 90 01, Paragraph 2 attached to this amendment.

4 SECTION 00 22

16, 2.2.1.

FACTOR I,

PAST

EXPERIENCE,

Solicitation Page

It states "The Government will evaluate the Offeror’s construction past experience on relevant projects to assess~" . We would like to confirm if the offeror shall show their ability to perform various projects under MATOC contract, not their ability to perform seed project in this section.

As stated in the referenced paragraph, "The Government will evaluate the Offeror’s construction past experience on relevant projects to assess the Offeror’s ability to complete task order requirements under this contract..." The term "contract" in the foregoing language is referring to the MATOC contract.

5 SECTION 00 21

00, 4. REQUEST

FOR

EXPLANATION

OR

INTERPRETAIO

N, Solicitation

After Pre-Proposal Conference on 16 September, we have only two working days untill the due for the explanation, considering week ends and Japanese holidays, from 21st to 23rd. It is extermely short to explore all aspects and make practical questions. Please consider to extend the due for the question for at least a week.

Due date will not be extended.

6 Solicitation 00 21 00 - 2, Para. 4:

Request for Explanation.

Please extend the due date of submitting Request for Explanation, September 22. As September 22 through 25 is Japanese Holiday, it's very difficult for our subcontracttors and us to prepare and submit questions. We would like to request the USG's fair and reasonable decision.

Due date will not be extended.

7 SF 1442, Block

13. A

Please extend the bid due date from 13 Oct 2015 to November 2015.

As a result of our research in Ie Island, there is only one concrete plant but the firm/plant is not be able to meet the specification. We need to re-organize our plan, progress schedule, material delivery, possible subcontractors and to negotiate with them.

The Government does not expect to extend the proposal due date and time.

8 Section 00 22 00

– Proposal Submission Requirements, Pg 1, item 2.2.1.

Section 00 22 00 – Proposal Submission Requirements, Pg 1, item 2.2.1. states that “Proposals should be submitted in two (2) separate envelopes…”. Due to the number of binders required for this submittal, would the Government please confirm that proposals may be submitted in two separate boxes?

If necessary, proposals may be submitted in two separate boxes. See revised Section 00 22 00, Paragraph 2.2.1.

9 Section 00 22 00

– Proposal Submission Requirements, Pg 2, item 2.2.1.3.

Section 00 22 00 – Proposal Submission Requirements, Pg 2, item 2.2.1.3. states that “It is recommended that the pages be standard 8-1/2” x 11” or A4 white bond paper using 12 characters per linear inch or equivalent as a minimum size standard for text.” Would the Government please confirm that 11” x 17” z-folded pages are acceptable for the presentation of graphics and tables?

11" X 17" folded pages are acceptable for the presentation of graphics and tables. If drawings or other graphics are submitted, Offerors should reduce them only to the extent that legibility is not lost. See revised Section 00 22 00, Paragraph 2.2.1.3 attached to this amendment.

10 Section 00 22 00

– Proposal Submission Requirements, Pg 2, item 2.2.1.3.

Section 00 22 00 – Proposal Submission Requirements, Pg 2, item 2.2.1.3. states that “It is recommended that the pages be standard 8-1/2” x 11” or A4 white bond paper using 12 characters per linear inch or equivalent as a minimum size standard for text.” Would the Government please confirm that Times New Roman 12 pt is an acceptable font and an acceptable minimum size standard for text? Would the Government please also confirm that Arial 8 pt font is an acceptable minimum size standard for use in proposal graphics and tables?

Times New Roman 12 pt is acceptable.

See above response concerning graphics and tables.

11 Section 00 22 00

– Proposal Submission Requirements, Pg 3, item

2.2.3.1.5.3.1.; SF

1442, Block 9

Section 00 22 00 – Proposal Submission Requirements, Pg 3, item 2.2.3.1.5.3.1.

states that Mr. Horiuchi’s email is takashi.horiuchi.ln@usace.army.mil, however Pg 1 of the SF1442, box 9 states that Mr. Horiuchi’s email is takashi.horiuchi@usace.army.mil. Would the Government please clarify which email is correct?

Mr. Horiuchi's e-mail address in SF 1442, Block 9 was corrected by the issuance of Amendment No. 0001.

