ATTACH 4 Playground IDIQ Bid Schedule EUROS.xlsx
XLSX spreadsheet 176 KB Posted
- Attached to
- FY22 PLAYGROUNDS SINGLE AWARD TASK ORDER CONTRACT (SATOC) Federal contract opportunity
- Solicitation number
- W912GB22R0008
- Issued by
- Department of the Army European Command
About this file
This document contains a schedule of rates for a federal indefinite delivery indefinite quantity (IDIQ) playgrounds single award task order contract (SATOC). The US Army Corps of Engineers Europe District intends to award a firm fixed price IDIQ contract to provide various playground installation, repair, and maintenance services at locations within the US European Command area of responsibility. Services include labor, resilient surface systems, aggregate bases, fencing, demolition, and equipment. Pricing is provided for five base years and one six-month option period. However, unit prices are blank, indicating this is a template. The solicitation number is W912GB22R0008 for fiscal year 2022 requirements.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE YR 1
| SECTION B | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | ||||||
| BASE YEAR 1 | |||||||
| LINE | |||||||
| ITEM | DESCRIPTION | EST | |||||
| QTY | U/I | Unit Price | Total Price | ||||
| 0001 | LABOR | ||||||
| IAW Section C, Paragraph C.1.6.1.8 | |||||||
| 0001 | AA | Labor | 1200 | HR | € - 0 | € - 0 | |
| 0001 | AB | Tractor / Lift Operator | 800 | HR | € - 0 | € - 0 | |
| 0001 | AC | Fall Material HIC test and report | 50 | EA | € - 0 | € - 0 | |
| 0001 | AD (i) | Preventive Maintenance and Inspection (for greater than 300 inspections to be performed) | 400 | EA | € - 0 | € - 0 | |
| 0001 | AD (ii) | Preventive Maintenance and Inspection (for between 100 and 300 inspections to be performed) | 200 | EA | € - 0 | € - 0 | |
| 0001 | AD (iii) | Preventive Maintenance and Inspection (for fewer than 100 inspections to be performed) | 50 | EA | € - 0 | € - 0 | |
| 0001 | AE (i) | Annual Safety Audit (for greater than 100 inspections to be performed) | 200 | EA | € - 0 | € - 0 | |
| 0001 | AE (ii) | Annual Safety Audit (for between 50 to 100 inspections to be performed) | 75 | EA | € - 0 | € - 0 | |
| 0001 | AE (iii) | Annual Safety Audit (for fewer than 50 inspections to be performed) | 25 | EA | € - 0 | € - 0 | |
| TOTAL COST (0001AA-AF) | € - 0 |
| 0002 | RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE | |||||
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | ||||||
| 0002 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0002 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0002 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0002 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| 0002 | AE | Wood Fiber | 500 | CM | € - 0 | € - 0 |
| TOTAL COST (0002AA-AE) | € - 0 |
| 0003 | RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT | |||||
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | ||||||
| 0003 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0003 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0003 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0003 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| 0003 | AE | Wood Fiber | 500 | CM | € - 0 | € - 0 |
| TOTAL COST (0003AA-AE) | € - 0 |
| C-0004 | DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE | |||||
| Delivery and installation of resilient surface system IAW Section C.6.2.4 | ||||||
| C-0004 | AA | Gravel | 3000 | CM | € - 0 | € - 0 |
| C-0004 | AB | Sand | 1000 | CM | € - 0 | € - 0 |
| C-0004 | AC | Re-compact and level base after equipment installation | 10000 | SM | € - 0 | € - 0 |
| TOTAL COST (0004AA-AC) | € - 0 |
| MISCELLANEOUS WORK DESCRIPTION | |||||
| C-0005 | Delivery and installation of rubber curbing, including porous concrete base, IAW Section 32 18 16.13 | 8000 | LM | € - 0 | € - 0 |
| C-0006 | Delivery and installation of concrete curbing, including porous concrete base, IAW Section C.6.2.10 | 5500 | LM | € - 0 | € - 0 |
| C-0007 | Delivery and installation of porous concrete, 15 cm thickness (pavers), IAW Section C.6.2.12 | 5000 | SM | € - 0 | € - 0 |
| C-0008 | Sewer/drain trench in soil, class 3-5, IAW Section 02300 and Section C.6.2.6 | 250 | CM | € - 0 | € - 0 |
| C-0009 | Furnish and install reinforced concrete (B25), IAW Section C.6.2.9 | 150 | CM | € - 0 | € - 0 |
| C-0010 | Remove and stockpile topsoil on site, IAW Section 02300 | 1000 | CM | € - 0 | € - 0 |
| C-0011 | Furnish and install unreinforced concrete (B25), IAW Section C.6.2.9 | 1000 | CM | € - 0 | € - 0 |
| C-0012 | Soil excavation, machine: class 3-5, IAW Section 02300 | 3000 | CM | € - 0 | € - 0 |
| C-0013 | Backfill trenches, IAW Section 02300 | 250 | CM | € - 0 | € - 0 |
| C-0014 | Install and connect drain/seepage lines, IAW Section C.6.2.6 | 250 | LM | € - 0 | € - 0 |
| C-0015 | Furnish and install trench\gutter draiange IAW C.6.2.6.1 | 25 | LM | € - 0 | € - 0 |
| C-0016 | Install bituminous surface material, IAW Section C.6.2.8 | 1000 | CM | € - 0 | € - 0 |
| C-0017 | Clean-up IAW Section C.6.2.16 | 5000 | SM | € - 0 | € - 0 |
| C-0018 | Safety fence, delivered and installed, IAW Section C.6.2.13.1 | 5000 | LM | € - 0 | € - 0 |
| C-0019 | Locate existing utility lines, IAW Section 02300 | 5000 | SM | € - 0 | € - 0 |
| C-0020 | Soil excavation, by hand: class 3-5, IAW Section 02300 | 500 | CM | € - 0 | € - 0 |
| C-0021 | Furnish and place topsoil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0022 | Furnish and place sub-grade soil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0023 | Furnish and install rolled sod IAW C.6.2.5.5 | 1000 | SM | € - 0 | € - 0 |
| C-0024 | Furnish and install geotextile seperation layer IAW C.6.2.5.6 | 1000 | SM | € - 0 | € - 0 |
| C-0025 | Furnish and install biodegradable type erosion control material IAW C.6.2.5.7 | 1000 | SM | € - 0 | € - 0 |
| C-0026 | Trim/cut tree limbs and bushes/brush and dispose of materials IAW C.6.2.5.8 | 400 | HR | € - 0 | € - 0 |
| C-0027 | Painting IAW C.6.2.5.9 | 1000 | SM | € - 0 | € - 0 |
| C-0028 | Water Line IAW C.6.2.6.2 | 1000 | LM | € - 0 | € - 0 |
| TOTAL COST (0005-0028) | € - 0 |
| DELIVERY AND INSTALLATION OF FENCING | ||||||
| IAW SOW and Additional Task Order Specs | ||||||
| C-0029 | AA | Welded bar fence IAW C.6.2.13.3 | 1500 | SM | € - 0 | € - 0 |
| C-0029 | AB | Chain Link Fence IAW C.6.2.13.4 | 400 | SM | € - 0 | € - 0 |
| C-0029 | AC | Wooden fence IAW C.6.2.13.2 | 100 | SM | € - 0 | € - 0 |
| C-0029 | AD | Round Fence Post IAW C.6.2.13.5 | 100 | M | € - 0 | € - 0 |
| C-0029 | AE | Square/Rect. Fence Post IAW C.6.2.13.5 | 500 | M | € - 0 | € - 0 |
| C-0029 | AF | Wooden fence post IAW C.6.2.13.2.1 | 50 | M | € - 0 | € - 0 |
| C-0029 | AG | Concrete Foundation IAW C.6.2.13.6 | 300 | CM | € - 0 | € - 0 |
| C-0029 | AH | Chain Link fence Gate IAW C.6.2.13.7 | 40 | SM | € - 0 | € - 0 |
| C-0029 | AI | Welded bar fence Gate IAW C.6.2.13.7 | 200 | SM | € - 0 | € - 0 |
| C-0029 | AJ | Wooden fence Gate IAW C.6.2.13.7 | 10 | SM | € - 0 | € - 0 |
| C-0029 | AK | Replace hardware IAW C.6.2.13.8 | 50 | EA | € - 0 | € - 0 |
| TOTAL COST (0029AA-AK) | € - 0 |
| DEMOLITION | ||||||
| IAW Section 02 41 00 | ||||||
| C-0030 | AA | Remove and dispose of fence post | 500 | EA | € - 0 | € - 0 |
| C-0030 | AB | Remove and dispose of fence material | 1000 | SM | € - 0 | € - 0 |
| C-0030 | AC | Remove and dispose of post foundation | 300 | CM | € - 0 | € - 0 |
| C-0030 | AD | Remove and dispose of old plastic Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AE | Remove and dispose of old wooden Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AF | Remove and dispose of old metal Equipment including connection mat. | 300 | CM | € - 0 | € - 0 |
| C-0030 | AG | Remove and dispose of earth | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AH | Remove and dispose of bituminous mat. | 200 | CM | € - 0 | € - 0 |
| C-0030 | AI | Remove and dispose of reinforced concrete | 400 | CM | € - 0 | € - 0 |
| C-0030 | AJ | Remove and dispose of unreinforced concrete | 500 | CM | € - 0 | € - 0 |
| C-0030 | AK | Remove and dispose of concrete pavers | 1600 | SM | € - 0 | € - 0 |
| C-0030 | AL | Remove and dispose of rubberized fall material | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AM | Remove and dispose of artificial grass fall material | 100 | CM | € - 0 | € - 0 |
| C-0030 | AN | Remove and dispose of wood fiber fall material | 200 | CM | € - 0 | € - 0 |
| TOTAL COST (0030AA-AN) | € - 0 |
| EQUIPMENT PRICING SCHEDULE | |||||
| IAW Section H & B | |||||
| 1Attach the Equipment Pricing Schedule for the BASE YEAR 1 | |||||
| 0031 | Exchange Rate multiplier established day of Task Order negotiation which converts from dollars to Euro if applicable | 0.8703 | Equipment Dollar Amount Total (if applicable) = | € - 0 | |
| 0032 | AA | Equipment Total Price in Euro | € - 0 |
| DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC) | ||||
| IAW Section B and C.5 | ||||
| 0033 | Cost applied to equipment price per individual task order, excluding shipping and handling (example 0.0%) | 0.00% | DLCEIC = | € - 0 |
| SHIPPING | ||
| IAW Section H & B and FAR 47 | ||
| 0034 | Cost determined per individual task order | € - 0 |
| TOTAL BASE YEAR | |
| € - 0 |
&KFF0000W912GB-17-D-00XX
12 September 2016
BASE YR 2
| SECTION B | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | ||||||
| BASE YEAR 2 | |||||||
| LINE | |||||||
| ITEM | DESCRIPTION | EST | |||||
| QTY | U/I | Unit Price | Total Price | ||||
| 0001 | LABOR | ||||||
| IAW Section C, Paragraph C.1.6.1.8 | |||||||
| 0001 | AA | Labor | 1200 | HR | € - 0 | € - 0 | |
| 0001 | AB | Tractor / Lift Operator | 800 | HR | € - 0 | € - 0 | |
| 0001 | AC | Fall Material HIC test and report | 50 | EA | € - 0 | € - 0 | |
| 0001 | AD (i) | Preventive Maintenance and Inspection (for greater than 300 inspections to be performed) | 400 | EA | € - 0 | € - 0 | |
| 0001 | AD (ii) | Preventive Maintenance and Inspection (for between 100 and 300 inspections to be performed) | 200 | EA | € - 0 | € - 0 | |
| 0001 | AD (iii) | Preventive Maintenance and Inspection (for fewer than 100 inspections to be performed) | 50 | EA | € - 0 | € - 0 | |
| 0001 | AE (i) | Annual Safety Audit (for greater than 100 inspections to be performed) | 200 | EA | € - 0 | € - 0 | |
| 0001 | AE (ii) | Annual Safety Audit (for between 50 to 100 inspections to be performed) | 75 | EA | € - 0 | € - 0 | |
| 0001 | AE (iii) | Annual Safety Audit (for fewer than 50 inspections to be performed) | 25 | EA | € - 0 | € - 0 | |
| TOTAL COST (0001AA-AF) | € - 0 |
| 0002 | RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE | |||||
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | ||||||
| 0002 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0002 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0002 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0002 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| 0002 | AE | Wood Fiber | 500 | CM | € - 0 | € - 0 |
| TOTAL COST (0002AA-AE) | € - 0 |
| 0003 | RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT | |||||
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | ||||||
| 0003 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0003 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0003 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0003 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| 0003 | AE | Wood Fiber | 500 | CM | € - 0 | € - 0 |
| TOTAL COST (0003AA-AE) | € - 0 |
| C-0004 | DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE | |||||
| Delivery and installation of resilient surface system IAW Section C.6.2.4 | ||||||
| C-0004 | AA | Gravel | 3000 | CM | € - 0 | € - 0 |
| C-0004 | AB | Sand | 1000 | CM | € - 0 | € - 0 |
| C-0004 | AC | Re-compact and level base after equipment installation | 10000 | SM | € - 0 | € - 0 |
| TOTAL COST (0004AA-AC) | € - 0 |
| MISCELLANEOUS WORK DESCRIPTION | |||||
| C-0005 | Delivery and installation of rubber curbing, including porous concrete base, IAW Section 32 18 16.13 | 8000 | LM | € - 0 | € - 0 |
| C-0006 | Delivery and installation of concrete curbing, including porous concrete base, IAW Section C.6.2.10 | 5500 | LM | € - 0 | € - 0 |
| C-0007 | Delivery and installation of porous concrete, 15 cm thickness (pavers), IAW Section C.6.2.12 | 5000 | SM | € - 0 | € - 0 |
| C-0008 | Sewer/drain trench in soil, class 3-5, IAW Section 02300 and Section C.6.2.6 | 250 | CM | € - 0 | € - 0 |
| C-0009 | Furnish and install reinforced concrete (B25), IAW Section C.6.2.9 | 150 | CM | € - 0 | € - 0 |
| C-0010 | Remove and stockpile topsoil on site, IAW Section 02300 | 1000 | CM | € - 0 | € - 0 |
| C-0011 | Furnish and install unreinforced concrete (B25), IAW Section C.6.2.9 | 1000 | CM | € - 0 | € - 0 |
| C-0012 | Soil excavation, machine: class 3-5, IAW Section 02300 | 3000 | CM | € - 0 | € - 0 |
| C-0013 | Backfill trenches, IAW Section 02300 | 250 | CM | € - 0 | € - 0 |
| C-0014 | Install and connect drain/seepage lines, IAW Section C.6.2.6 | 250 | LM | € - 0 | € - 0 |
| C-0015 | Furnish and install trench\gutter draiange IAW C.6.2.6.1 | 25 | LM | € - 0 | € - 0 |
| C-0016 | Install bituminous surface material, IAW Section C.6.2.8 | 1000 | CM | € - 0 | € - 0 |
| C-0017 | Clean-up IAW Section C.6.2.16 | 5000 | SM | € - 0 | € - 0 |
| C-0018 | Safety fence, delivered and installed, IAW Section C.6.2.13.1 | 5000 | LM | € - 0 | € - 0 |
| C-0019 | Locate existing utility lines, IAW Section 02300 | 5000 | SM | € - 0 | € - 0 |
| C-0020 | Soil excavation, by hand: class 3-5, IAW Section 02300 | 500 | CM | € - 0 | € - 0 |
| C-0021 | Furnish and place topsoil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0022 | Furnish and place sub-grade soil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0023 | Furnish and install rolled sod IAW C.6.2.5.5 | 1000 | SM | € - 0 | € - 0 |
| C-0024 | Furnish and install geotextile seperation layer IAW C.6.2.5.6 | 1000 | SM | € - 0 | € - 0 |
| C-0025 | Furnish and install biodegradable type erosion control material IAW C.6.2.5.7 | 1000 | SM | € - 0 | € - 0 |
| C-0026 | Trim/cut tree limbs and bushes/brush and dispose of materials IAW C.6.2.5.8 | 400 | HR | € - 0 | € - 0 |
| C-0027 | Painting IAW C.6.2.5.9 | 1000 | SM | € - 0 | € - 0 |
| C-0028 | Water Line IAW C.6.2.6.2 | 1000 | LM | € - 0 | € - 0 |
| TOTAL COST (0005-0028) | € - 0 |
| DELIVERY AND INSTALLATION OF FENCING | ||||||
| IAW SOW and Additional Task Order Specs | ||||||
| C-0029 | AA | Welded bar fence IAW C.6.2.13.3 | 1500 | SM | € - 0 | € - 0 |
| C-0029 | AB | Chain Link Fence IAW C.6.2.13.4 | 400 | SM | € - 0 | € - 0 |
| C-0029 | AC | Wooden fence IAW C.6.2.13.2 | 100 | SM | € - 0 | € - 0 |
| C-0029 | AD | Round Fence Post IAW C.6.2.13.5 | 100 | M | € - 0 | € - 0 |
| C-0029 | AE | Square/Rect. Fence Post IAW C.6.2.13.5 | 500 | M | € - 0 | € - 0 |
| C-0029 | AF | Wooden fence post IAW C.6.2.13.2.1 | 50 | M | € - 0 | € - 0 |
| C-0029 | AG | Concrete Foundation IAW C.6.2.13.6 | 300 | CM | € - 0 | € - 0 |
| C-0029 | AH | Chain Link fence Gate IAW C.6.2.13.7 | 40 | SM | € - 0 | € - 0 |
| C-0029 | AI | Welded bar fence Gate IAW C.6.2.13.7 | 200 | SM | € - 0 | € - 0 |
| C-0029 | AJ | Wooden fence Gate IAW C.6.2.13.7 | 10 | SM | € - 0 | € - 0 |
| C-0029 | AK | Replace hardware IAW C.6.2.13.8 | 50 | EA | € - 0 | € - 0 |
| TOTAL COST (0029AA-AK) | € - 0 |
| DEMOLITION | ||||||
| IAW Section 02 41 00 | ||||||
| C-0030 | AA | Remove and dispose of fence post | 500 | EA | € - 0 | € - 0 |
| C-0030 | AB | Remove and dispose of fence material | 1000 | SM | € - 0 | € - 0 |
| C-0030 | AC | Remove and dispose of post foundation | 300 | CM | € - 0 | € - 0 |
| C-0030 | AD | Remove and dispose of old plastic Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AE | Remove and dispose of old wooden Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AF | Remove and dispose of old metal Equipment including connection mat. | 300 | CM | € - 0 | € - 0 |
| C-0030 | AG | Remove and dispose of earth | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AH | Remove and dispose of bituminous mat. | 200 | CM | € - 0 | € - 0 |
| C-0030 | AI | Remove and dispose of reinforced concrete | 400 | CM | € - 0 | € - 0 |
| C-0030 | AJ | Remove and dispose of unreinforced concrete | 500 | CM | € - 0 | € - 0 |
| C-0030 | AK | Remove and dispose of concrete pavers | 1600 | SM | € - 0 | € - 0 |
| C-0030 | AL | Remove and dispose of rubberized fall material | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AM | Remove and dispose of artificial grass fall material | 100 | CM | € - 0 | € - 0 |
| C-0030 | AN | Remove and dispose of wood fiber fall material | 200 | CM | € - 0 | € - 0 |
| TOTAL COST (0030AA-AN) | € - 0 |
| EQUIPMENT PRICING SCHEDULE | |||||
| IAW Section H & B | |||||
| Attach the Equipment Pricing Schedule for the BASE YEAR 2 | |||||
| 0031 | Exchange Rate multiplier established day of Task Order negotiation which converts from dollars to Euro if applicable | 0.8703 | Equipment Dollar Amount Total (if applicable) = | € - 0 | |
| 0032 | AA | Equipment Total Price in Euro | € - 0 |
| DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC) | ||||
| IAW Section B and C.5 | ||||
| 0033 | Cost applied to equipment price per individual task order, excluding shipping and handling (example 0.0%) | 0.00% | DLCEIC = | € - 0 |
| SHIPPING | ||
| IAW Section H & B and FAR 47 | ||
| 0034 | Cost determined per individual task order | € - 0 |
| TOTAL BASE YEAR | |
| € - 0 |
BASE YR 3
| SECTION B | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | ||||||
| BASE YEAR 3 | |||||||
| LINE | |||||||
| ITEM | DESCRIPTION | EST | |||||
| QTY | U/I | Unit Price | Total Price | ||||
| 0001 | LABOR | ||||||
| IAW Section C, Paragraph C.1.6.1.8 | |||||||
| 0001 | AA | Labor | 1200 | HR | € - 0 | € - 0 | |
| 0001 | AB | Tractor / Lift Operator | 800 | HR | € - 0 | € - 0 | |
| 0001 | AC | Fall Material HIC test and report | 50 | EA | € - 0 | € - 0 | |
| 0001 | AD (i) | Preventive Maintenance and Inspection (for greater than 300 inspections to be performed) | 400 | EA | € - 0 | € - 0 | |
| 0001 | AD (ii) | Preventive Maintenance and Inspection (for between 100 and 300 inspections to be performed) | 200 | EA | € - 0 | € - 0 | |
| 0001 | AD (iii) | Preventive Maintenance and Inspection (for fewer than 100 inspections to be performed) | 50 | EA | € - 0 | € - 0 | |
| 0001 | AE (i) | Annual Safety Audit (for greater than 100 inspections to be performed) | 200 | EA | € - 0 | € - 0 | |
| 0001 | AE (ii) | Annual Safety Audit (for between 50 to 100 inspections to be performed) | 75 | EA | € - 0 | € - 0 | |
| 0001 | AE (iii) | Annual Safety Audit (for fewer than 50 inspections to be performed) | 25 | EA | € - 0 | € - 0 | |
| TOTAL COST (0001AA-AF) | € - 0 |
| 0002 | RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE | |||||
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | ||||||
| 0002 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0002 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0002 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0002 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| 0002 | AE | Wood Fiber | 500 | CM | € - 0 | € - 0 |
| TOTAL COST (0002AA-AE) | € - 0 |
| 0003 | RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT | |||||
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | ||||||
| 0003 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0003 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0003 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0003 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| 0003 | AE | Wood Fiber | 500 | CM | € - 0 | € - 0 |
| TOTAL COST (0003AA-AE) | € - 0 |
| C-0004 | DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE | |||||
| Delivery and installation of resilient surface system IAW Section C.6.2.4 | ||||||
| C-0004 | AA | Gravel | 3000 | CM | € - 0 | € - 0 |
| C-0004 | AB | Sand | 1000 | CM | € - 0 | € - 0 |
| C-0004 | AC | Re-compact and level base after equipment installation | 10000 | SM | € - 0 | € - 0 |
| TOTAL COST (0004AA-AC) | € - 0 |
| MISCELLANEOUS WORK DESCRIPTION | |||||
| C-0005 | Delivery and installation of rubber curbing, including porous concrete base, IAW Section 32 18 16.13 | 8000 | LM | € - 0 | € - 0 |
| C-0006 | Delivery and installation of concrete curbing, including porous concrete base, IAW Section C.6.2.10 | 5500 | LM | € - 0 | € - 0 |
| C-0007 | Delivery and installation of porous concrete, 15 cm thickness (pavers), IAW Section C.6.2.12 | 5000 | SM | € - 0 | € - 0 |
| C-0008 | Sewer/drain trench in soil, class 3-5, IAW Section 02300 and Section C.6.2.6 | 250 | CM | € - 0 | € - 0 |
| C-0009 | Furnish and install reinforced concrete (B25), IAW Section C.6.2.9 | 150 | CM | € - 0 | € - 0 |
| C-0010 | Remove and stockpile topsoil on site, IAW Section 02300 | 1000 | CM | € - 0 | € - 0 |
| C-0011 | Furnish and install unreinforced concrete (B25), IAW Section C.6.2.9 | 1000 | CM | € - 0 | € - 0 |
| C-0012 | Soil excavation, machine: class 3-5, IAW Section 02300 | 3000 | CM | € - 0 | € - 0 |
| C-0013 | Backfill trenches, IAW Section 02300 | 250 | CM | € - 0 | € - 0 |
| C-0014 | Install and connect drain/seepage lines, IAW Section C.6.2.6 | 250 | LM | € - 0 | € - 0 |
| C-0015 | Furnish and install trench\gutter draiange IAW C.6.2.6.1 | 25 | LM | € - 0 | € - 0 |
| C-0016 | Install bituminous surface material, IAW Section C.6.2.8 | 1000 | CM | € - 0 | € - 0 |
| C-0017 | Clean-up IAW Section C.6.2.16 | 5000 | SM | € - 0 | € - 0 |
| C-0018 | Safety fence, delivered and installed, IAW Section C.6.2.13.1 | 5000 | LM | € - 0 | € - 0 |
| C-0019 | Locate existing utility lines, IAW Section 02300 | 5000 | SM | € - 0 | € - 0 |
| C-0020 | Soil excavation, by hand: class 3-5, IAW Section 02300 | 500 | CM | € - 0 | € - 0 |
| C-0021 | Furnish and place topsoil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0022 | Furnish and place sub-grade soil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0023 | Furnish and install rolled sod IAW C.6.2.5.5 | 1000 | SM | € - 0 | € - 0 |
| C-0024 | Furnish and install geotextile seperation layer IAW C.6.2.5.6 | 1000 | SM | € - 0 | € - 0 |
| C-0025 | Furnish and install biodegradable type erosion control material IAW C.6.2.5.7 | 1000 | SM | € - 0 | € - 0 |
| C-0026 | Trim/cut tree limbs and bushes/brush and dispose of materials IAW C.6.2.5.8 | 400 | HR | € - 0 | € - 0 |
| C-0027 | Painting IAW C.6.2.5.9 | 1000 | SM | € - 0 | € - 0 |
| C-0028 | Water Line IAW C.6.2.6.2 | 1000 | LM | € - 0 | € - 0 |
| TOTAL COST (0005-0028) | € - 0 |
| DELIVERY AND INSTALLATION OF FENCING | ||||||
| IAW SOW and Additional Task Order Specs | ||||||
| C-0029 | AA | Welded bar fence IAW C.6.2.13.3 | 1500 | SM | € - 0 | € - 0 |
| C-0029 | AB | Chain Link Fence IAW C.6.2.13.4 | 400 | SM | € - 0 | € - 0 |
| C-0029 | AC | Wooden fence IAW C.6.2.13.2 | 100 | SM | € - 0 | € - 0 |
| C-0029 | AD | Round Fence Post IAW C.6.2.13.5 | 100 | M | € - 0 | € - 0 |
| C-0029 | AE | Square/Rect. Fence Post IAW C.6.2.13.5 | 500 | M | € - 0 | € - 0 |
| C-0029 | AF | Wooden fence post IAW C.6.2.13.2.1 | 50 | M | € - 0 | € - 0 |
| C-0029 | AG | Concrete Foundation IAW C.6.2.13.6 | 300 | CM | € - 0 | € - 0 |
| C-0029 | AH | Chain Link fence Gate IAW C.6.2.13.7 | 40 | SM | € - 0 | € - 0 |
| C-0029 | AI | Welded bar fence Gate IAW C.6.2.13.7 | 200 | SM | € - 0 | € - 0 |
| C-0029 | AJ | Wooden fence Gate IAW C.6.2.13.7 | 10 | SM | € - 0 | € - 0 |
| C-0029 | AK | Replace hardware IAW C.6.2.13.8 | 50 | EA | € - 0 | € - 0 |
| TOTAL COST (0029AA-AK) | € - 0 |
| DEMOLITION | ||||||
| IAW Section 02 41 00 | ||||||
| C-0030 | AA | Remove and dispose of fence post | 500 | EA | € - 0 | € - 0 |
| C-0030 | AB | Remove and dispose of fence material | 1000 | SM | € - 0 | € - 0 |
| C-0030 | AC | Remove and dispose of post foundation | 300 | CM | € - 0 | € - 0 |
| C-0030 | AD | Remove and dispose of old plastic Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AE | Remove and dispose of old wooden Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AF | Remove and dispose of old metal Equipment including connection mat. | 300 | CM | € - 0 | € - 0 |
| C-0030 | AG | Remove and dispose of earth | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AH | Remove and dispose of bituminous mat. | 200 | CM | € - 0 | € - 0 |
| C-0030 | AI | Remove and dispose of reinforced concrete | 400 | CM | € - 0 | € - 0 |
| C-0030 | AJ | Remove and dispose of unreinforced concrete | 500 | CM | € - 0 | € - 0 |
| C-0030 | AK | Remove and dispose of concrete pavers | 1600 | SM | € - 0 | € - 0 |
| C-0030 | AL | Remove and dispose of rubberized fall material | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AM | Remove and dispose of artificial grass fall material | 100 | CM | € - 0 | € - 0 |
| C-0030 | AN | Remove and dispose of wood fiber fall material | 200 | CM | € - 0 | € - 0 |
| TOTAL COST (0030AA-AN) | € - 0 |
| EQUIPMENT PRICING SCHEDULE | |||||
| IAW Section H & B | |||||
| Attach the Equipment Pricing Schedule for the BASE YEAR 3 | |||||
| 0031 | Exchange Rate multiplier established day of Task Order negotiation which converts from dollars to Euro if applicable | 0.8703 | Equipment Dollar Amount Total (if applicable) = | € - 0 | |
| 0032 | AA | Equipment Total Price in Euro | € - 0 |
| DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC) | ||||
| IAW Section B and C.5 | ||||
| 0033 | Cost applied to equipment price per individual task order, excluding shipping and handling (example 0.0%) | 0.00% | DLCEIC = | € - 0 |
| SHIPPING | ||
| IAW Section H & B and FAR 47 | ||
