W912HN-21-B-3007_DRAWINGS_VOL1_AMD2.pdf

PDF 2 MB Posted

Attached to
Repair TBUP Building 399 Phase 2
Solicitation number
W912HN21B3007
Issued by

About this file

This solicitation is for repair work to Building 399 Sections B and C at Fort Benning, Georgia. The work includes repairs to exterior walls, windows, fire protection, interior walls, doors, interior finishes, floors, ceilings, plumbing, HVAC, building controls, electrical, communications, building information systems, site utilities, and minor parking improvements. Demolition necessary to allow for the repairs and HAZMAT and asbestos abatement are also included. The acquisition will be awarded through sealed bidding in accordance with FAR Part 14. Bids are due by August 26, 2021. The contracting agency is the Department of the Army Corps of Engineers Engineering District Savannah. The magnitude of the requirement is between $25M and $100M.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP DN

DN

DNUP

B5 B6 B7 B8 B9 B10B1 B2 B3 B4

CENTER

MATCHLINE

SECTION BSECTION A

CENTER

MATCHLINE

SECTION BSECTION B

D45

D37

D04

D37

D04

D09

D10

D07

D07D37D05 D35 D19 D36D03D03

D51D51

D32D32

D32D32

D95

D96

D97

D04 D49

D35

TEMPORARY EGREES: SEE GENERAL

NOTES DEMOLITION "O". ALSO SEE LIFE

SAFETY AND FIRE PROTECTION DRAWINGS

FOR ADDITIONAL INFORMATION

AD405

D6

D10

D94

D96

D31

DEMOLITION LEGEND:

EXISTING WALLS TO REMAIN

ITEMS OR WALLS TO BE DEMOLISHED OR

REMOVED AS NOTED

SLAB TO BE DEMOLISHED AT NEW

ELEVATOR LOCATION. REFER TO

STRUCTURAL DRAWINGS FOR DETAILS

TEMPORARY EGRESS AREA

TEMPORARY DEMISING WALL AND OPENING

A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING

CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES

WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM

CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.

B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM

DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS

RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO

REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST

TO GOVERNMENT.

C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT

REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,

INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START

OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS

MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER

COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES

CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.

D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.

E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING

OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.

F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS

AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR

MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING

AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.

G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED

ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED

FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING

BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.

H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING

CONSTRUCTION.

I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL

CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL

CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF

CONSTRUCTION.

J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR

WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.

K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE

CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES

TO RECEIVE NEW WORK AND FINISHES.

L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE

EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING

CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND

FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING

OFFICER.

M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND

FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP

SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.

N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE

ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED

OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE

OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING

OFFICER.

O. TEMPORARY EGRESS DURING CONSTRUCTION:

TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A

THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE

PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE

WITH CONTRACTING OFFICER.

P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,

AND INFORMATION

Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE

DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO

RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.

PAINTED AS INDICATED

GENERAL NOTES DEMOLITION:

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S A

V A

N N

A H

D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E

A V

E N

U E

S A

V A

N N

A H

G

E O

R G

IA

JO

N

E S

F R

A N

K

LI

N R

D , S

U

IT

E

R A

LE

IG

H , N

C

-3

(9

1-

(9

1-

F

A X

LI

C

E N

S E

F

-0

F O

R T

B E

N N

IN

G

G

A B

U

IL

D

IN

G

T

R A

IN

E

E B

A R

R A

C K

S U

P G

R A

D E

P R

O G

R A

M

(T B

U P

P

H A

S E

F

Y P

N

FOR OFFICIAL USE ONLY

AD121

S E

C O

N D

F L O

O R

D E

M O

L

IT

IO

N

P L A

N

S E

C T

IO

N

B W

E S

T

Z K

A S

K Y

D V

A N

L O

O N

K B

R O

D B

E R

K B

R O

D B

E R

J U

L Y

W H

N B

- 7 -1

-2

C

A T

E G

O R

Y C

O D

E

F

IL

E N

A M

E A

D .D

W G

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

1/8" = 1'-0"A1

SECOND FLOOR DEMOLITION PLAN - B WEST KEY PLAN

G

F

E

N.T.S.

PLAN

NORTH

A

B C

DBUILDING 399

0 4' 8' 16' 24'

KEYNOTES DEMOLITION

D45 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR ELEVATOR. DO

NOT REMOVE CONCRETE SLAB OVER TUNNELS WHERE APPLICABLE - SEE

STRUCTURAL, PLUMBING AND FIRE PROTECTION DRAWINGS

D49 REMOVE EXISTING STONE SILL AT THIS LOCATION AND PREPARE TO RECEIVE

NEW STONE SILL AND WINDOW

D51 REMOVE ALL INTERIOR CEILINGS, FLOOR FINISHES INCLUDING GLUES,

FURRING, INSULATION, FIXTURES, MILLWORK, DOORS, FRAMES, AND

HARDWARE. REMOVE ALL GYPSUM BOARD FURRING ON THE INTERIOR SIDE OF

THE EXTERIOR MASONRY WALLS. REMOVE PAINT FROM ALL PAINTED

SURFACES ON INTERIOR FACE OF ALL EXTERIOR WALLS, SURFACES TO

RECIEVE NEW PAINT AND CONFORMING TO ENVIRONMENTAL SURVEY

RECOMMENDATIONS. METHODS USED TO REMOVE PAINT SHALL NOT DAMAGE

THE MASONRY. ENSURE A MINIMUM 70% OF INTERIOR SURFACE OF EXTERIOR

WALLS SHALL BE CLEAR OF PAINT TO INSURE VAPOR TRANSMISSION IS

ALLOWED (DRYING OF WALL SYSTEM). PREPARE ALL SURFACES TO RECIEVE

NEW WINDOWS, CASEWORK, APPLIANCES, FIXTURES, DOORS AND FRAMES AS

REQUIRED - TYPICAL

D94 REMOVE EXISTING HANDRAIL DURING CONSTRUCTION. PROTECT FROM

DAMAGE AND STORE. REINSTALL WHEN TEMPORARY EGRESS STAIR IS

REMOVED. REMOVE EXISTING COATINGS DOWN TO ORIGINAL STEEL. PREPARE

SURFACES TO RECEIVE PAINT

D95 TEMPORARY DEMISING WALL. SEE LIFE SAFETY AND FIRE PROTECTION

DRAWINGS FOR RATINGS AND ADDITIONAL INFORMATION. CONTRACTOR TO

COORDINATE PHASING WITH GOVERNMENT

D96 TEMPORARY 36" X 80" (WXH) DOOR. RATING TO MATCH RATING OF DEMISING

WALL

D97 TEMPORARY EGRESS STAIR DURING CONSTRUCTION. STAIR TO MEET IBC-2018

REQUIREMENTS AND OTHER APPLICABLE CODES. SEE AD405, LIFE SAFETY AND

FIRE PROTECTION DRAWINGS FOR RATINGS AND ADDITIONAL INFORMATION.

CONTRACTOR TO COORDINATE PHASING WITH GOVERNMENT

KEYNOTES DEMOLITION

D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE

NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS

D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.

CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE

SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL

D05 EXISTING STUCCO WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED. CLEAN

AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED - TYPICAL

D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE

STRUCTURAL DRAWINGS - TYPICAL

D09 EXISTING CONCRETE STAIRS TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW PAINT, NOSING, AND ANTI-SLIP

SURFACE. WHEN REPLACING STAIR NOSING, REPLACE ALL TO SAME - TYPICAL

D10 EXISTING HANDRAILS TO REMAIN. REMOVE EXISTING COATINGS DOWN TO

ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT - TYPICAL

D19 EXISTING CONCRETE WALLS TO REMAIN. PREPARE SURFACES TO RECEIVE

NEW FINISHES AS INDICATED - TYPICAL

D31 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR PLUMBING,

FIRE SUPPRESSION, AND HVAC WORK. DO NOT REMOVE CONCRETE SLAB

OVER TUNNELS WHERE APPLICABLE - SEE STRUCTURAL, MECHANICAL,

PLUMBING AND FIRE PROTECTION DRAWINGS

D32 REMOVE EXISTING PARTITIONS IN THEIR ENTIRETY. PREPARE FLOOR AND

ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -

TYPICAL

D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE

IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW

CONSTRUCTION AND FINISHES - TYPICAL

D36 REMOVE EXISTING DOOR, FRAME AND LINTEL, AND ASSOCIATED HARDWARE IN

THEIR ENTIRETY, INCLUDING BLOCKING AND WOOD FRAMING. PREPARE

ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -

TYPICAL

D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,

FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT

SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/1

/2

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/2

/2

07/22/21

UP DN

C8C1 C2 C3 C4 C5 C6 C7

1 1

3 3

4 4

C11

C17

C16

C15

C14

C13

C12

2 2

C9

C10

SECTION C

CENTER

MATCHLINE

S

EC

TIO

N C

D04

D37

D37

D04

D04

D37

D04

D10

D09

D07

D07D35D37D19 D03D03

D07

D07

D35

D05

D37

D19

D03D03

D51D51

D32D32

D51D51

D32D32

D35

D35

D71

D75

D34

D10

D10

D31D31

DEMOLITION LEGEND:

EXISTING WALLS TO REMAIN

ITEMS OR WALLS TO BE DEMOLISHED OR

REMOVED AS NOTED

SLAB TO BE DEMOLISHED AT NEW

ELEVATOR LOCATION. REFER TO

STRUCTURAL DRAWINGS FOR DETAILS

TEMPORARY EGRESS AREA

TEMPORARY DEMISING WALL AND OPENING

A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING

CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES

WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM

CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.

B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM

DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS

RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO

REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST

TO GOVERNMENT.

C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT

REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,

INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START

OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS

MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER

COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES

CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.

D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.

E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING

OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.

F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS

AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR

MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING

AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.

G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED

ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED

FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING

BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.

H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING

CONSTRUCTION.

I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL

CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL

CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF

CONSTRUCTION.

J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR

WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.

K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE

CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES

TO RECEIVE NEW WORK AND FINISHES.

L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE

EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING

CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND

FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING

OFFICER.

M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND

FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP

SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.

N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE

ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED

OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE

OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING

OFFICER.

GENERAL NOTES DEMOLITION:

O. TEMPORARY EGRESS DURING CONSTRUCTION:

TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A

THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE

PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE

WITH CONTRACTING OFFICER.

P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,

AND INFORMATION

Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE

DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO

RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.

PAINTED AS INDICATED

GENERAL NOTES DEMOLITION (CONT'D):

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S A

V A

N N

A H

D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E

A V

E N

U E

S A

V A

N N

A H

G

E O

R G

IA

JO

N

E S

F R

A N

K

LI

N R

D , S

U

IT

E

R A

LE

IG

H , N

C

-3

(9

1-

(9

1-

F

A X

LI

C

E N

S E

F

-0

F O

R T

B E

N N

IN

G

G

A B

U

IL

D

IN

G

T

R A

IN

E

E B

A R

R A

C K

S U

P G

R A

D E

P R

O G

R

U P

P

H A

S E

F

Y P

N

FOR OFFICIAL USE ONLY

AD123

S E

C O

N D

F L O

O R

D E

M O

L

IT

IO

N

P L A

N

S E

C T

IO

N

C W

E S

T

Z K

A S

K Y

D V

A N

L O

O N

K B

R O

D B

E R

K B

R O

D B

E R

J U

L Y

W H

N B

- 7 -1

-2

C

A T

E G

O R

Y C

O D

E

F

IL

E N

A M

E A

D .D

W G

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

1/8" = 1'-0"A1

SECOND FLOOR DEMOLITION PLAN - C

WEST

KEY PLAN

G

F

E

N.T.S.

PLAN

NORTH

A

B C

DBUILDING 399

0 4' 8' 16' 24'

KEYNOTES DEMOLITION

D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE

NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS

D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.

CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE

SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL

D05 EXISTING STUCCO WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED. CLEAN

AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED - TYPICAL

D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE

STRUCTURAL DRAWINGS - TYPICAL

D09 EXISTING CONCRETE STAIRS TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW PAINT, NOSING, AND ANTI-SLIP

SURFACE. WHEN REPLACING STAIR NOSING, REPLACE ALL TO SAME - TYPICAL

D10 EXISTING HANDRAILS TO REMAIN. REMOVE EXISTING COATINGS DOWN TO

ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT - TYPICAL

D19 EXISTING CONCRETE WALLS TO REMAIN. PREPARE SURFACES TO RECEIVE

NEW FINISHES AS INDICATED - TYPICAL

D31 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR PLUMBING,

FIRE SUPPRESSION, AND HVAC WORK. DO NOT REMOVE CONCRETE SLAB

OVER TUNNELS WHERE APPLICABLE - SEE STRUCTURAL, MECHANICAL,

PLUMBING AND FIRE PROTECTION DRAWINGS

D32 REMOVE EXISTING PARTITIONS IN THEIR ENTIRETY. PREPARE FLOOR AND

ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -

TYPICAL

D34 EXISTING HANDRAIL GATE TO REMAIN. REMOVE EXISTING COATINGS DOWN TO

ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT. FIELD VERIFY

LOCATIONS - TYPICAL

D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE

IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW

CONSTRUCTION AND FINISHES - TYPICAL

D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,

FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT

SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL

D51 REMOVE ALL INTERIOR CEILINGS, FLOOR FINISHES INCLUDING GLUES,

FURRING, INSULATION, FIXTURES, MILLWORK, DOORS, FRAMES, AND

HARDWARE. REMOVE ALL GYPSUM BOARD FURRING ON THE INTERIOR SIDE OF

THE EXTERIOR MASONRY WALLS. REMOVE PAINT FROM ALL PAINTED

SURFACES ON INTERIOR FACE OF ALL EXTERIOR WALLS, SURFACES TO

RECIEVE NEW PAINT AND CONFORMING TO ENVIRONMENTAL SURVEY

RECOMMENDATIONS. METHODS USED TO REMOVE PAINT SHALL NOT DAMAGE

THE MASONRY. ENSURE A MINIMUM 70% OF INTERIOR SURFACE OF EXTERIOR

WALLS SHALL BE CLEAR OF PAINT TO INSURE VAPOR TRANSMISSION IS

ALLOWED (DRYING OF WALL SYSTEM). PREPARE ALL SURFACES TO RECIEVE

NEW WINDOWS, CASEWORK, APPLIANCES, FIXTURES, DOORS AND FRAMES AS

REQUIRED - TYPICAL

D71 REMOVE EXISTING SINKS IN THEIR ENTIRETY. SEE PLUMBING DRAWINGS FOR

ADDITIONAL INFORMATION - TYPICAL

D75 REMOVE EXISTING STOVE

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/1

/2

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/2

/2

UP

B5 B6 B7 B8 B9 B10B1 B2 B3 B4

CENTER

MATCHLINE

SECTION BSECTION B

CENTER

MATCHLINE

SECTION BSECTION A

D37

D04

D09

D10

D35

D04

D37

D04

D37

D07

D07D37D05 D19 D35 D36D03D03

D51D51

D32D32

D32

D95

D96

D97

D04

D49

D35

TEMPORARY EGREES: SEE GENERAL NOTES

DEMOLITION "O". ALSO SEE LIFE SAFETY

AND FIRE PROTECTION DRAWINGS FOR

ADDITIONAL INFORMATION

D45

AD405

D12

D71

D75

D10

D94

D31

DEMOLITION LEGEND:

EXISTING WALLS TO REMAIN

ITEMS OR WALLS TO BE DEMOLISHED OR

REMOVED AS NOTED

SLAB TO BE DEMOLISHED AT NEW

ELEVATOR LOCATION. REFER TO

STRUCTURAL DRAWINGS FOR DETAILS

TEMPORARY EGRESS AREA

TEMPORARY DEMISING WALL AND OPENING

A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING

CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES

WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM

CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.

B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM

DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS

RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO

REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST

TO GOVERNMENT.

C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT

REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,

INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START

OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS

MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER

COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES

CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.

D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.

E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING

OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.

F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS

AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR

MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING

AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.

G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED

ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED

FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING

BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.

H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING

CONSTRUCTION.

I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL

CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL

CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF

CONSTRUCTION.

J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR

WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.

K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE

CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES

TO RECEIVE NEW WORK AND FINISHES.

L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE

EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING

CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND

FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING

OFFICER.

M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND

FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP

SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.

N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE

ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED

OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE

OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING

OFFICER.

O. TEMPORARY EGRESS DURING CONSTRUCTION:

TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A

THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE

PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE

WITH CONTRACTING OFFICER.

P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,

AND INFORMATION

Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE

DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO

RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.

PAINTED AS INDICATED

GENERAL NOTES DEMOLITION:

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S A

V A

N N

A H

D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E

A V

E N

U E

S A

V A

N N

A H

G

E O

R G

IA

JO

N

E S

F R

A N

K

LI

N R

D , S

U

IT

E

R A

LE

IG

H , N

C

-3

(9

1-

(9

1-

F

A X

LI

C

E N

S E

F

-0

F O

R T

B E

N N

IN

G

G

A B

U

IL

D

IN

G

T

R A

IN

E

E B

A R

R A

C K

S U

P G

R A

D E

P R

O G

R

U P

P

H A

S E

F

Y P

N

FOR OFFICIAL USE ONLY

AD131

T H

IR

D

F L O

O R

D E

M O

L

IT

IO

N

P L A

N

S E

C T

IO

N

B W

E S

T

Z K

A S

K Y

D V

A N

L O

O N

K B

R O

D B

E R

K B

R O

D B

E R

J U

L Y

W H

N B

- 7 -1

-2

C

A T

E G

O R

Y C

O D

E

F

IL

E N

A M

E A

D .D

W G

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

1/8" = 1'-0"A1

THIRD FLOOR DEMOLITION PLAN - SECTION B WEST

KEY PLAN

G

F

E

N.T.S.

PLAN

NORTH

A

B C

DBUILDING 399

KEYNOTES DEMOLITION

D49 REMOVE EXISTING STONE SILL AT THIS LOCATION AND PREPARE TO RECEIVE

NEW STONE SILL AND WINDOW

D51 REMOVE ALL INTERIOR CEILINGS, FLOOR FINISHES INCLUDING GLUES,

FURRING, INSULATION, FIXTURES, MILLWORK, DOORS, FRAMES, AND

HARDWARE. REMOVE ALL GYPSUM BOARD FURRING ON THE INTERIOR SIDE OF

THE EXTERIOR MASONRY WALLS. REMOVE PAINT FROM ALL PAINTED

SURFACES ON INTERIOR FACE OF ALL EXTERIOR WALLS, SURFACES TO

RECIEVE NEW PAINT AND CONFORMING TO ENVIRONMENTAL SURVEY

RECOMMENDATIONS. METHODS USED TO REMOVE PAINT SHALL NOT DAMAGE

THE MASONRY. ENSURE A MINIMUM 70% OF INTERIOR SURFACE OF EXTERIOR

WALLS SHALL BE CLEAR OF PAINT TO INSURE VAPOR TRANSMISSION IS

ALLOWED (DRYING OF WALL SYSTEM). PREPARE ALL SURFACES TO RECIEVE

NEW WINDOWS, CASEWORK, APPLIANCES, FIXTURES, DOORS AND FRAMES AS

REQUIRED - TYPICAL

D71 REMOVE EXISTING SINKS IN THEIR ENTIRETY. SEE PLUMBING DRAWINGS FOR

ADDITIONAL INFORMATION - TYPICAL

D75 REMOVE EXISTING STOVE

D94 REMOVE EXISTING HANDRAIL DURING CONSTRUCTION. PROTECT FROM

DAMAGE AND STORE. REINSTALL WHEN TEMPORARY EGRESS STAIR IS

REMOVED. REMOVE EXISTING COATINGS DOWN TO ORIGINAL STEEL. PREPARE

SURFACES TO RECEIVE PAINT

D95 TEMPORARY DEMISING WALL. SEE LIFE SAFETY AND FIRE PROTECTION

DRAWINGS FOR RATINGS AND ADDITIONAL INFORMATION. CONTRACTOR TO

COORDINATE PHASING WITH GOVERNMENT

D96 TEMPORARY 36" X 80" (WXH) DOOR. RATING TO MATCH RATING OF DEMISING

WALL

D97 TEMPORARY EGRESS STAIR DURING CONSTRUCTION. STAIR TO MEET IBC-2018

REQUIREMENTS AND OTHER APPLICABLE CODES. SEE AD405, LIFE SAFETY AND

FIRE PROTECTION DRAWINGS FOR RATINGS AND ADDITIONAL INFORMATION.

CONTRACTOR TO COORDINATE PHASING WITH GOVERNMENT

KEYNOTES DEMOLITION

D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE

NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS

D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.

CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE

SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL

D05 EXISTING STUCCO WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED. CLEAN

AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED - TYPICAL

D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE

STRUCTURAL DRAWINGS - TYPICAL

D09 EXISTING CONCRETE STAIRS TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW PAINT, NOSING, AND ANTI-SLIP

SURFACE. WHEN REPLACING STAIR NOSING, REPLACE ALL TO SAME - TYPICAL

D10 EXISTING HANDRAILS TO REMAIN. REMOVE EXISTING COATINGS DOWN TO

ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT - TYPICAL

D19 EXISTING CONCRETE WALLS TO REMAIN. PREPARE SURFACES TO RECEIVE

NEW FINISHES AS INDICATED - TYPICAL

D31 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR PLUMBING,

FIRE SUPPRESSION, AND HVAC WORK. DO NOT REMOVE CONCRETE SLAB

OVER TUNNELS WHERE APPLICABLE - SEE STRUCTURAL, MECHANICAL,

PLUMBING AND FIRE PROTECTION DRAWINGS

D32 REMOVE EXISTING PARTITIONS IN THEIR ENTIRETY. PREPARE FLOOR AND

ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -

TYPICAL

D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE

IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW

CONSTRUCTION AND FINISHES - TYPICAL

D36 REMOVE EXISTING DOOR, FRAME AND LINTEL, AND ASSOCIATED HARDWARE IN

THEIR ENTIRETY, INCLUDING BLOCKING AND WOOD FRAMING. PREPARE

ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -

TYPICAL

D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,

FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT

SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL

D45 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR ELEVATOR. DO

NOT REMOVE CONCRETE SLAB OVER TUNNELS WHERE APPLICABLE - SEE

STRUCTURAL, PLUMBING AND FIRE PROTECTION DRAWINGS

0 4' 8' 16' 24'

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/1

/2

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/2

/2

C8C1 C2 C3 C4 C5 C6 C7

C11

C17

C16

C15

C14

C13

C12

C9

C10

CENTER

MATCHLINE

S E C

TIO

N C

S

EC

TIO

N C

D37

D04

D37

D04

D09

D10

D04D04

D37

D04

D37

D04

D07

D07

D07D37D05D35D19

D37

D05

D35

D07

D05

D37

D19

D03D03

D03D03

D51D51

D51D51

D32D32

D32D32

D35

D35

SECTION C

CENTER

MATCHLINE

D41

D04

D71

D75

D10

D34

D10

D31D31

DEMOLITION LEGEND:

EXISTING WALLS TO REMAIN

ITEMS OR WALLS TO BE DEMOLISHED OR

REMOVED AS NOTED

SLAB TO BE DEMOLISHED AT NEW

ELEVATOR LOCATION. REFER TO

STRUCTURAL DRAWINGS FOR DETAILS

TEMPORARY EGRESS AREA

TEMPORARY DEMISING WALL AND OPENING

A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING

CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES

WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM

CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.

B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM

DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS

RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO

REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST

TO GOVERNMENT.

C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT

REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,

INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START

OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS

MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER

COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES

CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.

D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.

E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING

OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.

F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS

AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR

MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING

AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.

G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED

ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED

FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING

BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.

H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING

CONSTRUCTION.

I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL

CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL

CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF

CONSTRUCTION.

J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR

WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.

K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE

CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES

TO RECEIVE NEW WORK AND FINISHES.

L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE

EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING

CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND

FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING

OFFICER.

M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND

FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP

SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.

N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE

ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED

OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE

OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING

OFFICER.

GENERAL NOTES DEMOLITION:

O. TEMPORARY EGRESS DURING CONSTRUCTION:

TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A

THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE

PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE

WITH CONTRACTING OFFICER.

P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,

AND INFORMATION

Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE

DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO

RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.

PAINTED AS INDICATED

GENERAL NOTES DEMOLITION (CONT'D):

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S A

V A

N N

A H

D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E

A V

E N

U E

S A

V A

N N

A H

G

E O

R G

IA

JO

N

E S

F R

A N

K

LI

N R

D , S

U

IT

E

R A

LE

IG

H , N

C

-3

(9

1-

(9

1-

F

A X

LI

C

E N

S E

F

-0

F O

R T

B E

N N

IN

G

G

A B

U

IL

D

IN

G

T

R A

IN

E

E B

A R

R A

C K

S U

P G

R A

D E

P R

O G

R

U P

P

H A

S E

F

Y P

N

FOR OFFICIAL USE ONLY

AD133

T H

IR

D

F L O

O R

D E

M O

L

IT

IO

N

P L A

N

S E

C T

IO

N

C W

E S

T

Z K

A S

K Y

D V

A N

L O

O N

K B

R O

D B

E R

K B

R O

D B

E R

J U

L Y

W H

N B

- 7 -1

-2

C

A T

E G

O R

Y C

O D

E

F

IL

E N

A M

E A

D .D

W G

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

1/8" = 1'-0"A1

THIRD FLOOR DEMOLITION PLAN - C WEST

KEY PLAN

G

F

E

N.T.S.

PLAN

NORTH

A

B C

DBUILDING 399

0 4' 8' 16' 24'

KEYNOTES DEMOLITION

D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE

NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS

D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.

CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE

SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL

D05 EXISTING STUCCO WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED. CLEAN

AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED - TYPICAL

D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE

STRUCTURAL DRAWINGS - TYPICAL

D09 EXISTING CONCRETE STAIRS TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW PAINT, NOSING, AND ANTI-SLIP

SURFACE. WHEN REPLACING STAIR NOSING, REPLACE ALL TO SAME - TYPICAL

D10 EXISTING HANDRAILS TO REMAIN. REMOVE EXISTING COATINGS DOWN TO

ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT - TYPICAL

D19 EXISTING CONCRETE WALLS TO REMAIN. PREPARE SURFACES TO RECEIVE

NEW FINISHES AS INDICATED - TYPICAL

D31 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR PLUMBING,

FIRE SUPPRESSION, AND HVAC WORK. DO NOT REMOVE CONCRETE SLAB

OVER TUNNELS WHERE APPLICABLE - SEE STRUCTURAL, MECHANICAL,

PLUMBING AND FIRE PROTECTION DRAWINGS

D32 REMOVE EXISTING PARTITIONS IN THEIR ENTIRETY. PREPARE FLOOR AND

ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -

TYPICAL

D34 EXISTING HANDRAIL GATE TO REMAIN. REMOVE EXISTING COATINGS DOWN TO

ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT. FIELD VERIFY

LOCATIONS - TYPICAL

D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE

IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW

CONSTRUCTION AND FINISHES - TYPICAL

D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,

FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT

SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL

D41 REMOVE EXISTING BIRD SCREEN IN ITS ENTIRETY

D51 REMOVE ALL INTERIOR CEILINGS, FLOOR FINISHES INCLUDING GLUES,

FURRING, INSULATION, FIXTURES, MILLWORK, DOORS, FRAMES, AND

HARDWARE. REMOVE ALL GYPSUM BOARD FURRING ON THE INTERIOR SIDE OF

THE EXTERIOR MASONRY WALLS. REMOVE PAINT FROM ALL PAINTED

SURFACES ON INTERIOR FACE OF ALL EXTERIOR WALLS, SURFACES TO

RECIEVE NEW PAINT AND CONFORMING TO ENVIRONMENTAL SURVEY

RECOMMENDATIONS. METHODS USED TO REMOVE PAINT SHALL NOT DAMAGE

THE MASONRY. ENSURE A MINIMUM 70% OF INTERIOR SURFACE OF EXTERIOR

WALLS SHALL BE CLEAR OF PAINT TO INSURE VAPOR TRANSMISSION IS

ALLOWED (DRYING OF WALL SYSTEM). PREPARE ALL SURFACES TO RECIEVE

NEW WINDOWS, CASEWORK, APPLIANCES, FIXTURES, DOORS AND FRAMES AS

REQUIRED - TYPICAL

D71 REMOVE EXISTING SINKS IN THEIR ENTIRETY. SEE PLUMBING DRAWINGS FOR

ADDITIONAL INFORMATION - TYPICAL

D75 REMOVE EXISTING STOVE

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/1

/2

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/2

/2

DNUP

B5 B6 B7 B8 B9 B10B1 B2 B3 B4

CENTER

MATCHLINE

SECTION BSECTION A

D11

D04

D09

D35

D35

D10

D04

D04

D37

D24

D04

D37

D03 D17 D52 D62

D45

D04

D11

D04D03

D35

D52D62

D14 D15 D20

D47

D04

D11

D03

D03

D07D40

D31

B7 B8 B9 B10 B11 B12

D38 D38

D09

D10

D04

D11 D11 D14D14

D04

D25

D20

D14 D15 D20

DEMOLITION LEGEND:

EXISTING WALLS TO REMAIN

ITEMS OR WALLS TO BE DEMOLISHED OR

REMOVED AS NOTED

SLAB TO BE DEMOLISHED AT NEW

ELEVATOR LOCATION. REFER TO

STRUCTURAL DRAWINGS FOR DETAILS

TEMPORARY EGRESS AREA

TEMPORARY DEMISING WALL AND OPENING

A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING

CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES

WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM

CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.

B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM

DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS

RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO

REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST

TO GOVERNMENT.

C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT

REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,

INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START

OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS

MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER

COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES

CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.

D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.

E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING

OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.

F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS

AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR

MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING

AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.

G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED

ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED

FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING

BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.

H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING

CONSTRUCTION.

I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL

CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL

CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF

CONSTRUCTION.

J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR

WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.

K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE

CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES

TO RECEIVE NEW WORK AND FINISHES.

L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE

EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING

CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND

FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING

OFFICER.

M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND

FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP

SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.

N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE

ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED

OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE

OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING

OFFICER.

O. TEMPORARY EGRESS DURING CONSTRUCTION:

TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A

THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE

PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE

WITH CONTRACTING OFFICER.

P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,

AND INFORMATION

Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE

DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO

RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.

PAINTED AS INDICATED

GENERAL NOTES DEMOLITION:

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S A

V A

N N

A H

D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E

A V

E N

U E

S A

V A

N N

A H

G

E O

R G

IA

JO

N

E S

F R

A N

K

LI

N R

D , S

U

IT

E

R A

LE

IG

H , N

C

-3

(9

1-

(9

1-

F

A X

LI

C

E N

S E

F

-0

F O

R T

B E

N N

IN

G

G

A B

U

IL

D

IN

G

T

R A

IN

E

E B

A R

R A

C K

S U

P G

R A

D E

P R

O G

R

U P

P

H A

S E

F

Y P

N

FOR OFFICIAL USE ONLY

AD141

F O

U R

T H

A

T T

IC

F

L O

O R

R

O O

F D

E M

O L

IT

IO

N

P L A

N

S E

C T

IO

N

B W

E S

T

Z K

A S

K Y

D V

A N

L O

O N

K B

R O

D B

E R

K B

R O

D B

E R

J U

L Y

W H

N B

- 7 -1

-2

C

A T

E G

O R

Y C

O D

E

F

IL

E N

A M

E A

D .D

W G

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

1/8" = 1'-0"A1

FOURTH/ ATTIC FLOOR DEMOLITION PLAN - B WEST

KEY PLAN

G

F

E

N.T.S.

PLAN

NORTH

A

B C

DBUILDING 399

0 4' 8' 16' 24'

1/8" = 1'-0"J1

PARTIAL ROOF DEMOLITION PLAN - B WEST

KEYNOTES DEMOLITION

D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE

NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS

D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.

CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE

SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL

D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE

STRUCTURAL DRAWINGS - TYPICAL

D09 EXISTING CONCRETE STAIRS TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW PAINT, NOSING, AND ANTI-SLIP

SURFACE. WHEN REPLACING STAIR NOSING, REPLACE ALL TO SAME - TYPICAL

D10 EXISTING HANDRAILS TO REMAIN. REMOVE EXISTING COATINGS DOWN TO

ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT - TYPICAL

D11 EXISTING WINDOW AND FRAME TO REMAIN. TYPICAL FOR ALL FOURTH FLOOR

WINDOWS AT STAIR TOWERS, UNO.

D14 EXISTING ROOF SYSTEM TO REMAIN. CONTRACTOR IS TO NOT VOID EXISTING

ROOF WARRANTY. REMOVED AND REPLACED UNDER SEPARATE CONTRACT -

TYPICAL

D15 EXISTING GUTTERS AND DOWNSPOUTS TO REMAIN. REMOVED AND REPLACED

UNDER SEPARATE CONTRACT - TYPICAL

D17 EXISTING TRUSSES TO REMAIN. PREPARE TO RECEIVE NEW CONSTRUCTION

AND PAINT - TYPICAL

D20 EXISTING LIGHTNING PROTECTION SYSTEM TO REMAIN. REMOVED AND

REPLACED UNDER SEPARATE CONTRACT - TYPICAL

D24 EXISTING WOOD COLUMN TO REMAIN. PREPAIR TO RECEIVE PAINT - TYPICAL

D25 EXISTING COPING TO REMAIN - TYPICAL

D31 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR PLUMBING,

FIRE SUPPRESSION, AND HVAC WORK. DO NOT REMOVE CONCRETE SLAB

OVER TUNNELS WHERE APPLICABLE - SEE STRUCTURAL, MECHANICAL,

PLUMBING AND FIRE PROTECTION DRAWINGS

D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE

IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW

CONSTRUCTION AND FINISHES - TYPICAL

D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,

FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT

SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL

D38 REMOVE EXISTING SEALANT AROUND WINDOWS AT BOTH EXTERIOR AND

INTERIOR. PREPARE SURFACES FOR NEW SEALANT

D40 EXISTING MASONRY CHIMNEY. PATCH, REPAIR AS REQUIRED. PREPARE TO

RECEIVE NEW FINISH AS INDICATED - TYPICAL

D45 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR ELEVATOR. DO

NOT REMOVE CONCRETE SLAB OVER TUNNELS WHERE APPLICABLE - SEE

STRUCTURAL, PLUMBING AND FIRE PROTECTION DRAWINGS

D47 REMOVE PORTION OF EXISTING WALL FOR NEW DOOR AS SCHEDULED. ALSO

SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION

D52 REMOVE EXISTING MILLWORK IN ITS ENTIRETY

D62 REMOVE EXISTING MECHANICAL, ELECTRICAL EQUIPMENT, AND ASSOCIATED

HARDWARE, ETC. - SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR

ADDITIONAL INFORMATION

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/1

/2

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/2

/2

UP

C8C1 C2 C3 C4 C5 C6 C7

C11

C17

C16

C15

C14

C13

C12

C9

C10

SECTION C

CENTER

MATCHLINE

CENTER

MATCHLINE

S

EC

TIO

N C

D11

D04

D11

D04

D09

D35

D10

D04

D04

D07

D04D04

D03D03

D04

D37

D24

D04

D37

D03 D17 D52 D62

D04

D24

D37

D04

D03 D17 D52 D62

D14 D15 D20

D20D15D14

D35

D37

D37

D47

D03

D04

D52D62D40

D31D31

DEMOLITION LEGEND:

EXISTING WALLS TO REMAIN

ITEMS OR WALLS TO BE DEMOLISHED OR

REMOVED AS NOTED

SLAB TO BE DEMOLISHED AT NEW

ELEVATOR LOCATION. REFER TO

STRUCTURAL DRAWINGS FOR DETAILS

TEMPORARY EGRESS AREA

TEMPORARY DEMISING WALL AND OPENING

A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING

CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES

WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM

CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.

B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM

DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS

RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO

REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST

TO GOVERNMENT.

C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT

REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,

INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START

OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS

MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER

COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES

CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.

D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.

E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING

OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.

F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS

AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR

MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING

AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.

G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED

ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED

FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING

BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.

H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING

CONSTRUCTION.

I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL

CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL

CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF

CONSTRUCTION.

J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR

WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.

K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE

CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES

TO RECEIVE NEW WORK AND FINISHES.

L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE

EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING

CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND

FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING

OFFICER.

M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND

FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP

SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.

N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE

ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED

OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE

OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING

OFFICER.

GENERAL NOTES DEMOLITION:

O. TEMPORARY EGRESS DURING CONSTRUCTION:

TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A

THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE

PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE

WITH CONTRACTING OFFICER.

P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,

AND INFORMATION

Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE

DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO

RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.

PAINTED AS INDICATED

GENERAL NOTES DEMOLITION (CONT'D):

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S A

V A

N N

A H

D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E

A V

E N

U E

S A

V A

N N

A H

G

E O

R G

IA

JO

N

E S

F R

A N

K

LI

N R

D , S

U

IT

E

R A

LE

IG

H , N

C

-3

(9

1-

(9

1-

F

A X

LI

C

E N

S E

F

-0

F O

R T

B E

N N

IN

G

G

A B

U

IL

D

IN

G

T

R A

IN

E

E B

A R

R A

C K

S U

P G

R A

D E

P R

O G

R

U P

P

H A

S E

F

Y P

N

FOR OFFICIAL USE ONLY

AD143

F O

U R

T H

A

T T

IC

F

L O

O R

D E

M O

L

IT

IO

N

P L A

N

S E

C T

IO

N

C W

E S

T

Z K

A S

K Y

D V

A N

L O

O N

K B

R O

D B

E R

K B

R O

D B

E R

J U

L Y

W H

N B

- 7 -1

-2

C

A T

E G

O R

Y C

O D

E

F

IL

E N

A M

E A

D .D

W G

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

1/8" = 1'-0"A1

FOURTH/ ATTIC FLOOR DEMOLITION PLAN

- B EAST

0 4' 8' 16' 24'KEY PLAN

G

F

E

N.T.S.

PLAN

NORTH

A

B C

DBUILDING 399

KEYNOTES DEMOLITION

D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE

NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS

D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.

CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE

SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL

D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE

STRUCTURAL DRAWINGS - TYPICAL

D09 EXISTING CONCRETE STAIRS TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW PAINT, NOSING, AND ANTI-SLIP

SURFACE. WHEN REPLACING STAIR NOSING, REPLACE ALL TO SAME - TYPICAL

D10 EXISTING HANDRAILS TO REMAIN. REMOVE EXISTING COATINGS DOWN TO

ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT - TYPICAL

D11 EXISTING WINDOW AND FRAME TO REMAIN. TYPICAL FOR ALL FOURTH FLOOR

WINDOWS AT STAIR TOWERS, UNO.

D14 EXISTING ROOF SYSTEM TO REMAIN. CONTRACTOR IS TO NOT VOID EXISTING

ROOF WARRANTY. REMOVED AND REPLACED UNDER SEPARATE CONTRACT -

TYPICAL

D15 EXISTING GUTTERS AND DOWNSPOUTS TO REMAIN. REMOVED AND REPLACED

UNDER SEPARATE CONTRACT - TYPICAL

D17 EXISTING TRUSSES TO REMAIN. PREPARE TO RECEIVE NEW CONSTRUCTION

AND PAINT - TYPICAL

D20 EXISTING LIGHTNING PROTECTION SYSTEM TO REMAIN. REMOVED AND

REPLACED UNDER SEPARATE CONTRACT - TYPICAL

D24 EXISTING WOOD COLUMN TO REMAIN. PREPAIR TO RECEIVE PAINT - TYPICAL

D31 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR PLUMBING,

FIRE SUPPRESSION, AND HVAC WORK. DO NOT REMOVE CONCRETE SLAB

OVER TUNNELS WHERE APPLICABLE - SEE STRUCTURAL, MECHANICAL,

PLUMBING AND FIRE PROTECTION DRAWINGS

D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE

IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW

CONSTRUCTION AND FINISHES - TYPICAL

D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,

FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT

SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL

D40 EXISTING MASONRY CHIMNEY. PATCH, REPAIR AS REQUIRED. PREPARE TO

RECEIVE NEW FINISH AS INDICATED - TYPICAL

D47 REMOVE PORTION OF EXISTING WALL FOR NEW DOOR AS SCHEDULED. ALSO

SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION

D52 REMOVE EXISTING MILLWORK IN ITS ENTIRETY

D62 REMOVE EXISTING MECHANICAL, ELECTRICAL EQUIPMENT, AND ASSOCIATED

HARDWARE, ETC. - SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR

ADDITIONAL INFORMATION

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/1

/2

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/2

/2

AD121 SECOND FLOOR DEMOLITION PLAN -SECTION B WEST
AD123 SECOND FLOOR DEMOLITION PLAN -SECTION C WEST
AD131 THIRD FLOOR DEMOLITION PLAN -SECTION B WEST
AD133 THIRD FLOOR DEMOLITION PLAN -SECTION C WEST
AD141 FOURTH/ ATTIC FLOOR/ ROOF DEMOLITION PLAN -SECTION B WEST
AD143 FOURTH/ ATTIC FLOOR DEMOLITION PLAN -SECTION C WEST

File details come from the government source that posted it. Updated .