This document is an invitation for bid for construction services. It solicits bids for the construction of a 4,008 square foot Field Research Facility Annex to include offices, administrative support areas, team room, secure meeting room, support shop space, restrooms, janitor closet, telecommunications room, electrical room and mechanical room. Bids are due by September 14, 2020. The acquisition is designated as 100% competitive small business set-aside under NAICS code 236220 for commercial and institutional construction. The contract will be awarded in accordance with FAR Part 14 for sealed bidding. The magnitude of construction is between $1,000,000 to $5,000,000. Bidders must be registered in the System for Award Management. The point of contact is listed as Ms. Tonja Dreke of the U.S. Army Corps of Engineers Savannah District.

View the file

Other files

File Type Posted
Bid Opening Log.pdf PDF
Bid Opening Chat.pdf PDF
C.04 Abstract_W912HN20B3013 Duck NC FRF Annex.pdf PDF
W912HN-20-B-3013_VOL2_AMD2.pdf PDF
W912HN-20-B-3013_VOL1_AMD2.pdf PDF
W912HN20B30130002.pdf PDF
W912HN20B30130001.pdf PDF
20B3013vol2.pdf PDF
20B3013vol1.pdf PDF
FRF Annex Pre-Bid Site Visit.pdf PDF
20B3013vol2.pdf PDF
20B3013vol3.pdf PDF
20B3013vol1.pdf PDF
W912HN-20-B-3013_VOL2.pdf PDF
W912HN-20-B-3013_VOL1.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USACE BSU,

Duck, North Carolina

Solicitation Number

W912HN-20-B-3013

Field Research Facility Annex Volume 1 of 3: Procurement and Contracting Requirements and Specification Divisions 01 - 04

PN 91397

August 2020

U.S. ARMY ENGINEER DISTRICT, SAVANNAH

CORPS OF ENGINEERS

100 WEST OGLETHORPE AVENUE

SAVANNAH, GEORGIA 31401-3640

US Army Corps of Engineers Savannah District

Field Research Facility Annex 20B3013 Duck, NC

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 30 00 ADMINISTRATIVE PROCEDURES

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 QUALITY CONTROL

01 45 00.15 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.15 COMMISSIONING

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION

DI VI SI ON 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

03 42 13 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

DI VI SI ON 04 - MASONRY

04 20 00 UNIT MASONRY

DI VI SI ON 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 10 BUILDING AIR BARRIER SYSTEM

07 41 13 METAL ROOF PANELS

PROJECT TABLE OF CONTENTS Page 1

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES

08 14 00 WOOD DOORS

08 22 20 FIBERGLASS REINFORCED PLASTIC (FRP) DOORS AND FRAMES

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 06 00 SCHEDULES FOR FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 67 23.13 STANDARD RESINOUS FLOORING

09 68 00 CARPETING

09 90 00 PAINTS AND COATINGS

DI VI SI ON 10 - SPECI ALTI ES

10 11 00 VISUAL DISPLAY UNITS

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

DI VI SI ON 12 - FURNI SHI NGS

12 24 13 ROLLER WINDOW SHADES

12 36 00 COUNTERTOPS

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBING, GENERAL PURPOSE

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 48.19 BRACING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL

23 23 00 REFRIGERANT PIPING

PROJECT TABLE OF CONTENTS Page 2

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 82 00 TERMINAL HEATING UNITS

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11.23 CYBERSECURITY FOR HVAC CONTROL SYSTEMS

25 05 11.26 CYBERSECURITY FOR LIGHTING SYSTEMS

25 05 11.28 CYBERSECURITY FOR FIRE ALARM/MASS NOTIFICATION SYSTEMS

DI VI SI ON 26 - ELECTRI CAL

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 28 01 FAULT CURRENT AND ARC-FLASH STUDIES

26 33 53 STATIC UNINTERRUPTIBLE POWER SUPPLY (UPS)

26 36 00 AUTOMATIC TRANSFER SWITCH

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 LIGHTING

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 16 01 SMALL INTRUSION DETECTION SYSTEM

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEMS

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 11 00 CLEARING AND GRUBBING

31 31 16.13 CHEMICAL TERMITE CONTROL

31 32 11 SOIL SURFACE EROSION CONTROL

31 62 13.20 PRECAST/PRESTRESSED CONCRETE PILES

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 23 PAVEMENT MARKINGS

32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES

32 92 19 SEEDING

DI VI SI ON 33 - UTI LI TI ES

33 11 00 WATER DISTRIBUTION

33 30 00 SANITARY SEWERAGE

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 3

A. This is an Invitation for Bid for: PN 91397 Facility Annex, Duck, NC.

B. This acquisition is being solicited as 100% Competitive Small Business acquisition under NAICS 236220, Commercial and Institutional Construction.

C. This acquisition w ill be aw arded in accordance w ith FAR Part 14 (Sealed Bidding).

D. In accordance w ith FAR 36.204(f) the magnitude of construction for this project is betw een $1,000,000 and $5,000,000 E. Bidders must be registered in the System for Aw ard Management (w w w .sam.gov).

F. The contractual POC for this Procurement is Ms. Tonja Dreke, (912) 652-6071 or tonja.j.dreke@usace.army.mil

X

TONJA J DREKE 912-652-6071

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

13-Aug-2020

(RFP)

(IFB)

CALL:

Field Research Facility Annex, Duck, NC

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________360 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________14 Sep 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USACE - SAVANNAH DISTRICT

100 W. OGLETHORPE AVE

SAVANNAH GA 31401

W912HN

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

91397

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912HN20B3013 61

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

ProjNet: Logged In User Page 3 of 6 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll...

W912HN20B3013

Section SF 30 - Block 14 Continuation Page (SF 30)

SITE VISIT SIGN IN

ProjNet: Logged In User Page 4 of 6

ProjNet: Logged In User Page 5 of 6

AMENDMENT 0001

A. CONTRACT CHANGES: Wage Determination NC20200065 is updated. Site visit sign in roster added. FRF Annex Pre-Bid Site Visit Presentation added. Bid opening due date and time is changed to 14 September 2020 at 1:00pm ET.

B. TECHNICAL SPECIFICATION CHANGES: The revised Sections listed below (revised by Amendment No. 0001) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be found in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).

Revised Sections 01 50 00 07 41 13

C. CONTRACT DRAWINGS: There are no drawing changes with this amendment.

ProjNet: Logged In User Page 6 of 6

AMENDMENT 0002

A. CONTRACT CHANGES: Provide ProjNet Inquiry Report.

B. TECHNICAL SPECIFICATION CHANGES: The revised Sections listed below (revised by Amendment No. 0001) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be found in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).

Revised Sections 01 50 00 07 41 13

C. CONTRACT DRAWINGS: There are no drawing changes with this amendment.

PROJNET INQUIRY REPORT

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Bid Inquiry Contractor Report All Inquiries

Project: Field Research Facility Annex Review: Field Research Facility (00001) (sorted by CommentID ) Displaying 26 inquiries.

Id Discipline Sheet Detail Spec 8785815 Construction Management Section 01 50 00 page 361 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In section 3.6.1 of Spec Section 01 50 00 it states the contractor is to provide the government a telephone. Is the telephone required to be a landline or will the government use their on cellular telephone?

On: Aug 21 2020.

Government Response. . A phone is not required for government. The requirement will be addressed in a forthcoming amendment. On: Aug 26 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8785933 Construction Management Section 01 35 26 Page 8 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The specifications state to provide an SSHO person full time onsite. Can the full time SSHO person also serve as the superintendent?

On: Aug 21 2020.

Government Response. . Yes, for this size project, the SSHO and Superintendent may be the same person. On: Aug 28 2020 Current Request Status: Request Closed

ProjNet: Logged In User Page 7 of 6

Information for this report is procurement sensitive.

8794225 General RFP Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

According to page 6 of 51 of Section 00 21 13, I want to verify that items 1-4 are the only things needed to be submitted electronically for this bid.

On: Aug 26 2020.

Government Response. . Yes, confirmed plus the original bid bond must also be mailed prior to bid due date and time. On: Aug 27 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8794228 General RFP Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

According to page Standard Form 1442, this acquisition is solicited for 100% Competitive Small Business acquisition.

Will any documentation need to be submitted or a JV agreement submitted to provide back up information for this portion?

On: Aug 26 2020.

Government Response. . The government will use the active SAM registration at www.sam.gov using a bidder's DUNS or CAGE per FAR 52.204-7 to confirm size status of bidders. Any joint venture bidders can include their JV agreement with their bid as additional support. On: Aug 27 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8798636 Architectural multiple n/a Comment Classification: UNCLASSIFIED (U)

ProjNet: Logged In User Page 8 of 6

There are a few work items that don't seem to have a spec, are you able to provide a specification or further details for:

-siding -aluminum canopy -PVC fascia -window sun shades

On: Aug 28 2020.

Government Response. . Drawings will be revised by Amendment. Salient features for these items will be provided in the drawings. On: Sep 04 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8799908 Construction Management 1 31 62 13.20 Precast/Prestresed Concrete Pile

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) The spec calls for precast concrete piles will the government consider any other type of pile?

On: Aug 28 2020.

Government Response. . No, alternate types of piles will not be considered. On: Aug 31 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8801857 Construction Management Section 07 41 13 11

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) The spec calls for a 38 inch roofing panels with 1 1/2 inch high rib on 12 inch center. Is 1 1/4 inch rib acceptable?

On: Aug 31 2020.

Government Response. . No a 1 1/4" rib is not acceptable. The specification will be revised by a forthcoming amendment to provide a 2" rib. On: Sep 01 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8807792 Structural SF501 3

Comment Classification: UNCLASSIFIED (U)

Both 12 inch and 14 inch piles are depicted but not noted which size and where. Detail 2 references a sheet SB501 but there is only sheet SB101. Is it possible, for bidding purposes, to get the size and quantities of each size on the pile layout plan?

On: Sep 02 2020.

Government Response. . Per detail 3/SF501, the Contractor has the option to use either 12" or 14" piles. The final design shall be determined by the Contractor's delegated pile engineer. The total pile quantity is shown on sheet SB101. The reference to sheet SB501 in detail 2/SF501 should refer to 3/SF501. On: Sep 03 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8807800 Architectural 102813 Comment Classification: UNCLASSIFIED (U)

There is no description or products listed in the spec for the rag hooks and broom holder, can you provide a basis of design or more details?

On: Sep 02 2020.

Government Response. . Provide commercial products manufactured for the intended application. On:

Sep 04 2020 Current Request Status: Request Closed

8809059 General 01-30-00 SD-01

ProjNet: Logged In User Page 9 of 6

Do we have to purchase license for RMS software or is it provided by the army core?

On: Sep 03 2020.

Government Response. . No purchase for RMS software download. Site provided within specifications.

On: Sep 04 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8809084 General 01-57-19 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

What permits are required to be paid for by the contractor?

It looks as though we are paying for the SWPPP permit, is this the case?

Also is there any building permit inspection cost being this is a army core project, if so is the contractor paying for the building permit?

On: Sep 03 2020.

Government Response. . There are no building permit, or inspection costs. Bid as shown. On: Sep 04

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8809096 General 01-50-00 3.3.2

Comment Classification: UNCLASSIFIED (U)

The section listed above states that we are responsible for temporary utility usage. Are we responsible for the cost of final utility connection fees, such as tap and impact fees for permanent water and sewer? If we are can you give out an allowance for the cost of those fees? It is sometimes very difficult to get that information from the local municipalities.

Government Response. . Jordan Wood with Dominion Energies is the point of contact for the Field

Research Facility Annex project. Contact information is below.

Jordan Wood Key Account Manager Customer Service and Strategic Partnerships

Dominion Energy Virginia 2700 Cromwell Dr., Norfolk, VA 23509 O: 757-857-2950 C: 757-738-4681 email: jordan.a.wood@dominionenergy.com On: Sep 04 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8809158 General 01-00-00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Is the contractor responsible for the cost of permanent power charges from Dominion Power? If the contractor is responsible please give an allowance for this cost. It is impossible for the contractor to get these cost from Dominion Power before the bid. If the Army Core is not paying this fee directly an allowance is needed to put in bid.

On: Sep 03 2020.

Government Response. . Bid tab to be changed to reflect Dominion cost in a future amendment. On:

Sep 04 2020 Current Request Status: Request Closed

8809320 Structural 42000/2.4/C

ProjNet: Logged In User Page 10 of

The spec caalls out normal weight CMU. Would it be acceptable to use lightweight CMU? Lightweight is now the industry standard, and carries a 2 hour fire rating, whereas normal weight does not.

Government Response. . 04 20 00 Specification paragraph 2.2.2.2.4 Unit Types allows for either lightweight or normal weight units.

The general note, M-3, on S-002 only refers to normal weight units.

The general note, M-3, will be revised to correspond with the specification, and allow for either lightweight or normal weight units. On: Sep 04 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8810772 Civil CS501

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Please Clarify which NCDOT mix design is required for Asphalt.

On: Sep 03 2020.

Government Response. . Please refer to specification 32 12 16 Hot - Mix Asphalt (HMA)for Roads for asphalt requirements. On: Sep 04 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8810784 Civil CD-401

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

What are the small concrete pads that have to me removed from site area, what is the thickness of the concrete pads to be demolished from site? Is there any foundation under these pads?

Government Response. . These are monitoring equipment pads and foundations are not anticipated. On:

Sep 04 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8810791 Civil CS501

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

When utilities are removed under asphalt surfaces is it requires to fill in area with temporary concrete as shown on utility trench detail or is stone acceptable?

Government Response. . Construct as per detail. On: Sep 04 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8810796 Electrical ES101

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Can Electrical work under highway be directional bored?

On: Sep 03 2020.

Government Response. . Electrical work under the highway may be directional bored. The Contractor is responsible for submitting applicable forms and attaining applicable permits from the NC DOT and the local jurisdiction authorizing the highway crossings. On: Sep 04 2020

Current Request Status: Request Closed

8811747 Electrical 26 00 00

ProjNet: Logged In User Page 11 of

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Are North Carolina License for electrical required for this job since it is a government project.

On: Sep 04 2020.

Government Response. . A North Carolina Electrical Contractor License is not required. On: Sep 08

Current Request Status: Request Closed Information for this report is procurement sensitive.

8811982 Civil CS104

Comment Classification: UNCLASSIFIED (U)

Please provide further details/specifications for the 24" wide stop bar. Is this painted, or a product inserted in asphalt?

On: Sep 04 2020.

Government Response. . Stop bar is to be painted white per specification section 32 17 23. On: Sep 04

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8811989 Plumbing PL101 Note 5

Comment Classification: UNCLASSIFIED (U)

Can you please confirm the water meter will be provided by the controls contractor (not the plumber) per note 5 on

PL101?

Government Response. . Contract documents require controls contractor to provide the water meter and plumbing contractor to install the water meter. On: Sep 08 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8812009 Civil 31 00 00

Comment Classification: UNCLASSIFIED (U)

Specification section 01-57-19-3.7.6.3 Land Application (page 27) says to discharge water from new waterline flushing into the new sanitary sewer system. In this case it would be the existing septic tank and drainfield. Please confirm this is how it is to be handled, or if alternate method of flushing onto open sandy areas is preferred.

Government Response. . Discharge to an open sandy area is an option. The spec will be revised in a forthcoming amendment. On: Sep 08 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8812021 Civil 31 00 00

Comment Classification: UNCLASSIFIED (U)

For the waterline fittings materials, we are quoting domestic material, in accordance with the NCDOT Buy American Act; however we need to know does the material need to be AIS (American Iron and Steel) certified? That is another level of documentation and expense.

On: Sep 04 2020.

Government Response. . Water lines and fittings are to comply with American Water Works Association

AWWA requirements and will not require AIS certification. Please refer to Spec. 33 11 00 for water lines and fittings. On: Sep 08 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8812024 Civil 01-57-19-3.2.1.2

Specification section 01-57-19-3.2.1.2 (page 18) says that a notice of intent for construction activities and also a SWPPP must be prepared by the contractor. Can you confirm if there is a state permit issued for both the stormwater and erosion control construction for this project? Typically this permit is applied for and obtained by the designer from the state agencies. The section also says that fees for NOI are to be paid by the contractor. We would need clarification and explanation on this . In any case, please be advised we cannot either cost estimate or perform these permits and fees.

On: Sep 04 2020.

Government Response. . Both the State Erosion Control and Storm Water management permits have been obtained. There is a NOI fee of $100 to the State inspection agency for these activities that is to be paid for by the contractor awarded the contract prior to commencement of construction. The spec. has been revised in a forthcoming amendment. On: Sep 08 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8812028 Civil 01 30 00 Comment Classification: UNCLASSIFIED (U)

Please confirm that all NC state and Dare County water permits are in hand for the construction of the water system.

Typically this is handled by the designer, and permits are issued to the owner before the bidding process. See also note 3 above.

Government Response. . Both the State Erosion Control and Storm Water management permits have been obtained. There is a NOI fee of $100 to the State inspection agency for these activities that is to be paid for by the contractor prior to commencement of construction. No water permits are required, but coordination with Dare County water is required for new water meter, and connection to county water lines.

On: Sep 08 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8812036 Civil 31 00 00 Comment Classification: UNCLASSIFIED (U) Will a surveyor do the site layout for the site contractor work?

On: Sep 04 2020.

Government Response. . Site layout shall be per civil drawings. Contractor is responsible for laying out all site features and building location per civil drawings. It is contractor responsibility to hire a surveyor to stake out the site for correct placement of such items. On: Sep 04 2020

Current Request Status: Request Closed

Report Complete

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Patent 11/892,984 ProjNet property of ERDC since 2004.

Section 00 10 00 - Solicitation

SUMMARY

BID TOTALS

TOTAL BASE BID

(ITEMS 0001-0002)

TOTAL OPTION 1

(ITEMS 0003)

TOTAL BID

(ITEMS 0001-0003)

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Base Bid Site WorkFFP

Beyond the 5-foot Line Including all Site Work, Paving, Demolition Work, Site Utilities, and other Construction Work beyond the 5-foot Line, Complete.

FOB: Destination

PSC CD: Y1NZ

NET AMT

0002 1 Job Base Bid. Field Research AnnexFFP

Complete.

0003 1 Job OPTION Option 1: STC Interior WallsFFP

Sound Transmission Class (STC) Interior Walls Complete.

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 360 dys. ANP 1 SEYMOUR JOHNSON AFB RES OFFICE

(CD-BRJ)

STEPHEN T BLANCHARD

1095 PETERSON AVE., BLDG 3300

SEYMOUR JOHNSON AFB NC 27531

919-722-5869

W912HN

0002 360 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0003 360 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

BID DATA SHEET

BID DATA SHEET

W912HN-20-B-3013

Project Number: PN91397 Field Research Facility Annex, Duck, NC

Name of Firm: _________________________________________________

Address:______________________________________________________

Phone: _______________________________________________________

Fax:__________________________________________________________

Person(s) Authorized to Sign Bid: ___________________________________

E-mail:________________________________________________________

DUNS # (used for accessing SAM, CPARS, PPIRS):_______________________

CAGE CODE: __________________________

TAX ID: _______________________________

Section 00 21 13 - Instructions to Bidders

INSTRUCTIONS

1. BASIS FOR AWARD:

A. IN ORDER TO BE DETERMINED RESPONSIVE AND RESPONSIBLE, ALL PROSPECTIVE BIDDER

MUST FURNISH THE FOLLOWING INFORMATION WITHIN THE ELECTRONICALLY

SUBMITTED BID:

1) Standard Form 1442, completed and signed by an authorized person.

2) Unit and Total Pricing for all line items in the bid schedule (except CLINS marked “DO NOT BID THIS

CLIN.”, if any)

3) Current Financial Statements (e.g. the last three years financial statements, Annual Reports, Dun and

Bradstreet ratings and/or number, etc) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount. (The financial statement information will be protected from disclosure by the Contracting Officer.)

4) Bidders are required to submit a bid guarantee for this project in accordance with FAR Clause 52.228-

1, Bid Guarantee. An electronically copy of the bid guarantee must be submitted with the electronic bid submission. Also, the original bid guarantee shall be mailed by the Solicitation due date in SF1442 Box 13 to:

U.S. Army Corps of Engineers Savannah District CECT-SAS-E (Tonja Dreke) 100 W. Oglethorpe Ave.

Savannah, GA. 31401

2. SUBMISSION OF BIDS:

The Offeror’s bid shall be submitted electronically, as described below. The Offeror’s bid shall not contain classified data. The use of hyperlinks in bids is prohibited. The Offeror’s bid is due at the time and date specified in Block 13 of the SF1442.

The only authorized transmission method for bids in response to this solicitation is electronically via DODSAFE online submission. NO OTHER TRANSMISSION METHOD (EMAIL, FACSIMILE, US POSTAL MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED other than original bid guarantee as indicated above.

The Offeror’s bid must be received by the Government by the date/time specified in the solicitation in the SF1442, Box 13. Offerors shall submit their bid using the following link:

https://safe.apps.mil/

Please send bids using the link above to Contract Specialist, Tonja Dreke at tonja.j.dreke@usace.army.mil AND to Contracting Officer, Bruce Helms at bruce.a.helms@usace.army.mil.

INSTRUCTIONS FOR SUBMITTING ELECTRONIC BIDS: Due to the current COVID-19 pandemic, all bids shall be submitted electronically through the DODSAFE website. You are limited to five (5) maximum files per upload (total size cannot exceed 2GB). If you have a large number of files, recommend that you combine or ZIP your files before uploading to the DODSAFE site. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

REQUEST FOR UPLOAD CODE FOR SAFE WEBSITE: Offerors must email Contract Specialist, Tonja Dreke at tonja.j.dreke@usace.army.mil and to Contracting Officer, Bruce Helms at bruce.a.helms@usace.army.mil no later than five (5) working days prior to the bid due date to receive a request code which will allow for file uploads via the DODSAFE website. Offerors that fail to email for request of a code five (5) working days before bid submission date may not be able to receive a request code in time to upload their submission. The link requested for the bidder to upload will only be valid for 14 days.

FILE DESCRIPTION: Include a “File Description” for each file(s) you upload. The “File Description” will be in the email notice to each of the recipients you choose to have access your file(s).

NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII) in the File Description.)

Submission shall be in Adobe PDF format.

3. INSTRUCTION TO FOLLOW ON THE DODSAFE WEBSITE:

a. Once at the SAFE website, select the “Drop-off” icon. This allows users without a CAC or users whose computer is not configured to read a CAC the option to access the DODSAFE site as a guest.

b. After selecting the “Click Here” link you will be prompted to add your personal information, file information, receipt (Government representative) information and emails email settings.

c. When completing your file information for transmittal via the SAFE website, you will be required to enter email address for all recipients. For this solicitation, the receipts are the Contract Specialist and the Contracting Officer. The Contract Specialist for this solicitation Tonja Dreke at tonja.j.dreke@usace.army.mil, and the Contracting Officer is Bruce Helms at bruce.a.helms@usace.army.mil. The bidder must enter the E-Mail address for both the Contracting Specialist and Officer. After entering the email address, click the ADD button to add the person(s) email to the “Recipients List” of your response. When your bid is submitted, a notification will be sent to the recipients you added.

NOTE: Do NOT send the SAFE site packages to group email accounts.

Even if you successfully upload your bid to the DODSAFE site, notification will not be sent to the government recipients until you verify your email address. Entering an incorrect email may result in the rejection of your submission for lateness. A Bidder can confirm proper submission by the “Drop-Off Completed” screen which generates based on proper file submission.

NOTE: It has been reported that documents may more quickly upload in the DODSAFE website when using the Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Offerors will have more success utilizing any particular browser.

RECEIPT OF SUBMISSIONS: For the purposes of establishing whether a bid submission is considered timely, the government considers the date and time the submission is completely uploaded in the DODSAFE website as the submission date and time. For bids larger than the 2GB capacity of the DODSAFE website and require multiple submissions, the Government will consider the date and time the last submission is completely uploaded in to the DODSAFE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases.

The Government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive bids. Offerors are responsible for ensuring that bids are submitted so as to reach the designated recipient. Offerors are responsible for allowing sufficient time for the bid to be received in accordance with the instructions provided.

4. QUALITY CONTROL SYSTEM (QCS): Any contract award resulting from this solicitation will require the mandatory use of the automated Quality Control System. Please see Section 01 45 01 for additional information.

5. TECHNICAL MATTERS: Submit technical inquiries and questions relating to this solicitation via Bidder Inquiry in Projnet (https://www.projnet.org) at least 10 calendar days prior to the date established in the IFB for receipt of bids.

If a Bidder believes that the requirements in this Invitation for bid contain an error, omission, or are otherwise unsound; immediately notify the Contract Specialist in writing with supporting rationale. The Government reserves the right to award this Information for Bid based on the initial bid, as received, without discussion.

6. BIDDER INQUIRIES: To submit and review inquiry items, prospective vendors will need to use the

Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment or question will receive an acknowledgement via email, followed by an answer after it has been processed by our technical team. All timely questions and approved answers will be made available through ProjNet. Approved answers to all timely questions will also be posted to the solicitation notice on the Contract Opportunities site (https://beta.sam.gov) in the form of a report generated from ProjNet as soon as the bidder inquiry period is over and answers are all finalized.

7.

INVITATION FOR BID NO: W912HN20B3013

TITLE OF PROJECT: (PN91397) Field Research Facility Annex, Duck, NC Bidder Inquiry Key: 453F6W-A4SY8A

Specific Instructions for Initial ProjNet Bid Inquiry Access:

1. From the ProjNet home page, click on Quick Add on the upper right side of the screen.

2. Identify the Agency as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time

Zone. Remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

Steps 1 through 3: same as above.

4. Email. Enter the email address you used to register previously in ProjNet.

5. Click Continue. A page will then open asking for the answer to your Secret Question.

6. Enter your Secret Answer and click Login. Once this is completed, you are logged into the system.

Individuals interested in participating in the virtual bid opening can participate by following these instructions:

Interested individuals will navigate to the WEBEX link below and enter their email address and name. Please provide your full name and information. This information will be utilized to obtain the list of attendees at the virtual bid opening.

Upon entering the WEBEX ROOM, you will choose the audio option for “CALL Me” and enter your phone number, WEBEX will call the number you entered. Answer the phone, enter the security code noted below, and speak your name clearly. You will now have entered the audio portion of the WEBEX meeting. The bids will be read out-loud and individuals will be able to view the information on the WEBEX screen as the bid are entered inta a bid tabulation sheet.

WEBEX Meeting Information:

https://usace.webex.com/meet/mark.t.puhalla

(877) 336‐1831 or (404)443‐6397

ACCESS CODE: 8706726

Security Code: 1234

The WEBEX virtual bid opening will begin at 3:00 2:00p.m. ET on the bid opening due date (see Block 13 of the SF1442). WEBEX participants should be logged into the WEBEX room and audio portion at least 5 minutes prior to avoid missing any of the virtual bid opening.

A list of attendees and a bid abstract will be posted to the solicitation notice on https://beta.SAM.gov approximately within 2 days after the virtual bid opening.

CLAUSES INCORPORATED BY REFERENCE

52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.204-24 Representation Regarding Certain Telecommunications and

Video Surveillance Services or Equipment.

DEC 2019

52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.222-5 Construction Wage Rate Requirements--Secondary Site of the

Work

MAY 2014

52.225-10 Notice of Buy American Requirement--Construction Materials

MAY 2014

CLAUSES INCORPORATED BY FULL TEXT

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

(a) Definitions. As used in this provision--

Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.

Registered in the System for Award Management (SAM) means that--

(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14) into SAM;

(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in SAM;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and

(4) The Government has marked the record ``Active''.

Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.

(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in SAM.

(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:

(1) Company legal business name.

(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(3) Company physical street address, city, state, and Zip Code.

(4) Company mailing address, city, state and Zip Code (if separate from physical).

(5) Company telephone number.

(6) Date the company was started.

(7) Number of employees at your location.

(8) Chief executive officer/key manager.

(9) Line of business (industry).

(10) Company headquarters name and address (reporting relationship within your entity).

(d) Processing time should be taken into consideration when registering. Offerors who are not registered in SAM should consider applying for registration immediately upon receipt of this solicitation. See https://www.sam.gov for information on registration.

(End of Provision)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.

(End of provision)

52.217-4 EVALUATION OF OPTIONS EXERCISED AT TIME OF CONTRACT AWARD (JUN 1988)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate the total price for the basic requirement together with any option(s) exercised at the time of award.

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

31.7% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is: NC Carteret;

NC Craven; NC Dare; NC Edgecombe; NC Greene; NC Halifax; NC Hyde; NC Jones; NC Lenoir; NC Martin; NC Nash; NC Northampton; NC Pamlico; NC Pitt; NC Tyrrell; NC Washington; NC Wayne; NC Wilson.

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be __20%___ percent of the bid price or $3,000,000__, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

U.S. Army Corps of Engineers, Savannah District Attn: CECT-SAS-E (Bruce Helms) 100 West Oglethorpe Avenue Savannah, GA 31401

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

Thursday, 27 August 2020 at 10:00A.M. Eastern

(c) Participants will meet at--

1261 Duck Road, Kitty Hawk, NC 27949

POC: Stephen Blanchard; email: Stephen.T.Blanchard@usace.army.mil

Attendees should wear face masks due to social distancing protocols.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .