W912HN-21-B-3007_DRAWINGS_VOL4_AMD1.pdf
PDF 315 KB Posted
- Attached to
- Repair TBUP Building 399 Phase 2
- Solicitation number
- W912HN21B3007
About this file
This solicitation package includes technical drawings and specifications for a telecommunications network upgrade at Fort Benning, Georgia. The drawings detail requirements for voice and data outlet labeling, patch panel installation, and rack configurations. Technical requirements include installing fiber optic cassettes, voice and data patch panels, horizontal and vertical cable management, and grounding components. The related opportunity is a sealed bid solicitation from the Army Corps of Engineers seeking repairs to Building 399 at Fort Benning. Repairs include exterior walls, windows, fire protection, interior walls, doors, finishes, plumbing, HVAC, controls, electrical, communications, building information systems, site utilities, and parking. Demolition and asbestos abatement are also required. Bids are due in July 2021 and the project repairs failed and failing building systems.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTES:
A. PATCH PANELS SHOWN IN DETAIL ARE FOR REFERENCE ONLY.
B. ALL JACKS SHALL BE TERMINATED TO TIA-568-B STANDARD.
C. VOICE JACKS SHALL BE WHITE AND CABLE JACKET SHALL BE GRAY.
D. DATA JACKS SHALL BE ORANGE AND CABLE JACKET SHALL BE BLUE.
E. VOICE AND DATA JACKS SHALL NOT OCCUPY THE SAME PATCH PANEL.
OUTLET LABELS
TR100-R1-A01
TR100-R1-A01
PATCH PANEL
RACK NUMBER
TELECOM ROOM NUMBER
A
PATCH PANEL
PATCH
PANEL
IDENTIFIER
OUTLET
PORT
LOCATION
PORT NUMBER
TR
TYPICAL
ROOM/OFFICE
NOTES:
A. THE NUMBERING SYSTEM FOR WAO'S SHALL BE IN A CLOCKWISE ROTATION. BEGIN BY STANDING IN THE TR DOORWAY LOOKING OUT
AND PROCEEDING FROM ROOM TO ROOM IN A CLOCKWISE ROTATION.
B. UPON ENTERING A ROOM START DIRECTLY TO THE LEFT AND WORK AROUND THE ROOM IN A CLOCKWISE ROTATION.
C. FLOOR PLAN ABOVE IS FOR REFERENCE ONLY. EACH NETWORK SHALL BE NUMBERED SEPARATELY.
STAND IN DOORWAY FACING OUT AND WORK
AROUND THE FLOOR IN A CLOCKWISE
ROTATION, FINISHING WITH THE TR.
X
RACK 2RACK 1
10" VERTICAL WIRE
MANAGEMENT
6" VERTICAL WIRE
MANAGEMENT
6" VERTICAL WIRE
MANAGEMENT
1. RACK GROUNDING BUSBAR (RGB).
2. FIBER ENCLOSURE WITH HIGH DENSITY12-FIBER
DUPLEX LC CASSETTES.
3. 48-PORT VOICE PATCH PANEL FOR INCOMING 50-PAIR.
TERMINATE 1-PAIR PER PORT TO POSITIONS 4-5.
4. 48-PORT MODULAR VOICE PATCH PANEL.
5. 48-PORT MODULAR DATA PATCH PANEL.
6. HORIZONTAL WIRE MANAGEMENT.
7. GFGI ACTIVE IT EQUIPMENT.
8. VERTICAL PDU MOUNTED ON BOTH REAR SIDES OF
RACK.
KEY NOTES:#
7 7
88 8
C O N S U L T I N G E N G I N E E R S
413 DALTON AVENUE, SUITE A
CHARLOTTE, NC 28206 •704-295-4263
AME PROJECT NO.:
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S A
V A
N N
A H
D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
G
E O
R G
IA
JO
N
E S
F R
A N
K
LI
N R
D , S
U
IT
E
R A
LE
IG
H , N
C
-3
(9
1-
(9
1-
F
A X
LI
C
E N
S E
F
-0
F O
R T
B E
N N
IN
G
G
A B
U
IL
D
IN
G
T
R A
IN
E
E B
A R
R A
C K
S U
P G
R A
D E
P R
O G
R A
M
(T B
U P
P
H A
S E
F
Y P
N
FOR OFFICIAL USE ONLY
20063
TN502
T E
L E
C O
M N
E T
W O
R K
D
E T
A
IL
S
D H
E R
R E
P L
IV
E S
E Y
K B
R O
D B
E R
J T
H O
M P
S O
N
J U
L Y
W H
N B
- 7 -1
-2
C
A T
E G
O R
Y C
O D
E
F
IL
E N
A M
E
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
T N
.D
W G
NTSA1
WOA OUTLET AND PATCH PANEL LABELING
NTSH1
WORK AREA OUTLET (WAO) NUMBERING SYSTEM DIAGRAM
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/1
/2
NTSA11
RACK ELEVATIONS (TYPICAL)
TN502 TELECOM NETWORK - DETAILS
File details come from the government source that posted it. Updated .