W912HN-21-B-3007_DRAWINGS_VOL1_AMD2.pdf
PDF 2 MB Posted
- Attached to
- Repair TBUP Building 399 Phase 2
- Solicitation number
- W912HN21B3007
About this file
This solicitation is for repair work to Building 399 Sections B and C at Fort Benning, Georgia. The work includes repairs to exterior walls, windows, fire protection, interior walls, doors, interior finishes, floors, ceilings, plumbing, HVAC, building controls, electrical, communications, building information systems, site utilities, and minor parking improvements. Demolition necessary to allow for the repairs and HAZMAT and asbestos abatement are also included. The acquisition will be awarded through sealed bidding in accordance with FAR Part 14. Bids are due by August 26, 2021. The contracting agency is the Department of the Army Corps of Engineers Engineering District Savannah. The magnitude of the requirement is between $25M and $100M.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP DN
DN
DNUP
B5 B6 B7 B8 B9 B10B1 B2 B3 B4
CENTER
MATCHLINE
SECTION BSECTION A
CENTER
MATCHLINE
SECTION BSECTION B
D45
D37
D04
D37
D04
D09
D10
D07
D07D37D05 D35 D19 D36D03D03
D51D51
D32D32
D32D32
D95
D96
D97
D04 D49
D35
TEMPORARY EGREES: SEE GENERAL
NOTES DEMOLITION "O". ALSO SEE LIFE
SAFETY AND FIRE PROTECTION DRAWINGS
FOR ADDITIONAL INFORMATION
AD405
D6
D10
D94
D96
D31
DEMOLITION LEGEND:
EXISTING WALLS TO REMAIN
ITEMS OR WALLS TO BE DEMOLISHED OR
REMOVED AS NOTED
SLAB TO BE DEMOLISHED AT NEW
ELEVATOR LOCATION. REFER TO
STRUCTURAL DRAWINGS FOR DETAILS
TEMPORARY EGRESS AREA
TEMPORARY DEMISING WALL AND OPENING
A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES
WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM
CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.
B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM
DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS
RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO
REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST
TO GOVERNMENT.
C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT
REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,
INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START
OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS
MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER
COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES
CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.
D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.
E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING
OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.
F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS
AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR
MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING
AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.
G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED
ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED
FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING
BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.
H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING
CONSTRUCTION.
I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL
CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL
CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF
CONSTRUCTION.
J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR
WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.
K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE
CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES
TO RECEIVE NEW WORK AND FINISHES.
L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE
EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING
CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND
FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING
OFFICER.
M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND
FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP
SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.
N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE
ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED
OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE
OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING
OFFICER.
O. TEMPORARY EGRESS DURING CONSTRUCTION:
TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A
THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE
PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE
WITH CONTRACTING OFFICER.
P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,
AND INFORMATION
Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE
DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO
RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.
PAINTED AS INDICATED
GENERAL NOTES DEMOLITION:
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S A
V A
N N
A H
D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
G
E O
R G
IA
JO
N
E S
F R
A N
K
LI
N R
D , S
U
IT
E
R A
LE
IG
H , N
C
-3
(9
1-
(9
1-
F
A X
LI
C
E N
S E
F
-0
F O
R T
B E
N N
IN
G
G
A B
U
IL
D
IN
G
T
R A
IN
E
E B
A R
R A
C K
S U
P G
R A
D E
P R
O G
R A
M
(T B
U P
P
H A
S E
F
Y P
N
FOR OFFICIAL USE ONLY
AD121
S E
C O
N D
F L O
O R
D E
M O
L
IT
IO
N
P L A
N
S E
C T
IO
N
B W
E S
T
Z K
A S
K Y
D V
A N
L O
O N
K B
R O
D B
E R
K B
R O
D B
E R
J U
L Y
W H
N B
- 7 -1
-2
C
A T
E G
O R
Y C
O D
E
F
IL
E N
A M
E A
D .D
W G
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
1/8" = 1'-0"A1
SECOND FLOOR DEMOLITION PLAN - B WEST KEY PLAN
G
F
E
N.T.S.
PLAN
NORTH
A
B C
DBUILDING 399
0 4' 8' 16' 24'
KEYNOTES DEMOLITION
D45 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR ELEVATOR. DO
NOT REMOVE CONCRETE SLAB OVER TUNNELS WHERE APPLICABLE - SEE
STRUCTURAL, PLUMBING AND FIRE PROTECTION DRAWINGS
D49 REMOVE EXISTING STONE SILL AT THIS LOCATION AND PREPARE TO RECEIVE
NEW STONE SILL AND WINDOW
D51 REMOVE ALL INTERIOR CEILINGS, FLOOR FINISHES INCLUDING GLUES,
FURRING, INSULATION, FIXTURES, MILLWORK, DOORS, FRAMES, AND
HARDWARE. REMOVE ALL GYPSUM BOARD FURRING ON THE INTERIOR SIDE OF
THE EXTERIOR MASONRY WALLS. REMOVE PAINT FROM ALL PAINTED
SURFACES ON INTERIOR FACE OF ALL EXTERIOR WALLS, SURFACES TO
RECIEVE NEW PAINT AND CONFORMING TO ENVIRONMENTAL SURVEY
RECOMMENDATIONS. METHODS USED TO REMOVE PAINT SHALL NOT DAMAGE
THE MASONRY. ENSURE A MINIMUM 70% OF INTERIOR SURFACE OF EXTERIOR
WALLS SHALL BE CLEAR OF PAINT TO INSURE VAPOR TRANSMISSION IS
ALLOWED (DRYING OF WALL SYSTEM). PREPARE ALL SURFACES TO RECIEVE
NEW WINDOWS, CASEWORK, APPLIANCES, FIXTURES, DOORS AND FRAMES AS
REQUIRED - TYPICAL
D94 REMOVE EXISTING HANDRAIL DURING CONSTRUCTION. PROTECT FROM
DAMAGE AND STORE. REINSTALL WHEN TEMPORARY EGRESS STAIR IS
REMOVED. REMOVE EXISTING COATINGS DOWN TO ORIGINAL STEEL. PREPARE
SURFACES TO RECEIVE PAINT
D95 TEMPORARY DEMISING WALL. SEE LIFE SAFETY AND FIRE PROTECTION
DRAWINGS FOR RATINGS AND ADDITIONAL INFORMATION. CONTRACTOR TO
COORDINATE PHASING WITH GOVERNMENT
D96 TEMPORARY 36" X 80" (WXH) DOOR. RATING TO MATCH RATING OF DEMISING
WALL
D97 TEMPORARY EGRESS STAIR DURING CONSTRUCTION. STAIR TO MEET IBC-2018
REQUIREMENTS AND OTHER APPLICABLE CODES. SEE AD405, LIFE SAFETY AND
FIRE PROTECTION DRAWINGS FOR RATINGS AND ADDITIONAL INFORMATION.
CONTRACTOR TO COORDINATE PHASING WITH GOVERNMENT
KEYNOTES DEMOLITION
D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE
NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS
D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.
CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE
SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL
D05 EXISTING STUCCO WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED. CLEAN
AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED - TYPICAL
D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE
STRUCTURAL DRAWINGS - TYPICAL
D09 EXISTING CONCRETE STAIRS TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW PAINT, NOSING, AND ANTI-SLIP
SURFACE. WHEN REPLACING STAIR NOSING, REPLACE ALL TO SAME - TYPICAL
D10 EXISTING HANDRAILS TO REMAIN. REMOVE EXISTING COATINGS DOWN TO
ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT - TYPICAL
D19 EXISTING CONCRETE WALLS TO REMAIN. PREPARE SURFACES TO RECEIVE
NEW FINISHES AS INDICATED - TYPICAL
D31 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR PLUMBING,
FIRE SUPPRESSION, AND HVAC WORK. DO NOT REMOVE CONCRETE SLAB
OVER TUNNELS WHERE APPLICABLE - SEE STRUCTURAL, MECHANICAL,
PLUMBING AND FIRE PROTECTION DRAWINGS
D32 REMOVE EXISTING PARTITIONS IN THEIR ENTIRETY. PREPARE FLOOR AND
ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -
TYPICAL
D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE
IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW
CONSTRUCTION AND FINISHES - TYPICAL
D36 REMOVE EXISTING DOOR, FRAME AND LINTEL, AND ASSOCIATED HARDWARE IN
THEIR ENTIRETY, INCLUDING BLOCKING AND WOOD FRAMING. PREPARE
ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -
TYPICAL
D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,
FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT
SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/1
/2
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/2
/2
07/22/21
UP DN
C8C1 C2 C3 C4 C5 C6 C7
1 1
3 3
4 4
C11
C17
C16
C15
C14
C13
C12
2 2
C9
C10
SECTION C
CENTER
MATCHLINE
S
EC
TIO
N C
D04
D37
D37
D04
D04
D37
D04
D10
D09
D07
D07D35D37D19 D03D03
D07
D07
D35
D05
D37
D19
D03D03
D51D51
D32D32
D51D51
D32D32
D35
D35
D71
D75
D34
D10
D10
D31D31
DEMOLITION LEGEND:
EXISTING WALLS TO REMAIN
ITEMS OR WALLS TO BE DEMOLISHED OR
REMOVED AS NOTED
SLAB TO BE DEMOLISHED AT NEW
ELEVATOR LOCATION. REFER TO
STRUCTURAL DRAWINGS FOR DETAILS
TEMPORARY EGRESS AREA
TEMPORARY DEMISING WALL AND OPENING
A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES
WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM
CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.
B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM
DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS
RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO
REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST
TO GOVERNMENT.
C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT
REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,
INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START
OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS
MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER
COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES
CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.
D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.
E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING
OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.
F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS
AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR
MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING
AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.
G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED
ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED
FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING
BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.
H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING
CONSTRUCTION.
I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL
CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL
CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF
CONSTRUCTION.
J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR
WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.
K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE
CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES
TO RECEIVE NEW WORK AND FINISHES.
L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE
EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING
CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND
FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING
OFFICER.
M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND
FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP
SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.
N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE
ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED
OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE
OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING
OFFICER.
GENERAL NOTES DEMOLITION:
O. TEMPORARY EGRESS DURING CONSTRUCTION:
TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A
THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE
PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE
WITH CONTRACTING OFFICER.
P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,
AND INFORMATION
Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE
DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO
RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.
PAINTED AS INDICATED
GENERAL NOTES DEMOLITION (CONT'D):
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S A
V A
N N
A H
D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
G
E O
R G
IA
JO
N
E S
F R
A N
K
LI
N R
D , S
U
IT
E
R A
LE
IG
H , N
C
-3
(9
1-
(9
1-
F
A X
LI
C
E N
S E
F
-0
F O
R T
B E
N N
IN
G
G
A B
U
IL
D
IN
G
T
R A
IN
E
E B
A R
R A
C K
S U
P G
R A
D E
P R
O G
R
U P
P
H A
S E
F
Y P
N
FOR OFFICIAL USE ONLY
AD123
S E
C O
N D
F L O
O R
D E
M O
L
IT
IO
N
P L A
N
S E
C T
IO
N
C W
E S
T
Z K
A S
K Y
D V
A N
L O
O N
K B
R O
D B
E R
K B
R O
D B
E R
J U
L Y
W H
N B
- 7 -1
-2
C
A T
E G
O R
Y C
O D
E
F
IL
E N
A M
E A
D .D
W G
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
1/8" = 1'-0"A1
SECOND FLOOR DEMOLITION PLAN - C
WEST
KEY PLAN
G
F
E
N.T.S.
PLAN
NORTH
A
B C
DBUILDING 399
0 4' 8' 16' 24'
KEYNOTES DEMOLITION
D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE
NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS
D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.
CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE
SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL
D05 EXISTING STUCCO WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED. CLEAN
AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED - TYPICAL
D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE
STRUCTURAL DRAWINGS - TYPICAL
D09 EXISTING CONCRETE STAIRS TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW PAINT, NOSING, AND ANTI-SLIP
SURFACE. WHEN REPLACING STAIR NOSING, REPLACE ALL TO SAME - TYPICAL
D10 EXISTING HANDRAILS TO REMAIN. REMOVE EXISTING COATINGS DOWN TO
ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT - TYPICAL
D19 EXISTING CONCRETE WALLS TO REMAIN. PREPARE SURFACES TO RECEIVE
NEW FINISHES AS INDICATED - TYPICAL
D31 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR PLUMBING,
FIRE SUPPRESSION, AND HVAC WORK. DO NOT REMOVE CONCRETE SLAB
OVER TUNNELS WHERE APPLICABLE - SEE STRUCTURAL, MECHANICAL,
PLUMBING AND FIRE PROTECTION DRAWINGS
D32 REMOVE EXISTING PARTITIONS IN THEIR ENTIRETY. PREPARE FLOOR AND
ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -
TYPICAL
D34 EXISTING HANDRAIL GATE TO REMAIN. REMOVE EXISTING COATINGS DOWN TO
ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT. FIELD VERIFY
LOCATIONS - TYPICAL
D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE
IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW
CONSTRUCTION AND FINISHES - TYPICAL
D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,
FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT
SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL
D51 REMOVE ALL INTERIOR CEILINGS, FLOOR FINISHES INCLUDING GLUES,
FURRING, INSULATION, FIXTURES, MILLWORK, DOORS, FRAMES, AND
HARDWARE. REMOVE ALL GYPSUM BOARD FURRING ON THE INTERIOR SIDE OF
THE EXTERIOR MASONRY WALLS. REMOVE PAINT FROM ALL PAINTED
SURFACES ON INTERIOR FACE OF ALL EXTERIOR WALLS, SURFACES TO
RECIEVE NEW PAINT AND CONFORMING TO ENVIRONMENTAL SURVEY
RECOMMENDATIONS. METHODS USED TO REMOVE PAINT SHALL NOT DAMAGE
THE MASONRY. ENSURE A MINIMUM 70% OF INTERIOR SURFACE OF EXTERIOR
WALLS SHALL BE CLEAR OF PAINT TO INSURE VAPOR TRANSMISSION IS
ALLOWED (DRYING OF WALL SYSTEM). PREPARE ALL SURFACES TO RECIEVE
NEW WINDOWS, CASEWORK, APPLIANCES, FIXTURES, DOORS AND FRAMES AS
REQUIRED - TYPICAL
D71 REMOVE EXISTING SINKS IN THEIR ENTIRETY. SEE PLUMBING DRAWINGS FOR
ADDITIONAL INFORMATION - TYPICAL
D75 REMOVE EXISTING STOVE
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/1
/2
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/2
/2
UP
B5 B6 B7 B8 B9 B10B1 B2 B3 B4
CENTER
MATCHLINE
SECTION BSECTION B
CENTER
MATCHLINE
SECTION BSECTION A
D37
D04
D09
D10
D35
D04
D37
D04
D37
D07
D07D37D05 D19 D35 D36D03D03
D51D51
D32D32
D32
D95
D96
D97
D04
D49
D35
TEMPORARY EGREES: SEE GENERAL NOTES
DEMOLITION "O". ALSO SEE LIFE SAFETY
AND FIRE PROTECTION DRAWINGS FOR
ADDITIONAL INFORMATION
D45
AD405
D12
D71
D75
D10
D94
D31
DEMOLITION LEGEND:
EXISTING WALLS TO REMAIN
ITEMS OR WALLS TO BE DEMOLISHED OR
REMOVED AS NOTED
SLAB TO BE DEMOLISHED AT NEW
ELEVATOR LOCATION. REFER TO
STRUCTURAL DRAWINGS FOR DETAILS
TEMPORARY EGRESS AREA
TEMPORARY DEMISING WALL AND OPENING
A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES
WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM
CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.
B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM
DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS
RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO
REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST
TO GOVERNMENT.
C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT
REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,
INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START
OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS
MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER
COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES
CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.
D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.
E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING
OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.
F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS
AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR
MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING
AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.
G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED
ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED
FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING
BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.
H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING
CONSTRUCTION.
I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL
CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL
CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF
CONSTRUCTION.
J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR
WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.
K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE
CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES
TO RECEIVE NEW WORK AND FINISHES.
L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE
EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING
CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND
FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING
OFFICER.
M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND
FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP
SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.
N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE
ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED
OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE
OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING
OFFICER.
O. TEMPORARY EGRESS DURING CONSTRUCTION:
TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A
THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE
PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE
WITH CONTRACTING OFFICER.
P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,
AND INFORMATION
Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE
DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO
RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.
PAINTED AS INDICATED
GENERAL NOTES DEMOLITION:
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S A
V A
N N
A H
D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
G
E O
R G
IA
JO
N
E S
F R
A N
K
LI
N R
D , S
U
IT
E
R A
LE
IG
H , N
C
-3
(9
1-
(9
1-
F
A X
LI
C
E N
S E
F
-0
F O
R T
B E
N N
IN
G
G
A B
U
IL
D
IN
G
T
R A
IN
E
E B
A R
R A
C K
S U
P G
R A
D E
P R
O G
R
U P
P
H A
S E
F
Y P
N
FOR OFFICIAL USE ONLY
AD131
T H
IR
D
F L O
O R
D E
M O
L
IT
IO
N
P L A
N
S E
C T
IO
N
B W
E S
T
Z K
A S
K Y
D V
A N
L O
O N
K B
R O
D B
E R
K B
R O
D B
E R
J U
L Y
W H
N B
- 7 -1
-2
C
A T
E G
O R
Y C
O D
E
F
IL
E N
A M
E A
D .D
W G
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
1/8" = 1'-0"A1
THIRD FLOOR DEMOLITION PLAN - SECTION B WEST
KEY PLAN
G
F
E
N.T.S.
PLAN
NORTH
A
B C
DBUILDING 399
KEYNOTES DEMOLITION
D49 REMOVE EXISTING STONE SILL AT THIS LOCATION AND PREPARE TO RECEIVE
NEW STONE SILL AND WINDOW
D51 REMOVE ALL INTERIOR CEILINGS, FLOOR FINISHES INCLUDING GLUES,
FURRING, INSULATION, FIXTURES, MILLWORK, DOORS, FRAMES, AND
HARDWARE. REMOVE ALL GYPSUM BOARD FURRING ON THE INTERIOR SIDE OF
THE EXTERIOR MASONRY WALLS. REMOVE PAINT FROM ALL PAINTED
SURFACES ON INTERIOR FACE OF ALL EXTERIOR WALLS, SURFACES TO
RECIEVE NEW PAINT AND CONFORMING TO ENVIRONMENTAL SURVEY
RECOMMENDATIONS. METHODS USED TO REMOVE PAINT SHALL NOT DAMAGE
THE MASONRY. ENSURE A MINIMUM 70% OF INTERIOR SURFACE OF EXTERIOR
WALLS SHALL BE CLEAR OF PAINT TO INSURE VAPOR TRANSMISSION IS
ALLOWED (DRYING OF WALL SYSTEM). PREPARE ALL SURFACES TO RECIEVE
NEW WINDOWS, CASEWORK, APPLIANCES, FIXTURES, DOORS AND FRAMES AS
REQUIRED - TYPICAL
D71 REMOVE EXISTING SINKS IN THEIR ENTIRETY. SEE PLUMBING DRAWINGS FOR
ADDITIONAL INFORMATION - TYPICAL
D75 REMOVE EXISTING STOVE
D94 REMOVE EXISTING HANDRAIL DURING CONSTRUCTION. PROTECT FROM
DAMAGE AND STORE. REINSTALL WHEN TEMPORARY EGRESS STAIR IS
REMOVED. REMOVE EXISTING COATINGS DOWN TO ORIGINAL STEEL. PREPARE
SURFACES TO RECEIVE PAINT
D95 TEMPORARY DEMISING WALL. SEE LIFE SAFETY AND FIRE PROTECTION
DRAWINGS FOR RATINGS AND ADDITIONAL INFORMATION. CONTRACTOR TO
COORDINATE PHASING WITH GOVERNMENT
D96 TEMPORARY 36" X 80" (WXH) DOOR. RATING TO MATCH RATING OF DEMISING
WALL
D97 TEMPORARY EGRESS STAIR DURING CONSTRUCTION. STAIR TO MEET IBC-2018
REQUIREMENTS AND OTHER APPLICABLE CODES. SEE AD405, LIFE SAFETY AND
FIRE PROTECTION DRAWINGS FOR RATINGS AND ADDITIONAL INFORMATION.
CONTRACTOR TO COORDINATE PHASING WITH GOVERNMENT
KEYNOTES DEMOLITION
D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE
NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS
D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.
CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE
SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL
D05 EXISTING STUCCO WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED. CLEAN
AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED - TYPICAL
D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE
STRUCTURAL DRAWINGS - TYPICAL
D09 EXISTING CONCRETE STAIRS TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW PAINT, NOSING, AND ANTI-SLIP
SURFACE. WHEN REPLACING STAIR NOSING, REPLACE ALL TO SAME - TYPICAL
D10 EXISTING HANDRAILS TO REMAIN. REMOVE EXISTING COATINGS DOWN TO
ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT - TYPICAL
D19 EXISTING CONCRETE WALLS TO REMAIN. PREPARE SURFACES TO RECEIVE
NEW FINISHES AS INDICATED - TYPICAL
D31 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR PLUMBING,
FIRE SUPPRESSION, AND HVAC WORK. DO NOT REMOVE CONCRETE SLAB
OVER TUNNELS WHERE APPLICABLE - SEE STRUCTURAL, MECHANICAL,
PLUMBING AND FIRE PROTECTION DRAWINGS
D32 REMOVE EXISTING PARTITIONS IN THEIR ENTIRETY. PREPARE FLOOR AND
ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -
TYPICAL
D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE
IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW
CONSTRUCTION AND FINISHES - TYPICAL
D36 REMOVE EXISTING DOOR, FRAME AND LINTEL, AND ASSOCIATED HARDWARE IN
THEIR ENTIRETY, INCLUDING BLOCKING AND WOOD FRAMING. PREPARE
ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -
TYPICAL
D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,
FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT
SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL
D45 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR ELEVATOR. DO
NOT REMOVE CONCRETE SLAB OVER TUNNELS WHERE APPLICABLE - SEE
STRUCTURAL, PLUMBING AND FIRE PROTECTION DRAWINGS
0 4' 8' 16' 24'
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/1
/2
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/2
/2
C8C1 C2 C3 C4 C5 C6 C7
C11
C17
C16
C15
C14
C13
C12
C9
C10
CENTER
MATCHLINE
S E C
TIO
N C
S
EC
TIO
N C
D37
D04
D37
D04
D09
D10
D04D04
D37
D04
D37
D04
D07
D07
D07D37D05D35D19
D37
D05
D35
D07
D05
D37
D19
D03D03
D03D03
D51D51
D51D51
D32D32
D32D32
D35
D35
SECTION C
CENTER
MATCHLINE
D41
D04
D71
D75
D10
D34
D10
D31D31
DEMOLITION LEGEND:
EXISTING WALLS TO REMAIN
ITEMS OR WALLS TO BE DEMOLISHED OR
REMOVED AS NOTED
SLAB TO BE DEMOLISHED AT NEW
ELEVATOR LOCATION. REFER TO
STRUCTURAL DRAWINGS FOR DETAILS
TEMPORARY EGRESS AREA
TEMPORARY DEMISING WALL AND OPENING
A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES
WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM
CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.
B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM
DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS
RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO
REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST
TO GOVERNMENT.
C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT
REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,
INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START
OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS
MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER
COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES
CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.
D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.
E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING
OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.
F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS
AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR
MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING
AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.
G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED
ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED
FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING
BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.
H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING
CONSTRUCTION.
I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL
CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL
CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF
CONSTRUCTION.
J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR
WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.
K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE
CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES
TO RECEIVE NEW WORK AND FINISHES.
L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE
EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING
CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND
FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING
OFFICER.
M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND
FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP
SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.
N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE
ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED
OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE
OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING
OFFICER.
GENERAL NOTES DEMOLITION:
O. TEMPORARY EGRESS DURING CONSTRUCTION:
TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A
THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE
PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE
WITH CONTRACTING OFFICER.
P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,
AND INFORMATION
Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE
DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO
RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.
PAINTED AS INDICATED
GENERAL NOTES DEMOLITION (CONT'D):
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S A
V A
N N
A H
D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
G
E O
R G
IA
JO
N
E S
F R
A N
K
LI
N R
D , S
U
IT
E
R A
LE
IG
H , N
C
-3
(9
1-
(9
1-
F
A X
LI
C
E N
S E
F
-0
F O
R T
B E
N N
IN
G
G
A B
U
IL
D
IN
G
T
R A
IN
E
E B
A R
R A
C K
S U
P G
R A
D E
P R
O G
R
U P
P
H A
S E
F
Y P
N
FOR OFFICIAL USE ONLY
AD133
T H
IR
D
F L O
O R
D E
M O
L
IT
IO
N
P L A
N
S E
C T
IO
N
C W
E S
T
Z K
A S
K Y
D V
A N
L O
O N
K B
R O
D B
E R
K B
R O
D B
E R
J U
L Y
W H
N B
- 7 -1
-2
C
A T
E G
O R
Y C
O D
E
F
IL
E N
A M
E A
D .D
W G
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
1/8" = 1'-0"A1
THIRD FLOOR DEMOLITION PLAN - C WEST
KEY PLAN
G
F
E
N.T.S.
PLAN
NORTH
A
B C
DBUILDING 399
0 4' 8' 16' 24'
KEYNOTES DEMOLITION
D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE
NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS
D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.
CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE
SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL
D05 EXISTING STUCCO WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED. CLEAN
AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED - TYPICAL
D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE
STRUCTURAL DRAWINGS - TYPICAL
D09 EXISTING CONCRETE STAIRS TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW PAINT, NOSING, AND ANTI-SLIP
SURFACE. WHEN REPLACING STAIR NOSING, REPLACE ALL TO SAME - TYPICAL
D10 EXISTING HANDRAILS TO REMAIN. REMOVE EXISTING COATINGS DOWN TO
ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT - TYPICAL
D19 EXISTING CONCRETE WALLS TO REMAIN. PREPARE SURFACES TO RECEIVE
NEW FINISHES AS INDICATED - TYPICAL
D31 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR PLUMBING,
FIRE SUPPRESSION, AND HVAC WORK. DO NOT REMOVE CONCRETE SLAB
OVER TUNNELS WHERE APPLICABLE - SEE STRUCTURAL, MECHANICAL,
PLUMBING AND FIRE PROTECTION DRAWINGS
D32 REMOVE EXISTING PARTITIONS IN THEIR ENTIRETY. PREPARE FLOOR AND
ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -
TYPICAL
D34 EXISTING HANDRAIL GATE TO REMAIN. REMOVE EXISTING COATINGS DOWN TO
ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT. FIELD VERIFY
LOCATIONS - TYPICAL
D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE
IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW
CONSTRUCTION AND FINISHES - TYPICAL
D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,
FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT
SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL
D41 REMOVE EXISTING BIRD SCREEN IN ITS ENTIRETY
D51 REMOVE ALL INTERIOR CEILINGS, FLOOR FINISHES INCLUDING GLUES,
FURRING, INSULATION, FIXTURES, MILLWORK, DOORS, FRAMES, AND
HARDWARE. REMOVE ALL GYPSUM BOARD FURRING ON THE INTERIOR SIDE OF
THE EXTERIOR MASONRY WALLS. REMOVE PAINT FROM ALL PAINTED
SURFACES ON INTERIOR FACE OF ALL EXTERIOR WALLS, SURFACES TO
RECIEVE NEW PAINT AND CONFORMING TO ENVIRONMENTAL SURVEY
RECOMMENDATIONS. METHODS USED TO REMOVE PAINT SHALL NOT DAMAGE
THE MASONRY. ENSURE A MINIMUM 70% OF INTERIOR SURFACE OF EXTERIOR
WALLS SHALL BE CLEAR OF PAINT TO INSURE VAPOR TRANSMISSION IS
ALLOWED (DRYING OF WALL SYSTEM). PREPARE ALL SURFACES TO RECIEVE
NEW WINDOWS, CASEWORK, APPLIANCES, FIXTURES, DOORS AND FRAMES AS
REQUIRED - TYPICAL
D71 REMOVE EXISTING SINKS IN THEIR ENTIRETY. SEE PLUMBING DRAWINGS FOR
ADDITIONAL INFORMATION - TYPICAL
D75 REMOVE EXISTING STOVE
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/1
/2
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/2
/2
DNUP
B5 B6 B7 B8 B9 B10B1 B2 B3 B4
CENTER
MATCHLINE
SECTION BSECTION A
D11
D04
D09
D35
D35
D10
D04
D04
D37
D24
D04
D37
D03 D17 D52 D62
D45
D04
D11
D04D03
D35
D52D62
D14 D15 D20
D47
D04
D11
D03
D03
D07D40
D31
B7 B8 B9 B10 B11 B12
D38 D38
D09
D10
D04
D11 D11 D14D14
D04
D25
D20
D14 D15 D20
DEMOLITION LEGEND:
EXISTING WALLS TO REMAIN
ITEMS OR WALLS TO BE DEMOLISHED OR
REMOVED AS NOTED
SLAB TO BE DEMOLISHED AT NEW
ELEVATOR LOCATION. REFER TO
STRUCTURAL DRAWINGS FOR DETAILS
TEMPORARY EGRESS AREA
TEMPORARY DEMISING WALL AND OPENING
A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES
WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM
CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.
B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM
DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS
RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO
REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST
TO GOVERNMENT.
C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT
REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,
INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START
OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS
MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER
COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES
CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.
D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.
E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING
OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.
F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS
AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR
MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING
AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.
G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED
ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED
FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING
BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.
H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING
CONSTRUCTION.
I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL
CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL
CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF
CONSTRUCTION.
J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR
WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.
K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE
CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES
TO RECEIVE NEW WORK AND FINISHES.
L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE
EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING
CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND
FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING
OFFICER.
M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND
FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP
SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.
N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE
ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED
OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE
OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING
OFFICER.
O. TEMPORARY EGRESS DURING CONSTRUCTION:
TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A
THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE
PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE
WITH CONTRACTING OFFICER.
P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,
AND INFORMATION
Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE
DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO
RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.
PAINTED AS INDICATED
GENERAL NOTES DEMOLITION:
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S A
V A
N N
A H
D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
G
E O
R G
IA
JO
N
E S
F R
A N
K
LI
N R
D , S
U
IT
E
R A
LE
IG
H , N
C
-3
(9
1-
(9
1-
F
A X
LI
C
E N
S E
F
-0
F O
R T
B E
N N
IN
G
G
A B
U
IL
D
IN
G
T
R A
IN
E
E B
A R
R A
C K
S U
P G
R A
D E
P R
O G
R
U P
P
H A
S E
F
Y P
N
FOR OFFICIAL USE ONLY
AD141
F O
U R
T H
A
T T
IC
F
L O
O R
R
O O
F D
E M
O L
IT
IO
N
P L A
N
S E
C T
IO
N
B W
E S
T
Z K
A S
K Y
D V
A N
L O
O N
K B
R O
D B
E R
K B
R O
D B
E R
J U
L Y
W H
N B
- 7 -1
-2
C
A T
E G
O R
Y C
O D
E
F
IL
E N
A M
E A
D .D
W G
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
1/8" = 1'-0"A1
FOURTH/ ATTIC FLOOR DEMOLITION PLAN - B WEST
KEY PLAN
G
F
E
N.T.S.
PLAN
NORTH
A
B C
DBUILDING 399
0 4' 8' 16' 24'
1/8" = 1'-0"J1
PARTIAL ROOF DEMOLITION PLAN - B WEST
KEYNOTES DEMOLITION
D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE
NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS
D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.
CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE
SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL
D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE
STRUCTURAL DRAWINGS - TYPICAL
D09 EXISTING CONCRETE STAIRS TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW PAINT, NOSING, AND ANTI-SLIP
SURFACE. WHEN REPLACING STAIR NOSING, REPLACE ALL TO SAME - TYPICAL
D10 EXISTING HANDRAILS TO REMAIN. REMOVE EXISTING COATINGS DOWN TO
ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT - TYPICAL
D11 EXISTING WINDOW AND FRAME TO REMAIN. TYPICAL FOR ALL FOURTH FLOOR
WINDOWS AT STAIR TOWERS, UNO.
D14 EXISTING ROOF SYSTEM TO REMAIN. CONTRACTOR IS TO NOT VOID EXISTING
ROOF WARRANTY. REMOVED AND REPLACED UNDER SEPARATE CONTRACT -
TYPICAL
D15 EXISTING GUTTERS AND DOWNSPOUTS TO REMAIN. REMOVED AND REPLACED
UNDER SEPARATE CONTRACT - TYPICAL
D17 EXISTING TRUSSES TO REMAIN. PREPARE TO RECEIVE NEW CONSTRUCTION
AND PAINT - TYPICAL
D20 EXISTING LIGHTNING PROTECTION SYSTEM TO REMAIN. REMOVED AND
REPLACED UNDER SEPARATE CONTRACT - TYPICAL
D24 EXISTING WOOD COLUMN TO REMAIN. PREPAIR TO RECEIVE PAINT - TYPICAL
D25 EXISTING COPING TO REMAIN - TYPICAL
D31 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR PLUMBING,
FIRE SUPPRESSION, AND HVAC WORK. DO NOT REMOVE CONCRETE SLAB
OVER TUNNELS WHERE APPLICABLE - SEE STRUCTURAL, MECHANICAL,
PLUMBING AND FIRE PROTECTION DRAWINGS
D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE
IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW
CONSTRUCTION AND FINISHES - TYPICAL
D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,
FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT
SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL
D38 REMOVE EXISTING SEALANT AROUND WINDOWS AT BOTH EXTERIOR AND
INTERIOR. PREPARE SURFACES FOR NEW SEALANT
D40 EXISTING MASONRY CHIMNEY. PATCH, REPAIR AS REQUIRED. PREPARE TO
RECEIVE NEW FINISH AS INDICATED - TYPICAL
D45 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR ELEVATOR. DO
NOT REMOVE CONCRETE SLAB OVER TUNNELS WHERE APPLICABLE - SEE
STRUCTURAL, PLUMBING AND FIRE PROTECTION DRAWINGS
D47 REMOVE PORTION OF EXISTING WALL FOR NEW DOOR AS SCHEDULED. ALSO
SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION
D52 REMOVE EXISTING MILLWORK IN ITS ENTIRETY
D62 REMOVE EXISTING MECHANICAL, ELECTRICAL EQUIPMENT, AND ASSOCIATED
HARDWARE, ETC. - SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/1
/2
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/2
/2
UP
C8C1 C2 C3 C4 C5 C6 C7
C11
C17
C16
C15
C14
C13
C12
C9
C10
SECTION C
CENTER
MATCHLINE
CENTER
MATCHLINE
S
EC
TIO
N C
D11
D04
D11
D04
D09
D35
D10
D04
D04
D07
D04D04
D03D03
D04
D37
D24
D04
D37
D03 D17 D52 D62
D04
D24
D37
D04
D03 D17 D52 D62
D14 D15 D20
D20D15D14
D35
D37
D37
D47
D03
D04
D52D62D40
D31D31
DEMOLITION LEGEND:
EXISTING WALLS TO REMAIN
ITEMS OR WALLS TO BE DEMOLISHED OR
REMOVED AS NOTED
SLAB TO BE DEMOLISHED AT NEW
ELEVATOR LOCATION. REFER TO
STRUCTURAL DRAWINGS FOR DETAILS
TEMPORARY EGRESS AREA
TEMPORARY DEMISING WALL AND OPENING
A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES
WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM
CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.
B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM
DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS
RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO
REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST
TO GOVERNMENT.
C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT
REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,
INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START
OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS
MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER
COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES
CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.
D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.
E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING
OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.
F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS
AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR
MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING
AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.
G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED
ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED
FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING
BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.
H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING
CONSTRUCTION.
I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL
CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL
CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF
CONSTRUCTION.
J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR
WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.
K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE
CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES
TO RECEIVE NEW WORK AND FINISHES.
L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE
EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING
CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND
FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING
OFFICER.
M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND
FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP
SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.
N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE
ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED
OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE
OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING
OFFICER.
GENERAL NOTES DEMOLITION:
O. TEMPORARY EGRESS DURING CONSTRUCTION:
TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A
THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE
PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE
WITH CONTRACTING OFFICER.
P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,
AND INFORMATION
Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE
DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO
RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.
PAINTED AS INDICATED
GENERAL NOTES DEMOLITION (CONT'D):
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S A
V A
N N
A H
D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
G
E O
R G
IA
JO
N
E S
F R
A N
K
LI
N R
D , S
U
IT
E
R A
LE
IG
H , N
C
-3
(9
1-
(9
1-
F
A X
LI
C
E N
S E
F
-0
F O
R T
B E
N N
IN
G
G
A B
U
IL
D
IN
G
T
R A
IN
E
E B
A R
R A
C K
S U
P G
R A
D E
P R
O G
R
U P
P
H A
S E
F
Y P
N
FOR OFFICIAL USE ONLY
AD143
F O
U R
T H
A
T T
IC
F
L O
O R
D E
M O
L
IT
IO
N
P L A
N
S E
C T
IO
N
C W
E S
T
Z K
A S
K Y
D V
A N
L O
O N
K B
R O
D B
E R
K B
R O
D B
E R
J U
L Y
W H
N B
- 7 -1
-2
C
A T
E G
O R
Y C
O D
E
F
IL
E N
A M
E A
D .D
W G
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
1/8" = 1'-0"A1
FOURTH/ ATTIC FLOOR DEMOLITION PLAN
- B EAST
0 4' 8' 16' 24'KEY PLAN
G
F
E
N.T.S.
PLAN
NORTH
A
B C
DBUILDING 399
KEYNOTES DEMOLITION
D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE
NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS
D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.
CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE
SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL
D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE
STRUCTURAL DRAWINGS - TYPICAL
D09 EXISTING CONCRETE STAIRS TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW PAINT, NOSING, AND ANTI-SLIP
SURFACE. WHEN REPLACING STAIR NOSING, REPLACE ALL TO SAME - TYPICAL
D10 EXISTING HANDRAILS TO REMAIN. REMOVE EXISTING COATINGS DOWN TO
ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT - TYPICAL
D11 EXISTING WINDOW AND FRAME TO REMAIN. TYPICAL FOR ALL FOURTH FLOOR
WINDOWS AT STAIR TOWERS, UNO.
D14 EXISTING ROOF SYSTEM TO REMAIN. CONTRACTOR IS TO NOT VOID EXISTING
ROOF WARRANTY. REMOVED AND REPLACED UNDER SEPARATE CONTRACT -
TYPICAL
D15 EXISTING GUTTERS AND DOWNSPOUTS TO REMAIN. REMOVED AND REPLACED
UNDER SEPARATE CONTRACT - TYPICAL
D17 EXISTING TRUSSES TO REMAIN. PREPARE TO RECEIVE NEW CONSTRUCTION
AND PAINT - TYPICAL
D20 EXISTING LIGHTNING PROTECTION SYSTEM TO REMAIN. REMOVED AND
REPLACED UNDER SEPARATE CONTRACT - TYPICAL
D24 EXISTING WOOD COLUMN TO REMAIN. PREPAIR TO RECEIVE PAINT - TYPICAL
D31 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR PLUMBING,
FIRE SUPPRESSION, AND HVAC WORK. DO NOT REMOVE CONCRETE SLAB
OVER TUNNELS WHERE APPLICABLE - SEE STRUCTURAL, MECHANICAL,
PLUMBING AND FIRE PROTECTION DRAWINGS
D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE
IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW
CONSTRUCTION AND FINISHES - TYPICAL
D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,
FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT
SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL
D40 EXISTING MASONRY CHIMNEY. PATCH, REPAIR AS REQUIRED. PREPARE TO
RECEIVE NEW FINISH AS INDICATED - TYPICAL
D47 REMOVE PORTION OF EXISTING WALL FOR NEW DOOR AS SCHEDULED. ALSO
SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION
D52 REMOVE EXISTING MILLWORK IN ITS ENTIRETY
D62 REMOVE EXISTING MECHANICAL, ELECTRICAL EQUIPMENT, AND ASSOCIATED
HARDWARE, ETC. - SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/1
/2
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/2
/2
| AD121 SECOND FLOOR DEMOLITION PLAN -SECTION B WEST |
| AD123 SECOND FLOOR DEMOLITION PLAN -SECTION C WEST |
| AD131 THIRD FLOOR DEMOLITION PLAN -SECTION B WEST |
| AD133 THIRD FLOOR DEMOLITION PLAN -SECTION C WEST |
| AD141 FOURTH/ ATTIC FLOOR/ ROOF DEMOLITION PLAN -SECTION B WEST |
| AD143 FOURTH/ ATTIC FLOOR DEMOLITION PLAN -SECTION C WEST |
File details come from the government source that posted it. Updated .