W912HN-21-B-3007_DRAWINGS_VOL1_AMD3.pdf

PDF 31 MB Posted

Attached to
Repair TBUP Building 399 Phase 2
Solicitation number
W912HN21B3007
Issued by

About this file

This document outlines a federal contract solicitation for repair work. The U.S. Army Corps of Engineers Engineering District Savannah is seeking bids to repair Building 399 Sections B and C at Fort Benning, Georgia under solicitation number W912HN21B3007. Repairs include exterior walls, windows, fire protection, interior walls, doors, interior finishes, floors, ceilings, plumbing, HVAC, building controls, electrical, communications, building information systems, site utilities, and minor parking improvements. Demolition and hazardous material abatement are also required. Bids are due under a full and open competitive procurement process, with a price evaluation preference for HUBZone small businesses. The acquisition will follow sealed bid procedures outlined in FAR Part 14. Contractual contact is listed.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B5 B6 B7 B8 B9 B10B1 B2 B3 B4

CENTER

MATCHLINE

SECTION BSECTION A

D01

D01

D02

CENTER

MATCHLINE

SECTION BSECTION B

D07

D82

DEMOLITION LEGEND:

EXISTING WALLS TO REMAIN

ITEMS OR WALLS TO BE DEMOLISHED OR

REMOVED AS NOTED

SLAB TO BE DEMOLISHED AT NEW

ELEVATOR LOCATION. REFER TO

STRUCTURAL DRAWINGS FOR DETAILS

TEMPORARY EGRESS AREA

TEMPORARY DEMISING WALL AND OPENING

A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING

CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES

WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM

CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.

B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM

DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS

RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO

REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST

TO GOVERNMENT.

C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT

REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,

INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START

OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS

MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER

COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES

CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.

D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.

E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING

OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.

F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS

AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR

MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING

AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.

G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED

ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED

FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING

BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.

H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING

CONSTRUCTION.

I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL

CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL

CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF

CONSTRUCTION.

J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR

WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.

K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE

CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES

TO RECEIVE NEW WORK AND FINISHES.

L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE

EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING

CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND

FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING

OFFICER.

M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND

FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP

SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.

N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE

ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED

OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE

OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING

OFFICER.

O. TEMPORARY EGRESS DURING CONSTRUCTION:

TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A

THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE

PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE

WITH CONTRACTING OFFICER.

P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,

INFORMATION, QUANTITIES, AND EXTENT OF REPAIRS

Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE

DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO

RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.

PAINTED AS INDICATED

GENERAL NOTES DEMOLITION:

A. SEE MECHANICAL, ELECTRICAL, PLUMBING AND STRUCTURAL DRAWINGS

FOR ADDITIONAL INFORMATION AND SCOPE OF WORK AT FOUNDATIONS/

TUNNEL FLOOR.

SHEET NOTES FOUNDATION/ TUNNEL FLOOR:

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S A

V A

N N

A H

D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E

A V

E N

U E

S A

V A

N N

A H

G

E O

R G

IA

JO

N

E S

F R

A N

K

LI

N R

D , S

U

IT

E

R A

LE

IG

H , N

C

-3

(9

1-

(9

1-

F

A X

LI

C

E N

S E

F

-0

F O

R T

B E

N N

IN

G

G

A B

U

IL

D

IN

G

T

R A

IN

E

E B

A R

R A

C K

S U

P G

R A

D E

P R

O G

R A

M

(T B

U P

P

H A

S E

F

Y P

N

FOR OFFICIAL USE ONLY

AD101

F O

U N

D A

T

IO

N

T U

N N

E L F

L O

O R

D E

M O

L

IT

IO

N

P L A

N

S E

C T

IO

N

B W

E S

T

Z K

A S

K Y

D V

A N

L O

O N

K B

R O

D B

E R

K B

R O

D B

E R

J U

L Y

W H

N B

- 7 -1

-2

C

A T

E G

O R

Y C

O D

E

F

IL

E N

A M

E A

D .D

W G

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

1/8" = 1'-0"A1

FOUNDATION/ TUNNEL FLOOR DEMOLITION PLAN - B WEST

KEY PLAN

G

F

E

N.T.S.

PLAN

NORTH

A

B C

DBUILDING 399

KEYNOTES DEMOLITION

D01 EXISTING TUNNEL TO REMAIN. PATCH, REPAIR, WALLS, FLOOR AND CEILING AS

REQUIRED, TO MATCH EXISTING. SEE MECHANICAL, PLUMBING, ELECTRICAL

AND FIRE PROTECTION DRAWINGS FOR SCOPE OF WORK - TYPICAL

D02 EXISTING FOOTING TO REMAIN - TYPICAL - SEE STRUCTURAL DRAWINGS

D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE

STRUCTURAL DRAWINGS - TYPICAL

D82 PREPARE AREA FOR NEW ELEVATOR PIT. SEE STRUCTURAL AND PLUMBING

DRAWINGS

0 4' 8' 16' 24'

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/1

/2

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/3

/2

07/22/21

UP

B5 B6 B7 B8 B9 B10B1 B2 B3 B4

CENTER

MATCHLINE

SECTION BSECTION A

D04

D09

D37

D32D32

D32D32

CENTER

MATCHLINE

SECTION BSECTION B

D51D51D32D32

D05 D04

D36

D37 D35 D19

D03D03

D04

D37

D45

D07

D07

D95

D97

D96

D96

D35

D35

D49

D31

D35

D22

TEMPORARY EGREES: SEE GENERAL

NOTES DEMOLITION "O". ALSO SEE LIFE

SAFETY AND FIRE PROTECTION DRAWINGS

FOR ADDITIONAL INFORMATION

D10

D98

D99

AD405

D1

D75

D71

D48

A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING

CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES

WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM

CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.

B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM

DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS

RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO

REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST

TO GOVERNMENT.

C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT

REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,

INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START

OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS

MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER

COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES

CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.

D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.

E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING

OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.

F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS

AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR

MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING

AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.

G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED

ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED

FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING

BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.

H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING

CONSTRUCTION.

I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL

CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL

CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF

CONSTRUCTION.

J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR

WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.

K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE

CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES

TO RECEIVE NEW WORK AND FINISHES.

L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE

EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING

CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND

FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING

OFFICER.

M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND

FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP

SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.

N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE

ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED

OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE

OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING

OFFICER.