12 Basic Contract Div 01, Section 3.4.1., Pg 75 of 136;

Basic Contract Div 01, Section 3.4.1., Pg 77 of

Basic Contract Div 01, Section 3.4.1., Pg 75 of 136 references the requirement for a “Design Quality Manager”. However, the table found in Basic Contract Div 01, Section 3.4.1., Pg 77 of 136 uses the title “Design Quality Control Manager”. Would the Government please confirm that these titles refer to the same position and that the full and correct title for this position is “Design Quality Control Manager”?

Response to be provided in future amendment.

13 We have noticed that while this MATOC is for Design-Bid-Build construction services, the Seed Project for this MATOC is a Design-Build project. Approximately what percentage of Task Orders issued under this MATOC are expected to be Design- Build?

The Seed Project is Design-Bid-Build. None of the task orders to be issued under this MATOC will be Design-Build.

Note: Response to other questions received by September 22, 2015, will be provided in future amendment(s).

W912HV-15-R-0027

00 21 00 - 1 (Am-0002)

SECTION 00 21 00 – INSTRUCTIONS

1. DELIVERY OF BIDS/OFFERS (MAR 2014).

a. Each bidder/offeror is solely responsible for ensuring that their bid/offer is received by the Government as specified in the solicitation. Please read the following statements to ensure timely submittal of your bid/offer:

(1) Closely coordinate the delivery of your bid/offer in sufficient time before the bid opening date/proposal due date.

(2) Bids/offers will not be accepted at the main gate of Government facilities.

(3) Valid picture identification is required for entry into Government facilities.

b. For Japanese visitors, Residential Registration Card, Passport, or Japanese Driver's License are considered valid picture Identification. Those individuals using a newly issued Japanese driver’s license with an Identity Code (IC) chip as a form of identification will be required to enter an 8 digit Personal Identification Number (PIN) into an IC Chip Reader. Individuals are granted 3 attempts to input their PIN and will be denied access if they are unable to input the correct PIN. To obtain or reset the PIN code, individuals should go to their local Japanese police driver’s licensing center for assistance.

c. For non-Japanese visitors, Passport or Alien Registration Card are considered valid picture identification.

d. The Government will not escort or provide any base access to any door-to-door service company.

e. For bids/offers addressed to Camp Zama.

(1) The Japan Post has access to Camp Zama.

(2) If you decide to hand-carry your bid/offer to Camp Zama, please allow sufficient time to have a Government personnel meet your representative(s) at the Camp Zama main gate, sign your representative(s) in, and be escorted to our office. We suggest arriving at the gate to Camp Zama at least 30 minutes before the closing time for bid/offer acceptance.

2. SOLICITATIONS FOR LOCAL SOURCES ONLY. This contract will be performed in its entirety in the country of Japan and is intended only for local sources. (See Federal Acquisition Regulation 5.202(a)(12) and Paragraph titled, ”Offeror Eligibility”.) (JED APR 2006)

00 22 00 – 1

SECTION 00 22 00 – PROPOSAL SUBMISSION REQUIREMENTS

1. GENERAL INSTRUCTIONS

1.1. Offerors shall strictly adhere to the requirements in this Section when preparing the proposal to be submitted in response to this Request for Proposal (RFP). All proposals shall be in English. The Government will not reimburse any Offeror any cost incurred in response to this RFP. Proposals that fail to comply with the proposal submittal requirements addressed in this section of the solicitation may be deemed unacceptable. To assure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors. The Offeror shall submit in the proposal all requested information specified in this section of the Request for Proposal (RFP) solicitation at or before the exact time specified. There will be no public opening of the proposals received as a result of this RFP. Failure to meet a requirement may result in an offer being ineligible for award. Copies of the RFP are available by INTERNET ACCESS ONLY. All RFP documents will be posted to the Army Single Face to Industry (ASFI) website (https://acquisition.army.mil) and made available for viewing in Federal Business Opportunities (http://www.fbo.gov). All amendments will be posted to ASFI and made available for viewing in FedBizOpps. It shall be the Offeror’s responsibility to check the website for any amendments.

1.2. Offerors are required to provide information addressing all stated factors and subfactors in a clear and understandable format. If an Offeror does not have information relating to a specific factor or subfactor, the Offeror shall clearly state so in the proposal. Proposals that do not clearly address all factors and subfactors may be considered unacceptable and may not receive further consideration.

2. SUBMISSION INSTRUCTIONS:

2.1. General Requirements: The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims. The proposal shall not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the Offeror intends to meet the requirements. Offerors shall assume that the Government has no prior knowledge of their facilities or experience, and will base its evaluation on the information presented in the Offeror’s proposal.

2.2. Proposal Format

2.2.1. Proposals should be submitted in two (2) separate envelopes/boxes as follows:

2.2.1.1. Volume I shall contain the Technical Proposal and should be clearly marked Volume I – Technical Proposal.

00 22 00 – 2

2.2.1.2. Volume II shall contain the Price Proposal and should be clearly marked Volume II, Price Proposal.

2.2.1.3. Each volume shall be separate and complete in itself so that evaluation of one may be accomplished independently from evaluation of the other. It is recommended that the pages be standard 8-1/2” x 11” or A4 white bond paper using 12 characters per linear inch or equivalent as the minimum size standard for text.

11” x 17” folded pages are acceptable for the presentation of graphics and tables. If drawings or other graphics are submitted, Offerors should reduce them only to the extent that legibility is not lost.

2.2.1.4. The Government recognizes that offerors go to considerable expense to prepare proposals for this solicitation, so the Government prefers that proposals be practical. Elaborate format, special binders, special reproduction techniques, and the like are not necessary or desired. In short, the proposal shall completely and adequately address the requirements stated in solicitation. Proposal legibility, clarity, coherence, and contents are important.

2.2.2. Revised Proposal. Revised proposals will not be accepted unless specifically requested by the Contracting Officer. If the Contracting Officer decides to conduct discussions and requests revised proposals from the offerors; offerors shall ensure that all replacement pages are clearly marked “REVISED”, shall show the date of revision, shall be submitted in the appropriate number of copies (e.g., if two copies of the original page was required, then two copies of the revised page will also be required). All proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g. bold face print or underlining.

2.2.3. Content.

2.2.3.1. Volume I – Technical Proposal

2.2.3.1.1. Submit one (1) original and five (5) paper copies of the documents shown in the table below. Each volume shall be bound and tabbed and in the order as shown in the table below. The Technical Proposal shall not contain any reference to cost for this project. The total pages submitted for the Technical Proposal shall not exceed 100 pages. Each page should be numbered. Any pages over the prescribed limit will not be considered for evaluation. Do not include the front and back cover of the technical proposal in the 100 sheet count.

2.2.3.1.2. In addition, provide the complete Volume I – Technical Proposal submittal, including text, renderings, drawings, photographs, etc. as PDF files and on CD or DVD (one copy). The CD or DVD should be marked with the offeror’s name, the solicitation number, and be identified as the electronic copy of the technical proposal.

2.2.3.1.3. In the event of any conflicts or differences between the original sealed offer and any paper copy or electronic (PDF) copy of the proposal, the sealed original offer shall control. The offeror is responsible for ensuring that all copies of the proposal, whether a paper copy or an electronic copy, is consistent with the original sealed offer.

2.2.3.1.4. The submittals should be formatted as follows:

P801 LHD Practice Site Improvements, Ie Shima, Okinawa

00 90 01 – 1

SECTION 00 90 01 – TASK ORDER SPECIFIC PROVISIONS

1. GENERAL

All applicable provisions set-forth in the contract shall apply to this task order, except as supplemented by this section. The following revisions and/or requirements apply only to this specific task order.

2. TYPE OF TASK ORDER. The Government contemplates the issuance of a firm-fixed-price Design-Bid-Build (D-B-B) construction task order as a result of this Request For Proposal (RFP).

3. MAGNITUDE OF THE PROPOSED PROJECT. The estimated price range of this work is between ¥2,500,000,000 and ¥10,000,000,000 [FAR 36.204].

4. SECTION 00 70 00 – CONDITIONS OF THE CONTRACT

All applicable clauses in Section 00 70 00 of the basic MATOC apply except as revised in this section.

a. 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF

WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 550 calendar days after the date the contractor receives the notice to proceed.

The time stated for completion shall include final cleanup of the premises.

(End of clause)

b. 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of ¥153,531 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

SF 30
ATTACHMENT - QUESTION(S) AND RESPONSE(S)
SECTION 00 21 00 – INSTRUCTIONS
SECTION 00 22 00 – PROPOSAL SUBMISSION REQUIREMENTS
SECTION 00 90 01 – TASK ORDER SPECIFIC PROVISIONS