This is a site visit record and presentation slides from a pre-bid conference held on July 31, 2019 for solicitation W912HN19R5002 concerning maintenance, repair, minor construction, and operations of the Hartwell Project.
The document details key aspects of the Hartwell Project, including: a 17,790-foot dam with 5 generating units producing 426,000 kilowatts total capacity; management of 55,950 acres of water and 23,563 acres of land with 962 miles of shoreline; 8 campgrounds with 497 campsites, 13 day-use recreation areas, and 24 access areas; $21.6M in hydropower generation value for FY18; and over 8M annual visitors. The site visit included presentations on proposal requirements, technical provisions, and facility tours. Important operational details were clarified, including that government furniture would be available (except one desk), bulk fuel storage tanks would not be available, and contractors would be responsible for sediment disposal at Clemson Pumping Station. Proposals were to be submitted through AMRDEC SAFE, with questions handled through ProjNet.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0003_14Feb new proposal due date.pdf | ||
| Attachment 12.pdf | ||
| Site Visit Minutes and Handouts (W912HN24R5003).pdf | ||
| Estimated Quantities 2024 (12 Dec 2024 Submission)).xlsx | XLSX spreadsheet | |
| W912HN24R5003 Amendment 0002 Signed.pdf | ||
| APPENDICES.pdf | ||
| Solicitation Hartwell O and M Amendment 0001.pdf | ||
| Solicitation Hartwell O and M Amendment 0001 Mod Copy.pdf | ||
| Solicitation Hartwell O and M 27NOV24.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site Visit Conference for
Solicitation W912HN19R5002 Maintenance, Repair, Minor Construction, and
Operations of the Hartwell Project
MINUTES
A formal site visit of solicitation W912HN19R5002 was held on
July 31st 2019 at 08:30 A.M. (Eastern) in accordance with Section L.6.
The following agenda was provided to all attendees:
1. Pre-Bid On-site Meeting for contract solicitation W912HN-19-R-5002 commenced at the Hartwell Project Operations Manager’s Office in Hartwell Georgia. Attached is the meeting agenda and attendance sheet. The meeting opened with a welcoming by Program Manager Kenneth Bedenbaugh and introductions by all attendees.
Following introductions, Mr. Bedenbaugh presented a Power Point presentation to provided an overview of the Hartwell Project to establish a better understanding of project missions and size.
Mr. Lennie K. Mattis, Savannah District Contract Specialist, spoke on behalf of Contracting Officer Mr. Bruce Helms, who was unable to attend. He discussed ProjNet and encouraged bidders to use it to submit questions about the contract. All questions should go through ProjNet at https://www.projnet.org. Mr. Mattis then provided a brief overview of sections L and M of the solicitation. He also discussed use of AMRDEC SAFE for proposal submittals:https://safe.amrdec.army.mil/SAFE/. He explained that, if you run in to issues uploading documents, the contracting office goes by the date & time stamp on the receiving end. He encouraged bidders to start uploading at least 2-4 hours ahead of time. Mr. Mattis will download the documents and send an e-mail stating that the proposal has been received. This does not mean your proposal is responsive and compliant; only that it has been received by the contracting office. You only need to submit one (1) copy of your proposal via AMRDEC SAFE. You can also ask for a ‘read receipt’. Keep in mind that it may take a while to upload. Mr. Mattis discussed additional submission requirements, to include compliance with file formats and page restrictions. Regarding past performance on previous projects, they will go by the Past Performance Questionnaire (PPQ) and Contractor Performance Assessment Reporting System (CPARS). So, if you submit any information that conflicts with these two sources, PPQ and CPARS will supersede. Mr. Mattis again encouraged the use of ProjNet to submit questions related to the solicitation.
Mark Dotson, Hartwell Project Contracting Officer’s Representative (COR) highlighted specific language within section L.5.2.1 Volume 1 –Technical, that could potentially raise questions concerning detail required in proposals regarding technical approach.
Mr. Dotson clarified that although past performance will be a primary basis for determining an offeror’s ability to perform contract tasks, presentation of the bidder’s approach to accomplish all 17 technical provisions (TP’s) is also required, but not to the level of detail such as how one proposes to change a trash can liner. Basically, proposals should reflect offeror’s understanding of, and concisely demonstrate their approach to, completing each TP. Mr. Dotson also encouraged bidders to pay close attention to each line of the Estimated Quantities List as some items provide general information and some provide more specific information. In relation to cost proposals associated with TP-14, Mr. Dotson explained that only the items listed on the Estimated Quantities List should be used. He further requested that estimates for gate house construction (described at TP 14.3) be included in Option Year 1 and Option Year 4 of proposals and estimates for septic tank installations (described at TP 14.13) be included in the Base Year and Option Year 3 of proposals to assist with consistent review of proposals. Upon conclusion of formal presentations and tour of the Operations Manager’s Office, all participants proceeded to tour project facilities as outlined in the attached agenda.
2. During the course of the above meeting and site visits, the following questions were addressed with all participants:
1) Question - Will furniture located in the government provided offices at the contractor compound be available to the new contractor?
Answer – Yes, with the exception of the maroon colored L-shaped desk in the front office.
2) Question – Are bulk fuel storage tanks available for contractor use?
Answer – No.
3) Question – Is contractor responsible for sediment disposal in relation to cleaning sand trap at Clemson Pumping Station?
Answer – Yes. (Please note, however, that sediment has historically been disposed of at the base area of the lower diversion dam within a few hundred yards of the sand trap.)
4) Question – Is special equipment needed to clean the sand trap at Clemson Pumping Station?
Answer – See TP-6.6.2.1 for equipment needed to accomplish this task.
5) Question – Is the government planning to purchase any new equipment?
Answer – No. (Please see TP-1.10.2, Equipment, for more detail concerning government furnished equipment.)
3. The Pre-Bid Meeting and site visits concluded following a tour of the Clemson Pumping Station.
MARK A. DOTSON
Contracting Officer’s Representative
PRE-BID CONFERENCE
Solicitation W912HN19R5002
Hartwell Project O&M Services Hartwell Operations Project Managers Office
31 July 2019
0830 to 0900 Welcome, Introductions, Project Overview (SAS- OP-H: Bedenbaugh)
0900 to 1000 Proposal Format/Content-Section L&M and ProjNet (SAS-CT: Mattis, SAS-OP-H: Dotson)
1000 to 1030 Tour Government Furnished Facilities and Contractor Compound (SAS-OP-H: Dotson)
1030 to 1145 Tour Power Plant (SAS-OP-H: Hanna/Dotson)
1145 to 1400 Lunch and recreation area tour (on your own).
Reconvene at Clemson Pumping Station (604 Lake Drive, Clemson, SC 29631) at 1400.
*Companies may visit recreation areas on their own in route to Clemson Pumping Station.
Representative areas recommended below.
1400 to 1500 Conclude/Wrap Up at Clemson Pumping Station (SAS-OP-H: Hanna/Dotson)
Representative Recreation Areas
*Watsadler Campground: 286 Watsadler Road, Hartwell, GA 30643 *Singing Pines Recreation Area: 6600 US Hwy 29S, Starr, SC 29684 *Broyles Recreation Area: 900 Smyzer Road, Townville, SC 29689 *Twin Lakes Campground: 140 Winnebago Trail, Pendleton, SC 29670 *Twin Lakes Recreation Area: Located adjacent to campground
SC Dam Viewing Area
Sing ing Pines _j ,_ _______ ___.
Jarrett
Richland Creek
River Forks
Denver
Asbury
Eighteen Mile Creek
Twin Lakes
Twelve Mile
Martin Creek
Friendship
Camp Creek
Broyles
Apple Island
Double Springs
Spring Branch
Jenkins Ferry
Poplar Springs
-.. . -Georgia River
Corps Campground
Twin Lakes
Paynes Creek
Georgia River
Crescent Group Camp
Springfield
Oconee Point
Coneross
Watsadler
Quick Facts
Completed: 1962 Water Surface Area: 55,950 Acres Land Area: 20,933 Acres Shoreline: 962 Miles Full Pool: 660 ft. msl
US Army Corps of Engineers Savannah Dist rict
Project Manager's Office & Visitor Center Hartwell Dam & Lake 5625 Anderson Hwy Hartwell, GA 30643 Phone: (888)893-0678 or (706)856-0300 www.CorpsLakes.us or www.sas.usace.army.mil/hartwell
For campground and picnic shelter reservations 877-444-6777 or www.recreation.gov
\ ~f \ ~ Pickens Co
11?( ,v/
21 Choestoea Hunting Area
50 Sadler's Creek State Park
51 Green Pond
52 Jack's Landing
53 White City
54 Honea Path
55 Brown Road
56 Darwin H. Wright
57 Hurricane Creek
58 Clemson
59 Lawrence Bridge
60 Seneca Creek
61 Hoyt-Tilley
62 Cove Inlet
63 Fair Play
64 Lake Hartwell State Park
65 Port Bass
66 South Union
67 Mullins Ford
68 Stephens County
69 Bruce Creek
70 Holcomb
71 Tugaloo State Park
72 Franklin County
73 Rocky Ford
74 Reed Creek
75 Milltown
76 Bradberry
77 Hart State Recreation Area
78 Gum Branch
Anderson Co 79 Long Point
Commercial Marinas
N Portman
Harbor Light
J·· 4 6 8 Miles
1 in= 3 miles
.59
“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”
HARTWELL PROJECT
HARTWELL PROJECT VISION
We will provide ethical stewardship of public land and water resources, flood control and hydropower production readiness while balancing competing demands through authorized project purposes .
Project Location
Atlanta
Cleveland Greenville
Anderson
Elberton
Athens
Augusta
Columbia
Charlotte
GA
SC
NCTN
I-75
I-20
I-20
I-85
I-77 I-26Hartwell
I-85
I-75 40 Miles
Lies in Upper Piedmont Plateau and Lower Foothills of the Blue Ridge Mountains
2 states and 6 counties
98 miles above Augusta, GA
305 miles to Atlantic Ocean
115 miles from Atlanta
50 miles from Greenville, SC
Project Size
55,950 acres of water
23,563 acres of land
962 miles of Shoreline
840 miles of boundary Line
7 miles from dam to confluence of Tugaloo and Seneca Rivers
49 miles to top of Tugaloo River
45 miles to top of Seneca River
N
GA
SC
Hartwell Dam & Powerplant
Watershed/Drainage Basin
GA
SC
N
J. Strom Thurmond Dam & Lake
Augusta
Savannah
Richard B. Russell Dam & Lake
New Savannah Bluff Lock & Dam
Hartwell Dam & Lake
• Construction 1955 – 1962
• Cost - $89 million
• Second Corps project on Savannah River
• Impoundment began in 1961
• 660’ msl elevation reached on March 12, 1962
• On-line in April, 1962
• 50th anniversary celebrated in April 2012
History
• HD 78-657 (Flood Control Act of 1950) and PL 81-
• Purposes
Navigation Hydropower
Flood Control
Authorizing Document
• Recreation Flood Control Act of 1944 and PL 89-72
• Fish & Wildlife Management
PL 85-624
• Water Quality Management
PL 92-500
• Water Supply
PL 85-500
Additional Authorities
.59
HARTWELL DAM &
POWERPLANT
File Name
• Dam – 17,790 ft. long
• Concrete dam – 1,900 ft. long
• 204 ft. above Savannah River bed
• 5 generating units
Dam & Powerplant
*Nameplate Rating
• Units 1 – 4 66,000 kilowatts* (1962) 85,500 kilowatts* (2007)
• Unit 5 = 84,000 kilowatts* (1983)
• Total = 426,000 kilowatts*
Hydropower
FY 18
• 430,915 megawatt hours produced
• Total generation and capacity value: $21,672,125
Hydropower
• $8,413,437 – Hartwell FY18 prevention
• $31,231,580 – Total Basin FY18 prevention
• $101,146,643 – Hartwell prevention since 1962
• $342,165,955 – Total basin prevention since 1962
Flood Prevention
• Main Dam
• Clemson Pumping Station and Upper & Lower Diversion Dams
• 12 spillway gates (40’ W x 35.5’ H)
• Total storage (665’ msl) = 2,842,700 acre-feet (926.3 billion gallons)
• 565,000 CFS maximum discharge (design flood)
Main Dam
Old Seneca River Bed
• 2 electric pumps (2,000 gal/min each)
• 2 diesel pumps (23,500 gal/min each)
Clemson Pumping Station Upper & Lower Diversion Dams
.59
RECREATION
FACILITY
OPERATIONS
• Consistently top 3 in visitation (#2 in FY18)
• 8M+ visitors per year
• Economic Impact
Recreation
• Facility descriptions 8 campgrounds
• 497 campsites 13 day use recreation areas
• 315 picnic sites, 14 shelters, 20 swim beaches
24 access areas
• Park Attendant Program
• Volunteer Program 23,656 hours valued at
$584,066 in FY18 (11 FTE)
Recreation Area Operations & Management
Fisheries Christmas tree recycling program
Cut & cable trees around the shoreline
Planting aquatic plants to improve fisheries
• Maidencane – out of the water, shoreline stabilizer
• Water willow – subaquatic, fish habitat
Natural Resources Management
Water Quality Dissolved oxygen readings
• Blueback herring management
Monitor Water Temperature
• Fish spawn
Fisheries population study
• Secure measurements to determine healthy population
Forestry Manage timber for wildlife & disease control
Small land base – limited opportunity to manage forests for timber sales
Concentration on planting wildlife friendly trees (saw-tooth oak, white oak, red oak, swamp chestnut oak, etc.)
Natural Resources Management
Wildlife Actively manage 23 food plots (36 acres) located at 4 locations (GA Quarry, SC Dove Field, Payne’s Creek, Choestoea).
Bluebird and Wood Duck box program
.59SHORELINE & LAND
MANAGEMENT
PROGRAM
Shoreline Management Statistics Largest program in the nation
11,883+ total permits / licenses
58,652+ total permitted activities
10,804 boat docks 1,154 adjacent subdivisions
$733,526.67 shoreline use permit fees in FY18
76% of shoreline is open to various permitted facilities/activities
50% of shoreline open to docks
• Ensuring protection of our natural resources through balancing public and private use
• Fostering positive attitudes toward resource management
• Public involvement is critical
Program Strengths
• Real estate outgrant management
• Boundary line management
• Water supply
Components Land Management
• 840 miles of boundary line
• 9,800 monuments
• Encroachments
Boundary Line Management Land Management
.59ENVIRONMENTAL
COMPLIANCE
PROGRAM
Environmental Compliance Program