O. TEMPORARY EGRESS DURING CONSTRUCTION:

TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A

THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE

PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE

WITH CONTRACTING OFFICER.

P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,

INFORMATION, QUANTITIES, AND EXTENT OF REPAIRS

Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE

DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO

RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.

PAINTED AS INDICATED

GENERAL NOTES DEMOLITION:

DEMOLITION LEGEND:

EXISTING WALLS TO REMAIN

ITEMS OR WALLS TO BE DEMOLISHED OR

REMOVED AS NOTED

SLAB TO BE DEMOLISHED AT NEW

ELEVATOR LOCATION. REFER TO

STRUCTURAL DRAWINGS FOR DETAILS

TEMPORARY EGRESS AREA

TEMPORARY DEMISING WALL AND OPENING

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S A

V A

N N

A H

D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E

A V

E N

U E

S A

V A

N N

A H

G

E O

R G

IA

JO

N

E S

F R

A N

K

LI

N R

D , S

U

IT

E

R A

LE

IG

H , N

C

-3

(9

1-

(9

1-

F

A X

LI

C

E N

S E

F

-0

F O

R T

B E

N N

IN

G

G

A B

U

IL

D

IN

G

T

R A

IN

E

E B

A R

R A

C K

S U

P G

R A

D E

P R

O G

R

U P

P

H A

S E

F

Y P

N

FOR OFFICIAL USE ONLY

AD111

F

IR

S T

F L O

O R

D E

M O

L

IT

IO

N

P L A

N

S E

C T

IO

N

B W

E S

T

Z K

A S

K Y

D V

A N

L O

O N

K B

R O

D B

E R

K B

R O

D B

E R

J U

L Y

W H

N B

- 7 -1

-2

C

A T

E G

O R

Y C

O D

E

F

IL

E N

A M

E A

D .D

W G

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

KEY PLAN

G

F

E

N.T.S.

PLAN

NORTH

A

B C

DBUILDING 399

1/8" = 1'-0"A1

FIRST FLOOR DEMOLITION PLAN - B WEST

0 4' 8' 16' 24'

KEYNOTES DEMOLITION

D45 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR ELEVATOR. DO

NOT REMOVE CONCRETE SLAB OVER TUNNELS WHERE APPLICABLE - SEE

STRUCTURAL, PLUMBING AND FIRE PROTECTION DRAWINGS

D48 REMOVE EXISITNG BURGLAR BARS AND PATCH REPAIR SURFACES TO MATCH

ADJACENT SURFACES AND FINISHES - TYPICAL

D49 REMOVE EXISTING STONE SILL AT THIS LOCATION AND PREPARE TO RECEIVE

NEW STONE SILL AND WINDOW

D51 REMOVE ALL INTERIOR CEILINGS, FLOOR FINISHES INCLUDING GLUES,

FURRING, INSULATION, FIXTURES, MILLWORK, DOORS, FRAMES, AND

HARDWARE. REMOVE ALL GYPSUM BOARD FURRING ON THE INTERIOR SIDE OF

THE EXTERIOR MASONRY WALLS. REMOVE PAINT FROM ALL PAINTED

SURFACES ON INTERIOR FACE OF ALL EXTERIOR WALLS, SURFACES TO

RECIEVE NEW PAINT AND CONFORMING TO ENVIRONMENTAL SURVEY

RECOMMENDATIONS. METHODS USED TO REMOVE PAINT SHALL NOT DAMAGE

THE MASONRY. ENSURE A MINIMUM 70% OF INTERIOR SURFACE OF EXTERIOR

WALLS SHALL BE CLEAR OF PAINT TO INSURE VAPOR TRANSMISSION IS

ALLOWED (DRYING OF WALL SYSTEM). PREPARE ALL SURFACES TO RECIEVE

NEW WINDOWS, CASEWORK, APPLIANCES, FIXTURES, DOORS AND FRAMES AS

REQUIRED - TYPICAL

D71 REMOVE EXISTING SINKS IN THEIR ENTIRETY. SEE PLUMBING DRAWINGS FOR

ADDITIONAL INFORMATION - TYPICAL

D75 REMOVE EXISTING STOVE

D95 TEMPORARY DEMISING WALL. SEE LIFE SAFETY AND FIRE PROTECTION

DRAWINGS FOR RATINGS AND ADDITIONAL INFORMATION. CONTRACTOR TO

COORDINATE PHASING WITH GOVERNMENT

D96 TEMPORARY 36" X 80" (WXH) DOOR. RATING TO MATCH RATING OF DEMISING

WALL

D97 TEMPORARY EGRESS STAIR DURING CONSTRUCTION. STAIR TO MEET IBC-2018

REQUIREMENTS AND OTHER APPLICABLE CODES. SEE AD405, LIFE SAFETY AND

FIRE PROTECTION DRAWINGS FOR RATINGS AND ADDITIONAL INFORMATION.

CONTRACTOR TO COORDINATE PHASING WITH GOVERNMENT

D98 TEMPORARY CONSTRUCTION FENCE

D99 TEMPORARY HARD SURFACE FOR CLEAR EGRESS PATH. AREA TO BE CLEAR OF

ANY OBSTRUCTIONS

KEYNOTES DEMOLITION

D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE

NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS

D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.

CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE

SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL

D05 EXISTING STUCCO WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED. CLEAN

AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED - TYPICAL

D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE

STRUCTURAL DRAWINGS - TYPICAL

D09 EXISTING CONCRETE STAIRS TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW PAINT, NOSING, AND ANTI-SLIP

SURFACE. WHEN REPLACING STAIR NOSING, REPLACE ALL TO SAME - TYPICAL

D10 EXISTING HANDRAILS TO REMAIN. REMOVE EXISTING COATINGS DOWN TO

ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT - TYPICAL

D19 EXISTING CONCRETE WALLS TO REMAIN. PREPARE SURFACES TO RECEIVE

NEW FINISHES AS INDICATED - TYPICAL

D22 EXISTING LADDER TO REMAIN. PREPARE TO RECEIVE NEW FINISH

D31 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR PLUMBING,

FIRE SUPPRESSION, AND HVAC WORK. DO NOT REMOVE CONCRETE SLAB

OVER TUNNELS WHERE APPLICABLE - SEE STRUCTURAL, MECHANICAL,

PLUMBING AND FIRE PROTECTION DRAWINGS

D32 REMOVE EXISTING PARTITIONS IN THEIR ENTIRETY. PREPARE FLOOR AND

ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -

TYPICAL

D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE

IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW

CONSTRUCTION AND FINISHES - TYPICAL

D36 REMOVE EXISTING DOOR, FRAME AND LINTEL, AND ASSOCIATED HARDWARE IN

THEIR ENTIRETY, INCLUDING BLOCKING AND WOOD FRAMING. PREPARE

ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -

TYPICAL

D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,

FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT

SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/1

/2

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/3

/2

DN

B15 B16 B17 C1

B9 B10 B11 B12 B13 B14

SECTION CSECTION B

CENTER

MATCHLINE

SECTION BSECTION B

CENTER

MATCHLINE

D45

D04D04

D37

D51D51

D32D32

D32D32

D37

D12

D35

D43

D04D37D35

D06

D19

D04

D92

D07

D03D03 D07

D03

D06

D35D35

D35 D35

5' - 10" 5' - 7" 5' - 10"

D31

D35

DEMOLITION LEGEND:

EXISTING WALLS TO REMAIN

ITEMS OR WALLS TO BE DEMOLISHED OR

REMOVED AS NOTED

SLAB TO BE DEMOLISHED AT NEW

ELEVATOR LOCATION. REFER TO

STRUCTURAL DRAWINGS FOR DETAILS

TEMPORARY EGRESS AREA

TEMPORARY DEMISING WALL AND OPENING

A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING

CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES

WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM

CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.

B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM

DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS

RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO

REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST

TO GOVERNMENT.

C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT

REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,

INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START

OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS

MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER

COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES

CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.

D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.

E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING

OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.

F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS

AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR

MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING

AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.

G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED

ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED

FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING

BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.

H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING

CONSTRUCTION.

I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL

CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL

CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF

CONSTRUCTION.

J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR

WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.

K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE

CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES

TO RECEIVE NEW WORK AND FINISHES.

L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE

EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING

CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND

FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING

OFFICER.

M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND

FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP

SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.

N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE

ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED

OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE

OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING

OFFICER.

O. TEMPORARY EGRESS DURING CONSTRUCTION:

TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A

THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE

PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE

WITH CONTRACTING OFFICER.

P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,

INFORMATION, QUANTITIES, AND EXTENT OF REPAIRS

Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE

DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO

RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.

PAINTED AS INDICATED

GENERAL NOTES DEMOLITION:

B11 B12

D35

D04

D23

D21

D03

D06D06

D19

D02

D06D06

D04

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S A

V A

N N

A H

D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E

A V

E N

U E

S A

V A

N N

A H

G

E O

R G

IA

JO

N

E S

F R

A N

K

LI

N R

D , S

U

IT

E

R A

LE

IG

H , N

C

-3

(9

1-

(9

1-

F

A X

LI

C

E N

S E

F

-0

F O

R T

B E

N N

IN

G

G

A B

U

IL

D

IN

G

T

R A

IN

E

E B

A R

R A

C K

S U

P G

R A

D E

P R

O G

R

U P

P

H A

S E

F

Y P

N

FOR OFFICIAL USE ONLY

AD112

F

IR

S T

F L O

O R

D E

M O

L

IT

IO

N

P L A

N

S E

C T

IO

N

B E

A S

T

Z K

A S

K Y

D V

A N

L O

O N

K B

R O

D B

E R

K B

R O

D B

E R

J U

L Y

W H

N B

- 7 -1

-2

C

A T

E G

O R

Y C

O D

E

F

IL

E N

A M

E A

D .D

W G

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

1/8" = 1'-0"A1

FIRST FLOOR DEMOLITION PLAN - B EAST

KEY PLAN

G

F

E

N.T.S.

PLAN

NORTH

A

B C

DBUILDING 399

0 4' 8' 16' 24'

KEYNOTES DEMOLITION

D45 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR ELEVATOR. DO

NOT REMOVE CONCRETE SLAB OVER TUNNELS WHERE APPLICABLE - SEE

STRUCTURAL, PLUMBING AND FIRE PROTECTION DRAWINGS

D51 REMOVE ALL INTERIOR CEILINGS, FLOOR FINISHES INCLUDING GLUES,

FURRING, INSULATION, FIXTURES, MILLWORK, DOORS, FRAMES, AND

HARDWARE. REMOVE ALL GYPSUM BOARD FURRING ON THE INTERIOR SIDE OF

THE EXTERIOR MASONRY WALLS. REMOVE PAINT FROM ALL PAINTED

SURFACES ON INTERIOR FACE OF ALL EXTERIOR WALLS, SURFACES TO

RECIEVE NEW PAINT AND CONFORMING TO ENVIRONMENTAL SURVEY

RECOMMENDATIONS. METHODS USED TO REMOVE PAINT SHALL NOT DAMAGE

THE MASONRY. ENSURE A MINIMUM 70% OF INTERIOR SURFACE OF EXTERIOR

WALLS SHALL BE CLEAR OF PAINT TO INSURE VAPOR TRANSMISSION IS

ALLOWED (DRYING OF WALL SYSTEM). PREPARE ALL SURFACES TO RECIEVE

NEW WINDOWS, CASEWORK, APPLIANCES, FIXTURES, DOORS AND FRAMES AS

REQUIRED - TYPICAL

D92 EXISTING CONCRETE SIDEWALK. SEE CIVIL DRAWINGS

KEYNOTES DEMOLITION

D02 EXISTING FOOTING TO REMAIN - TYPICAL - SEE STRUCTURAL DRAWINGS

D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE

NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS

D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.

CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE

SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL

D06 EXISTING WALL TO REMAIN. PATCH, REPAIR, AND CAULK JOINTS AS REQUIRED.

CLEAN AND PREPARE TO RECEIVE NEW FINISHES AS INDICATED - TYPICAL

D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE

STRUCTURAL DRAWINGS - TYPICAL

D12 EXISTING DOOR AND FRAME TO REMAIN. PREPARE TO RECEIVE NEW FINISHES

AS INDICATED

D19 EXISTING CONCRETE WALLS TO REMAIN. PREPARE SURFACES TO RECEIVE

NEW FINISHES AS INDICATED - TYPICAL

D21 EXISTING AREA/ FLOOR DRAIN TO REMAIN. CLEAR OUT AND CLEAN DRAIN TO

NEAREST MAIN. MISSING OR BROKEN DRAIN GRATES ARE TO BE REPLACED BY

NEW TO MATCH EXISTING. REPLACE CLEANOUT PLUG IF BROKEN OR MISSING -

TYPICAL

D23 EXISTING EXTERIOR CONCRETE STAIRS TO REMAIN. CLEAN, PATCH AND

REPAIR AS REQUIRED

D31 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR PLUMBING,

FIRE SUPPRESSION, AND HVAC WORK. DO NOT REMOVE CONCRETE SLAB

OVER TUNNELS WHERE APPLICABLE - SEE STRUCTURAL, MECHANICAL,

PLUMBING AND FIRE PROTECTION DRAWINGS

D32 REMOVE EXISTING PARTITIONS IN THEIR ENTIRETY. PREPARE FLOOR AND

ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -

TYPICAL

D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE

IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW

CONSTRUCTION AND FINISHES - TYPICAL

D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,

FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT

SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL

D43 REMOVE EXISTING HARDWARE AND PREPARE TO RECEIVE NEW HARDWARE

1/8" = 1'-0"L1

FOUNDATION/ TUNNEL FLOOR - PARTIAL

DEMOLITION PLAN

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/1

/2

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/3

/2

C8C1 C2 C3 C4 C5 C6 C7

C11

C17

C16

C15

C14

C13

C12

C9

C10

CENTER

MATCHLINE

SECTION B SECTION C

S E C

TIO

N C

S

EC

TIO

N C

CENTER

MATCHLINE

D51D51D07

D32D32

D37

D04

D09

D10

D92

D04

D37

D07 D35 D37 D36D05

D37

D04

D37

D04

D07

D51D51

D32D32

D12 D43

D06

D35 D04

D19 D92

D03D03

D05

D37

D35

D19 D07

D03D03

D03

D35

D06

D35

D35

D31

D35

D22

D35

D35

D48

DEMOLITION LEGEND:

EXISTING WALLS TO REMAIN

ITEMS OR WALLS TO BE DEMOLISHED OR

REMOVED AS NOTED

SLAB TO BE DEMOLISHED AT NEW

ELEVATOR LOCATION. REFER TO

STRUCTURAL DRAWINGS FOR DETAILS

TEMPORARY EGRESS AREA

TEMPORARY DEMISING WALL AND OPENING

A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING

CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES

WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM

CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.

B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM

DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS

RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO

REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST

TO GOVERNMENT.

C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT

REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,

INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START

OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS

MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER

COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES

CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.

D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.

E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING

OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.

F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS

AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR

MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING

AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.

G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED

ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED

FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING

BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.

H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING

CONSTRUCTION.

I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL

CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL

CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF

CONSTRUCTION.

J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR

WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.

K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE

CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES

TO RECEIVE NEW WORK AND FINISHES.

L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE

EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING

CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND

FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING

OFFICER.

M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND

FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP

SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.

N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE

ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED

OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE

OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING

OFFICER.

O. TEMPORARY EGRESS DURING CONSTRUCTION:

TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A

THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE

PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE

WITH CONTRACTING OFFICER.

P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,

INFORMATION, QUANTITIES, AND EXTENT OF REPAIRS

Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE

DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO

RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.

PAINTED AS INDICATED

GENERAL NOTES DEMOLITION:

C5 C6

D21

D23

D04

D19

D02

D04

D06D06

D06D06

D03 D35

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S A

V A

N N

A H

D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E

A V

E N

U E

S A

V A

N N

A H

G

E O

R G

IA

JO

N

E S

F R

A N

K

LI

N R

D , S

U

IT

E

R A

LE

IG

H , N

C

-3

(9

1-

(9

1-

F

A X

LI

C

E N

S E

F

-0

F O

R T

B E

N N

IN

G

G

A B

U

IL

D

IN

G

T

R A

IN

E

E B

A R

R A

C K

S U

P G

R A

D E

P R

O G

R

U P

P

H A

S E

F

Y P

N

FOR OFFICIAL USE ONLY

AD113

F

IR

S T

F L O

O R

D E

M O

L

IT

IO

N

P L A

N

S E

C T

IO

N

C W

E S

T

Z K

A S

K Y

D V

A N

L O

O N

K B

R O

D B

E R

K B

R O

D B

E R

J U

L Y

W H

N B

- 7 -1

-2

C

A T

E G

O R

Y C

O D

E

F

IL

E N

A M

E A

D .D

W G

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

1/8" = 1'-0"A1

FIRST FLOOR DEMOLITION PLAN - C WEST KEY PLAN

G

F

E

N.T.S.

PLAN

NORTH

A

B C

DBUILDING 399

0 4' 8' 16' 24'

KEYNOTES DEMOLITION

D02 EXISTING FOOTING TO REMAIN - TYPICAL - SEE STRUCTURAL DRAWINGS

D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE

NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS

D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.

CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE

SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL

D05 EXISTING STUCCO WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED. CLEAN

AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED - TYPICAL

D06 EXISTING WALL TO REMAIN. PATCH, REPAIR, AND CAULK JOINTS AS REQUIRED.

CLEAN AND PREPARE TO RECEIVE NEW FINISHES AS INDICATED - TYPICAL

D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE

STRUCTURAL DRAWINGS - TYPICAL

D09 EXISTING CONCRETE STAIRS TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW PAINT, NOSING, AND ANTI-SLIP

SURFACE. WHEN REPLACING STAIR NOSING, REPLACE ALL TO SAME - TYPICAL

D10 EXISTING HANDRAILS TO REMAIN. REMOVE EXISTING COATINGS DOWN TO

ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT - TYPICAL

D12 EXISTING DOOR AND FRAME TO REMAIN. PREPARE TO RECEIVE NEW FINISHES

AS INDICATED

D19 EXISTING CONCRETE WALLS TO REMAIN. PREPARE SURFACES TO RECEIVE

NEW FINISHES AS INDICATED - TYPICAL

D21 EXISTING AREA/ FLOOR DRAIN TO REMAIN. CLEAR OUT AND CLEAN DRAIN TO

NEAREST MAIN. MISSING OR BROKEN DRAIN GRATES ARE TO BE REPLACED BY

NEW TO MATCH EXISTING. REPLACE CLEANOUT PLUG IF BROKEN OR MISSING -

TYPICAL

D22 EXISTING LADDER TO REMAIN. PREPARE TO RECEIVE NEW FINISH

D23 EXISTING EXTERIOR CONCRETE STAIRS TO REMAIN. CLEAN, PATCH AND

REPAIR AS REQUIRED

D31 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR PLUMBING,

FIRE SUPPRESSION, AND HVAC WORK. DO NOT REMOVE CONCRETE SLAB

OVER TUNNELS WHERE APPLICABLE - SEE STRUCTURAL, MECHANICAL,

PLUMBING AND FIRE PROTECTION DRAWINGS

D32 REMOVE EXISTING PARTITIONS IN THEIR ENTIRETY. PREPARE FLOOR AND

ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -

TYPICAL

D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE

IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW

CONSTRUCTION AND FINISHES - TYPICAL

D36 REMOVE EXISTING DOOR, FRAME AND LINTEL, AND ASSOCIATED HARDWARE IN

THEIR ENTIRETY, INCLUDING BLOCKING AND WOOD FRAMING. PREPARE

ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -

TYPICAL

D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,

FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT

SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL

D43 REMOVE EXISTING HARDWARE AND PREPARE TO RECEIVE NEW HARDWARE

D48 REMOVE EXISITNG BURGLAR BARS AND PATCH REPAIR SURFACES TO MATCH

ADJACENT SURFACES AND FINISHES - TYPICAL

D51 REMOVE ALL INTERIOR CEILINGS, FLOOR FINISHES INCLUDING GLUES,

FURRING, INSULATION, FIXTURES, MILLWORK, DOORS, FRAMES, AND

HARDWARE. REMOVE ALL GYPSUM BOARD FURRING ON THE INTERIOR SIDE OF

THE EXTERIOR MASONRY WALLS. REMOVE PAINT FROM ALL PAINTED

SURFACES ON INTERIOR FACE OF ALL EXTERIOR WALLS, SURFACES TO

RECIEVE NEW PAINT AND CONFORMING TO ENVIRONMENTAL SURVEY

RECOMMENDATIONS. METHODS USED TO REMOVE PAINT SHALL NOT DAMAGE

THE MASONRY. ENSURE A MINIMUM 70% OF INTERIOR SURFACE OF EXTERIOR

WALLS SHALL BE CLEAR OF PAINT TO INSURE VAPOR TRANSMISSION IS

ALLOWED (DRYING OF WALL SYSTEM). PREPARE ALL SURFACES TO RECIEVE

NEW WINDOWS, CASEWORK, APPLIANCES, FIXTURES, DOORS AND FRAMES AS

REQUIRED - TYPICAL

D92 EXISTING CONCRETE SIDEWALK. SEE CIVIL DRAWINGS

1/8" = 1'-0"L16

FOUNDATION/ TUNNEL

FLOOR - PARTIAL

DEMOLITION PLAN

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/1

/2

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/3

/2

C21

C20

C19

C18

C17

C24

D1

C26

C25

1 3 4

C23

C22

SECTION C

CENTER

MATCHLINE

SECTION D

D46

D58

D04

D09

D10

D36D36

D04

D36

D37

D04

D35

D05

D37

D07

D19

D51D51

D51D51

D04

D37

D32D32

D12 D43

D06

D35

D19

D04

D07

D37

D05

D03D03

D03D03

D23

D95 D96

D06

D35D35

D46

D62

D07

D07

D35

D35

D31

D35

D22

D32

D32

D35

DEMOLITION LEGEND:

EXISTING WALLS TO REMAIN

ITEMS OR WALLS TO BE DEMOLISHED OR

REMOVED AS NOTED

SLAB TO BE DEMOLISHED AT NEW

ELEVATOR LOCATION. REFER TO

STRUCTURAL DRAWINGS FOR DETAILS

TEMPORARY EGRESS AREA

TEMPORARY DEMISING WALL AND OPENING

A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING

CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES

WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM

CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.

B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM

DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS

RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO

REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST

TO GOVERNMENT.

C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT

REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,

INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START

OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS

MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER

COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES

CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.

D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.

E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING

OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.

F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS

AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR

MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING

AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.

G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED

ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED

FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING

BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.

H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING

CONSTRUCTION.

I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL

CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL

CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF

CONSTRUCTION.

J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR

WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.

K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE

CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES

TO RECEIVE NEW WORK AND FINISHES.

L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE

EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING

CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND

FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING

OFFICER.

M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND

FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP

SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.

N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE

ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED

OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE

OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING

OFFICER.

O. TEMPORARY EGRESS DURING CONSTRUCTION:

TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A

THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE

PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE

WITH CONTRACTING OFFICER.

P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,

INFORMATION, QUANTITIES, AND EXTENT OF REPAIRS

Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE

DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO

RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.

PAINTED AS INDICATED

GENERAL NOTES DEMOLITION:

C19

C18

D04D04

D21

D23

D06D06

D06D06

D03

D35

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S A

V A

N N

A H

D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E

A V

E N

U E

S A

V A

N N

A H

G

E O

R G

IA

JO

N

E S

F R

A N

K

LI

N R

D , S

U

IT

E

R A

LE

IG

H , N

C

-3

(9

1-

(9

1-

F

A X

LI

C

E N

S E

F

-0

F O

R T

B E

N N

IN

G

G

A B

U

IL

D

IN

G

T

R A

IN

E

E B

A R

R A

C K

S U

P G

R A

D E

P R

O G

R

U P

P

H A

S E

F

Y P

N

FOR OFFICIAL USE ONLY

AD114

F

IR

S T

F L O

O R

D E

M O

L

IT

IO

N

P L A

N

S E

C T

IO

N

C E

A S

T

Z K

A S

K Y

D V

A N

L O

O N

K B

R O

D B

E R

K B

R O

D B

E R

J U

L Y

W H

N B

- 7 -1

-2

C

A T

E G

O R

Y C

O D

E

F

IL

E N

A M

E A

D .D

W G

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

1/8" = 1'-0"A1

FIRST FLOOR DEMOLITION PLAN - C EAST KEY PLAN

G

F

E

N.T.S.

PLAN

NORTH

A

B C

DBUILDING 399

0 4' 8' 16' 24'

KEYNOTES DEMOLITION

D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE

NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS

D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.

CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE

SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL

D05 EXISTING STUCCO WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED. CLEAN

AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED - TYPICAL

D06 EXISTING WALL TO REMAIN. PATCH, REPAIR, AND CAULK JOINTS AS REQUIRED.

CLEAN AND PREPARE TO RECEIVE NEW FINISHES AS INDICATED - TYPICAL

D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE

STRUCTURAL DRAWINGS - TYPICAL

D09 EXISTING CONCRETE STAIRS TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW PAINT, NOSING, AND ANTI-SLIP

SURFACE. WHEN REPLACING STAIR NOSING, REPLACE ALL TO SAME - TYPICAL

D10 EXISTING HANDRAILS TO REMAIN. REMOVE EXISTING COATINGS DOWN TO

ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT - TYPICAL

D12 EXISTING DOOR AND FRAME TO REMAIN. PREPARE TO RECEIVE NEW FINISHES

AS INDICATED

D19 EXISTING CONCRETE WALLS TO REMAIN. PREPARE SURFACES TO RECEIVE

NEW FINISHES AS INDICATED - TYPICAL

D21 EXISTING AREA/ FLOOR DRAIN TO REMAIN. CLEAR OUT AND CLEAN DRAIN TO

NEAREST MAIN. MISSING OR BROKEN DRAIN GRATES ARE TO BE REPLACED BY

NEW TO MATCH EXISTING. REPLACE CLEANOUT PLUG IF BROKEN OR MISSING -

TYPICAL

D22 EXISTING LADDER TO REMAIN. PREPARE TO RECEIVE NEW FINISH

D23 EXISTING EXTERIOR CONCRETE STAIRS TO REMAIN. CLEAN, PATCH AND

REPAIR AS REQUIRED

D31 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR PLUMBING,

FIRE SUPPRESSION, AND HVAC WORK. DO NOT REMOVE CONCRETE SLAB

OVER TUNNELS WHERE APPLICABLE - SEE STRUCTURAL, MECHANICAL,

PLUMBING AND FIRE PROTECTION DRAWINGS

D32 REMOVE EXISTING PARTITIONS IN THEIR ENTIRETY. PREPARE FLOOR AND

ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -

TYPICAL

D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE

IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW

CONSTRUCTION AND FINISHES - TYPICAL

D36 REMOVE EXISTING DOOR, FRAME AND LINTEL, AND ASSOCIATED HARDWARE IN

THEIR ENTIRETY, INCLUDING BLOCKING AND WOOD FRAMING. PREPARE

ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -

TYPICAL

D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,

FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT

SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL

D43 REMOVE EXISTING HARDWARE AND PREPARE TO RECEIVE NEW HARDWARE

D46 REMOVE EXISTING CONCRETE SLAB. SEE CIVIL DRAWINGS

D51 REMOVE ALL INTERIOR CEILINGS, FLOOR FINISHES INCLUDING GLUES,

FURRING, INSULATION, FIXTURES, MILLWORK, DOORS, FRAMES, AND

HARDWARE. REMOVE ALL GYPSUM BOARD FURRING ON THE INTERIOR SIDE OF

THE EXTERIOR MASONRY WALLS. REMOVE PAINT FROM ALL PAINTED

SURFACES ON INTERIOR FACE OF ALL EXTERIOR WALLS, SURFACES TO

RECIEVE NEW PAINT AND CONFORMING TO ENVIRONMENTAL SURVEY

RECOMMENDATIONS. METHODS USED TO REMOVE PAINT SHALL NOT DAMAGE

THE MASONRY. ENSURE A MINIMUM 70% OF INTERIOR SURFACE OF EXTERIOR

WALLS SHALL BE CLEAR OF PAINT TO INSURE VAPOR TRANSMISSION IS

ALLOWED (DRYING OF WALL SYSTEM). PREPARE ALL SURFACES TO RECIEVE

NEW WINDOWS, CASEWORK, APPLIANCES, FIXTURES, DOORS AND FRAMES AS

REQUIRED - TYPICAL

D58 REMOVE PORTION OF EXISTING WALL FOR NEW WINDOW AS SCHEDULED. ALSO

SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION

D62 REMOVE EXISTING MECHANICAL, ELECTRICAL EQUIPMENT, AND ASSOCIATED

HARDWARE, ETC. - SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR

ADDITIONAL INFORMATION

D95 TEMPORARY DEMISING WALL. SEE LIFE SAFETY AND FIRE PROTECTION

DRAWINGS FOR RATINGS AND ADDITIONAL INFORMATION. CONTRACTOR TO

COORDINATE PHASING WITH GOVERNMENT

D96 TEMPORARY 36" X 80" (WXH) DOOR. RATING TO MATCH RATING OF DEMISING

WALL

1/8" = 1'-0"C13

FOUNDATION/ TUNNEL FLOOR - PARTIAL

DEMOLITION PLAN

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/1

/2

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/3

/2

UP DN

DNUP

B5 B6 B7 B8 B9 B10B1 B2 B3 B4

CENTER

MATCHLINE

SECTION BSECTION A

CENTER

MATCHLINE

SECTION BSECTION B

D45

D37

D04

D37

D04

D09

D10

D07

D07D37D05 D35 D19 D36D03D03

D51D51

D32D32

D32D32

D95

D96

D97

D04 D49

D35

TEMPORARY EGREES: SEE GENERAL

NOTES DEMOLITION "O". ALSO SEE LIFE

SAFETY AND FIRE PROTECTION DRAWINGS

FOR ADDITIONAL INFORMATION

AD405

D6

D10

D94

D96

D31

DEMOLITION LEGEND:

EXISTING WALLS TO REMAIN

ITEMS OR WALLS TO BE DEMOLISHED OR

REMOVED AS NOTED

SLAB TO BE DEMOLISHED AT NEW

ELEVATOR LOCATION. REFER TO

STRUCTURAL DRAWINGS FOR DETAILS

TEMPORARY EGRESS AREA

TEMPORARY DEMISING WALL AND OPENING

A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING

CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES

WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM

CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.

B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM

DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS

RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO

REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST

TO GOVERNMENT.

C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT

REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,

INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START

OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS

MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER

COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES

CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.

D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.

E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING

OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.

F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS

AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR

MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING

AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.

G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED

ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED

FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING

BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.

H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING

CONSTRUCTION.

I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL

CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL

CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF

CONSTRUCTION.

J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR

WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.

K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE

CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES

TO RECEIVE NEW WORK AND FINISHES.

L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE

EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING

CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND

FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING

OFFICER.

M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND

FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP

SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.

N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE

ALARM EQUIPMENT AND DEVICES ARE TO BE SALVAGED AND HANDED

OVER TO THE GOVERNMENT. CONTRACTOR IS TO COORDINATE STORAGE

OF SALVAGED FIRE ALARM EQUIPMENT AND DEVICES WITH CONTRACTING

OFFICER.

O. TEMPORARY EGRESS DURING CONSTRUCTION:

TEMPORARY EGRESS CORRIDOR PARTITIONS AND STAIR FROM SECTION A

THROUGH SECTION B. SEE DEMOLITION NOTES D95, D96, D97, AND FIRE

PROTECTION AND LIFE SAFETY DRAWINGS. CONTRACTOR TO COORDINATE

WITH CONTRACTING OFFICER.

P. SEE SHEET AE215 FOR ADDITIONAL EXTERIOR WALL DEMOLITION, REPAIR,

INFORMATION, QUANTITIES, AND EXTENT OF REPAIRS

Q. EXISTING HANDRAILS AND HANDRAIL GATES AT BALCONIES: REMOVE

DAMAGED HANDRAILS AND HANDRAIL GATES. PREPRE SURFACES TO

RECEIVE NEW HANDRAIL AND GATE TO MATCH EXISTING AS REQUIRED.

PAINTED AS INDICATED

GENERAL NOTES DEMOLITION:

US Army Corps of Engineers ®

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S A

V A

N N

A H

D

IS

T R

IC

T

W

E S

T O

G L E

T H

O R

P E

A V

E N

U E

S A

V A

N N

A H

G

E O

R G

IA

JO

N

E S

F R

A N

K

LI

N R

D , S

U

IT

E

R A

LE

IG

H , N

C

-3

(9

1-

(9

1-

F

A X

LI

C

E N

S E

F

-0

F O

R T

B E

N N

IN

G

G

A B

U

IL

D

IN

G

T

R A

IN

E

E B

A R

R A

C K

S U

P G

R A

D E

P R

O G

R

U P

P

H A

S E

F

Y P

N

FOR OFFICIAL USE ONLY

AD121

S E

C O

N D

F L O

O R

D E

M O

L

IT

IO

N

P L A

N

S E

C T

IO

N

B W

E S

T

Z K

A S

K Y

D V

A N

L O

O N

K B

R O

D B

E R

K B

R O

D B

E R

J U

L Y

W H

N B

- 7 -1

-2

C

A T

E G

O R

Y C

O D

E

F

IL

E N

A M

E A

D .D

W G

R E

A D

Y T

O A

D V

E R

T

IS

E

R T

A

1/8" = 1'-0"A1

SECOND FLOOR DEMOLITION PLAN - B WEST KEY PLAN

G

F

E

N.T.S.

PLAN

NORTH

A

B C

DBUILDING 399

0 4' 8' 16' 24'

KEYNOTES DEMOLITION

D45 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR ELEVATOR. DO

NOT REMOVE CONCRETE SLAB OVER TUNNELS WHERE APPLICABLE - SEE

STRUCTURAL, PLUMBING AND FIRE PROTECTION DRAWINGS

D49 REMOVE EXISTING STONE SILL AT THIS LOCATION AND PREPARE TO RECEIVE

NEW STONE SILL AND WINDOW

D51 REMOVE ALL INTERIOR CEILINGS, FLOOR FINISHES INCLUDING GLUES,

FURRING, INSULATION, FIXTURES, MILLWORK, DOORS, FRAMES, AND

HARDWARE. REMOVE ALL GYPSUM BOARD FURRING ON THE INTERIOR SIDE OF

THE EXTERIOR MASONRY WALLS. REMOVE PAINT FROM ALL PAINTED

SURFACES ON INTERIOR FACE OF ALL EXTERIOR WALLS, SURFACES TO

RECIEVE NEW PAINT AND CONFORMING TO ENVIRONMENTAL SURVEY

RECOMMENDATIONS. METHODS USED TO REMOVE PAINT SHALL NOT DAMAGE

THE MASONRY. ENSURE A MINIMUM 70% OF INTERIOR SURFACE OF EXTERIOR

WALLS SHALL BE CLEAR OF PAINT TO INSURE VAPOR TRANSMISSION IS

ALLOWED (DRYING OF WALL SYSTEM). PREPARE ALL SURFACES TO RECIEVE

NEW WINDOWS, CASEWORK, APPLIANCES, FIXTURES, DOORS AND FRAMES AS

REQUIRED - TYPICAL

D94 REMOVE EXISTING HANDRAIL DURING CONSTRUCTION. PROTECT FROM

DAMAGE AND STORE. REINSTALL WHEN TEMPORARY EGRESS STAIR IS

REMOVED. REMOVE EXISTING COATINGS DOWN TO ORIGINAL STEEL. PREPARE

SURFACES TO RECEIVE PAINT

D95 TEMPORARY DEMISING WALL. SEE LIFE SAFETY AND FIRE PROTECTION

DRAWINGS FOR RATINGS AND ADDITIONAL INFORMATION. CONTRACTOR TO

COORDINATE PHASING WITH GOVERNMENT

D96 TEMPORARY 36" X 80" (WXH) DOOR. RATING TO MATCH RATING OF DEMISING

WALL

D97 TEMPORARY EGRESS STAIR DURING CONSTRUCTION. STAIR TO MEET IBC-2018

REQUIREMENTS AND OTHER APPLICABLE CODES. SEE AD405, LIFE SAFETY AND

FIRE PROTECTION DRAWINGS FOR RATINGS AND ADDITIONAL INFORMATION.

CONTRACTOR TO COORDINATE PHASING WITH GOVERNMENT

KEYNOTES DEMOLITION

D03 EXISTING FLOOR SLAB TO REMAIN. PATCH AND REPAIR. PREPARE TO RECEIVE

NEW CONSTRUCTION AND FINISH - SEE STRUCTURAL DRAWINGS

D04 EXISTING MASONRY WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED.

CLEAN AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED. SEE

SHEET AE215 FOR ADDITIONAL INFORMATION - TYPICAL

D05 EXISTING STUCCO WALL TO REMAIN. PATCH AND REPAIR AS REQUIRED. CLEAN

AND PREPARE TO RECEIVE NEW FINISHES WHERE INDICATED - TYPICAL

D07 EXISTING CONCRETE COLUMN TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW FINISHES AS INDICATED - SEE

STRUCTURAL DRAWINGS - TYPICAL

D09 EXISTING CONCRETE STAIRS TO REMAIN. PATCH AND REPAIR AS REQUIRED.

PREPARE SURFACES TO RECEIVE NEW PAINT, NOSING, AND ANTI-SLIP

SURFACE. WHEN REPLACING STAIR NOSING, REPLACE ALL TO SAME - TYPICAL

D10 EXISTING HANDRAILS TO REMAIN. REMOVE EXISTING COATINGS DOWN TO

ORIGINAL STEEL. PREPARE SURFACES TO RECEIVE PAINT - TYPICAL

D19 EXISTING CONCRETE WALLS TO REMAIN. PREPARE SURFACES TO RECEIVE

NEW FINISHES AS INDICATED - TYPICAL

D31 REMOVE PORTION OF EXISTING FLOOR SLAB AS REQUIRED FOR PLUMBING,

FIRE SUPPRESSION, AND HVAC WORK. DO NOT REMOVE CONCRETE SLAB

OVER TUNNELS WHERE APPLICABLE - SEE STRUCTURAL, MECHANICAL,

PLUMBING AND FIRE PROTECTION DRAWINGS

D32 REMOVE EXISTING PARTITIONS IN THEIR ENTIRETY. PREPARE FLOOR AND

ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -

TYPICAL

D35 REMOVE EXISTING DOOR, FRAME, THRESHOLD AND ASSOCIATED HARDWARE

IN THEIR ENTIRETY. PREPARE ADJACENT SURFACES TO RECEIVE NEW

CONSTRUCTION AND FINISHES - TYPICAL

D36 REMOVE EXISTING DOOR, FRAME AND LINTEL, AND ASSOCIATED HARDWARE IN

THEIR ENTIRETY, INCLUDING BLOCKING AND WOOD FRAMING. PREPARE

ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND FINISHES -

TYPICAL

D37 REMOVE EXISTING WINDOW SYSTEM IN THEIR ENTIRETY, INCLUDING GLAZING,

FRAMES, SILL, BLOCKING AND WOOD FRAMING. PREPARE ADJACENT

SURFACES TO RECEIVE NEW WINDOWS AND WORK AS INDICATED - TYPICAL

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/1

/2

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/2

/2

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

/3

/2

B9 B10 B11 B12 B13 B14

SECTION CSECTION B

CENTER

MATCHLINE

SECTION BSECTION B

CENTER

MATCHLINE

D45

D37

D04

D37

D04

D37D04D05 D19D10 D07

D07

D35 D05D03D03

D51D51

D32D32

D32D32

D35

DEMOLITION LEGEND:

EXISTING WALLS TO REMAIN

ITEMS OR WALLS TO BE DEMOLISHED OR

REMOVED AS NOTED

SLAB TO BE DEMOLISHED AT NEW

ELEVATOR LOCATION. REFER TO

STRUCTURAL DRAWINGS FOR DETAILS

TEMPORARY EGRESS AREA

TEMPORARY DEMISING WALL AND OPENING

A. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING

CONDITIONS PRIOR TO START OF CONSTRUCTION. IF ANY DISCREPANCIES

WITH CONSTRUCTION DOCUMENTS, CONTRACTOR IS TO INFORM

CONTRACTING OFFICER IN WRITING PRIOR TO START OF CONSTRUCTION.

B. CONTRACTOR IS TO PROTECT ALL EXISTING ITEMS TO REMAIN FROM

DAMAGE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR IS

RESPONSIBLE FOR REPAIRING, AND/ OR REPLACING DAMAGED ITEMS TO

REMAIN WITH EQUAL OR BETTER, TO THEIR ORIGINAL STATE, AT NO COST

TO GOVERNMENT.

C. REFER TO THE ENVIRONMENTAL SURVEY AND REPORT FOR ABATEMENT

REQUIREMENTS, ASBESTOS AND/ OR LEAD CONTAINING MATERIALS, MOLD,

INCLUDING ABOVE CEILINGS, RAILINGS AND STAIR ROOMS PRIOR TO START

OF CONSTRUCTION. REMOVE AND DISPOSE OF ALL HAZARDOUS

MATERIALS AS PER APPLICABLE CODES AND REGULATIONS. AFTER

COMPLETION OF REMEDIATION, ISSUE A FINAL REPORT THAT INCLUDES

CLEAN AIR QUALITY SAMPLING AND MATERIAL DISPOSAL RECORDS.

D. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND NEW WORK.

E. COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH CONTRACTING

OFFICER 14 DAYS PRIOR TO PERFORMING SHUT-DOWNS.

F. CONTRACTOR SHALL PATCH, INFILL, AND SEAL WALLS WHERE AIR DUCTS

AND UTILITIES THAT PENETRATE WALLS WERE REMOVED WITH SIMILAR

MATERIAL(S). ALL INFILL AND SEALANTS SHALL CONFORM WITH EXISTING

AND NEW FIRE WALL AND SMOKE RATING REQUIREMENTS.

G. MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL FIRE-RATED

ASSEMBLIES (FOR EXAMPLE DOORS, GYPSUM ENCLOSURES, SPRAYED

FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW LOCATIONS INCLUDING

BUT NOT LIMITED TO STRUCTURAL COLUMNS, BEAMS, AND FLOOR SLABS.

H. MAINTAIN ACCESS/ EXIT FOR SECTIONS A AND D AT ALL TIMES DURING

CONSTRUCTION.

I. ALL CORE DRILL LOCATIONS ARE TO BE VERIFIED BY GENERAL

CONTRACTOR (GC) PRIOR TO DRILLING. GC IS TO COORDINATE ALL FINAL

CORE DRILL LOCATIONS WITH ASSOCIATED TRADES PRIOR TO START OF

CONSTRUCTION.

J. PROVIDE TEMPORARY WATER- AND WEATHERTIGHT WALL AT EXTERIOR

WALL OPENINGS AT ALL TIMES DURING DEMOLITION AND CONSTRCUTION.

K. REMOVE EXISTING FLOOR FINISHES, INCLUDING GLUES, TO BARE

CONCRETE. PATCH, REPAIR, CLEAN, AND PREPARE CONCRETE SURFACES

TO RECEIVE NEW WORK AND FINISHES.

L. GENERAL CONTRACTOR IS TO PROTECT FROM DAMAGE AND STORE

EXISTING ITEMS TO BE REMOVED AND REINSTALLED DURING

CONSTRUCTION. PROVIDE MATERIALS REQUIRED FOR COMPLETE AND

FUNCTIONING REINSTALLATION. COORDINATE WITH CONTRACTING

OFFICER.

M. FOR ADDITIONAL STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND

FIRE PROTECTION DEMOLITION SCOPE AND INFORMATION, REFER TO RFP

SECTION , STRUCTURAL, MPE, AND FP DRAWINGS.

N. CONTRACTOR IS TO DISPOSE OF ALL FURNITURE AND EQUIPMENT. FIRE

ALARM EQUIPMENT AND DEVICES…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .