The file's text, extracted by GovTribe without its formatting.
BASE YR 1
| SECTION B | | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | | Changes from previous version Amend 001 highlighted in Red Font |
| BASE YEAR 1 | | | | |
| LINE | | | | |
| ITEM | | DESCRIPTION | EST | | |
| QTY | U/I | Unit Price | Total Price | Geographic Distribution: non-binding approximate % of work by country: | |
Germany – 90%, BENELUX – 5%, Italy 4%, Other geographic areas throughout EUCOM AOR – 1%.
0001 LABOR
| 0001 | AF | Project Manager | 400 | HR | € - 0 | € - 0 |
| 0001 | AA | Labor | 1200 | HR | € - 0 | € - 0 |
| 0001 | AB | Tractor / Lift Operator | 800 | HR | € - 0 | € - 0 |
| 0001 | AC | Fall Material HIC test and report | 50 | EA | € - 0 | € - 0 |
| 0001 | AD | Playground Inspection & Report | 50 | EA | € - 0 | € - 0 |
| 0001 | AE | Safety Audit Inspection & Report | 50 | EA | € - 0 | € - 0 |
| | TOTAL COST (0001AA-AF) | | | | € - 0 |
0002 RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE
| 0002 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0002 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0002 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0002 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| | TOTAL COST (0002AA-AE) | | | | € - 0 |
0003 RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT
| 0003 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0003 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0003 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0003 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| | TOTAL COST (0003AA-AE) | | | | € - 0 |
C-0004 DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE
| C-0004 | AA | Gravel | 3000 | CM | € - 0 | € - 0 |
| C-0004 | AB | Sand | 1000 | CM | € - 0 | € - 0 |
| C-0004 | AC | Re-compact and level base after equipment installation | 10000 | SM | € - 0 | € - 0 |
| | TOTAL COST (0004AA-AC) | | | | € - 0 |
| MISCELLANEOUS WORK DESCRIPTION | | | | |
| C-0005 | Delivery and installation of rubber curbing, including porous concrete base, IAW Section 32 18 16.13 | 8000 | LM | € - 0 | € - 0 |
| C-0006 | Delivery and installation of concrete curbing, including porous concrete base, IAW Section C.6.2.10 | 5500 | LM | € - 0 | € - 0 |
| C-0007 | Delivery and installation of porous concrete, 15 cm thickness (pavers), IAW Section C.6.2.12 | 5000 | SM | € - 0 | € - 0 |
| C-0008 | Sewer/drain trench in soil, class 3-5, IAW Section 02300 and Section C.6.2.6 | 250 | CM | € - 0 | € - 0 |
| C-0009 | Furnish and install reinforced concrete (B25), IAW Section C.6.2.9 | 150 | CM | € - 0 | € - 0 |
| C-0010 | Remove and stockpile topsoil on site, IAW Section 02300 | 1000 | CM | € - 0 | € - 0 |
| C-0011 | Furnish and install unreinforced concrete (B25), IAW Section C.6.2.9 | 1000 | CM | € - 0 | € - 0 |
| C-0012 | Soil excavation, machine: class 3-5, IAW Section 02300 | 3000 | CM | € - 0 | € - 0 |
| C-0013 | Backfill trenches, IAW Section 02300 | 250 | CM | € - 0 | € - 0 |
| C-0014 | Install and connect drain/seepage lines, IAW Section C.6.2.6 | 250 | LM | € - 0 | € - 0 |
| C-0015 | Furnish and install trench\gutter draiange IAW C.6.2.6.1 | 25 | LM | € - 0 | € - 0 |
| C-0016 | Install bituminous surface material, IAW Section C.6.2.8 | 1000 | CM | € - 0 | € - 0 |
| C-0017 | Clean-up IAW Section C.6.2.16 | 5000 | SM | € - 0 | € - 0 |
| C-0018 | Safety fence, delivered and installed, IAW Section C.6.2.13.1 | 5000 | LM | € - 0 | € - 0 |
| C-0019 | Locate existing utility lines, IAW Section 02300 | 5000 | SM | € - 0 | € - 0 |
| C-0020 | Soil excavation, by hand: class 3-5, IAW Section 02300 | 500 | CM | € - 0 | € - 0 |
| C-0021 | Furnish and place topsoil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0022 | Furnish and place sub-grade soil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0023 | Furnish and install rolled sod IAW C.6.2.5.5 | 1000 | SM | € - 0 | € - 0 |
| C-0024 | Furnish and install geotextile seperation layer IAW C.6.2.5.6 | 1000 | SM | € - 0 | € - 0 |
| C-0025 | Furnish and install biodegradable type erosion control material IAW C.6.2.5.7 | 1000 | SM | € - 0 | € - 0 |
| C-0026 | Trim/cut tree limbs and bushes/brush and dispose of materials IAW C.6.2.5.8 | 400 | HR | € - 0 | € - 0 |
| C-0027 | Painting IAW C.6.2.5.9 | 1000 | SM | € - 0 | € - 0 |
| C-0028 | Water Line IAW C.6.2.6.2 | 1000 | LM | € - 0 | € - 0 |
| TOTAL COST (0005-0028) | | | | € - 0 |
| | DELIVERY AND INSTALLATION OF FENCING | | | | |
| IAW SOW and Additional Task Order Specs | | | | | | |
| C-0029 | AA | Welded bar fence IAW C.6.2.13.3 | 1500 | SM | € - 0 | € - 0 |
| C-0029 | AB | Chain Link Fence IAW C.6.2.13.4 | 400 | SM | € - 0 | € - 0 |
| C-0029 | AC | Wooden fence IAW C.6.2.13.2 | 100 | SM | € - 0 | € - 0 |
| C-0029 | AD | Round Fence Post IAW C.6.2.13.5 | 100 | M | € - 0 | € - 0 |
| C-0029 | AE | Square/Rect. Fence Post IAW C.6.2.13.5 | 500 | M | € - 0 | € - 0 |
| C-0029 | AF | Wooden fence post IAW C.6.2.13.2.1 | 50 | M | € - 0 | € - 0 |
| C-0029 | AG | Concrete Foundation IAW C.6.2.13.6 | 300 | CM | € - 0 | € - 0 |
| C-0029 | AH | Chain Link fence Gate IAW C.6.2.13.7 | 40 | SM | € - 0 | € - 0 |
| C-0029 | AI | Welded bar fence Gate IAW C.6.2.13.7 | 200 | SM | € - 0 | € - 0 |
| C-0029 | AJ | Wooden fence Gate IAW C.6.2.13.7 | 10 | SM | € - 0 | € - 0 |
| C-0029 | AK | Replace hardware IAW C.6.2.13.8 | 50 | EA | € - 0 | € - 0 |
| | TOTAL COST (0029AA-AK) | | | | € - 0 |
DEMOLITION
| C-0030 | AA | Remove and dispose of fence post | 500 | EA | € - 0 | € - 0 |
| C-0030 | AB | Remove and dispose of fence material | 1000 | SM | € - 0 | € - 0 |
| C-0030 | AC | Remove and dispose of post foundation | 300 | CM | € - 0 | € - 0 |
| C-0030 | AD | Remove and dispose of old plastic Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AE | Remove and dispose of old wooden Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AF | Remove and dispose of old metal Equipment including connection mat. | 300 | CM | € - 0 | € - 0 |
| C-0030 | AG | Remove and dispose of earth | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AH | Remove and dispose of bituminous mat. | 200 | CM | € - 0 | € - 0 |
| C-0030 | AI | Remove and dispose of reinforced concrete | 400 | CM | € - 0 | € - 0 |
| C-0030 | AJ | Remove and dispose of unreinforced concrete | 500 | CM | € - 0 | € - 0 |
| C-0030 | AK | Remove and dispose of concrete pavers | 1600 | SM | € - 0 | € - 0 |
| C-0030 | AL | Remove and dispose of rubberized fall material | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AM | Remove and dispose of artificial grass fall material | 100 | CM | € - 0 | |
| C-0030 | AN | Remove and dispose of wood fiber fall material | 200 | CM | € - 0 | |
| | TOTAL COST (0030AA-AN) | | | | € - 0 |
EQUIPMENT PRICING SCHEDULE
| Attach the Equipment Price List (in Excel format) | | |
| 0031 | Equipment Price List TOTAL COST (in Euros) | € - 0 |
| DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC) | | | |
| IAW Section B and C.5 | | | | |
| 0032 | Percentage applied to (CLIN: 0031) equipment pricing per individual task order, excluding shipping and handling (as a percentage %) | 0.00% | DLCEIC % | € - 0 |
| SHIPPING | |
| IAW Section H & B and FAR 47 | | |
| 0033 | Cost determined per individual task order | Not Entered by Contractor |
&KFF0000W912GB-17-D-00XX
12 September 2016
BASE YR 2
| SECTION B | | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | | Changes from previous version Amend 001 highlighted in Red Font |
| BASE YEAR 2 | | | | |
| LINE | | | | |
| ITEM | | DESCRIPTION | EST | | |
| QTY | U/I | Unit Price | Total Price | Geographic Distribution: non-binding approximate % of work by country: | |
Germany – 90%, BENELUX – 5%, Italy 4%, Other geographic areas throughout EUCOM AOR – 1%.
0001 LABOR
| 0001 | AA | Labor | 1200 | HR | € - 0 | € - 0 |
| 0001 | AB | Tractor / Lift Operator | 800 | HR | € - 0 | € - 0 |
| 0001 | AC | Fall Material HIC test and report | 20 | EA | € - 0 | € - 0 |
| 0001 | AD | Playground Inspection & Report | 20 | EA | € - 0 | € - 0 |
| 0001 | AE | Safety Audit Inspection & Report | 20 | EA | € - 0 | € - 0 |
| | TOTAL COST (0001AA-AF) | | | | € - 0 |
0002 RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE
| 0002 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0002 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0002 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0002 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| | TOTAL COST (0002AA-AE) | | | | € - 0 |
0003 RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT
| 0003 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0003 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0003 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0003 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| | TOTAL COST (0003AA-AE) | | | | € - 0 |
C-0004 DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE
| C-0004 | AA | Gravel | 3000 | CM | € - 0 | € - 0 |
| C-0004 | AB | Sand | 1000 | CM | € - 0 | € - 0 |
| C-0004 | AC | Re-compact and level base after equipment installation | 10000 | SM | € - 0 | € - 0 |
| | TOTAL COST (0004AA-AC) | | | | € - 0 |
| MISCELLANEOUS WORK DESCRIPTION | | | | |
| C-0005 | Delivery and installation of rubber curbing, including porous concrete base, IAW Section 32 18 16.13 | 8000 | LM | € - 0 | € - 0 |
| C-0006 | Delivery and installation of concrete curbing, including porous concrete base, IAW Section C.6.2.10 | 5500 | LM | € - 0 | € - 0 |
| C-0007 | Delivery and installation of porous concrete, 15 cm thickness (pavers), IAW Section C.6.2.12 | 5000 | SM | € - 0 | € - 0 |
| C-0008 | Sewer/drain trench in soil, class 3-5, IAW Section 02300 and Section C.6.2.6 | 250 | CM | € - 0 | € - 0 |
| C-0009 | Furnish and install reinforced concrete (B25), IAW Section C.6.2.9 | 150 | CM | € - 0 | € - 0 |
| C-0010 | Remove and stockpile topsoil on site, IAW Section 02300 | 1000 | CM | € - 0 | € - 0 |
| C-0011 | Furnish and install unreinforced concrete (B25), IAW Section C.6.2.9 | 1000 | CM | € - 0 | € - 0 |
| C-0012 | Soil excavation, machine: class 3-5, IAW Section 02300 | 3000 | CM | € - 0 | € - 0 |
| C-0013 | Backfill trenches, IAW Section 02300 | 250 | CM | € - 0 | € - 0 |
| C-0014 | Install and connect drain/seepage lines, IAW Section C.6.2.6 | 250 | LM | € - 0 | € - 0 |
| C-0015 | Furnish and install trench\gutter draiange IAW C.6.2.6.1 | 25 | LM | € - 0 | € - 0 |
| C-0016 | Install bituminous surface material, IAW Section C.6.2.8 | 1000 | CM | € - 0 | € - 0 |
| C-0017 | Clean-up IAW Section C.6.2.16 | 5000 | SM | € - 0 | € - 0 |
| C-0018 | Safety fence, delivered and installed, IAW Section C.6.2.13.1 | 5000 | LM | € - 0 | € - 0 |
| C-0019 | Locate existing utility lines, IAW Section 02300 | 5000 | SM | € - 0 | € - 0 |
| C-0020 | Soil excavation, by hand: class 3-5, IAW Section 02300 | 500 | CM | € - 0 | € - 0 |
| C-0021 | Furnish and place topsoil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0022 | Furnish and place sub-grade soil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0023 | Furnish and install rolled sod IAW C.6.2.5.5 | 1000 | SM | € - 0 | € - 0 |
| C-0024 | Furnish and install geotextile seperation layer IAW C.6.2.5.6 | 1000 | SM | € - 0 | € - 0 |
| C-0025 | Furnish and install biodegradable type erosion control material IAW C.6.2.5.7 | 1000 | SM | € - 0 | € - 0 |
| C-0026 | Trim/cut tree limbs and bushes/brush and dispose of materials IAW C.6.2.5.8 | 400 | HR | € - 0 | € - 0 |
| C-0027 | Painting IAW C.6.2.5.9 | 1000 | SM | € - 0 | € - 0 |
| C-0028 | Water Line IAW C.6.2.6.2 | 1000 | LM | € - 0 | € - 0 |
| TOTAL COST (0005-0028) | | | | € - 0 |
| | DELIVERY AND INSTALLATION OF FENCING | | | | |
| IAW SOW and Additional Task Order Specs | | | | | | |
| C-0029 | AA | Welded bar fence IAW C.6.2.13.3 | 1500 | SM | € - 0 | € - 0 |
| C-0029 | AB | Chain Link Fence IAW C.6.2.13.4 | 400 | SM | € - 0 | € - 0 |
| C-0029 | AC | Wooden fence IAW C.6.2.13.2 | 100 | SM | € - 0 | € - 0 |
| C-0029 | AD | Round Fence Post IAW C.6.2.13.5 | 100 | M | € - 0 | € - 0 |
| C-0029 | AE | Square/Rect. Fence Post IAW C.6.2.13.5 | 500 | M | € - 0 | € - 0 |
| C-0029 | AF | Wooden fence post IAW C.6.2.13.2.1 | 50 | M | € - 0 | € - 0 |
| C-0029 | AG | Concrete Foundation IAW C.6.2.13.6 | 300 | CM | € - 0 | € - 0 |
| C-0029 | AH | Chain Link fence Gate IAW C.6.2.13.7 | 40 | SM | € - 0 | € - 0 |
| C-0029 | AI | Welded bar fence Gate IAW C.6.2.13.7 | 200 | SM | € - 0 | € - 0 |
| C-0029 | AJ | Wooden fence Gate IAW C.6.2.13.7 | 10 | SM | € - 0 | € - 0 |
| C-0029 | AK | Replace hardware IAW C.6.2.13.8 | 50 | EA | € - 0 | € - 0 |
| | TOTAL COST (0029AA-AK) | | | | € - 0 |
DEMOLITION
| C-0030 | AA | Remove and dispose of fence post | 500 | EA | € - 0 | € - 0 |
| C-0030 | AB | Remove and dispose of fence material | 1000 | SM | € - 0 | € - 0 |
| C-0030 | AC | Remove and dispose of post foundation | 300 | CM | € - 0 | € - 0 |
| C-0030 | AD | Remove and dispose of old plastic Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AE | Remove and dispose of old wooden Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AF | Remove and dispose of old metal Equipment including connection mat. | 300 | CM | € - 0 | € - 0 |
| C-0030 | AG | Remove and dispose of earth | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AH | Remove and dispose of bituminous mat. | 200 | CM | € - 0 | € - 0 |
| C-0030 | AI | Remove and dispose of reinforced concrete | 400 | CM | € - 0 | € - 0 |
| C-0030 | AJ | Remove and dispose of unreinforced concrete | 500 | CM | € - 0 | € - 0 |
| C-0030 | AK | Remove and dispose of concrete pavers | 1600 | SM | € - 0 | € - 0 |
| C-0030 | AL | Remove and dispose of rubberized fall material | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AM | Remove and dispose of artificial grass fall material | 100 | CM | € - 0 | |
| C-0030 | AN | Remove and dispose of wood fiber fall material | 200 | CM | € - 0 | |
| | TOTAL COST (0030AA-AN) | | | | € - 0 |
EQUIPMENT PRICING SCHEDULE
| Attach the Equipment Price List | | |
| 0031 | Equipment Price List TOTAL COST (in Euros) | € - 0 |
| DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC) | | | |
| IAW Section B and C.5 | | | | |
| 0032 | Percentage applied to (CLIN: 0031) equipment pricing per individual task order, excluding shipping and handling (as a percentage %) | 0.00% | DLCEIC % | € - 0 |
| SHIPPING | |
| IAW Section H & B and FAR 47 | | |
| 0033 | Cost determined per individual task order | Not Entered by Contractor |
BASE YR 3
| SECTION B | | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | | Changes from previous version Amend 001 highlighted in Red Font |
| BASE YEAR 3 | | | | |
| LINE | | | | |
| ITEM | | DESCRIPTION | EST | | |
| QTY | U/I | Unit Price | Total Price | Geographic Distribution: non-binding approximate % of work by country: | |
Germany – 90%, BENELUX – 5%, Italy 4%, Other geographic areas throughout EUCOM AOR – 1%.
0001 LABOR
| 0001 | AA | Labor | 1200 | HR | € - 0 | € - 0 |
| 0001 | AB | Tractor / Lift Operator | 800 | HR | € - 0 | € - 0 |
| 0001 | AC | Fall Material HIC test and report | 20 | EA | € - 0 | € - 0 |
| 0001 | AD | Playground Inspection & Report | 20 | EA | € - 0 | € - 0 |
| 0001 | AE | Safety Audit Inspection & Report | 20 | EA | € - 0 | € - 0 |
| | TOTAL COST (0001AA-AF) | | | | € - 0 |
0002 RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE
| 0002 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0002 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0002 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0002 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| | TOTAL COST (0002AA-AE) | | | | € - 0 |
0003 RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT
| 0003 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0003 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0003 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0003 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| | TOTAL COST (0003AA-AE) | | | | € - 0 |
C-0004 DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE
| C-0004 | AA | Gravel | 3000 | CM | € - 0 | € - 0 |
| C-0004 | AB | Sand | 1000 | CM | € - 0 | € - 0 |
| C-0004 | AC | Re-compact and level base after equipment installation | 10000 | SM | € - 0 | € - 0 |
| | TOTAL COST (0004AA-AC) | | | | € - 0 |
| MISCELLANEOUS WORK DESCRIPTION | | | | |
| C-0005 | Delivery and installation of rubber curbing, including porous concrete base, IAW Section 32 18 16.13 | 8000 | LM | € - 0 | € - 0 |
| C-0006 | Delivery and installation of concrete curbing, including porous concrete base, IAW Section C.6.2.10 | 5500 | LM | € - 0 | € - 0 |
| C-0007 | Delivery and installation of porous concrete, 15 cm thickness (pavers), IAW Section C.6.2.12 | 5000 | SM | € - 0 | € - 0 |
| C-0008 | Sewer/drain trench in soil, class 3-5, IAW Section 02300 and Section C.6.2.6 | 250 | CM | € - 0 | € - 0 |
| C-0009 | Furnish and install reinforced concrete (B25), IAW Section C.6.2.9 | 150 | CM | € - 0 | € - 0 |
| C-0010 | Remove and stockpile topsoil on site, IAW Section 02300 | 1000 | CM | € - 0 | € - 0 |
| C-0011 | Furnish and install unreinforced concrete (B25), IAW Section C.6.2.9 | 1000 | CM | € - 0 | € - 0 |
| C-0012 | Soil excavation, machine: class 3-5, IAW Section 02300 | 3000 | CM | € - 0 | € - 0 |
| C-0013 | Backfill trenches, IAW Section 02300 | 250 | CM | € - 0 | € - 0 |
| C-0014 | Install and connect drain/seepage lines, IAW Section C.6.2.6 | 250 | LM | € - 0 | € - 0 |
| C-0015 | Furnish and install trench\gutter draiange IAW C.6.2.6.1 | 25 | LM | € - 0 | € - 0 |
| C-0016 | Install bituminous surface material, IAW Section C.6.2.8 | 1000 | CM | € - 0 | € - 0 |
| C-0017 | Clean-up IAW Section C.6.2.16 | 5000 | SM | € - 0 | € - 0 |
| C-0018 | Safety fence, delivered and installed, IAW Section C.6.2.13.1 | 5000 | LM | € - 0 | € - 0 |
| C-0019 | Locate existing utility lines, IAW Section 02300 | 5000 | SM | € - 0 | € - 0 |
| C-0020 | Soil excavation, by hand: class 3-5, IAW Section 02300 | 500 | CM | € - 0 | € - 0 |
| C-0021 | Furnish and place topsoil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0022 | Furnish and place sub-grade soil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0023 | Furnish and install rolled sod IAW C.6.2.5.5 | 1000 | SM | € - 0 | € - 0 |
| C-0024 | Furnish and install geotextile seperation layer IAW C.6.2.5.6 | 1000 | SM | € - 0 | € - 0 |
| C-0025 | Furnish and install biodegradable type erosion control material IAW C.6.2.5.7 | 1000 | SM | € - 0 | € - 0 |
| C-0026 | Trim/cut tree limbs and bushes/brush and dispose of materials IAW C.6.2.5.8 | 400 | HR | € - 0 | € - 0 |
| C-0027 | Painting IAW C.6.2.5.9 | 1000 | SM | € - 0 | € - 0 |
| C-0028 | Water Line IAW C.6.2.6.2 | 1000 | LM | € - 0 | € - 0 |
| TOTAL COST (0005-0028) | | | | € - 0 |
| | DELIVERY AND INSTALLATION OF FENCING | | | | |
| IAW SOW and Additional Task Order Specs | | | | | | |
| C-0029 | AA | Welded bar fence IAW C.6.2.13.3 | 1500 | SM | € - 0 | € - 0 |
| C-0029 | AB | Chain Link Fence IAW C.6.2.13.4 | 400 | SM | € - 0 | € - 0 |
| C-0029 | AC | Wooden fence IAW C.6.2.13.2 | 100 | SM | € - 0 | € - 0 |
| C-0029 | AD | Round Fence Post IAW C.6.2.13.5 | 100 | M | € - 0 | € - 0 |
| C-0029 | AE | Square/Rect. Fence Post IAW C.6.2.13.5 | 500 | M | € - 0 | € - 0 |
| C-0029 | AF | Wooden fence post IAW C.6.2.13.2.1 | 50 | M | € - 0 | € - 0 |
| C-0029 | AG | Concrete Foundation IAW C.6.2.13.6 | 300 | CM | € - 0 | € - 0 |
| C-0029 | AH | Chain Link fence Gate IAW C.6.2.13.7 | 40 | SM | € - 0 | € - 0 |
| C-0029 | AI | Welded bar fence Gate IAW C.6.2.13.7 | 200 | SM | € - 0 | € - 0 |
| C-0029 | AJ | Wooden fence Gate IAW C.6.2.13.7 | 10 | SM | € - 0 | € - 0 |
| C-0029 | AK | Replace hardware IAW C.6.2.13.8 | 50 | EA | € - 0 | € - 0 |
| | TOTAL COST (0029AA-AK) | | | | € - 0 |
DEMOLITION
| C-0030 | AA | Remove and dispose of fence post | 500 | EA | € - 0 | € - 0 |
| C-0030 | AB | Remove and dispose of fence material | 1000 | SM | € - 0 | € - 0 |
| C-0030 | AC | Remove and dispose of post foundation | 300 | CM | € - 0 | € - 0 |
| C-0030 | AD | Remove and dispose of old plastic Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AE | Remove and dispose of old wooden Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AF | Remove and dispose of old metal Equipment including connection mat. | 300 | CM | € - 0 | € - 0 |
| C-0030 | AG | Remove and dispose of earth | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AH | Remove and dispose of bituminous mat. | 200 | CM | € - 0 | € - 0 |
| C-0030 | AI | Remove and dispose of reinforced concrete | 400 | CM | € - 0 | € - 0 |
| C-0030 | AJ | Remove and dispose of unreinforced concrete | 500 | CM | € - 0 | € - 0 |
| C-0030 | AK | Remove and dispose of concrete pavers | 1600 | SM | € - 0 | € - 0 |
| C-0030 | AL | Remove and dispose of rubberized fall material | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AM | Remove and dispose of artificial grass fall material | 100 | CM | € - 0 | |
| C-0030 | AN | Remove and dispose of wood fiber fall material | 200 | CM | € - 0 | |
| | TOTAL COST (0030AA-AN) | | | | € - 0 |
EQUIPMENT PRICING SCHEDULE
| Attach the Equipment Price List | | |
| 0031 | Equipment Price List TOTAL COST (in Euros) | € - 0 |
| DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC) | | | |
| IAW Section B and C.5 | | | | |
| 0032 | Percentage applied to (CLIN: 0031) equipment pricing per individual task order, excluding shipping and handling (as a percentage %) | 0.00% | DLCEIC % | € - 0 |
| SHIPPING | |
| IAW Section H & B and FAR 47 | | |
| 0033 | Cost determined per individual task order | Not Entered by Contractor |
BASE YR 4
| SECTION B | | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | | Changes from previous version Amend 001 highlighted in Red Font |
| BASE YEAR 4 | | | | |
| LINE | | | | |
| ITEM | | DESCRIPTION | EST | | |
| QTY | U/I | Unit Price | Total Price | Geographic Distribution: non-binding approximate % of work by country: | |
Germany – 90%, BENELUX – 5%, Italy 4%, Other geographic areas throughout EUCOM AOR – 1%.
0001 LABOR
| 0001 | AA | Labor | 1200 | HR | € - 0 | € - 0 |
| 0001 | AB | Tractor / Lift Operator | 800 | HR | € - 0 | € - 0 |
| 0001 | AC | Fall Material HIC test and report | 20 | EA | € - 0 | € - 0 |
| 0001 | AD | Playground Inspection & Report | 20 | EA | € - 0 | € - 0 |
| 0001 | AE | Safety Audit Inspection & Report | 20 | EA | € - 0 | € - 0 |
| | TOTAL COST (0001AA-AF) | | | | € - 0 |
0002 RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE
| 0002 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0002 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0002 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0002 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| | TOTAL COST (0002AA-AE) | | | | € - 0 |
0003 RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT
| 0003 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0003 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0003 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0003 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| | TOTAL COST (0003AA-AE) | | | | € - 0 |
C-0004 DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE
| C-0004 | AA | Gravel | 3000 | CM | € - 0 | € - 0 |
| C-0004 | AB | Sand | 1000 | CM | € - 0 | € - 0 |
| C-0004 | AC | Re-compact and level base after equipment installation | 10000 | SM | € - 0 | € - 0 |
| | TOTAL COST (0004AA-AC) | | | | € - 0 |
| MISCELLANEOUS WORK DESCRIPTION | | | | |
| C-0005 | Delivery and installation of rubber curbing, including porous concrete base, IAW Section 32 18 16.13 | 8000 | LM | € - 0 | € - 0 |
| C-0006 | Delivery and installation of concrete curbing, including porous concrete base, IAW Section C.6.2.10 | 5500 | LM | € - 0 | € - 0 |
| C-0007 | Delivery and installation of porous concrete, 15 cm thickness (pavers), IAW Section C.6.2.12 | 5000 | SM | € - 0 | € - 0 |
| C-0008 | Sewer/drain trench in soil, class 3-5, IAW Section 02300 and Section C.6.2.6 | 250 | CM | € - 0 | € - 0 |
| C-0009 | Furnish and install reinforced concrete (B25), IAW Section C.6.2.9 | 150 | CM | € - 0 | € - 0 |
| C-0010 | Remove and stockpile topsoil on site, IAW Section 02300 | 1000 | CM | € - 0 | € - 0 |
| C-0011 | Furnish and install unreinforced concrete (B25), IAW Section C.6.2.9 | 1000 | CM | € - 0 | € - 0 |
| C-0012 | Soil excavation, machine: class 3-5, IAW Section 02300 | 3000 | CM | € - 0 | € - 0 |
| C-0013 | Backfill trenches, IAW Section 02300 | 250 | CM | € - 0 | € - 0 |
| C-0014 | Install and connect drain/seepage lines, IAW Section C.6.2.6 | 250 | LM | € - 0 | € - 0 |
| C-0015 | Furnish and install trench\gutter draiange IAW C.6.2.6.1 | 25 | LM | € - 0 | € - 0 |
| C-0016 | Install bituminous surface material, IAW Section C.6.2.8 | 1000 | CM | € - 0 | € - 0 |
| C-0017 | Clean-up IAW Section C.6.2.16 | 5000 | SM | € - 0 | € - 0 |
| C-0018 | Safety fence, delivered and installed, IAW Section C.6.2.13.1 | 5000 | LM | € - 0 | € - 0 |
| C-0019 | Locate existing utility lines, IAW Section 02300 | 5000 | SM | € - 0 | € - 0 |
| C-0020 | Soil excavation, by hand: class 3-5, IAW Section 02300 | 500 | CM | € - 0 | € - 0 |
| C-0021 | Furnish and place topsoil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0022 | Furnish and place sub-grade soil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0023 | Furnish and install rolled sod IAW C.6.2.5.5 | 1000 | SM | € - 0 | € - 0 |
| C-0024 | Furnish and install geotextile seperation layer IAW C.6.2.5.6 | 1000 | SM | € - 0 | € - 0 |
| C-0025 | Furnish and install biodegradable type erosion control material IAW C.6.2.5.7 | 1000 | SM | € - 0 | € - 0 |
| C-0026 | Trim/cut tree limbs and bushes/brush and dispose of materials IAW C.6.2.5.8 | 400 | HR | € - 0 | € - 0 |
| C-0027 | Painting IAW C.6.2.5.9 | 1000 | SM | € - 0 | € - 0 |
| C-0028 | Water Line IAW C.6.2.6.2 | 1000 | LM | € - 0 | € - 0 |
| TOTAL COST (0005-0028) | | | | € - 0 |
| | DELIVERY AND INSTALLATION OF FENCING | | | | |
| IAW SOW and Additional Task Order Specs | | | | | | |
| C-0029 | AA | Welded bar fence IAW C.6.2.13.3 | 1500 | SM | € - 0 | € - 0 |
| C-0029 | AB | Chain Link Fence IAW C.6.2.13.4 | 400 | SM | € - 0 | € - 0 |
| C-0029 | AC | Wooden fence IAW C.6.2.13.2 | 100 | SM | € - 0 | € - 0 |
| C-0029 | AD | Round Fence Post IAW C.6.2.13.5 | 100 | M | € - 0 | € - 0 |
| C-0029 | AE | Square/Rect. Fence Post IAW C.6.2.13.5 | 500 | M | € - 0 | € - 0 |
| C-0029 | AF | Wooden fence post IAW C.6.2.13.2.1 | 50 | M | € - 0 | € - 0 |
| C-0029 | AG | Concrete Foundation IAW C.6.2.13.6 | 300 | CM | € - 0 | € - 0 |
| C-0029 | AH | Chain Link fence Gate IAW C.6.2.13.7 | 40 | SM | € - 0 | € - 0 |
| C-0029 | AI | Welded bar fence Gate IAW C.6.2.13.7 | 200 | SM | € - 0 | € - 0 |
| C-0029 | AJ | Wooden fence Gate IAW C.6.2.13.7 | 10 | SM | € - 0 | € - 0 |
| C-0029 | AK | Replace hardware IAW C.6.2.13.8 | 50 | EA | € - 0 | € - 0 |
| | TOTAL COST (0029AA-AK) | | | | € - 0 |
DEMOLITION
| C-0030 | AA | Remove and dispose of fence post | 500 | EA | € - 0 | € - 0 |
| C-0030 | AB | Remove and dispose of fence material | 1000 | SM | € - 0 | € - 0 |
| C-0030 | AC | Remove and dispose of post foundation | 300 | CM | € - 0 | € - 0 |
| C-0030 | AD | Remove and dispose of old plastic Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AE | Remove and dispose of old wooden Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AF | Remove and dispose of old metal Equipment including connection mat. | 300 | CM | € - 0 | € - 0 |
| C-0030 | AG | Remove and dispose of earth | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AH | Remove and dispose of bituminous mat. | 200 | CM | € - 0 | € - 0 |
| C-0030 | AI | Remove and dispose of reinforced concrete | 400 | CM | € - 0 | € - 0 |
| C-0030 | AJ | Remove and dispose of unreinforced concrete | 500 | CM | € - 0 | € - 0 |
| C-0030 | AK | Remove and dispose of concrete pavers | 1600 | SM | € - 0 | € - 0 |
| C-0030 | AL | Remove and dispose of rubberized fall material | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AM | Remove and dispose of artificial grass fall material | 100 | CM | € - 0 | |
| C-0030 | AN | Remove and dispose of wood fiber fall material | 200 | CM | € - 0 | |
| | TOTAL COST (0030AA-AN) | | | | € - 0 |
EQUIPMENT PRICING SCHEDULE
| Attach the Equipment Price List | | |
| 0031 | Equipment Price List TOTAL COST (in Euros) | € - 0 |
| DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC) | | | |
| IAW Section B and C.5 | | | | |
| 0032 | Percentage applied to (CLIN: 0031) equipment pricing per individual task order, excluding shipping and handling (as a percentage %) | 0.00% | DLCEIC % | € - 0 |
| SHIPPING | |
| IAW Section H & B and FAR 47 | | |
| 0033 | Cost determined per individual task order | Not Entered by Contractor |
BASE YR 5
| SECTION B | | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | | Changes from previous version Amend 001 highlighted in Red Font |
| BASE YEAR 5 | | | | |
| LINE | | | | |
| ITEM | | DESCRIPTION | EST | | |
| QTY | U/I | Unit Price | Total Price | Geographic Distribution: non-binding approximate % of work by country: | |
Germany – 90%, BENELUX – 5%, Italy 4%, Other geographic areas throughout EUCOM AOR – 1%.
0001 LABOR
| 0001 | AA | Labor | 1200 | HR | € - 0 | € - 0 |
| 0001 | AB | Tractor / Lift Operator | 800 | HR | € - 0 | € - 0 |
| 0001 | AC | Fall Material HIC test and report | 20 | EA | € - 0 | € - 0 |
| 0001 | AD | Playground Inspection & Report | 20 | EA | € - 0 | € - 0 |
| 0001 | AE | Safety Audit Inspection & Report | 20 | EA | € - 0 | € - 0 |
| | TOTAL COST (0001AA-AF) | | | | € - 0 |
0002 RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE
| 0002 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0002 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0002 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0002 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| | TOTAL COST (0002AA-AE) | | | | € - 0 |
0003 RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT
| 0003 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0003 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0003 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0003 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| | TOTAL COST (0003AA-AE) | | | | € - 0 |
C-0004 DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE
| C-0004 | AA | Gravel | 3000 | CM | € - 0 | € - 0 |
| C-0004 | AB | Sand | 1000 | CM | € - 0 | € - 0 |
| C-0004 | AC | Re-compact and level base after equipment installation | 10000 | SM | € - 0 | € - 0 |
| | TOTAL COST (0004AA-AC) | | | | € - 0 |
| MISCELLANEOUS WORK DESCRIPTION | | | | |
| C-0005 | Delivery and installation of rubber curbing, including porous concrete base, IAW Section 32 18 16.13 | 8000 | LM | € - 0 | € - 0 |
| C-0006 | Delivery and installation of concrete curbing, including porous concrete base, IAW Section C.6.2.10 | 5500 | LM | € - 0 | € - 0 |
| C-0007 | Delivery and installation of porous concrete, 15 cm thickness (pavers), IAW Section C.6.2.12 | 5000 | SM | € - 0 | € - 0 |
| C-0008 | Sewer/drain trench in soil, class 3-5, IAW Section 02300 and Section C.6.2.6 | 250 | CM | € - 0 | € - 0 |
| C-0009 | Furnish and install reinforced concrete (B25), IAW Section C.6.2.9 | 150 | CM | € - 0 | € - 0 |
| C-0010 | Remove and stockpile topsoil on site, IAW Section 02300 | 1000 | CM | € - 0 | € - 0 |
| C-0011 | Furnish and install unreinforced concrete (B25), IAW Section C.6.2.9 | 1000 | CM | € - 0 | € - 0 |
| C-0012 | Soil excavation, machine: class 3-5, IAW Section 02300 | 3000 | CM | € - 0 | € - 0 |
| C-0013 | Backfill trenches, IAW Section 02300 | 250 | CM | € - 0 | € - 0 |
| C-0014 | Install and connect drain/seepage lines, IAW Section C.6.2.6 | 250 | LM | € - 0 | € - 0 |
| C-0015 | Furnish and install trench\gutter draiange IAW C.6.2.6.1 | 25 | LM | € - 0 | € - 0 |
| C-0016 | Install bituminous surface material, IAW Section C.6.2.8 | 1000 | CM | € - 0 | € - 0 |
| C-0017 | Clean-up IAW Section C.6.2.16 | 5000 | SM | € - 0 | € - 0 |
| C-0018 | Safety fence, delivered and installed, IAW Section C.6.2.13.1 | 5000 | LM | € - 0 | € - 0 |
| C-0019 | Locate existing utility lines, IAW Section 02300 | 5000 | SM | € - 0 | € - 0 |
| C-0020 | Soil excavation, by hand: class 3-5, IAW Section 02300 | 500 | CM | € - 0 | € - 0 |
| C-0021 | Furnish and place topsoil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0022 | Furnish and place sub-grade soil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0023 | Furnish and install rolled sod IAW C.6.2.5.5 | 1000 | SM | € - 0 | € - 0 |
| C-0024 | Furnish and install geotextile seperation layer IAW C.6.2.5.6 | 1000 | SM | € - 0 | € - 0 |
| C-0025 | Furnish and install biodegradable type erosion control material IAW C.6.2.5.7 | 1000 | SM | € - 0 | € - 0 |
| C-0026 | Trim/cut tree limbs and bushes/brush and dispose of materials IAW C.6.2.5.8 | 400 | HR | € - 0 | € - 0 |
| C-0027 | Painting IAW C.6.2.5.9 | 1000 | SM | € - 0 | € - 0 |
| C-0028 | Water Line IAW C.6.2.6.2 | 1000 | LM | € - 0 | € - 0 |
| TOTAL COST (0005-0028) | | | | € - 0 |
| | DELIVERY AND INSTALLATION OF FENCING | | | | |
| IAW SOW and Additional Task Order Specs | | | | | | |
| C-0029 | AA | Welded bar fence IAW C.6.2.13.3 | 1500 | SM | € - 0 | € - 0 |
| C-0029 | AB | Chain Link Fence IAW C.6.2.13.4 | 400 | SM | € - 0 | € - 0 |
| C-0029 | AC | Wooden fence IAW C.6.2.13.2 | 100 | SM | € - 0 | € - 0 |
| C-0029 | AD | Round Fence Post IAW C.6.2.13.5 | 100 | M | € - 0 | € - 0 |
| C-0029 | AE | Square/Rect. Fence Post IAW C.6.2.13.5 | 500 | M | € - 0 | € - 0 |
| C-0029 | AF | Wooden fence post IAW C.6.2.13.2.1 | 50 | M | € - 0 | € - 0 |
| C-0029 | AG | Concrete Foundation IAW C.6.2.13.6 | 300 | CM | € - 0 | € - 0 |
| C-0029 | AH | Chain Link fence Gate IAW C.6.2.13.7 | 40 | SM | € - 0 | € - 0 |
| C-0029 | AI | Welded bar fence Gate IAW C.6.2.13.7 | 200 | SM | € - 0 | € - 0 |
| C-0029 | AJ | Wooden fence Gate IAW C.6.2.13.7 | 10 | SM | € - 0 | € - 0 |
| C-0029 | AK | Replace hardware IAW C.6.2.13.8 | 50 | EA | € - 0 | € - 0 |
| | TOTAL COST (0029AA-AK) | | | | € - 0 |
DEMOLITION
| C-0030 | AA | Remove and dispose of fence post | 500 | EA | € - 0 | € - 0 |
| C-0030 | AB | Remove and dispose of fence material | 1000 | SM | € - 0 | € - 0 |
| C-0030 | AC | Remove and dispose of post foundation | 300 | CM | € - 0 | € - 0 |
| C-0030 | AD | Remove and dispose of old plastic Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AE | Remove and dispose of old wooden Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AF | Remove and dispose of old metal Equipment including connection mat. | 300 | CM | € - 0 | € - 0 |
| C-0030 | AG | Remove and dispose of earth | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AH | Remove and dispose of bituminous mat. | 200 | CM | € - 0 | € - 0 |
| C-0030 | AI | Remove and dispose of reinforced concrete | 400 | CM | € - 0 | € - 0 |
| C-0030 | AJ | Remove and dispose of unreinforced concrete | 500 | CM | € - 0 | € - 0 |
| C-0030 | AK | Remove and dispose of concrete pavers | 1600 | SM | € - 0 | € - 0 |
| C-0030 | AL | Remove and dispose of rubberized fall material | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AM | Remove and dispose of artificial grass fall material | 100 | CM | € - 0 | |
| C-0030 | AN | Remove and dispose of wood fiber fall material | 200 | CM | € - 0 | |
| | TOTAL COST (0030AA-AN) | | | | € - 0 |
EQUIPMENT PRICING SCHEDULE
| Attach the Equipment Price List | | |
| 0031 | Equipment Price List TOTAL COST (in Euros) | € - 0 |
| DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC) | | | |
| IAW Section B and C.5 | | | | |
| 0032 | Percentage applied to (CLIN: 0031) equipment pricing per individual task order, excluding shipping and handling (as a percentage %) | 0.00% | DLCEIC % | € - 0 |
| SHIPPING | |
| IAW Section H & B and FAR 47 | | |
| 0033 | Cost determined per individual task order | Not Entered by Contractor |
SUM
| Base Period | |
| Bottom Line Sum Base Year 1 | € - 0 |
| Bottom Line Sum Base Year 2 | € - 0 |
| Bottom Line Sum Base Year 3 | € - 0 |
| Bottom Line Sum Base Year 4 | € - 0 |
| Bottom Line Sum Base Year 5 | € - 0 |
| Total Bottom Line Sum | € - 0 |