Solicitation Hartwell O and M Amendment 0001 Mod Copy.pdf
PDF 403 KB Posted
- Attached to
- Solicitation Hartwell O AND M Project Federal contract opportunity
- Solicitation number
- W912HN24R5003
About this file
This is Amendment 0001 to solicitation W912HN24R5003, issued by the USACE Savannah District with an effective date of December 2, 2024. The amendment adds 30 appendices (Appendix A through Appendix Y) to Section J of the solicitation, which include detailed information about lake operations, maintenance schedules, facility specifications, and standard operating procedures.
The appendices cover a wide range of operational areas including: lake information, durable tools, facilities, dumpster schedules, cleaning schedules for various facilities, pest control, fire extinguishers, HVAC descriptions, tree planting, equipment specifications, bulkhead construction, pothole repair, boundary line marking, buoy specifications, campsite configurations, and beach sampling procedures. The amendment does not extend the solicitation response date and all other terms and conditions remain unchanged.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0003_14Feb new proposal due date.pdf | ||
| Attachment 12.pdf | ||
| Site Visit Minutes and Handouts (W912HN24R5003).pdf | ||
| Estimated Quantities 2024 (12 Dec 2024 Submission)).xlsx | XLSX spreadsheet | |
| Hartwell Site Visit Record posted to FBO.pdf | ||
| W912HN24R5003 Amendment 0002 Signed.pdf | ||
| APPENDICES.pdf | ||
| Solicitation Hartwell O and M Amendment 0001.pdf | ||
| Solicitation Hartwell O and M 27NOV24.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to add Appendix A - Appendix Y (Section J) to the solicitation.
All other Terms and Conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
U 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HN24R5003
X 9B. DATED (SEE ITEM 11)
27-Nov-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Dec-2024
CODE
USACE - SAVANNAH DISTRICT
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN24R5003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been added by full text:
LIST OF ATTACHMENTS
LIST OF ATTACHMENTS
Number Title
1. Appendix A, Lake Info
2. Appendix B, Durable Tools
3. Appendix C, Facilities
4. Appendix D, Dumpster Schedule
5. Appendix E, PMO Cleaning Schedule and Guide
6. Appendix F, PH & CPS Cleaning Schedule & Guide
7. Appendix H, Contractor Area Cleaning
8. Appendix I, Recreation Schedule OP-H
9. Appendix J, Pest Control Schedule
10. Appendix L, Fire Extinguishers
11. Appendix N, HVAC Descriptions
12. Appendix O, Tree Plant Diagram
13. Appendix P, Equipment
14. Appendix Q, Bulkhead Construction
15. Appendix R, Pothole Repair
16. Appendix S1
17. Appendix S2
18. Appendix S3
19. Appendix T, Boundrary Line Marking
20. Appendix U-1, Buoys
21. Appendix U-3, Buoys
22. Appendix U-4, Buoys
23. Appendix U-5, Buoys
24. Appendix U-6, Buoys
25. Appendix V-1, Back-in Site
26. Appendix V-2, Pull Thru Site
27. Appendix V-3, Picnic Site
28. Appendix W, Hartwell SPCCP Nov 2021
29. Appendix X, WBS
W912HN24R5003
30. Appendix Y, Beach Sampling SOP
(End of Summary of Changes)
File details come from the government source that posted it. Updated .