W912HN-21-B-3007_DRAWINGS_VOL1_AMD1.pdf
PDF 4 MB Posted
- Attached to
- Repair TBUP Building 399 Phase 2
- Solicitation number
- W912HN21B3007
About this file
This is a solicitation for a competitive full and open acquisition to repair Building 399 Sections B & C at Fort Benning, GA. The project includes repairs to exterior walls, windows, fire protection, interior walls, doors, interior finishes, floors, ceilings, plumbing, HVAC, building controls, electrical, communications, building information systems, site utilities, and minor parking improvements. Demolition necessary to allow for the repairs and HAZMAT and asbestos abatement are also within scope. The acquisition will be awarded in accordance with FAR Part 14 and bids are due by the response date specified in SAM.GOV. A price evaluation preference will be applied to bids from HUBZone small businesses. The US Army Corps of Engineers Engineering District Savannah is the contracting agency.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B5 B6 B7 B8 B9 B10B1 B2 B3 B4
CENTER
MATCHLINE
SECTION BSECTION A
D01
D01
D02
CENTER
MATCHLINE
SECTION BSECTION B
D07
D82
DEMOLITION LEGEND:
EXISTING WALLS TO REMAIN
ITEMS OR WALLS TO BE DEMOLISHED OR
REMOVED AS NOTED
SLAB TO BE DEMOLISHED AT NEW
ELEVATOR LOCATION. REFER TO
STRUCTURAL DRAWINGS FOR DETAILS
TEMPORARY EGRESS AREA
TEMPORARY DEMISING WALL AND OPENING
A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES
WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM
CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.
B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM
DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS
RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO
REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST
TO GOVERNMENT.
C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT
REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,
INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START
OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS
MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER
COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES
CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.
D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.
E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING
OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.
F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS
AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR
MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING
AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.
G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED
ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED
FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING
BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.
H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING
CONSTRUCTION.
I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL
CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL
CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF
CONSTRUCTION.
J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR
WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.
K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE
CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES
TO RECEIVE NEW WORK AND FINISHES.
L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE
EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING
CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND
FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING
OFFICER.
M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND
FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP
SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.
N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE
ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED
OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE
OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING
OFFICER.
O. TEMPORARY EGRESS DURING CONSTRUCTION:
TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A
THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE
PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE
WITH CONTRACTING OFFICER.
P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,
AND INFORMATION
Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE
DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO
RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.
PAINTED AS INDICATED
GENERAL NOTES DEMOLITION:
A. SEE MECHANICAL, ELECTRICAL, PLUMBING AND STRUCTURAL DRAWINGS
FOR ADDITIONAL INFORMATION AND SCOPE OF WORK AT FOUNDATIONS/
TUNNEL FLOOR.
SHEET NOTES FOUNDATION/ TUNNEL FLOOR:
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S A
V A
N N
A H
D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
G
E O
R G
IA
JO
N
E S
F R
A N
K
LI
N R
D , S
U
IT
E
R A
LE
IG
H , N
C
-3
(9
1-
(9
1-
F
A X
LI
C
E N
S E
F
-0
F O
R T
B E
N N
IN
G
G
A B
U
IL
D
IN
G
T
R A
IN
E
E B
A R
R A
C K
S U
P G
R A
D E
P R
O G
R A
M
(T B
U P
P
H A
S E
F
Y P
N
FOR OFFICIAL USE ONLY
AD101
F O
U N
D A
T
IO
N
T U
N N
E L F
L O
O R
D E
M O
L
IT
IO
N
P L A
N
S E
C T
IO
N
B W
E S
T
Z K
A S
K Y
D V
A N
L O
O N
K B
R O
D B
E R
K B
R O
D B
E R
J U
L Y
W H
N B
- 7 -1
-2
C
A T
E G
O R
Y C
O D
E
F
IL
E N
A M
E A
D .D
W G
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
1/8" = 1'-0"A1
FOUNDATION/ TUNNEL FLOOR DEMOLITION PLAN - B WEST
KEY PLAN
G
F
E
N.T.S.
PLAN
NORTH
A
B C
DBUILDING 399
KEYNOTES DEMOLITION
D01 EXISTING TUNNEL TO REMAIN. PATCH, REPAIR, WALLS, FLOOR AND CEILING AS
REQUIRED, TO MATCH EXISTING. SEE MECHANICAL, PLUMBING, ELECTRICAL
AND FIRE PROTECTION DRAWINGS FOR SCOPE OF WORK - TYPICAL
D02 EXISTING FOOTING TO REMAIN - TYPICAL - SEE STRUCTURAL DRAWINGS
D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE
STRUCTURAL DRAWINGS - TYPICAL
D82 PREPARE AREA FOR NEW ELEVATOR PIT. SEE STRUCTURAL AND PLUMBING
DRAWINGS
0 4' 8' 16' 24'
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/1
/2
07/22/21
UP
B5 B6 B7 B8 B9 B10B1 B2 B3 B4
CENTER
MATCHLINE
SECTION BSECTION A
D04
D09
D37
D32D32
D32D32
CENTER
MATCHLINE
SECTION BSECTION B
D51D51D32D32
D05 D04
D36
D37 D35 D19
D03D03
D04
D37
D45
D07
D07
D36
D95
D97
D96
D96
D35
D35
D49
D31
D35
D22
TEMPORARY EGREES: SEE GENERAL
NOTES DEMOLITION "O". ALSO SEE LIFE
SAFETY AND FIRE PROTECTION DRAWINGS
FOR ADDITIONAL INFORMATION
D10
D98
D99
AD405
D1
D75
D71
D48
A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES
WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM
CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.
B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM
DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS
RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO
REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST
TO GOVERNMENT.
C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT
REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,
INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START
OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS
MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER
COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES
CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.
D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.
E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING
OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.
F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS
AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR
MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING
AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.
G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED
ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED
FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING
BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.
H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING
CONSTRUCTION.
I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL
CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL
CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF
CONSTRUCTION.
J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR
WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.
K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE
CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES
TO RECEIVE NEW WORK AND FINISHES.
L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE
EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING
CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND
FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING
OFFICER.
M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND
FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP
SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.
N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE
ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED
OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE
OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING
OFFICER.
O. TEMPORARY EGRESS DURING CONSTRUCTION:
TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A
THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE
PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE
WITH CONTRACTING OFFICER.
P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,
AND INFORMATION
Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE
DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO
RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.
PAINTED AS INDICATED
GENERAL NOTES DEMOLITION:
DEMOLITION LEGEND:
EXISTING WALLS TO REMAIN
ITEMS OR WALLS TO BE DEMOLISHED OR
REMOVED AS NOTED
SLAB TO BE DEMOLISHED AT NEW
ELEVATOR LOCATION. REFER TO
STRUCTURAL DRAWINGS FOR DETAILS
TEMPORARY EGRESS AREA
TEMPORARY DEMISING WALL AND OPENING
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S A
V A
N N
A H
D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
G
E O
R G
IA
JO
N
E S
F R
A N
K
LI
N R
D , S
U
IT
E
R A
LE
IG
H , N
C
-3
(9
1-
(9
1-
F
A X
LI
C
E N
S E
F
-0
F O
R T
B E
N N
IN
G
G
A B
U
IL
D
IN
G
T
R A
IN
E
E B
A R
R A
C K
S U
P G
R A
D E
P R
O G
R
U P
P
H A
S E
F
Y P
N
FOR OFFICIAL USE ONLY
AD111
F
IR
S T
F L O
O R
D E
M O
L
IT
IO
N
P L A
N
S E
C T
IO
N
B W
E S
T
Z K
A S
K Y
D V
A N
L O
O N
K B
R O
D B
E R
K B
R O
D B
E R
J U
L Y
W H
N B
- 7 -1
-2
C
A T
E G
O R
Y C
O D
E
F
IL
E N
A M
E A
D .D
W G
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
KEY PLAN
G
F
E
N.T.S.
PLAN
NORTH
A
B C
DBUILDING 399
1/8" = 1'-0"A1
FIRST FLOOR DEMOLITION PLAN - B WEST
0 4' 8' 16' 24'
KEYNOTES DEMOLITION
D45 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR ELEVATOR. DO
NOT REMOVE CONCRETE SLAB OVER TUNNELS WHERE APPLICABLE - SEE
STRUCTURAL, PLUMBING AND FIRE PROTECTION DRAWINGS
D48 REMOVE EXISITNG BURGLAR BARS AND PATCH REPAIR SURFACES TO MATCH
ADJACENT SURFACES AND FINISHES - TYPICAL
D49 REMOVE EXISTING STONE SILL AT THIS LOCATION AND PREPARE TO RECEIVE
NEW STONE SILL AND WINDOW
D51 REMOVE ALL INTERIOR CEILINGS, FLOOR FINISHES INCLUDING GLUES,
FURRING, INSULATION, FIXTURES, MILLWORK, DOORS, FRAMES, AND
HARDWARE. REMOVE ALL GYPSUM BOARD FURRING ON THE INTERIOR SIDE OF
THE EXTERIOR MASONRY WALLS. REMOVE PAINT FROM ALL PAINTED
SURFACES ON INTERIOR FACE OF ALL EXTERIOR WALLS, SURFACES TO
RECIEVE NEW PAINT AND CONFORMING TO ENVIRONMENTAL SURVEY
RECOMMENDATIONS. METHODS USED TO REMOVE PAINT SHALL NOT DAMAGE
THE MASONRY. ENSURE A MINIMUM 70% OF INTERIOR SURFACE OF EXTERIOR
WALLS SHALL BE CLEAR OF PAINT TO INSURE VAPOR TRANSMISSION IS
ALLOWED (DRYING OF WALL SYSTEM). PREPARE ALL SURFACES TO RECIEVE
NEW WINDOWS, CASEWORK, APPLIANCES, FIXTURES, DOORS AND FRAMES AS
REQUIRED - TYPICAL
D71 REMOVE EXISTING SINKS IN THEIR ENTIRETY. SEE PLUMBING DRAWINGS FOR
ADDITIONAL INFORMATION - TYPICAL
D75 REMOVE EXISTING STOVE
D95 TEMPORARY DEMISING WALL. SEE LIFE SAFETY AND FIRE PROTECTION
DRAWINGS FOR RATINGS AND ADDITIONAL INFORMATION. CONTRACTOR TO
COORDINATE PHASING WITH GOVERNMENT
D96 TEMPORARY 36" X 80" (WXH) DOOR. RATING TO MATCH RATING OF DEMISING
WALL
D97 TEMPORARY EGRESS STAIR DURING CONSTRUCTION. STAIR TO MEET IBC-2018
REQUIREMENTS AND OTHER APPLICABLE CODES. SEE AD405, LIFE SAFETY AND
FIRE PROTECTION DRAWINGS FOR RATINGS AND ADDITIONAL INFORMATION.
CONTRACTOR TO COORDINATE PHASING WITH GOVERNMENT
D98 TEMPORARY CONSTRUCTION FENCE
D99 TEMPORARY HARD SURFACE FOR CLEAR EGRESS PATH. AREA TO BE CLEAR OF
ANY OBSTRUCTIONS
KEYNOTES DEMOLITION
D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE
NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS
D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.
CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE
SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL
D05 EXISTING STUCCO WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED. CLEAN
AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED - TYPICAL
D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE
STRUCTURAL DRAWINGS - TYPICAL
D09 EXISTING CONCRETE STAIRS TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW PAINT, NOSING, AND ANTI-SLIP
SURFACE. WHEN REPLACING STAIR NOSING, REPLACE ALL TO SAME - TYPICAL
D10 EXISTING HANDRAILS TO REMAIN. REMOVE EXISTING COATINGS DOWN TO
ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT - TYPICAL
D19 EXISTING CONCRETE WALLS TO REMAIN. PREPARE SURFACES TO RECEIVE
NEW FINISHES AS INDICATED - TYPICAL
D22 EXISTING LADDER TO REMAIN. PREPARE TO RECEIVE NEW FINISH
D31 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR PLUMBING,
FIRE SUPPRESSION, AND HVAC WORK. DO NOT REMOVE CONCRETE SLAB
OVER TUNNELS WHERE APPLICABLE - SEE STRUCTURAL, MECHANICAL,
PLUMBING AND FIRE PROTECTION DRAWINGS
D32 REMOVE EXISTING PARTITIONS IN THEIR ENTIRETY. PREPARE FLOOR AND
ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -
TYPICAL
D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE
IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW
CONSTRUCTION AND FINISHES - TYPICAL
D36 REMOVE EXISTING DOOR, FRAME AND LINTEL, AND ASSOCIATED HARDWARE IN
THEIR ENTIRETY, INCLUDING BLOCKING AND WOOD FRAMING. PREPARE
ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -
TYPICAL
D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,
FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT
SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/1
/2
DN
B15 B16 B17 C1
B9 B10 B11 B12 B13 B14
SECTION CSECTION B
CENTER
MATCHLINE
SECTION BSECTION B
CENTER
MATCHLINE
D45
D04D04
D37
D51D51
D32D32
D32D32
D37
D12
D35
D43
D04D37D35
D06
D19
D04
D92
D07
D03D03 D07
D03
D06
D35D35
D35 D35
5' - 10" 5' - 7" 5' - 10"
D31
D35
DEMOLITION LEGEND:
EXISTING WALLS TO REMAIN
ITEMS OR WALLS TO BE DEMOLISHED OR
REMOVED AS NOTED
SLAB TO BE DEMOLISHED AT NEW
ELEVATOR LOCATION. REFER TO
STRUCTURAL DRAWINGS FOR DETAILS
TEMPORARY EGRESS AREA
TEMPORARY DEMISING WALL AND OPENING
A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES
WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM
CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.
B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM
DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS
RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO
REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST
TO GOVERNMENT.
C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT
REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,
INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START
OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS
MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER
COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES
CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.
D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.
E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING
OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.
F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS
AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR
MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING
AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.
G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED
ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED
FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING
BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.
H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING
CONSTRUCTION.
I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL
CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL
CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF
CONSTRUCTION.
J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR
WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.
K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE
CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES
TO RECEIVE NEW WORK AND FINISHES.
L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE
EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING
CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND
FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING
OFFICER.
M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND
FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP
SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.
N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE
ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED
OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE
OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING
OFFICER.
O. TEMPORARY EGRESS DURING CONSTRUCTION:
TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A
THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE
PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE
WITH CONTRACTING OFFICER.
P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,
AND INFORMATION
Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE
DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO
RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.
PAINTED AS INDICATED
GENERAL NOTES DEMOLITION:
B11 B12
D35
D04
D23
D21
D03
D06D06
D19
D02
D06D06
D04
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S A
V A
N N
A H
D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
G
E O
R G
IA
JO
N
E S
F R
A N
K
LI
N R
D , S
U
IT
E
R A
LE
IG
H , N
C
-3
(9
1-
(9
1-
F
A X
LI
C
E N
S E
F
-0
F O
R T
B E
N N
IN
G
G
A B
U
IL
D
IN
G
T
R A
IN
E
E B
A R
R A
C K
S U
P G
R A
D E
P R
O G
R
U P
P
H A
S E
F
Y P
N
FOR OFFICIAL USE ONLY
AD112
F
IR
S T
F L O
O R
D E
M O
L
IT
IO
N
P L A
N
S E
C T
IO
N
B E
A S
T
Z K
A S
K Y
D V
A N
L O
O N
K B
R O
D B
E R
K B
R O
D B
E R
J U
L Y
W H
N B
- 7 -1
-2
C
A T
E G
O R
Y C
O D
E
F
IL
E N
A M
E A
D .D
W G
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
1/8" = 1'-0"A1
FIRST FLOOR DEMOLITION PLAN - B EAST
KEY PLAN
G
F
E
N.T.S.
PLAN
NORTH
A
B C
DBUILDING 399
0 4' 8' 16' 24'
KEYNOTES DEMOLITION
D45 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR ELEVATOR. DO
NOT REMOVE CONCRETE SLAB OVER TUNNELS WHERE APPLICABLE - SEE
STRUCTURAL, PLUMBING AND FIRE PROTECTION DRAWINGS
D51 REMOVE ALL INTERIOR CEILINGS, FLOOR FINISHES INCLUDING GLUES,
FURRING, INSULATION, FIXTURES, MILLWORK, DOORS, FRAMES, AND
HARDWARE. REMOVE ALL GYPSUM BOARD FURRING ON THE INTERIOR SIDE OF
THE EXTERIOR MASONRY WALLS. REMOVE PAINT FROM ALL PAINTED
SURFACES ON INTERIOR FACE OF ALL EXTERIOR WALLS, SURFACES TO
RECIEVE NEW PAINT AND CONFORMING TO ENVIRONMENTAL SURVEY
RECOMMENDATIONS. METHODS USED TO REMOVE PAINT SHALL NOT DAMAGE
THE MASONRY. ENSURE A MINIMUM 70% OF INTERIOR SURFACE OF EXTERIOR
WALLS SHALL BE CLEAR OF PAINT TO INSURE VAPOR TRANSMISSION IS
ALLOWED (DRYING OF WALL SYSTEM). PREPARE ALL SURFACES TO RECIEVE
NEW WINDOWS, CASEWORK, APPLIANCES, FIXTURES, DOORS AND FRAMES AS
REQUIRED - TYPICAL
D92 EXISTING CONCRETE SIDEWALK. SEE CIVIL DRAWINGS
KEYNOTES DEMOLITION
D02 EXISTING FOOTING TO REMAIN - TYPICAL - SEE STRUCTURAL DRAWINGS
D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE
NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS
D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.
CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE
SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL
D06 EXISTING WALL TO REMAIN. PATCH, REPAIR, AND CAULK JOINTS AS REQUIRED.
CLEAN AND PREPARE TO RECEIVE NEW FINISHES AS INDICATED - TYPICAL
D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE
STRUCTURAL DRAWINGS - TYPICAL
D12 EXISTING DOOR AND FRAME TO REMAIN. PREPARE TO RECEIVE NEW FINISHES
AS INDICATED
D19 EXISTING CONCRETE WALLS TO REMAIN. PREPARE SURFACES TO RECEIVE
NEW FINISHES AS INDICATED - TYPICAL
D21 EXISTING AREA/ FLOOR DRAIN TO REMAIN. CLEAR OUT AND CLEAN DRAIN TO
NEAREST MAIN. MISSING OR BROKEN DRAIN GRATES ARE TO BE REPLACED BY
NEW TO MATCH EXISTING. REPLACE CLEANOUT PLUG IF BROKEN OR MISSING -
TYPICAL
D23 EXISTING EXTERIOR CONCRETE STAIRS TO REMAIN. CLEAN, PATCH AND
REPAIR AS REQUIRED
D31 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR PLUMBING,
FIRE SUPPRESSION, AND HVAC WORK. DO NOT REMOVE CONCRETE SLAB
OVER TUNNELS WHERE APPLICABLE - SEE STRUCTURAL, MECHANICAL,
PLUMBING AND FIRE PROTECTION DRAWINGS
D32 REMOVE EXISTING PARTITIONS IN THEIR ENTIRETY. PREPARE FLOOR AND
ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -
TYPICAL
D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE
IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW
CONSTRUCTION AND FINISHES - TYPICAL
D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,
FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT
SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL
D43 REMOVE EXISTING HARDWARE AND PREPARE TO RECEIVE NEW HARDWARE
1/8" = 1'-0"L1
FOUNDATION/ TUNNEL FLOOR - PARTIAL
DEMOLITION PLAN
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/1
/2
C8C1 C2 C3 C4 C5 C6 C7
C11
C17
C16
C15
C14
C13
C12
C9
C10
CENTER
MATCHLINE
SECTION B SECTION C
S E C
TIO
N C
S
EC
TIO
N C
CENTER
MATCHLINE
D51D51D07
D32D32
D37
D04
D09
D10
D92
D04
D37
D07 D35 D37 D36D05
D37
D04
D37
D04
D07
D51D51
D32D32
D12 D43
D06
D35 D04
D19 D92
D03D03
D05
D37
D35
D19 D07
D03D03
D03
D35
D06
D35
D35
D31
D35
D22
D35
D35
D48
DEMOLITION LEGEND:
EXISTING WALLS TO REMAIN
ITEMS OR WALLS TO BE DEMOLISHED OR
REMOVED AS NOTED
SLAB TO BE DEMOLISHED AT NEW
ELEVATOR LOCATION. REFER TO
STRUCTURAL DRAWINGS FOR DETAILS
TEMPORARY EGRESS AREA
TEMPORARY DEMISING WALL AND OPENING
A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES
WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM
CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.
B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM
DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS
RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO
REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST
TO GOVERNMENT.
C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT
REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,
INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START
OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS
MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER
COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES
CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.
D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.
E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING
OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.
F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS
AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR
MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING
AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.
G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED
ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED
FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING
BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.
H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING
CONSTRUCTION.
I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL
CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL
CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF
CONSTRUCTION.
J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR
WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.
K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE
CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES
TO RECEIVE NEW WORK AND FINISHES.
L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE
EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING
CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND
FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING
OFFICER.
M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND
FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP
SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.
N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE
ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED
OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE
OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING
OFFICER.
O. TEMPORARY EGRESS DURING CONSTRUCTION:
TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A
THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE
PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE
WITH CONTRACTING OFFICER.
P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,
AND INFORMATION
Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE
DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO
RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.
PAINTED AS INDICATED
GENERAL NOTES DEMOLITION:
C5 C6
D21
D23
D04
D19
D02
D04
D06D06
D06D06
D03 D35
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S A
V A
N N
A H
D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
G
E O
R G
IA
JO
N
E S
F R
A N
K
LI
N R
D , S
U
IT
E
R A
LE
IG
H , N
C
-3
(9
1-
(9
1-
F
A X
LI
C
E N
S E
F
-0
F O
R T
B E
N N
IN
G
G
A B
U
IL
D
IN
G
T
R A
IN
E
E B
A R
R A
C K
S U
P G
R A
D E
P R
O G
R
U P
P
H A
S E
F
Y P
N
FOR OFFICIAL USE ONLY
AD113
F
IR
S T
F L O
O R
D E
M O
L
IT
IO
N
P L A
N
S E
C T
IO
N
C W
E S
T
Z K
A S
K Y
D V
A N
L O
O N
K B
R O
D B
E R
K B
R O
D B
E R
J U
L Y
W H
N B
- 7 -1
-2
C
A T
E G
O R
Y C
O D
E
F
IL
E N
A M
E A
D .D
W G
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
1/8" = 1'-0"A1
FIRST FLOOR DEMOLITION PLAN - C WEST KEY PLAN
G
F
E
N.T.S.
PLAN
NORTH
A
B C
DBUILDING 399
0 4' 8' 16' 24'
KEYNOTES DEMOLITION
D02 EXISTING FOOTING TO REMAIN - TYPICAL - SEE STRUCTURAL DRAWINGS
D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE
NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS
D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.
CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE
SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL
D05 EXISTING STUCCO WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED. CLEAN
AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED - TYPICAL
D06 EXISTING WALL TO REMAIN. PATCH, REPAIR, AND CAULK JOINTS AS REQUIRED.
CLEAN AND PREPARE TO RECEIVE NEW FINISHES AS INDICATED - TYPICAL
D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE
STRUCTURAL DRAWINGS - TYPICAL
D09 EXISTING CONCRETE STAIRS TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW PAINT, NOSING, AND ANTI-SLIP
SURFACE. WHEN REPLACING STAIR NOSING, REPLACE ALL TO SAME - TYPICAL
D10 EXISTING HANDRAILS TO REMAIN. REMOVE EXISTING COATINGS DOWN TO
ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT - TYPICAL
D12 EXISTING DOOR AND FRAME TO REMAIN. PREPARE TO RECEIVE NEW FINISHES
AS INDICATED
D19 EXISTING CONCRETE WALLS TO REMAIN. PREPARE SURFACES TO RECEIVE
NEW FINISHES AS INDICATED - TYPICAL
D21 EXISTING AREA/ FLOOR DRAIN TO REMAIN. CLEAR OUT AND CLEAN DRAIN TO
NEAREST MAIN. MISSING OR BROKEN DRAIN GRATES ARE TO BE REPLACED BY
NEW TO MATCH EXISTING. REPLACE CLEANOUT PLUG IF BROKEN OR MISSING -
TYPICAL
D22 EXISTING LADDER TO REMAIN. PREPARE TO RECEIVE NEW FINISH
D23 EXISTING EXTERIOR CONCRETE STAIRS TO REMAIN. CLEAN, PATCH AND
REPAIR AS REQUIRED
D31 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR PLUMBING,
FIRE SUPPRESSION, AND HVAC WORK. DO NOT REMOVE CONCRETE SLAB
OVER TUNNELS WHERE APPLICABLE - SEE STRUCTURAL, MECHANICAL,
PLUMBING AND FIRE PROTECTION DRAWINGS
D32 REMOVE EXISTING PARTITIONS IN THEIR ENTIRETY. PREPARE FLOOR AND
ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -
TYPICAL
D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE
IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW
CONSTRUCTION AND FINISHES - TYPICAL
D36 REMOVE EXISTING DOOR, FRAME AND LINTEL, AND ASSOCIATED HARDWARE IN
THEIR ENTIRETY, INCLUDING BLOCKING AND WOOD FRAMING. PREPARE
ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -
TYPICAL
D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,
FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT
SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL
D43 REMOVE EXISTING HARDWARE AND PREPARE TO RECEIVE NEW HARDWARE
D48 REMOVE EXISITNG BURGLAR BARS AND PATCH REPAIR SURFACES TO MATCH
ADJACENT SURFACES AND FINISHES - TYPICAL
D51 REMOVE ALL INTERIOR CEILINGS, FLOOR FINISHES INCLUDING GLUES,
FURRING, INSULATION, FIXTURES, MILLWORK, DOORS, FRAMES, AND
HARDWARE. REMOVE ALL GYPSUM BOARD FURRING ON THE INTERIOR SIDE OF
THE EXTERIOR MASONRY WALLS. REMOVE PAINT FROM ALL PAINTED
SURFACES ON INTERIOR FACE OF ALL EXTERIOR WALLS, SURFACES TO
RECIEVE NEW PAINT AND CONFORMING TO ENVIRONMENTAL SURVEY
RECOMMENDATIONS. METHODS USED TO REMOVE PAINT SHALL NOT DAMAGE
THE MASONRY. ENSURE A MINIMUM 70% OF INTERIOR SURFACE OF EXTERIOR
WALLS SHALL BE CLEAR OF PAINT TO INSURE VAPOR TRANSMISSION IS
ALLOWED (DRYING OF WALL SYSTEM). PREPARE ALL SURFACES TO RECIEVE
NEW WINDOWS, CASEWORK, APPLIANCES, FIXTURES, DOORS AND FRAMES AS
REQUIRED - TYPICAL
D92 EXISTING CONCRETE SIDEWALK. SEE CIVIL DRAWINGS
1/8" = 1'-0"L16
FOUNDATION/ TUNNEL
FLOOR - PARTIAL
DEMOLITION PLAN
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/1
/2
C21
C20
C19
C18
C17
C24
D1
C26
C25
1 3 4
C23
C22
SECTION C
CENTER
MATCHLINE
SECTION D
D46
D58
D04
D09
D10
D36D36
D04
D36
D37
D04
D35
D05
D37
D07
D19
D51D51
D51D51
D04
D37
D32D32
D12 D43
D06
D35
D19
D04
D07
D37
D05
D37
D03D03
D03D03
D23
D95 D96
D06
D35D35
D46
D62
D07
D07
D35
D35
D31
D35
D22
D32
D32
D35
DEMOLITION LEGEND:
EXISTING WALLS TO REMAIN
ITEMS OR WALLS TO BE DEMOLISHED OR
REMOVED AS NOTED
SLAB TO BE DEMOLISHED AT NEW
ELEVATOR LOCATION. REFER TO
STRUCTURAL DRAWINGS FOR DETAILS
TEMPORARY EGRESS AREA
TEMPORARY DEMISING WALL AND OPENING
A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES
WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM
CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.
B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM
DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS
RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO
REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST
TO GOVERNMENT.
C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT
REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,
INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START
OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS
MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER
COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES
CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.
D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.
E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING
OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.
F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS
AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR
MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING
AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.
G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED
ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED
FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING
BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.
H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING
CONSTRUCTION.
I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL
CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL
CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF
CONSTRUCTION.
J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR
WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.
K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE
CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES
TO RECEIVE NEW WORK AND FINISHES.
L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE
EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING
CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND
FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING
OFFICER.
M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND
FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP
SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.
N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE
ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED
OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE
OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING
OFFICER.
O. TEMPORARY EGRESS DURING CONSTRUCTION:
TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A
THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE
PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE
WITH CONTRACTING OFFICER.
P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,
AND INFORMATION
Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE
DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO
RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.
PAINTED AS INDICATED
GENERAL NOTES DEMOLITION:
C19
C18
D04D04
D21
D23
D06D06
D06D06
D03
D35
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S A
V A
N N
A H
D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
G
E O
R G
IA
JO
N
E S
F R
A N
K
LI
N R
D , S
U
IT
E
R A
LE
IG
H , N
C
-3
(9
1-
(9
1-
F
A X
LI
C
E N
S E
F
-0
F O
R T
B E
N N
IN
G
G
A B
U
IL
D
IN
G
T
R A
IN
E
E B
A R
R A
C K
S U
P G
R A
D E
P R
O G
R
U P
P
H A
S E
F
Y P
N
FOR OFFICIAL USE ONLY
AD114
F
IR
S T
F L O
O R
D E
M O
L
IT
IO
N
P L A
N
S E
C T
IO
N
C E
A S
T
Z K
A S
K Y
D V
A N
L O
O N
K B
R O
D B
E R
K B
R O
D B
E R
J U
L Y
W H
N B
- 7 -1
-2
C
A T
E G
O R
Y C
O D
E
F
IL
E N
A M
E A
D .D
W G
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
1/8" = 1'-0"A1
FIRST FLOOR DEMOLITION PLAN - C EAST KEY PLAN
G
F
E
N.T.S.
PLAN
NORTH
A
B C
DBUILDING 399
0 4' 8' 16' 24'
KEYNOTES DEMOLITION
D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE
NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS
D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.
CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE
SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL
D05 EXISTING STUCCO WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED. CLEAN
AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED - TYPICAL
D06 EXISTING WALL TO REMAIN. PATCH, REPAIR, AND CAULK JOINTS AS REQUIRED.
CLEAN AND PREPARE TO RECEIVE NEW FINISHES AS INDICATED - TYPICAL
D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE
STRUCTURAL DRAWINGS - TYPICAL
D09 EXISTING CONCRETE STAIRS TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW PAINT, NOSING, AND ANTI-SLIP
SURFACE. WHEN REPLACING STAIR NOSING, REPLACE ALL TO SAME - TYPICAL
D10 EXISTING HANDRAILS TO REMAIN. REMOVE EXISTING COATINGS DOWN TO
ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT - TYPICAL
D12 EXISTING DOOR AND FRAME TO REMAIN. PREPARE TO RECEIVE NEW FINISHES
AS INDICATED
D19 EXISTING CONCRETE WALLS TO REMAIN. PREPARE SURFACES TO RECEIVE
NEW FINISHES AS INDICATED - TYPICAL
D21 EXISTING AREA/ FLOOR DRAIN TO REMAIN. CLEAR OUT AND CLEAN DRAIN TO
NEAREST MAIN. MISSING OR BROKEN DRAIN GRATES ARE TO BE REPLACED BY
NEW TO MATCH EXISTING. REPLACE CLEANOUT PLUG IF BROKEN OR MISSING -
TYPICAL
D22 EXISTING LADDER TO REMAIN. PREPARE TO RECEIVE NEW FINISH
D23 EXISTING EXTERIOR CONCRETE STAIRS TO REMAIN. CLEAN, PATCH AND
REPAIR AS REQUIRED
D31 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR PLUMBING,
FIRE SUPPRESSION, AND HVAC WORK. DO NOT REMOVE CONCRETE SLAB
OVER TUNNELS WHERE APPLICABLE - SEE STRUCTURAL, MECHANICAL,
PLUMBING AND FIRE PROTECTION DRAWINGS
D32 REMOVE EXISTING PARTITIONS IN THEIR ENTIRETY. PREPARE FLOOR AND
ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -
TYPICAL
D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE
IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW
CONSTRUCTION AND FINISHES - TYPICAL
D36 REMOVE EXISTING DOOR, FRAME AND LINTEL, AND ASSOCIATED HARDWARE IN
THEIR ENTIRETY, INCLUDING BLOCKING AND WOOD FRAMING. PREPARE
ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -
TYPICAL
D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,
FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT
SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL
D43 REMOVE EXISTING HARDWARE AND PREPARE TO RECEIVE NEW HARDWARE
D46 REMOVE EXISTING CONCRETE SLAB. SEE CIVIL DRAWINGS
D51 REMOVE ALL INTERIOR CEILINGS, FLOOR FINISHES INCLUDING GLUES,
FURRING, INSULATION, FIXTURES, MILLWORK, DOORS, FRAMES, AND
HARDWARE. REMOVE ALL GYPSUM BOARD FURRING ON THE INTERIOR SIDE OF
THE EXTERIOR MASONRY WALLS. REMOVE PAINT FROM ALL PAINTED
SURFACES ON INTERIOR FACE OF ALL EXTERIOR WALLS, SURFACES TO
RECIEVE NEW PAINT AND CONFORMING TO ENVIRONMENTAL SURVEY
RECOMMENDATIONS. METHODS USED TO REMOVE PAINT SHALL NOT DAMAGE
THE MASONRY. ENSURE A MINIMUM 70% OF INTERIOR SURFACE OF EXTERIOR
WALLS SHALL BE CLEAR OF PAINT TO INSURE VAPOR TRANSMISSION IS
ALLOWED (DRYING OF WALL SYSTEM). PREPARE ALL SURFACES TO RECIEVE
NEW WINDOWS, CASEWORK, APPLIANCES, FIXTURES, DOORS AND FRAMES AS
REQUIRED - TYPICAL
D58 REMOVE PORTION OF EXISTING WALL FOR NEW WINDOW AS SCHEDULED. ALSO
SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION
D62 REMOVE EXISTING MECHANICAL, ELECTRICAL EQUIPMENT, AND ASSOCIATED
HARDWARE, ETC. - SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION
D95 TEMPORARY DEMISING WALL. SEE LIFE SAFETY AND FIRE PROTECTION
DRAWINGS FOR RATINGS AND ADDITIONAL INFORMATION. CONTRACTOR TO
COORDINATE PHASING WITH GOVERNMENT
D96 TEMPORARY 36" X 80" (WXH) DOOR. RATING TO MATCH RATING OF DEMISING
WALL
1/8" = 1'-0"C13
FOUNDATION/ TUNNEL FLOOR - PARTIAL
DEMOLITION PLAN
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/1
/2
UP DN
DNUP
B5 B6 B7 B8 B9 B10B1 B2 B3 B4
CENTER
MATCHLINE
SECTION BSECTION A
CENTER
MATCHLINE
SECTION BSECTION B
D45
D37
D04
D37
D04
D09
D10
D07
D07D37D05 D35 D19 D36D03D03
D51D51
D32D32
D32D32
D95
D96
D97
D04 D49
D35
TEMPORARY EGREES: SEE GENERAL
NOTES DEMOLITION "O". ALSO SEE LIFE
SAFETY AND FIRE PROTECTION DRAWINGS
FOR ADDITIONAL INFORMATION
AD405
D6
D10
D94
D96
DEMOLITION LEGEND:
EXISTING WALLS TO REMAIN
ITEMS OR WALLS TO BE DEMOLISHED OR
REMOVED AS NOTED
SLAB TO BE DEMOLISHED AT NEW
ELEVATOR LOCATION. REFER TO
STRUCTURAL DRAWINGS FOR DETAILS
TEMPORARY EGRESS AREA
TEMPORARY DEMISING WALL AND OPENING
A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES
WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM
CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.
B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM
DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS
RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO
REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST
TO GOVERNMENT.
C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT
REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,
INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START
OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS
MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER
COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES
CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.
D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.
E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING
OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.
F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS
AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR
MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING
AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.
G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED
ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED
FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING
BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.
H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING
CONSTRUCTION.
I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL
CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL
CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF
CONSTRUCTION.
J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR
WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.
K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE
CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES
TO RECEIVE NEW WORK AND FINISHES.
L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE
EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING
CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND
FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING
OFFICER.
M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND
FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP
SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.
N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE
ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED
OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE
OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING
OFFICER.
O. TEMPORARY EGRESS DURING CONSTRUCTION:
TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A
THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE
PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE
WITH CONTRACTING OFFICER.
P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,
AND INFORMATION
Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE
DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO
RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.
PAINTED AS INDICATED
GENERAL NOTES DEMOLITION:
US Army Corps of Engineers ®
SHEET ID
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S A
V A
N N
A H
D
IS
T R
IC
T
W
E S
T O
G L E
T H
O R
P E
A V
E N
U E
S A
V A
N N
A H
G
E O
R G
IA
JO
N
E S
F R
A N
K
LI
N R
D , S
U
IT
E
R A
LE
IG
H , N
C
-3
(9
1-
(9
1-
F
A X
LI
C
E N
S E
F
-0
F O
R T
B E
N N
IN
G
G
A B
U
IL
D
IN
G
T
R A
IN
E
E B
A R
R A
C K
S U
P G
R A
D E
P R
O G
R
U P
P
H A
S E
F
Y P
N
FOR OFFICIAL USE ONLY
AD121
S E
C O
N D
F L O
O R
D E
M O
L
IT
IO
N
P L A
N
S E
C T
IO
N
B W
E S
T
Z K
A S
K Y
D V
A N
L O
O N
K B
R O
D B
E R
K B
R O
D B
E R
J U
L Y
W H
N B
- 7 -1
-2
C
A T
E G
O R
Y C
O D
E
F
IL
E N
A M
E A
D .D
W G
R E
A D
Y T
O A
D V
E R
T
IS
E
R T
A
1/8" = 1'-0"A1
SECOND FLOOR DEMOLITION PLAN - B WEST KEY PLAN
G
F
E
N.T.S.
PLAN
NORTH
A
B C
DBUILDING 399
0 4' 8' 16' 24'
KEYNOTES DEMOLITION
D51 REMOVE ALL INTERIOR CEILINGS, FLOOR FINISHES INCLUDING GLUES,
FURRING, INSULATION, FIXTURES, MILLWORK, DOORS, FRAMES, AND
HARDWARE. REMOVE ALL GYPSUM BOARD FURRING ON THE INTERIOR SIDE OF
THE EXTERIOR MASONRY WALLS. REMOVE PAINT FROM ALL PAINTED
SURFACES ON INTERIOR FACE OF ALL EXTERIOR WALLS, SURFACES TO
RECIEVE NEW PAINT AND CONFORMING TO ENVIRONMENTAL SURVEY
RECOMMENDATIONS. METHODS USED TO REMOVE PAINT SHALL NOT DAMAGE
THE MASONRY. ENSURE A MINIMUM 70% OF INTERIOR SURFACE OF EXTERIOR
WALLS SHALL BE CLEAR OF PAINT TO INSURE VAPOR TRANSMISSION IS
ALLOWED (DRYING OF WALL SYSTEM). PREPARE ALL SURFACES TO RECIEVE
NEW WINDOWS, CASEWORK, APPLIANCES, FIXTURES, DOORS AND FRAMES AS
REQUIRED - TYPICAL
D94 REMOVE EXISTING HANDRAIL DURING CONSTRUCTION. PROTECT FROM
DAMAGE AND STORE. REINSTALL WHEN TEMPORARY EGRESS STAIR IS
REMOVED. REMOVE EXISTING COATINGS DOWN TO ORIGINAL STEEL. PREPARE
SURFACES TO RECEIVE PAINT
D95 TEMPORARY DEMISING WALL. SEE LIFE SAFETY AND FIRE PROTECTION
DRAWINGS FOR RATINGS AND ADDITIONAL INFORMATION. CONTRACTOR TO
COORDINATE PHASING WITH GOVERNMENT
D96 TEMPORARY 36" X 80" (WXH) DOOR. RATING TO MATCH RATING OF DEMISING
WALL
D97 TEMPORARY EGRESS STAIR DURING CONSTRUCTION. STAIR TO MEET IBC-2018
REQUIREMENTS AND OTHER APPLICABLE CODES. SEE AD405, LIFE SAFETY AND
FIRE PROTECTION DRAWINGS FOR RATINGS AND ADDITIONAL INFORMATION.
CONTRACTOR TO COORDINATE PHASING WITH GOVERNMENT
KEYNOTES DEMOLITION
D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE
NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS
D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.
CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE
SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL
D05 EXISTING STUCCO WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED. CLEAN
AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED - TYPICAL
D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE
STRUCTURAL DRAWINGS - TYPICAL
D09 EXISTING CONCRETE STAIRS TO REMAIN. PATCH AND REPAIR AS REQUIRED.
PREPARE SURFACES TO RECEIVE NEW PAINT, NOSING, AND ANTI-SLIP
SURFACE. WHEN REPLACING STAIR NOSING, REPLACE ALL TO SAME - TYPICAL
D10 EXISTING HANDRAILS TO REMAIN. REMOVE EXISTING COATINGS DOWN TO
ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT - TYPICAL
D19 EXISTING CONCRETE WALLS TO REMAIN. PREPARE SURFACES TO RECEIVE
NEW FINISHES AS INDICATED - TYPICAL
D32 REMOVE EXISTING PARTITIONS IN THEIR ENTIRETY. PREPARE FLOOR AND
ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -
TYPICAL
D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE
IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW
CONSTRUCTION AND FINISHES - TYPICAL
D36 REMOVE EXISTING DOOR, FRAME AND LINTEL, AND ASSOCIATED HARDWARE IN
THEIR ENTIRETY, INCLUDING BLOCKING AND WOOD FRAMING. PREPARE
ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -
TYPICAL
D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,
FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT
SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL
D45 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR ELEVATOR. DO
NOT REMOVE CONCRETE SLAB OVER TUNNELS WHERE APPLICABLE - SEE
STRUCTURAL, PLUMBING AND FIRE PROTECTION DRAWINGS
D49 REMOVE EXISTING STONE SILL AT THIS LOCATION AND PREPARE TO RECEIVE
NEW STONE SILL AND WINDOW
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/1
/2
B9 B10 B11 B12 B13 B14
SECTION CSECTION B
CENTER
MATCHLINE
SECTION BSECTION B
CENTER
MATCHLINE
D45
D37
D04
D37
D04
D37D04D05 D19D10 D07
D07
D35 D05D03D03
D51D51
D32D32
D32D32
D35
DEMOLITION LEGEND:
EXISTING WALLS TO REMAIN
ITEMS OR WALLS TO BE DEMOLISHED OR
REMOVED AS NOTED
SLAB TO BE DEMOLISHED AT NEW
ELEVATOR LOCATION. REFER TO
STRUCTURAL DRAWINGS FOR DETAILS
TEMPORARY EGRESS AREA
TEMPORARY DEMISING WALL AND OPENING
A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES
WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM
CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.
B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM
DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS
RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO
REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST
TO GOVERNMENT.
C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT
REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,
INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START
OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS
MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER
COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES
CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.
D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.
E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING
OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.
F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS
AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR
MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING
AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.
G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED
ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED
FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING
BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.
H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING
CONSTRUCTION.
I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL
CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL
CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF
CONSTRUCTION.
J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR
WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.
K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE
CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES
TO RECEIVE NEW WORK AND FINISHES.
L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE
EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING
CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND
FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING
OFFICER.
M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND
FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP
SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.
N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE
ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED
OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE
OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING
OFFICER.
O. TEMPORARY EGRESS DURING CONSTRUCTION:
TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A
THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE
PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE
WITH CONTRACTING OFFICER.
P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,
AND INFORMATION
Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE
DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO
RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.
PAINTED AS INDICATED
GENERAL NOTES DEMOLITION:
US Army Corps of Engineers ®
SH…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .