Attachment - Playground IDIQ Bid Schedule EUROS_17MAR2022.xlsx
XLSX spreadsheet 157 KB Posted
- Solicitation number
- W912GB22R0008
- Issued by
-
Department of the Army European Command
About this file
This document contains a schedule of rates and services for a playgrounds single award task order contract (SATOC) to be awarded by the US Army Corps of Engineers Europe District. The contract will have a one year base period and four one-year options and will cover playground equipment installation, repair, and maintenance services across the US European Command area of responsibility, with an estimated 90% of work in Germany, 5% in the Benelux region, and 4% in Italy. Pricing is provided for various types of playground equipment, installation and repair services, safety inspections, surfacing materials, fencing, and site work. However, unit pricing is left blank, indicating this is a template used to solicit fixed prices from offerors for a firm fixed price IDIQ contract for playground services requirements across Europe.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Equipment Price List
| SECTION B | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | |||||
| Equipment Price List | ||||||
| ITEM | DESCRIPTION | EST | ||||
| QTY | U/I | Unit Price | Total Price | Catalog/Page Number | ||
| 1 | Park bench with back, 6-foot long. | 20 | EA | € 0.00 | € - 0 | |
| 2 | Park bench without back, 6-foot long. | 10 | EA | € 0.00 | € - 0 | |
| 3 | Square sunshade structure, 10-foot x 10 foot, minimum 8-foot clearance | 5 | EA | € 0.00 | € - 0 | |
| 4 | Square sunshade structure, 15-foot x 15 foot, minimum 8-foot clearance | 5 | EA | € 0.00 | € - 0 | |
| 5 | Square sunshade structure, 20-foot x 20 foot, minimum 8-foot clearance | 10 | EA | € 0.00 | € - 0 | |
| 6 | Pre-school age (2 to 5 years old) climb structure | 15 | EA | € 0.00 | € - 0 | |
| 7 | School age (5 to 12 years old) climb structure | 20 | EA | € 0.00 | € - 0 | |
| 8 | Swing set, 7-foot high x 10-foot wide, including two seats for pre-school children. | 15 | EA | € 0.00 | € - 0 | |
| 9 | Swing set, 8-foot high x 10-foot wide, including two each seats for school age children. | 15 | EA | € 0.00 | € - 0 | |
| 10 | Playhouse, minimum of 5-foot x 5 foot, with solid roof structure, floor, doorway, and two windows. | 15 | EA | € 0.00 | € - 0 | |
| 11 | Picnic table, 6-foot long, minimum 24-inch clearance from ground. | 10 | EA | € 0.00 | ||
| 12 | Picnic table, 4-foot long, minimum 24-inch clearance from ground. | 10 | EA | € 0.00 | € - 0 | |
| Price for Equipment | € - 0 | |||||
| Discount | 0.00% |
0031 Equipment Total Price € 0.00
BASE YR 1
| SECTION B | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | Changes from previous version Amend 001 highlighted in Red Font | |||
| BASE YEAR 1 | |||||
| LINE | |||||
| ITEM | DESCRIPTION | EST | |||
| QTY | U/I | Unit Price | Total Price | Geographic Distribution: non-binding approximate % of work by country: |
Germany – 90%, BENELUX – 5%, Italy 4%, Other geographic areas throughout EUCOM AOR – 1%.
0001 LABOR
| 0001 | AF | Project Manager | 400 | HR | € - 0 | € - 0 |
| 0001 | AA | Labor | 1200 | HR | € - 0 | € - 0 |
| 0001 | AB | Tractor / Lift Operator | 800 | HR | € - 0 | € - 0 |
| 0001 | AC | Fall Material HIC test and report | 50 | EA | € - 0 | € - 0 |
| 0001 | AD | Playground Inspection & Report | 50 | EA | € - 0 | € - 0 |
| 0001 | AE | Safety Audit Inspection & Report | 50 | EA | € - 0 | € - 0 |
| TOTAL COST (0001AA-AF) | € - 0 |
0002 RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE
| 0002 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0002 | AB | Poured in Place under 5cm(IAW ASTM and pass HIC Test) | 500 | SM | € - 0 | € - 0 |
| 0002 | AC | Poured in Place over 5cm (IAW ASTM and pass HIC Test) | 1000 | SM | € - 0 | € - 0 |
| 0002 | AD | Artificial Grass | 1000 | SM | € - 0 | € - 0 |
| TOTAL COST (0002AA-AE) | € - 0 |
0003 RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT
| 0003 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0003 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0003 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0003 | AD | Artificial Grass | 1000 | SM | € - 0 | € - 0 |
| TOTAL COST (0003AA-AE) | € - 0 |
C-0004 DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE
| C-0004 | AA | Gravel | 3000 | CM | € - 0 | € - 0 |
| C-0004 | AB | Sand | 1000 | CM | € - 0 | € - 0 |
| C-0004 | AC | Re-compact and level base after equipment installation | 10000 | SM | € - 0 | € - 0 |
| TOTAL COST (0004AA-AC) | € - 0 |
| MISCELLANEOUS WORK DESCRIPTION | |||||
| C-0005 | Delivery and installation of rubber curbing, including porous concrete base | 8000 | LM | € - 0 | € - 0 |
| C-0006 | Delivery and installation of concrete curbing, including porous concrete base | 5500 | LM | € - 0 | € - 0 |
| C-0007 | Delivery and installation of porous concrete, 15 cm thickness (pavers) | 5000 | SM | € - 0 | € - 0 |
| C-0008 | Sewer/drain trench in soil, class 3-5 | 250 | CM | € - 0 | € - 0 |
| C-0009 | Furnish and install reinforced concrete (B25) | 150 | CM | € - 0 | € - 0 |
| C-0010 | Remove and stockpile topsoil on site | 1000 | CM | € - 0 | € - 0 |
| C-0011 | Furnish and install unreinforced concrete (B25) | 1000 | CM | € - 0 | € - 0 |
| C-0012 | Soil excavation, machine: class 3-5 | 3000 | CM | € - 0 | € - 0 |
| C-0013 | Backfill trenches | 250 | CM | € - 0 | € - 0 |
| C-0014 | Install and connect drain/seepage lines | 250 | LM | € - 0 | € - 0 |
| C-0015 | Furnish and install trench\gutter draiange | 25 | LM | € - 0 | € - 0 |
| C-0016 | Install bituminous surface material | 1000 | CM | € - 0 | € - 0 |
| C-0017 | Clean-up | 5000 | SM | € - 0 | € - 0 |
| C-0018 | Safety fence, delivered and installed | 5000 | LM | € - 0 | € - 0 |
| C-0019 | Locate existing utility lines | 5000 | SM | € - 0 | € - 0 |
| C-0020 | Soil excavation, by hand: class 3-5 | 500 | CM | € - 0 | € - 0 |
| C-0021 | Furnish and place topsoil | 1000 | CM | € - 0 | € - 0 |
| C-0022 | Furnish and place sub-grade soil | 1000 | CM | € - 0 | € - 0 |
| C-0023 | Furnish and install rolled sod | 1000 | SM | € - 0 | € - 0 |
| C-0024 | Furnish and install geotextile seperation layer | 1000 | SM | € - 0 | € - 0 |
| C-0025 | Furnish and install biodegradable type erosion control material | 1000 | SM | € - 0 | € - 0 |
| C-0026 | Trim/cut tree limbs and bushes/brush and dispose of materials | 400 | HR | € - 0 | € - 0 |
| C-0027 | Painting | 1000 | SM | € - 0 | € - 0 |
| C-0028 | Water Line | 1000 | LM | € - 0 | € - 0 |
| TOTAL COST (0005-0028) | € - 0 |
| DELIVERY AND INSTALLATION OF FENCING | ||||||
| IAW SOW and Additional Task Order Specs | ||||||
| C-0029 | AA | Welded bar fence | 1500 | SM | € - 0 | € - 0 |
| C-0029 | AB | Chain Link Fence | 400 | SM | € - 0 | € - 0 |
| C-0029 | AC | Wooden fence | 100 | SM | € - 0 | € - 0 |
| C-0029 | AD | Round Fence Post | 100 | M | € - 0 | € - 0 |
| C-0029 | AE | Square/Rect. Fence Post | 500 | M | € - 0 | € - 0 |
| C-0029 | AF | Wooden fence post | 50 | M | € - 0 | € - 0 |
| C-0029 | AG | Concrete Foundation | 300 | CM | € - 0 | € - 0 |
| C-0029 | AH | Chain Link fence Gate | 40 | SM | € - 0 | € - 0 |
| C-0029 | AI | Welded bar fence Gate | 200 | SM | € - 0 | € - 0 |
| C-0029 | AJ | Wooden fence Gate | 10 | SM | € - 0 | € - 0 |
| C-0029 | AK | Replace hardware | 50 | EA | € - 0 | € - 0 |
| TOTAL COST (0029AA-AK) | € - 0 |
DEMOLITION
| C-0030 | AA | Remove and dispose of fence post | 500 | EA | € - 0 | € - 0 |
| C-0030 | AB | Remove and dispose of fence material | 1000 | SM | € - 0 | € - 0 |
| C-0030 | AC | Remove and dispose of post foundation | 300 | CM | € - 0 | € - 0 |
| C-0030 | AD | Remove and dispose of old plastic Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AE | Remove and dispose of old wooden Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AF | Remove and dispose of old metal Equipment including connection mat. | 300 | CM | € - 0 | € - 0 |
| C-0030 | AG | Remove and dispose of earth | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AH | Remove and dispose of bituminous mat. | 200 | CM | € - 0 | € - 0 |
| C-0030 | AI | Remove and dispose of reinforced concrete | 400 | CM | € - 0 | € - 0 |
| C-0030 | AJ | Remove and dispose of unreinforced concrete | 500 | CM | € - 0 | € - 0 |
| C-0030 | AK | Remove and dispose of concrete pavers | 1600 | SM | € - 0 | € - 0 |
| C-0030 | AL | Remove and dispose of rubberized fall material | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AM | Remove and dispose of artificial grass fall material | 100 | CM | € - 0 | |
| C-0030 | AN | Remove and dispose of wood fiber fall material | 200 | CM | € - 0 | |
| TOTAL COST (0030AA-AN) | € - 0 |
EQUIPMENT PRICING SCHEDULE
| Attach the Equipment Price List (in Excel format) | |||
| 0031 | Equipment Price List TOTAL COST calculated in Tab 1 (Exchange Rate multiplier established each fiscal year by the government to convert from Dollars to Euros, if applicable) | 0.8703 | € - 0 |
DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC)
0032 Percentage applied to (CLIN: 0031) equipment pricing per individual task order, excluding shipping and handling (as a percentage %) 0.00% DLCEIC % € - 0
SHIPPING
0033 Cost determined per individual task order € - 0
| TOTAL BASE YEAR | |
| € - 0 |
&KFF0000W912GB-17-D-00XX
12 September 2016
BASE YR 2
| SECTION B | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | Changes from previous version Amend 001 highlighted in Red Font | |||
| BASE YEAR 2 | |||||
| LINE | |||||
| ITEM | DESCRIPTION | EST | |||
| QTY | U/I | Unit Price | Total Price | Geographic Distribution: non-binding approximate % of work by country: |
Germany – 90%, BENELUX – 5%, Italy 4%, Other geographic areas throughout EUCOM AOR – 1%.
0001 LABOR
| 0001 | AF | Project Manager | 400 | HR | € - 0 | € - 0 |
| 0001 | AA | Labor | 1200 | HR | € - 0 | € - 0 |
| 0001 | AB | Tractor / Lift Operator | 800 | HR | € - 0 | € - 0 |
| 0001 | AC | Fall Material HIC test and report | 50 | EA | € - 0 | € - 0 |
| 0001 | AD | Playground Inspection & Report | 50 | EA | € - 0 | € - 0 |
| 0001 | AE | Safety Audit Inspection & Report | 50 | EA | € - 0 | € - 0 |
| TOTAL COST (0001AA-AF) | € - 0 |
0002 RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE
| 0002 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0002 | AB | Poured in Place under 5cm(IAW ASTM and pass HIC Test) | 500 | SM | € - 0 | € - 0 |
| 0002 | AC | Poured in Place over 5cm (IAW ASTM and pass HIC Test) | 1000 | SM | € - 0 | € - 0 |
| 0002 | AD | Artificial Grass | 1000 | SM | € - 0 | € - 0 |
| TOTAL COST (0002AA-AE) | € - 0 |
0003 RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT
| 0003 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0003 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0003 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0003 | AD | Artificial Grass | 1000 | SM | € - 0 | € - 0 |
| TOTAL COST (0003AA-AE) | € - 0 |
C-0004 DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE
| C-0004 | AA | Gravel | 3000 | CM | € - 0 | € - 0 |
| C-0004 | AB | Sand | 1000 | CM | € - 0 | € - 0 |
| C-0004 | AC | Re-compact and level base after equipment installation | 10000 | SM | € - 0 | € - 0 |
| TOTAL COST (0004AA-AC) | € - 0 |
| MISCELLANEOUS WORK DESCRIPTION | |||||
| C-0005 | Delivery and installation of rubber curbing, including porous concrete base | 8000 | LM | € - 0 | € - 0 |
| C-0006 | Delivery and installation of concrete curbing, including porous concrete base | 5500 | LM | € - 0 | € - 0 |
| C-0007 | Delivery and installation of porous concrete, 15 cm thickness (pavers) | 5000 | SM | € - 0 | € - 0 |
| C-0008 | Sewer/drain trench in soil, class 3-5 | 250 | CM | € - 0 | € - 0 |
| C-0009 | Furnish and install reinforced concrete (B25) | 150 | CM | € - 0 | € - 0 |
| C-0010 | Remove and stockpile topsoil on site | 1000 | CM | € - 0 | € - 0 |
| C-0011 | Furnish and install unreinforced concrete (B25) | 1000 | CM | € - 0 | € - 0 |
| C-0012 | Soil excavation, machine: class 3-5 | 3000 | CM | € - 0 | € - 0 |
| C-0013 | Backfill trenches | 250 | CM | € - 0 | € - 0 |
| C-0014 | Install and connect drain/seepage lines | 250 | LM | € - 0 | € - 0 |
| C-0015 | Furnish and install trench\gutter draiange | 25 | LM | € - 0 | € - 0 |
| C-0016 | Install bituminous surface material | 1000 | CM | € - 0 | € - 0 |
| C-0017 | Clean-up | 5000 | SM | € - 0 | € - 0 |
| C-0018 | Safety fence, delivered and installed | 5000 | LM | € - 0 | € - 0 |
| C-0019 | Locate existing utility lines | 5000 | SM | € - 0 | € - 0 |
| C-0020 | Soil excavation, by hand: class 3-5 | 500 | CM | € - 0 | € - 0 |
| C-0021 | Furnish and place topsoil | 1000 | CM | € - 0 | € - 0 |
| C-0022 | Furnish and place sub-grade soil | 1000 | CM | € - 0 | € - 0 |
| C-0023 | Furnish and install rolled sod | 1000 | SM | € - 0 | € - 0 |
| C-0024 | Furnish and install geotextile seperation layer | 1000 | SM | € - 0 | € - 0 |
| C-0025 | Furnish and install biodegradable type erosion control material | 1000 | SM | € - 0 | € - 0 |
| C-0026 | Trim/cut tree limbs and bushes/brush and dispose of materials | 400 | HR | € - 0 | € - 0 |
| C-0027 | Painting | 1000 | SM | € - 0 | € - 0 |
| C-0028 | Water Line | 1000 | LM | € - 0 | € - 0 |
| TOTAL COST (0005-0028) | € - 0 |
| DELIVERY AND INSTALLATION OF FENCING | ||||||
| IAW SOW and Additional Task Order Specs | ||||||
| C-0029 | AA | Welded bar fence | 1500 | SM | € - 0 | € - 0 |
| C-0029 | AB | Chain Link Fence | 400 | SM | € - 0 | € - 0 |
| C-0029 | AC | Wooden fence | 100 | SM | € - 0 | € - 0 |
| C-0029 | AD | Round Fence Post | 100 | M | € - 0 | € - 0 |
| C-0029 | AE | Square/Rect. Fence Post | 500 | M | € - 0 | € - 0 |
| C-0029 | AF | Wooden fence post | 50 | M | € - 0 | € - 0 |
| C-0029 | AG | Concrete Foundation | 300 | CM | € - 0 | € - 0 |
| C-0029 | AH | Chain Link fence Gate | 40 | SM | € - 0 | € - 0 |
| C-0029 | AI | Welded bar fence Gate | 200 | SM | € - 0 | € - 0 |
| C-0029 | AJ | Wooden fence Gate | 10 | SM | € - 0 | € - 0 |
| C-0029 | AK | Replace hardware | 50 | EA | € - 0 | € - 0 |
| TOTAL COST (0029AA-AK) | € - 0 |
DEMOLITION
| C-0030 | AA | Remove and dispose of fence post | 500 | EA | € - 0 | € - 0 |
| C-0030 | AB | Remove and dispose of fence material | 1000 | SM | € - 0 | € - 0 |
| C-0030 | AC | Remove and dispose of post foundation | 300 | CM | € - 0 | € - 0 |
| C-0030 | AD | Remove and dispose of old plastic Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AE | Remove and dispose of old wooden Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AF | Remove and dispose of old metal Equipment including connection mat. | 300 | CM | € - 0 | € - 0 |
| C-0030 | AG | Remove and dispose of earth | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AH | Remove and dispose of bituminous mat. | 200 | CM | € - 0 | € - 0 |
| C-0030 | AI | Remove and dispose of reinforced concrete | 400 | CM | € - 0 | € - 0 |
| C-0030 | AJ | Remove and dispose of unreinforced concrete | 500 | CM | € - 0 | € - 0 |
| C-0030 | AK | Remove and dispose of concrete pavers | 1600 | SM | € - 0 | € - 0 |
| C-0030 | AL | Remove and dispose of rubberized fall material | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AM | Remove and dispose of artificial grass fall material | 100 | CM | € - 0 | |
| C-0030 | AN | Remove and dispose of wood fiber fall material | 200 | CM | € - 0 | |
| TOTAL COST (0030AA-AN) | € - 0 |
EQUIPMENT PRICING SCHEDULE
| Attach the Equipment Price List (in Excel format) | |||
| 0031 | Equipment Price List TOTAL COST (Exchange Rate multiplier established each fiscal year by the government to convert from Dollars to Euros, if applicable) | 0.8703 | € - 0 |
DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC)
0032 Percentage applied to (CLIN: 0031) equipment pricing per individual task order, excluding shipping and handling (as a percentage %) 0.00% DLCEIC % € - 0
SHIPPING
0033 Cost determined per individual task order € - 0
| TOTAL BASE YEAR | |
| € - 0 |
BASE YR 3
| SECTION B | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | Changes from previous version Amend 001 highlighted in Red Font | |||
| BASE YEAR 3 | |||||
| LINE | |||||
| ITEM | DESCRIPTION | EST | |||
| QTY | U/I | Unit Price | Total Price | Geographic Distribution: non-binding approximate % of work by country: |
Germany – 90%, BENELUX – 5%, Italy 4%, Other geographic areas throughout EUCOM AOR – 1%.
0001 LABOR
| 0001 | AF | Project Manager | 400 | HR | € - 0 | € - 0 |
| 0001 | AA | Labor | 1200 | HR | € - 0 | € - 0 |
| 0001 | AB | Tractor / Lift Operator | 800 | HR | € - 0 | € - 0 |
| 0001 | AC | Fall Material HIC test and report | 50 | EA | € - 0 | € - 0 |
| 0001 | AD | Playground Inspection & Report | 50 | EA | € - 0 | € - 0 |
| 0001 | AE | Safety Audit Inspection & Report | 50 | EA | € - 0 | € - 0 |
| TOTAL COST (0001AA-AF) | € - 0 |
0002 RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE
| 0002 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0002 | AB | Poured in Place under 5cm(IAW ASTM and pass HIC Test) | 500 | SM | € - 0 | € - 0 |
| 0002 | AC | Poured in Place over 5cm (IAW ASTM and pass HIC Test) | 1000 | SM | € - 0 | € - 0 |
| 0002 | AD | Artificial Grass | 1000 | SM | € - 0 | € - 0 |
| TOTAL COST (0002AA-AE) | € - 0 |
0003 RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT
| 0003 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0003 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0003 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0003 | AD | Artificial Grass | 1000 | SM | € - 0 | € - 0 |
| TOTAL COST (0003AA-AE) | € - 0 |
C-0004 DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE
| C-0004 | AA | Gravel | 3000 | CM | € - 0 | € - 0 |
| C-0004 | AB | Sand | 1000 | CM | € - 0 | € - 0 |
| C-0004 | AC | Re-compact and level base after equipment installation | 10000 | SM | € - 0 | € - 0 |
| TOTAL COST (0004AA-AC) | € - 0 |
| MISCELLANEOUS WORK DESCRIPTION | |||||
| C-0005 | Delivery and installation of rubber curbing, including porous concrete base | 8000 | LM | € - 0 | € - 0 |
| C-0006 | Delivery and installation of concrete curbing, including porous concrete base | 5500 | LM | € - 0 | € - 0 |
| C-0007 | Delivery and installation of porous concrete, 15 cm thickness (pavers) | 5000 | SM | € - 0 | € - 0 |
| C-0008 | Sewer/drain trench in soil, class 3-5 | 250 | CM | € - 0 | € - 0 |
| C-0009 | Furnish and install reinforced concrete (B25) | 150 | CM | € - 0 | € - 0 |
| C-0010 | Remove and stockpile topsoil on site | 1000 | CM | € - 0 | € - 0 |
| C-0011 | Furnish and install unreinforced concrete (B25) | 1000 | CM | € - 0 | € - 0 |
| C-0012 | Soil excavation, machine: class 3-5 | 3000 | CM | € - 0 | € - 0 |
| C-0013 | Backfill trenches | 250 | CM | € - 0 | € - 0 |
| C-0014 | Install and connect drain/seepage lines | 250 | LM | € - 0 | € - 0 |
| C-0015 | Furnish and install trench\gutter draiange | 25 | LM | € - 0 | € - 0 |
| C-0016 | Install bituminous surface material | 1000 | CM | € - 0 | € - 0 |
| C-0017 | Clean-up | 5000 | SM | € - 0 | € - 0 |
| C-0018 | Safety fence, delivered and installed | 5000 | LM | € - 0 | € - 0 |
| C-0019 | Locate existing utility lines | 5000 | SM | € - 0 | € - 0 |
| C-0020 | Soil excavation, by hand: class 3-5 | 500 | CM | € - 0 | € - 0 |
| C-0021 | Furnish and place topsoil | 1000 | CM | € - 0 | € - 0 |
| C-0022 | Furnish and place sub-grade soil | 1000 | CM | € - 0 | € - 0 |
| C-0023 | Furnish and install rolled sod | 1000 | SM | € - 0 | € - 0 |
| C-0024 | Furnish and install geotextile seperation layer | 1000 | SM | € - 0 | € - 0 |
| C-0025 | Furnish and install biodegradable type erosion control material | 1000 | SM | € - 0 | € - 0 |
| C-0026 | Trim/cut tree limbs and bushes/brush and dispose of materials | 400 | HR | € - 0 | € - 0 |
| C-0027 | Painting | 1000 | SM | € - 0 | € - 0 |
| C-0028 | Water Line | 1000 | LM | € - 0 | € - 0 |
| TOTAL COST (0005-0028) | € - 0 |
| DELIVERY AND INSTALLATION OF FENCING | ||||||
| IAW SOW and Additional Task Order Specs | ||||||
| C-0029 | AA | Welded bar fence | 1500 | SM | € - 0 | € - 0 |
| C-0029 | AB | Chain Link Fence | 400 | SM | € - 0 | € - 0 |
| C-0029 | AC | Wooden fence | 100 | SM | € - 0 | € - 0 |
| C-0029 | AD | Round Fence Post | 100 | M | € - 0 | € - 0 |
| C-0029 | AE | Square/Rect. Fence Post | 500 | M | € - 0 | € - 0 |
| C-0029 | AF | Wooden fence post | 50 | M | € - 0 | € - 0 |
| C-0029 | AG | Concrete Foundation | 300 | CM | € - 0 | € - 0 |
| C-0029 | AH | Chain Link fence Gate | 40 | SM | € - 0 | € - 0 |
| C-0029 | AI | Welded bar fence Gate | 200 | SM | € - 0 | € - 0 |
| C-0029 | AJ | Wooden fence Gate | 10 | SM | € - 0 | € - 0 |
| C-0029 | AK | Replace hardware | 50 | EA | € - 0 | € - 0 |
| TOTAL COST (0029AA-AK) | € - 0 |
DEMOLITION
| C-0030 | AA | Remove and dispose of fence post | 500 | EA | € - 0 | € - 0 |
| C-0030 | AB | Remove and dispose of fence material | 1000 | SM | € - 0 | € - 0 |
| C-0030 | AC | Remove and dispose of post foundation | 300 | CM | € - 0 | € - 0 |
| C-0030 | AD | Remove and dispose of old plastic Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AE | Remove and dispose of old wooden Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AF | Remove and dispose of old metal Equipment including connection mat. | 300 | CM | € - 0 | € - 0 |
| C-0030 | AG | Remove and dispose of earth | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AH | Remove and dispose of bituminous mat. | 200 | CM | € - 0 | € - 0 |
| C-0030 | AI | Remove and dispose of reinforced concrete | 400 | CM | € - 0 | € - 0 |
| C-0030 | AJ | Remove and dispose of unreinforced concrete | 500 | CM | € - 0 | € - 0 |
| C-0030 | AK | Remove and dispose of concrete pavers | 1600 | SM | € - 0 | € - 0 |
| C-0030 | AL | Remove and dispose of rubberized fall material | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AM | Remove and dispose of artificial grass fall material | 100 | CM | € - 0 | |
| C-0030 | AN | Remove and dispose of wood fiber fall material | 200 | CM | € - 0 | |
| TOTAL COST (0030AA-AN) | € - 0 |
EQUIPMENT PRICING SCHEDULE
| Attach the Equipment Price List (in Excel format) | |||
| 0031 | Equipment Price List TOTAL COST (Exchange Rate multiplier established each fiscal year by the government to convert from Dollars to Euros, if applicable) | 0.8703 | € - 0 |
DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC)
0032 Percentage applied to (CLIN: 0031) equipment pricing per individual task order, excluding shipping and handling (as a percentage %) 0.00% DLCEIC % € - 0
SHIPPING
0033 Cost determined per individual task order € - 0
| TOTAL BASE YEAR | |
| € - 0 |
BASE YR 4
| SECTION B | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | Changes from previous version Amend 001 highlighted in Red Font | |||
| BASE YEAR 4 | |||||
| LINE | |||||
| ITEM | DESCRIPTION | EST | |||
| QTY | U/I | Unit Price | Total Price | Geographic Distribution: non-binding approximate % of work by country: |
Germany – 90%, BENELUX – 5%, Italy 4%, Other geographic areas throughout EUCOM AOR – 1%.
0001 LABOR
| 0001 | AF | Project Manager | 400 | HR | € - 0 | € - 0 |
| 0001 | AA | Labor | 1200 | HR | € - 0 | € - 0 |
| 0001 | AB | Tractor / Lift Operator | 800 | HR | € - 0 | € - 0 |
| 0001 | AC | Fall Material HIC test and report | 50 | EA | € - 0 | € - 0 |
| 0001 | AD | Playground Inspection & Report | 50 | EA | € - 0 | € - 0 |
| 0001 | AE | Safety Audit Inspection & Report | 50 | EA | € - 0 | € - 0 |
| TOTAL COST (0001AA-AF) | € - 0 |
0002 RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE
| 0002 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0002 | AB | Poured in Place under 5cm(IAW ASTM and pass HIC Test) | 500 | SM | € - 0 | € - 0 |
| 0002 | AC | Poured in Place over 5cm (IAW ASTM and pass HIC Test) | 1000 | SM | € - 0 | € - 0 |
| 0002 | AD | Artificial Grass | 1000 | SM | € - 0 | € - 0 |
| TOTAL COST (0002AA-AE) | € - 0 |
0003 RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT
| 0003 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0003 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0003 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0003 | AD | Artificial Grass | 1000 | SM | € - 0 | € - 0 |
| TOTAL COST (0003AA-AE) | € - 0 |
C-0004 DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE
| C-0004 | AA | Gravel | 3000 | CM | € - 0 | € - 0 |
| C-0004 | AB | Sand | 1000 | CM | € - 0 | € - 0 |
| C-0004 | AC | Re-compact and level base after equipment installation | 10000 | SM | € - 0 | € - 0 |
| TOTAL COST (0004AA-AC) | € - 0 |
| MISCELLANEOUS WORK DESCRIPTION | |||||
| C-0005 | Delivery and installation of rubber curbing, including porous concrete base | 8000 | LM | € - 0 | € - 0 |
| C-0006 | Delivery and installation of concrete curbing, including porous concrete base | 5500 | LM | € - 0 | € - 0 |
| C-0007 | Delivery and installation of porous concrete, 15 cm thickness (pavers) | 5000 | SM | € - 0 | € - 0 |
| C-0008 | Sewer/drain trench in soil, class 3-5 | 250 | CM | € - 0 | € - 0 |
| C-0009 | Furnish and install reinforced concrete (B25) | 150 | CM | € - 0 | € - 0 |
| C-0010 | Remove and stockpile topsoil on site | 1000 | CM | € - 0 | € - 0 |
| C-0011 | Furnish and install unreinforced concrete (B25) | 1000 | CM | € - 0 | € - 0 |
| C-0012 | Soil excavation, machine: class 3-5 | 3000 | CM | € - 0 | € - 0 |
| C-0013 | Backfill trenches | 250 | CM | € - 0 | € - 0 |
| C-0014 | Install and connect drain/seepage lines | 250 | LM | € - 0 | € - 0 |
| C-0015 | Furnish and install trench\gutter draiange | 25 | LM | € - 0 | € - 0 |
| C-0016 | Install bituminous surface material | 1000 | CM | € - 0 | € - 0 |
| C-0017 | Clean-up | 5000 | SM | € - 0 | € - 0 |
| C-0018 | Safety fence, delivered and installed | 5000 | LM | € - 0 | € - 0 |
| C-0019 | Locate existing utility lines | 5000 | SM | € - 0 | € - 0 |
| C-0020 | Soil excavation, by hand: class 3-5 | 500 | CM | € - 0 | € - 0 |
| C-0021 | Furnish and place topsoil | 1000 | CM | € - 0 | € - 0 |
| C-0022 | Furnish and place sub-grade soil | 1000 | CM | € - 0 | € - 0 |
| C-0023 | Furnish and install rolled sod | 1000 | SM | € - 0 | € - 0 |
| C-0024 | Furnish and install geotextile seperation layer | 1000 | SM | € - 0 | € - 0 |
| C-0025 | Furnish and install biodegradable type erosion control material | 1000 | SM | € - 0 | € - 0 |
| C-0026 | Trim/cut tree limbs and bushes/brush and dispose of materials | 400 | HR | € - 0 | € - 0 |
| C-0027 | Painting | 1000 | SM | € - 0 | € - 0 |
| C-0028 | Water Line | 1000 | LM | € - 0 | € - 0 |
| TOTAL COST (0005-0028) | € - 0 |
| DELIVERY AND INSTALLATION OF FENCING | ||||||
| IAW SOW and Additional Task Order Specs | ||||||
| C-0029 | AA | Welded bar fence | 1500 | SM | € - 0 | € - 0 |
| C-0029 | AB | Chain Link Fence | 400 | SM | € - 0 | € - 0 |
| C-0029 | AC | Wooden fence | 100 | SM | € - 0 | € - 0 |
| C-0029 | AD | Round Fence Post | 100 | M | € - 0 | € - 0 |
| C-0029 | AE | Square/Rect. Fence Post | 500 | M | € - 0 | € - 0 |
| C-0029 | AF | Wooden fence post | 50 | M | € - 0 | € - 0 |
| C-0029 | AG | Concrete Foundation | 300 | CM | € - 0 | € - 0 |
| C-0029 | AH | Chain Link fence Gate | 40 | SM | € - 0 | € - 0 |
| C-0029 | AI | Welded bar fence Gate | 200 | SM | € - 0 | € - 0 |
| C-0029 | AJ | Wooden fence Gate | 10 | SM | € - 0 | € - 0 |
| C-0029 | AK | Replace hardware | 50 | EA | € - 0 | € - 0 |
| TOTAL COST (0029AA-AK) | € - 0 |
DEMOLITION
| C-0030 | AA | Remove and dispose of fence post | 500 | EA | € - 0 | € - 0 |
| C-0030 | AB | Remove and dispose of fence material | 1000 | SM | € - 0 | € - 0 |
| C-0030 | AC | Remove and dispose of post foundation | 300 | CM | € - 0 | € - 0 |
| C-0030 | AD | Remove and dispose of old plastic Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AE | Remove and dispose of old wooden Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AF | Remove and dispose of old metal Equipment including connection mat. | 300 | CM | € - 0 | € - 0 |
| C-0030 | AG | Remove and dispose of earth | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AH | Remove and dispose of bituminous mat. | 200 | CM | € - 0 | € - 0 |
| C-0030 | AI | Remove and dispose of reinforced concrete | 400 | CM | € - 0 | € - 0 |
| C-0030 | AJ | Remove and dispose of unreinforced concrete | 500 | CM | € - 0 | € - 0 |
| C-0030 | AK | Remove and dispose of concrete pavers | 1600 | SM | € - 0 | € - 0 |
| C-0030 | AL | Remove and dispose of rubberized fall material | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AM | Remove and dispose of artificial grass fall material | 100 | CM | € - 0 | |
| C-0030 | AN | Remove and dispose of wood fiber fall material | 200 | CM | € - 0 | |
| TOTAL COST (0030AA-AN) | € - 0 |
EQUIPMENT PRICING SCHEDULE
| Attach the Equipment Price List (in Excel format) | |||
| 0031 | Equipment Price List TOTAL COST (Exchange Rate multiplier established each fiscal year by the government to convert from Dollars to Euros, if applicable) | 0.8703 | € - 0 |
DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC)
0032 Percentage applied to (CLIN: 0031) equipment pricing per individual task order, excluding shipping and handling (as a percentage %) 0.00% DLCEIC % € - 0
SHIPPING
0033 Cost determined per individual task order € - 0
| TOTAL BASE YEAR | |
| € - 0 |
BASE YR 5
| SECTION B | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | Changes from previous version Amend 001 highlighted in Red Font | |||
| BASE YEAR 5 | |||||
| LINE | |||||
| ITEM | DESCRIPTION | EST | |||
| QTY | U/I | Unit Price | Total Price | Geographic Distribution: non-binding approximate % of work by country: |
Germany – 90%, BENELUX – 5%, Italy 4%, Other geographic areas throughout EUCOM AOR – 1%.
0001 LABOR
| 0001 | AF | Project Manager | 400 | HR | € - 0 | € - 0 |
| 0001 | AA | Labor | 1200 | HR | € - 0 | € - 0 |
| 0001 | AB | Tractor / Lift Operator | 800 | HR | € - 0 | € - 0 |
| 0001 | AC | Fall Material HIC test and report | 50 | EA | € - 0 | € - 0 |
| 0001 | AD | Playground Inspection & Report | 50 | EA | € - 0 | € - 0 |
| 0001 | AE | Safety Audit Inspection & Report | 50 | EA | € - 0 | € - 0 |
| TOTAL COST (0001AA-AF) | € - 0 |
0002 RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE
| 0002 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0002 | AB | Poured in Place under 5cm(IAW ASTM and pass HIC Test) | 500 | SM | € - 0 | € - 0 |
| 0002 | AC | Poured in Place over 5cm (IAW ASTM and pass HIC Test) | 1000 | SM | € - 0 | € - 0 |
| 0002 | AD | Artificial Grass | 1000 | SM | € - 0 | € - 0 |
| TOTAL COST (0002AA-AE) | € - 0 |
0003 RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT
| 0003 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0003 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0003 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0003 | AD | Artificial Grass | 1000 | SM | € - 0 | € - 0 |
| TOTAL COST (0003AA-AE) | € - 0 |
C-0004 DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE
| C-0004 | AA | Gravel | 3000 | CM | € - 0 | € - 0 |
| C-0004 | AB | Sand | 1000 | CM | € - 0 | € - 0 |
| C-0004 | AC | Re-compact and level base after equipment installation | 10000 | SM | € - 0 | € - 0 |
| TOTAL COST (0004AA-AC) | € - 0 |
| MISCELLANEOUS WORK DESCRIPTION | |||||
| C-0005 | Delivery and installation of rubber curbing, including porous concrete base | 8000 | LM | € - 0 | € - 0 |
| C-0006 | Delivery and installation of concrete curbing, including porous concrete base | 5500 | LM | € - 0 | € - 0 |
| C-0007 | Delivery and installation of porous concrete, 15 cm thickness (pavers) | 5000 | SM | € - 0 | € - 0 |
| C-0008 | Sewer/drain trench in soil, class 3-5 | 250 | CM | € - 0 | € - 0 |
| C-0009 | Furnish and install reinforced concrete (B25) | 150 | CM | € - 0 | € - 0 |
| C-0010 | Remove and stockpile topsoil on site | 1000 | CM | € - 0 | € - 0 |
| C-0011 | Furnish and install unreinforced concrete (B25) | 1000 | CM | € - 0 | € - 0 |
| C-0012 | Soil excavation, machine: class 3-5 | 3000 | CM | € - 0 | € - 0 |
| C-0013 | Backfill trenches | 250 | CM | € - 0 | € - 0 |
| C-0014 | Install and connect drain/seepage lines | 250 | LM | € - 0 | € - 0 |
| C-0015 | Furnish and install trench\gutter draiange | 25 | LM | € - 0 | € - 0 |
| C-0016 | Install bituminous surface material | 1000 | CM | € - 0 | € - 0 |
| C-0017 | Clean-up | 5000 | SM | € - 0 | € - 0 |
| C-0018 | Safety fence, delivered and installed | 5000 | LM | € - 0 | € - 0 |
| C-0019 | Locate existing utility lines | 5000 | SM | € - 0 | € - 0 |
| C-0020 | Soil excavation, by hand: class 3-5 | 500 | CM | € - 0 | € - 0 |
| C-0021 | Furnish and place topsoil | 1000 | CM | € - 0 | € - 0 |
| C-0022 | Furnish and place sub-grade soil | 1000 | CM | € - 0 | € - 0 |
| C-0023 | Furnish and install rolled sod | 1000 | SM | € - 0 | € - 0 |
| C-0024 | Furnish and install geotextile seperation layer | 1000 | SM | € - 0 | € - 0 |
| C-0025 | Furnish and install biodegradable type erosion control material | 1000 | SM | € - 0 | € - 0 |
| C-0026 | Trim/cut tree limbs and bushes/brush and dispose of materials | 400 | HR | € - 0 | € - 0 |
| C-0027 | Painting | 1000 | SM | € - 0 | € - 0 |
| C-0028 | Water Line | 1000 | LM | € - 0 | € - 0 |
| TOTAL COST (0005-0028) | € - 0 |
| DELIVERY AND INSTALLATION OF FENCING | ||||||
| IAW SOW and Additional Task Order Specs | ||||||
| C-0029 | AA | Welded bar fence | 1500 | SM | € - 0 | € - 0 |
| C-0029 | AB | Chain Link Fence | 400 | SM | € - 0 | € - 0 |
| C-0029 | AC | Wooden fence | 100 | SM | € - 0 | € - 0 |
| C-0029 | AD | Round Fence Post | 100 | M | € - 0 | € - 0 |
| C-0029 | AE | Square/Rect. Fence Post | 500 | M | € - 0 | € - 0 |
| C-0029 | AF | Wooden fence post | 50 | M | € - 0 | € - 0 |
| C-0029 | AG | Concrete Foundation | 300 | CM | € - 0 | € - 0 |
| C-0029 | AH | Chain Link fence Gate | 40 | SM | € - 0 | € - 0 |
| C-0029 | AI | Welded bar fence Gate | 200 | SM | € - 0 | € - 0 |
| C-0029 | AJ | Wooden fence Gate | 10 | SM | € - 0 | € - 0 |
| C-0029 | AK | Replace hardware | 50 | EA | € - 0 | € - 0 |
| TOTAL COST (0029AA-AK) | € - 0 |
DEMOLITION
| C-0030 | AA | Remove and dispose of fence post | 500 | EA | € - 0 | € - 0 |
| C-0030 | AB | Remove and dispose of fence material | 1000 | SM | € - 0 | € - 0 |
| C-0030 | AC | Remove and dispose of post foundation | 300 | CM | € - 0 | € - 0 |
| C-0030 | AD | Remove and dispose of old plastic Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AE | Remove and dispose of old wooden Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AF | Remove and dispose of old metal Equipment including connection mat. | 300 | CM | € - 0 | € - 0 |
| C-0030 | AG | Remove and dispose of earth | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AH | Remove and dispose of bituminous mat. | 200 | CM | € - 0 | € - 0 |
| C-0030 | AI | Remove and dispose of reinforced concrete | 400 | CM | € - 0 | € - 0 |
| C-0030 | AJ | Remove and dispose of unreinforced concrete | 500 | CM | € - 0 | € - 0 |
| C-0030 | AK | Remove and dispose of concrete pavers | 1600 | SM | € - 0 | € - 0 |
| C-0030 | AL | Remove and dispose of rubberized fall material | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AM | Remove and dispose of artificial grass fall material | 100 | CM | € - 0 | |
| C-0030 | AN | Remove and dispose of wood fiber fall material | 200 | CM | € - 0 | |
| TOTAL COST (0030AA-AN) | € - 0 |
EQUIPMENT PRICING SCHEDULE
| Attach the Equipment Price List (in Excel format) | |||
| 0031 | Equipment Price List TOTAL COST (Exchange Rate multiplier established each fiscal year by the government to convert from Dollars to Euros, if applicable) | 0.8703 | € - 0 |
DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC)
0032 Percentage applied to (CLIN: 0031) equipment pricing per individual task order, excluding shipping and handling (as a percentage %) 0.00% DLCEIC % € - 0
SHIPPING
0033 Cost determined per individual task order € - 0
| TOTAL BASE YEAR | |
| € - 0 |
SUM
| Base Period | |
| Bottom Line Sum Base Year 1 | € - 0 |
| Bottom Line Sum Base Year 2 | € - 0 |
| Bottom Line Sum Base Year 3 | € - 0 |
| Bottom Line Sum Base Year 4 | € - 0 |
| Bottom Line Sum Base Year 5 | € - 0 |
| Total Bottom Line Sum | € - 0 |
File details come from the government source that posted it. Updated .