AMD_7_16R26_PMS_Ft._Jackson_2017.03.22.pdf

PDF 816 KB Posted

Attached to
Fort Jackson Preventative Maintenance Services
Solicitation number
W912HP-16-R-0026
Issued by

About this file

RFP Amendment 6 SF30

View the file

Other files

File Type Posted
AMD_8_16R26_PMS_Ft._Jackson_2017.03.24.pdf PDF
AMD_6_Bidder_Inquiries__2017.03.23_UPDATE.pdf PDF
J-02_00_000-13_Record_of_Environmental_Consideration_(REC).pdf PDF
J_02_00_000_07_ELINs_R4.xlsx XLSX spreadsheet
16R26_PMS_Ft._Jackson_-_conformed_thru_AMD_7.pdf PDF
AMD_6_Bidder_Inquiries.pdf PDF
J_02_00_000_07_ELINs_R3.xlsx XLSX spreadsheet
16R26_PMS_Ft._Jackson_-_conformed_thru_AMD_6.pdf PDF
AMD_6_16R26_PMS_Ft._Jackson_2017.03.20.pdf PDF
J_15_02_000_05_DFAC_Equipment_Listings.pdf PDF
J_15_02_000_07_2017_02_17_Work_Orders_with_total_cost.xlsx XLSX spreadsheet
J_15_02-000_10_Work_Order_Status.xlsx XLSX spreadsheet
AMD_5_16R26_PMS_Ft._Jackson_2017.03.11.pdf PDF
J_02_00_000_12_Employee_Background_check_information.pdf PDF
16R26_PMS_Ft._Jackson_-_conformed_thru_AMD_5.pdf PDF
J_15_02_000_03_Optional_equipment_Inventory_R1.xlsx XLSX spreadsheet
J_15_02_000_09_Building_Inventory.xlsx XLSX spreadsheet
J_15_02_000_06_GFEBS_Role_Authorization_Form.pdf PDF
J_15_02_000_08_ALMS_GFEBS_directions.doc DOC document
J_02_00_000_07_ELINs_R2.xlsx XLSX spreadsheet
16R26_PMS_Ft._Jackson_SF30.pdf PDF
16R26_PMS_Ft._Jackson_-_conformed.pdf PDF
Section_J_02_00_000_07_ELINS_R1.xlsx XLSX spreadsheet
AMD_3_16R26_Ft._Jackson_-_Conformed.pdf PDF
Preproposal_Sign-In_Sheet.pdf PDF
AMD_3_16R26_PMS_Ft._Jackson__2017.02.09.pdf PDF
Preproposal_Sign-in_sheet_2.pdf PDF
AMD_2_16R26_-_conformed.pdf PDF
APPENDIX_D2_Corp_Experience_Data_Sheet.docx DOCX document
APPENDIX_D3_Past_Performance_Questionnaire.docx DOCX document
AMD_2_16R26_-_SF30.pdf PDF
APPENDIX_D1_Proposal_Data_Sheet.docx DOCX document
AMD_1_16R26_PMS_Ft_Jackson_-_Conformed.pdf PDF
AMD_1_16R26_PMS_Ft_Jackson.pdf PDF
J_1502000_03_Optional_equipment_Inventory.xlsx XLSX spreadsheet
J_1502000_04_Building_Inventory.xlsx XLSX spreadsheet
J_0200000_06_Government_Funished_Property_Materials_and_Services.pdf PDF
J_0200000_05_Forms.pdf PDF
J_0200000_07_Exhibit_Line_Item_Number_(ELINS).xlsx XLSX spreadsheet
J_0200000_04_Invoicing_Procedures_.pdf PDF
J_0200000_10__Sample_IDIQ_proposal.pdf PDF
W912HP-16-R-0026_PMS_Ft._Jackson.pdf PDF
Section_J_15_02_000_02__Service_call_History.xlsx XLSX spreadsheet
J_0200000_02_Wage_Determinations.pdf PDF
J_1502000_05_Fort_Jackson_Map.pdf PDF
J_0200000_03_References_Instructions_and_Directives_.pdf PDF
J_0200000_01_Acronyms_and_Abbreviations.pdf PDF
J_1502000_01_Expected_Service_Call_Amount.pdf PDF
DRAFT_PWS_Fort_Jackson_FIS_90__REV_2016.12.06.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

W912HP-16-R-0026 Fort Jackson Preventative Maintenance Services. The purpose of this amendment is to:

a) Extend the proposal deadline. The proposal deadline is hereby extended until March 27, 2017 at 9:00 PM (Eastern Time). Offerors are reminded of the RFP Section L, Submission Requirements, para D3 as it pertains to the deadline and electronic proposals. After hours submission diff iculties should be coordinated w ith the Federal Service Desk at https://w w w .fsd.gov and/or 866-606-8220 (M-F 8am-8pm ET).

b) Incorporate the Fort Jackson DPW's Record of Environmental Consideration (REC) and related performance requirements.

c) Issue a new Attachment J-0200000-07 ELINs to correct a minor calculation error on the CLIN summary tab.

A change log is provided in the SF30 block 14 continuation page. Changes to the RFP sections are also show n w ithin this amendment in the follow ing pages via "track changes". Insertions are highlighted via blue, bold font. Deletions are highlighted via red, strikethrough font.

1. CONTRACT ID CODE PAGE OF PAGES

1 93

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Mar-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HP-16-R-0026

X 9B. DATED (SEE ITEM 11)

24-Jan-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Mar-2017

CODE

US ARMY CORPS OF ENGINEERS, CHARLESTON

69-A HAGOOD AVENUE

CHARLESTON SC 29403

W912HP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HP-16-R-0026

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 07 CHANGES SUMMARY

Amendment 07 Summary Change Log

Section C- Performance Work Statement

C- 02 00 000 Management and Administration.

1. Added para 2.3.6.1 Record of Environmental Consideration (REC) The REC attached in J-0200000-13 contains the requirements for environmental reporting and procedures which supersede any requirements of this solicitation.

2. Added sentence to para 2.9.3.2 “This plan shall also incorporate submittal requirements and training requirements as articulated in attachment “J-0200000-

13 Record Of Environmental Consideration (REC)”

3. Added new paragraph at end of para 2.10.2.1: “The contractor shall ensure the addition and removal of any type of refrigerant is performed by a mechanic certified to US Environmental Protection Agency, Title VI standards. Refrigerant must be handled, stored and disposed IAW Federal regulations. Use of Class I

Ozone Depleting Chemicals is prohibited. If the refrigerant removed from the unit is R-22, the contractor shall collect the R-22 in an approved, properly labeled container and turn it in to DPW-ENV. Information pertaining to the newly installed unit(s) must be submitted to Christy Pollock. This information is to include (but not limited to) unit location, installation date, manufacturer, model, serial number, fuel source (if applicable) and manufacturers suggested maintenance schedule. For additional information, contact Christy Pollock, Air

Quality Program Manager, at 803-751-6629 or Christina.b.pollock.civ@mail.mil.”

4. Added sentences to para 2.10.2.2: “The Contractor shall properly dispose of any and all contaminated debris and waste generated during the project in accordance with State environmental regulations. The contractor shall divert (i.e.

reuse, recycle, or compost) at least 50% of municipal solid waste and 60% of construction and demolition waste from landfills. All reused materials, recyclables, yard waste, and trash that are transported off-post must be reported to the COR by the tenth day of the following month and upon completion of the project. The report must identify the amount, by weight, of waste reused, recycled, composted, or disposed, and the name of the receiving facility. The

COR shall provide a copy of this report to the Environmental Division within 10 days of receipt. A tracking form is located at http://jackson.armylive.dodlive.mil/files/2014/05/Construction-and-Demolition-

Waste-Management-Form.pdf. Exception: Carpet that has asbestos containing carpet mastic cannot be recycled. For additional information, contact Lisa mailto:Christina.b.pollock.civ@mail.mil http://jackson.armylive.dodlive.mil/files/2014/05/Construction-and-Demolition-Waste-Management-Form.pdf http://jackson.armylive.dodlive.mil/files/2014/05/Construction-and-Demolition-Waste-Management-Form.pdf

McKnight, Solid Waste Program Manager, at 751-5971 or lisa.a.mcknight11.ctr@mail.mil.”

5. Added sentences and new paragraphs to para 2.10.2.3: “Hazardous waste manifests, non-hazardous waste manifests, bills of lading, and any other documentation requiring a generator’s signature must be signed by the primary or secondary Fort Jackson Hazardous Substance Program Manager. The documentation must be provided to the Hazardous Substance Program Manager at least one week prior to shipment. The Generator ID Number, name, mailing address, and phone number are shown below.

SC3210020449

US ARMY GARRISON, FORT JACKSON

ENVIRONMENTAL DIVISION

2562 ESSAYONS WAY

FORT JACKSON SC 29207-5608

803-751-4231

The contractor shall manage hazardous substances, including lamps (light bulbs), rechargeable batteries, and mercury containing equipment, in accordance with Federal, State, local, and military regulations. The Fort Jackson Hazardous

Substance Management Plan (HSMP), dated September 2014, may be used for guidance. The HSMP is located at:

http://jackson.armylive.dodlive.mil/files/2014/05/HSMP-2014.pdf. The contractor is responsible for hazardous substance spill prevention, training, clean up, and reporting, and must comply with the Fort Jackson Spill Response Plan (page 16 of the HSMP). For additional information, contact the Hazardous Substance

Program Manager at 751-4231.”

6. Added sentences to para 2.10.2.9 after the first sentence “Any personnel with the potential to disturb ACM shall attend an Environmental Protection Agency (EPA) certified Asbestos Operation and Maintenance (O&M) Workers Course and obtain SCDHEC group licensing. It is the responsibility of the contractor to ensure that all technicians that attend the EPA Asbestos O&M Workers Course maintain certification for the life of this contract. The contractor has sole responsibility in identifying and assessing all potential asbestos disturbances for its employees prior to performing any maintenance or repair activities. The contractor shall notify the Toxic Substance Program Manager prior to disturbing any RACM. For additional information, contact LaVaughn Berry, Toxic Substance

Program Manager, at 751-3838.”

7. Added new para 2.10.2.9.1: “2.10.2.9.1 PRE ABATEMENT REQUIREMENTS:

Four (4) days prior to starting any asbestos abatement work activities, the

Contractor’s Project Manager or government COR shall hand carry or email (to lavaughn.a.berry.civ@mail.mil) a copy of the approved SCDHEC asbestos notification to the Toxic Substance Program Manager in Bldg. 2563, Rm 106.

The Contractor shall provide the Contracting Office Representative (COR) a copy of the asbestos abatement plan for review by the Environmental Management

Branch at least one week prior to starting any abatement work activities. The mailto:lisa.a.mcknight11.ctr@mail.mil http://jackson.armylive.dodlive.mil/files/2014/05/HSMP-2014.pdf mailto:lavaughn.a.berry.civ@mail.mil plan shall identify specific work practices that will be used to abate the ACM.

Four (4) days prior to starting any abatement work activities, the Contractor’s

Project Manager or government COR shall hand carry or email (to lavaughn.a.berry.civ@mail.mil) a copy of the approved SCDHEC asbestos notification to the Toxic Substance Program Manager in Bldg. 2563, Rm 106.”

8. Added new para 2.10.2.9.2: “2.10.2.9.2 POST ABATEMENT REQUIREMENTS:

Within 45 days of completion of the abatement phase of the project, the

Contractor shall submit the following documentation to the government COR for project records retention:

- Copy of State Asbestos Project Licenses

- Copy of the Certificate of Liability Insurance coverage documentation

- Copy of EPA training certificates and DHEC Licenses for individuals on the jobsite.

- Copy of the abatement activity log, and sign in/out sheets (for multi-day projects)

- Copy of third-party air monitoring and final clearance results (if required)

- Copy of the Asbestos Waste Shipment Record and Landfill Disposal Weight

Tickets”

C-15 02 000 Preventative Maintenance and Maintenance Services

1. Added sentences to 3.2.5.1.D: “The proponent must meet the requirements of federal regulations 40 CFR Part 60 IIII, JJJJ or 40 CFR Part 63 ZZZZ when performing preventive maintenance on stationary generators. All maintenance documentation for the generators must be provided to Christy Pollock. For additional information, contact Christy Pollock, Air Quality Program Manager, at

751-6629 or christina.b.pollock.civ@mail.mil.”

2. Added sentences to 3.2.5.2.D: “The contractor shall perform tightness testing and leak detector function checks on UST systems in accordance with state and federal regulations within 365 days of the last test. The contractor shall perform cathodic protection system testing in accordance with state and federal regulations within 3 years of the last test. Copies of the final report for all UST testing must be submitted to DPW ENV. For additional information, contact Mark

Merritt, SPCC Program Manager, at 803-751-9511 or mark.d.merritt6.civ@mail.mil.”

3. Added new paragraph to para 3.3.2: “Results of the test, including failures, repairs made to devices failing inspection, and subsequent testing of repaired devices shall be reported to ENV. Reporting should also include building number and device location. Any device that is taken out of service, either permanently or for replacement, shall be reported to ENV. For additional information, contact the

Drinking Water Program Manager at 751-4231.”

Section F Submittals

Added the word “washracks” to the Oil Water Separator Program entry in final row.

Section J 00 00 002 Index

Added attachment J-0200000-13 Record Of Environmental Consideration (REC) mailto:lavaughn.a.berry.civ@mail.mil mailto:christina.b.pollock.civ@mail.mil mailto:mark.d.merritt6.civ@mail.mil

J-0200000-07 ELINS attachment name changed from R3 to R4

Attachment J 02 00 000 07 ELINS The “R4” file of this attachment is provided, which corrects the CLIN summary tab’s summary calculation in the TOTAL (row 23) to include CLIN 4003. CLIN 4003 was mistakenly omitted from the TOTAL summary calculation in previous file versions..

-- END OF SECTION --

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 27-Mar-2017 10:00 AM to 27-Mar-2017 09:00 PM.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

PERFORMANCE WORK STATEMENT

01 00 000 – General Information

1.0 General Information

1.1 Outline of Services: Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide Preventative Maintenance services in the locations outlined in the Performance Work Statement (PWS)

1.1.1 Periods of Performance: The Contractor shall provide services as specified herein for 365 calendar days commencing on August 24, 2017, which will comprise the base contract award. Additionally, pursuant to clause FAR 52.217-7, this contract shall have four (4) option performance periods, each consisting of one (1) calendar year and each commencing annually on August 24.

1.1.2 Further information: The PWS is organized into Sections. Section 1 is "General Information". Section 2 contains on-site project management and administration requirements. Section 15 includes preventative maintenance technical requirements.

1.2 Project Location: The work shall be performed at various locations as listed in the PWS below, and will vary from location to location. Services and locations located on the Ft. Jackson campus may be added or deleted via contract modification at the discretion of the Government.

IDIQ work is expected to be completed on the entire Ft. Jackson campus and can include buildings that are not listed within this contract.

1.3 Background Information: Fort Jackson is currently receiving these services from a contract which is managed by the Corps of Engineers. These services are PM with a service call component.

1.4 Verification of Workload and Conditions: Throughout the PWS, the workload data is generally referred to as being located in Section J. Section J provides data such as maps, floor plans, and tables to represent the type, quantity and location of services to be provided. The information provided is an example of what the contractor will be servicing.

1.5 Climate Patterns: The climate pattern is predominately hot sultry summers and mild winters. The Ft. Jackson campus falls within the Southern East coast of the United States.

1.6 Related Information: There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:

1. Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout the sections below are subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.

2. Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.

3. Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.

4. Requirement Information further describes client requirements associated with each Performance Objective.

1.7 Army Approach to Service Contracting: The Department of Army (DoA) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations. The Army also supports the following principles:

1.7.1 Partnering Philosophy: The first principle is that the Army views its contractors as partners and not just abstract service providers. The Army wants its contractors to succeed because partners' success drives the Army's successful mission completion. Within the bounds of acquisition policy the Army intends to work to find solutions that will be beneficial to both the Government and its partners.

1.7.2 Contractor's Knowledge: The second principle is that the Army will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Army clients’ strategic and operational goals and objectives. The Army's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Army wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.

1.7.3 Industry Best Practices The third principle is that the Army will adopt industry best commercial practices and maintain state-of-the-art service delivery. It is the Army's and contractor's responsibility as partners to reach this goal. To that end, the Army's emphasis will be in evaluating performance objectives (end results). This is not intended to remove any requirements imposed by the manufactures suggested maintenance but is meant to be in addition to these requirements.

1.8 Standard Template: Key to implementing a programmatic approach is using a standard template that ensures Army-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Army’s requirements and expectations.

The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract. Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification item 1 will always contain General Information. Specification item 2 will always contain the management and administrative requirements. Specification item 3 will always contain the Firm Fixed-Price (FFP) requirements.

Specification item 4 will always contain the Indefinite Delivery-Indefinite Quantity (IDIQ) requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all firm fixed priced specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items.

Specification Items 3.2 and 3.3 are not considered subordinate to 3.1. All costs associated with Annexes 1 and 2 and Specification items 1 and 2 must be priced and distributed within Specification Item 3 of Annexes 3 through 18.

1.9 Army PBSC Approach: The Army’s approach to performance-based service contracting (PBSC) includes four component parts which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) quality assurance surveillance plan.

1.10 Technical Proposal Certification: The contractor warrants that its proposal incorporated herein by reference including, but not limited to, proposed approaches, staffing, methodology, or work plans, will meet the performance objectives set forth in this contract during execution thereof. The contractor is not excused from meeting such performance objectives in the event such proposal proves inadequate as conceived or executed to meet such performance objectives. The contractor understands that it bears all of the cost and performance risk associated with adopting acceptable additional (and/or alternative) means or methods of meeting the performance objective.

02 00 000 - Management and Administration

2.0 Management and Administration

2.1 Definitions and Acronyms See J-02 000 00-01 for Acronyms.

2.1.1 Administrative contracting officer (ACO) A Government representative as indicated by a letter from the contracting Officer

2.1.2 Calendar Days Unless otherwise noted, all days are calendar days.

2.1.3 Competent Person A person who has the professional experience and training necessary to identify existing and predictable hazards at a work or service environment, and who has the authority to take prompt and corrective action to eliminate or remove dangers from the environment.

2.1.4 Contract Deficiency The failure of the Contractor to perform in accordance with contract requirements and specifications. A contract deficiency may result from failure of the Contractor to provide, or provide on time, the required contract service or it may result when the required service does not meet specific contract standards.

2.1.4.1 Initial Failure Report (IFR) Is a report generated by the contractor to identify failed equipment at the start of the initial performance period. This report shall identify non-operational equipment, which was not operational at the start of the performance period and which is covered under the PM program. This report shall only include equipment that does not operate (i.e. a motor does not generate any measurable mechanical output when energized) and shall not include operational equipment that is simply not running smoothly, in use past it’s service life, etc. Reporting procedures are in

2.16 of section C 02 00 000.

2.1.5 Contracting Officer (KO) That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer in writing.

2.1.6 Contracting Officer’s Representative (COR) The person designated in writing by the Contracting Officer to act as his/her authorized representative to assist in administration of the contract.

2.1.7 Contractor (KTR) That entity or its representative responsible for the delivery of the services or materials specified in this contract, as designated by contract award. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall insure that subcontractors comply with the provision of this contract.

2.1.8 Contractor Representative That individual appointed by the Contractor, either orally or in writing, who has been assigned responsibility for executing the requirements of this contract.

2.1.9 Direct Labor Costs The number of direct labor hours multiplied by the appropriate Service Contract Act or Davis-Bacon Act wage rate(s), including fringe benefits.

2.1.10 Direct Material Costs The actual vendor invoice charges for materials used for performance of work under this contract. Direct material costs shall include transportation charges when such charges are included on the invoice by the vendor, as well as any discounts allowed for prompt payment and discounts or rebates for core value or salvage value that accrue to the Contractor. When questions arise concerning the cost of materials, material costs will be based on the lowest of quotes provided by the Contractor from at least three different commercial vendors for the direct material cost. The Government retains the right to obtain additional quotes in questionable situations. The lowest price will be used.

2.1.11 Equipment Anything kept, furnished, or provided for a specific purpose.

2.1.12 Facility A building or structure designed and created to serve a particular function.

2.1.13 Facility Coordinator The Government employee designated by the Center Commander at each service location to provide building access and other local coordination with the Contractor as required for the provision of services under this contract.

2.1.14 Frequency of Service

Annual (A). Services performed once during each 12-month period of the contract at intervals of 335 to 395 calendar days.

Biennial (B). Services performed once during each 24-month period of the contract at internals of 670 to 790 calendar days.

Daily (D5). Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted.

Daily (D7). Services performed once each calendar day, seven days per week, including weekends and holidays.

Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days.

Quarterly (Q). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days.

Semiannual (SA). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days.

Semimonthly (SM). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days.

Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday.

Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or Tuesday and Friday.

Weekly (W) Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days.

Daily (D) Services which are performed 260 times during each 12- month Period of the contract. Daily tasks are working days or 5 days per week.

2.1.15 Indirect costs All expenses which are not project specific, this includes overhead expenses, travel, and any oversight expenses.

2.1.16 Maintenance and Repair The preservation or restoration of a piece of equipment, system, or facility to such condition that it may be effectively used for its designated purposes. Maintenance/repair may be adjustment, overhaul, reprocessing, or replacement of constituent parts or materials that are missing or have deteriorated by action of the elements or usage, or replacement of the entire unit or system if beyond economical repair.

2.1.17 CMMS The contractor shall populate and maintain a computerized maintenance management system (CMMS). At a minimum the contractor shall keep track of all aspects of the contract, and contract administration in the CMMS system. GFEBS (General Fund Enterprise Business System) is to be the official CMMS for this contract. Any data entered into any other system will not be considered as complying with this contract.

2.1.18 Means Cost Data A data collection and organization system developed by R. S.

Means Company which can be used to prepare accurate, estimates and budgets in a variety of ways. The Contractor shall use the latest edition. Material prices are based on a national average and computed labor costs are based on a 30-city national average. Data has been targeted for residential, commercial, and industrial repair/remodeling projects. An estimate prepared using this data is called a "Means estimate" data may simply be referred to as "Means." The following are required Means data, R. S. Means Repair and Remodeling Cost Data, R. S. Means facilities & Maintenance data, R. S. Means Commercial Renovation.

2.1.19 Operation and Maintenance and Support Information (OMSI) OMSI is a set of consultant-prepared data manuals that contain detailed, as-built technical information that describes the efficient, economical and safe operation, maintenance and repair of a facility, plant, equipment or system throughout its life cycle. Generally prepared following completion of new construction facility or major facility upgrade. OMSI’s typically include staffing and budgeting information, supply support including critical spare parts, operating procedures, troubleshooting and diagnostic guides, extended warranty data, maintenance task frequencies and documentation, technical data, repair procedures and manufacturer’s product data.

2.1.20 Pre-expended Bin Materials and Supplies The minor materials and supplies that are incidental to the job, for which the total direct cost of any one material line item shown on the material estimate is $10.00 or less. Examples of pre-expended bin materials and supplies include, but are not limited to, solder, lead, flux, electrical connectors, electrical tape, fuses, nails, screws, bolts, nuts, washers, spacers, masking tape, sand paper, solvent, cleaners, lubricants, grease, oil, rags, mops, glue, epoxy, spackling compound, joint tape, plumbers tape and compound, clips, welding rods, and touch up paint.

2.1.21 Quality Assurance A method used by the Government to provide some measure of control over the quality of purchased goods and services received.

2.1.22 Quality Assurance Representative (QAR) An individual designated by the KO to be responsible for the monitoring of Contractor performance.

2.1.21 Quality Control (QC) A method used by the Contractor to control the quality of goods and services produced.

2.1.23 Response Time The time allowed to Contractor after initial notification of a work requirement to be physically on the premises at the work site with appropriate personnel, tools, equipment, and materials, ready to perform the work required.

2.1.24 As-built For the purposes of this contract and as-built is a digital and paper record of changes to the facility. These changes are both from the contractor, and through other actions which resulted in a difference from the existing records.

2.1.25 Asset are land, structures, equipment (including motor and aircraft fleets), and intellectual property (including software), which are used by the Federal Government and that have an estimated useful life of two years or more.

2.2 General Information

2.2.1 Government Regular Working Hours The Government's regular working hours include times in which facilities are used to support the military mission, and vary from building to building. Regular working hours are typically 0700-1600, five days per week, Monday through Friday, except observed Federal holidays; and Saturdays and Sundays up to two weekends per month. Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval. The following days are the only authorize time off, and other service gaps must be approved by the KO.

2.2.1.1 Observed Federal Holidays The Government observes the following holidays:

New Year’s Day, January 1st Martin Luther King Jr.’s Birthday, 3rd Monday in January President’s Day, 3rd Monday in February Memorial Day, last Monday in May Independence Day, July 4th Labor Day, 1st Monday in September Columbus Day, 2nd Monday in October

Veterans’ Day, November 12th Thanksgiving Day, 4th Thursday in November Christmas Day, December 25th.

2.2.2 Wage Determinations Refer to J-02 000 00-02 for Service Contract Act wage determinations.

2.2.3 Requirements Hierarchy Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.

2.3 General Administrative Requirements

2.3.1 Required Conferences and Meetings The Contractor may be required to attend administrative and coordination meetings at the KO’s discretion.

2.3.2 Permits and Licenses Within 15 calendar days after award of this contract, the Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable federal, state and local laws and regulations. Provide evidence of such permits and licenses to the KO before work commences and at other times as requested by the KO.

2.3.3 Insurance Within 15 calendar days after award of this contract, the Contractor shall furnish the KO a certificate of insurance as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-05, INSURANCE – WORK ON A GOVERNMENT INSTALLATION.

This insurance must be maintained during the performance period.

2.3.3.1 Certificate of Insurance The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.

2.3.3.2 Minimum Insurance Amounts The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:

Comprehensive General Liability: $500,000 per occurrence Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage Workmen's Compensation: As required by Federal and State worker's compensation and occupational disease statutes Employer's Liability coverage: $100,000, except where worker's compensation may not be written by private carriers Other as required by State Law

2.3.4 Protection of Government Property During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of contractor negligence under this contract to their original condition at no cost to the Government. (For example cosmetic repairs to ceiling tiles, or walls caused by an HVAC unit under service of this contract)

2.3.5 Access to Work Areas The Contractor shall make all arrangements through the appropriate office necessary to obtain access to buildings, facilities and other work areas, and when necessary, arrange for them to be opened and closed by the controlling authority.

The Government will not issue keys to the Contractor. The Contractor shall use due diligence and be responsible for compromised security systems to include replacement costs that result from its action or inaction.

2.3.6 Instructions, Directives, and References Applicable Department of Defense (DoD) and other directives, instructions, and references are listed in J-02 000 00-03.

2.3.6.1 Record of Environmental Consideration (REC) The REC attached in J- 0200000-13 contains the requirements for environmental reporting and procedures which supersede any requirements of this solicitation.

2.3.7 Invoicing Procedures See 52.212-4(g), CONTRACT TERMS AND CONDITIONS— COMMERCIAL ITEMS, Section I. A consolidated package with all sites individually invoiced will be accepted no more frequently than monthly. See invoicing procedures in J-02 000 00- 04.

2.3.7.1 WARNING At this time the Army Corps of Engineers is NOT using Wide Area Work Flow (WAWF) for invoice submission. Until further notice is provided any invoices submitted via WAWF will not be processed.

2.3.7.2 CMMS: The contractor shall have updated all status, competed IDIQ, service tickets and all other information required for reporting into the CMMS for the invoice period prior to the invoiced submission to the government. The CMMS will be used to generate the invoicing form attached in section J-02 000 00-04. Statuses in the CMMS will be used to verify completed work, any work completed and not entered into CMMS will not be expensed.

2.3.8 Forms See Section J-02 00 000-05 for accident reporting, and damage reporting.

2.3.9 Training for Maintenance and Operation of New and Replacement Systems and Equipment When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.

2.3.10 CMMS for contract tracking: The contractor will be required to utilize the work order function within the CMMS to track all preventative maintenance activities and service requests, including but not limited to, scheduling, estimated costs, and actual costs. The contractor is also expected to utilize the CMMS for all invoicing activities for the duration of the contract in addition to the requirements of section 2.3.7 invoicing procedures.

2.3.11 Inventory Management: The inventory provided within attachment J-15 02 000 03, J- 15 02 000-05, J-15 02 000 09 and any other inventory items listed shall be validated by the Contractor after contract award. Any discrepancies identified within the inventory as provided by the Government shall be identified by the Contractor in a report submitted a report to the COR within 90 days following the start of the base year performance period that details the Contractor's perceived discrepancies. This report shall include an updated version of the Government provided inventory and the changes shall include for each entry, at a minimum, the type of equipment, the make/model, and the serial number. A bilateral contract modification may be needed as a result of the Contractor's inventory validation report, up to the discretion of the KO. The contractor may submit a Request for Equitable Adjustment, in the event they disagree with the outcome of this procedure, pursuant of clause DFARS 252.243-7002. Submittals are to be submitted in accordance to section F of this contract.

2.4 Government-Furnished Property, Materials and Services Refer to J-02 000 00-06.

2.4.1 Government-Furnished Facilities (GFF) The contractor will have limited use of designated areas. These areas will be defined in section J-02 00 00-06

2.4.2 Government-Furnished Utilities All normally available utilities will be free to the Contractor at existing outlets for completion of this contract, to include water, sewer, and electricity. Internet access is not included in these utilities.

2.4.3 Government-Furnished Materials (GFM): None

2.4.4 Government-Furnished Equipment (GFE): Access to the government’s CMMS system.

2.5 Contractor-Furnished Items Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. This is to include a computer which will be imaged by Ft Jackson to be used solely for GFEBS. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and PCB’s shall not be brought on site. The KO may at any time require samples, Material Safety Data Sheets (MSDS), manufacturer’s data cut sheets of materials used in this contract.

2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality control. The Contractor shall provide staff with the necessary management expertise to assure performance objectives and standards are met.

2.6.1 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein.

Verbal scheduling and status reports shall be provided when requested by the KO. A written status report of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.

2.6.2 Work Schedule The Contractor's work shall not interfere with normal Government business. In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls.

2.6.3 Service Interruptions If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, affected tenants, and customers a minimum of 10 calendar days in advance. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, affected tenants and customers as soon as practicable.

2.6.4 Asset Management and Control: The Contractor shall use the CMMS system for asset tracking and management. The Contractor shall maintain complete and accurate records of all services provided and make these records available for the Government's use in managing the effort required under this contract. The contractor shall provide all data collected in MS EXCEL compatible format once per year at the end of EACH task order year to the KO.

2.6.4.1 Work Authorization Forms: The Contractor shall initiate a record for all ELIN designated services, to include a description of the problem or requested work, date and time received, location, and other appropriate information into the CMMS. For services other than service calls (e.g. preventive maintenance), the record number shall be coded to differentiate that work from service call work and be tracked in the

CMMS.

1) Immediately upon receipt of a service call, the following information shall be recorded:

- General Fund Enterprise Business System (GFEBS) Work authorization number

- ticket number

- Service call priority (emergency, urgent, routine)

- Name, office and command of requester

- Type of funding

- Paying Activity Code (PAC) (as required)

- Date and time call received

- Specific craft designation(s)

- Caller's description of the problem or requirement

- Associated Asset ID number

- Description of equipment or system (e.g., type of equipment, size, serial number, model number)

2) Upon completion of the requested service, the Contractor shall enter the following actions into the CMMS no later than 0900 the following working day after completion of the service:

- Description of problem or requirement as found by craftsman

- Description of work performed

- Labor hours expended, labor and material costs

- Date, time work was commenced, and completed

- Authorized signature indicating work was performed

- Root cause analysis of failure (Codes)

- Is failure abuse

2.6.4.2 Maintenance Management System (PM work): The records shall include complete logs of all Facilities Maintenance Services work provided, including but not limited to the following:

- Scheduled Start Date service scheduled to be performed document

- Date(s) of actual performance of service

- Location of service (e.g., site code, building number, and room number)

- Associated Asset ID number

- Description of equipment or system (e.g., type of equipment, size, serial number, model number)

- Description of maintenance provided or service performed

- List of parts replaced or equipment replaced in kind (e.g., type of equipment, size, serial number, and model number)

- Other information as needed to completely describe the work performed

- Labor hours expended, labor, and material costs

- Authorized signature indicating work was performed

2.6.4.3 Adding New or Replacement Assets: The records system shall be updated to included missing and updated equipment information in the Section J-1502000 equipment inventories, such as description for the piece of equipment, location (site code + 5 digit IFS Building Number), manufacturer, model number, capacity, etc.

The contractor should provide the government with any O&M data, and recommended PM services for added and replaced assets. Asset Inventory updates shall be provided with the monthly invoice in Microsoft Excel format.

2.6.5 Quality Management System (QMS) The Contractor shall establish and maintain a complete QC program in accordance with the provisions specified herein. The Contractor’s QC Program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QC program shall address:

•Accurate documentation of work processes, procedures, and output measures.

•A systematic procedure for assessing compliance with performance objectives and standards.

•Accurate documentation of quality inspections conducted throughout the execution of work.

•Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.

2.6.5.1 Quality Management (QM) Plan The Contractor shall develop and submit a QM Plan within 15 calendar days after award. The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QM Plan for acceptance.

2.6.5.2 Quality Inspection and Surveillance The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246-4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be turned over to the KO within five calendar days of termination of the contract.

2.6.5.3 Quality Inspection and Surveillance Report The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report monthly with the monthly invoice. The Contractor Quality Inspection and Surveillance Report shall include a summary and results of the quality inspection and surveillance events performed and assessment-driven corrective actions and process adjustments during the previous month. The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.

2.6.6 System and Equipment Replacement The Contractor shall maintain the integrity and performance of existing energy saving, water conservation or other sustainability design features of systems and equipment in the performance of repair and replacement work. Except where otherwise specified, replacement components shall be of the same model/style or equivalent as the component being replaced. Substitutes for replacement components must be accepted by the KO prior to use. The KO will furnish available information for the existing systems and equipment.

2.7 Personnel Requirements The Contractor shall comply with the personnel requirements stated below.

2.7.1 Key Personnel: Each of the following positions shall be full time personnel.

2.7.1.1 Project Manager (PM): The PM shall perform as the single point of contact for all mattered related to this contract. The PM must have relevant experience at a comparable level of responsibility in projects of similar size, scope and complexity.

The PM or alternate shall have full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be available by phone within one hour both during and after the Government's regular working hours.

2.7.1.2 Quality Control Manager (QCM) The Contractor shall provide a QCM who shall have full authority and responsibility for assuring performance objectives and standards identified in this contract are met.

2.7.1.3 Site Safety and Health Officer (SSHO) A Contractor employee whose primary duty and responsibility is to prepare and enforce the Contractor’s safety program on this contract. The SSHO shall have fulfilled the following prerequisite training and experiences before being hired as the SSHO under this contract: For contracts “The SSHO shall have completed 5 years of satisfactory experience in preparing and enforcing the Contractor’s safety program on contracts of similar size and complexity in the past, and shall have completed 30-hour OSHA safety class or equivalent within the last three years.” More detailed information can…