| 0034 | Cost determined per individual task order | € - 0 |
| TOTAL BASE YEAR | |
| € - 0 |
BASE YR 4
| SECTION B | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | ||||||
| BASE YEAR 4 | |||||||
| LINE | |||||||
| ITEM | DESCRIPTION | EST | |||||
| QTY | U/I | Unit Price | Total Price | ||||
| 0001 | LABOR | ||||||
| IAW Section C, Paragraph C.1.6.1.8 | |||||||
| 0001 | AA | Labor | 1200 | HR | € - 0 | € - 0 | |
| 0001 | AB | Tractor / Lift Operator | 800 | HR | € - 0 | € - 0 | |
| 0001 | AC | Fall Material HIC test and report | 50 | EA | € - 0 | € - 0 | |
| 0001 | AD (i) | Preventive Maintenance and Inspection (for greater than 300 inspections to be performed) | 400 | EA | € - 0 | € - 0 | |
| 0001 | AD (ii) | Preventive Maintenance and Inspection (for between 100 and 300 inspections to be performed) | 200 | EA | € - 0 | € - 0 | |
| 0001 | AD (iii) | Preventive Maintenance and Inspection (for fewer than 100 inspections to be performed) | 50 | EA | € - 0 | € - 0 | |
| 0001 | AE (i) | Annual Safety Audit (for greater than 100 inspections to be performed) | 200 | EA | € - 0 | € - 0 | |
| 0001 | AE (ii) | Annual Safety Audit (for between 50 to 100 inspections to be performed) | 75 | EA | € - 0 | € - 0 | |
| 0001 | AE (iii) | Annual Safety Audit (for fewer than 50 inspections to be performed) | 25 | EA | € - 0 | € - 0 | |
| TOTAL COST (0001AA-AF) | € - 0 |
| 0002 | RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE | |||||
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | ||||||
| 0002 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0002 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0002 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0002 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| 0002 | AE | Wood Fiber | 500 | CM | € - 0 | € - 0 |
| TOTAL COST (0002AA-AE) | € - 0 |
| 0003 | RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT | |||||
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | ||||||
| 0003 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0003 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0003 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0003 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| 0003 | AE | Wood Fiber | 500 | CM | € - 0 | € - 0 |
| TOTAL COST (0003AA-AE) | € - 0 |
| C-0004 | DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE | |||||
| Delivery and installation of resilient surface system IAW Section C.6.2.4 | ||||||
| C-0004 | AA | Gravel | 3000 | CM | € - 0 | € - 0 |
| C-0004 | AB | Sand | 1000 | CM | € - 0 | € - 0 |
| C-0004 | AC | Re-compact and level base after equipment installation | 10000 | SM | € - 0 | € - 0 |
| TOTAL COST (0004AA-AC) | € - 0 |
| MISCELLANEOUS WORK DESCRIPTION | |||||
| C-0005 | Delivery and installation of rubber curbing, including porous concrete base, IAW Section 32 18 16.13 | 8000 | LM | € - 0 | € - 0 |
| C-0006 | Delivery and installation of concrete curbing, including porous concrete base, IAW Section C.6.2.10 | 5500 | LM | € - 0 | € - 0 |
| C-0007 | Delivery and installation of porous concrete, 15 cm thickness (pavers), IAW Section C.6.2.12 | 5000 | SM | € - 0 | € - 0 |
| C-0008 | Sewer/drain trench in soil, class 3-5, IAW Section 02300 and Section C.6.2.6 | 250 | CM | € - 0 | € - 0 |
| C-0009 | Furnish and install reinforced concrete (B25), IAW Section C.6.2.9 | 150 | CM | € - 0 | € - 0 |
| C-0010 | Remove and stockpile topsoil on site, IAW Section 02300 | 1000 | CM | € - 0 | € - 0 |
| C-0011 | Furnish and install unreinforced concrete (B25), IAW Section C.6.2.9 | 1000 | CM | € - 0 | € - 0 |
| C-0012 | Soil excavation, machine: class 3-5, IAW Section 02300 | 3000 | CM | € - 0 | € - 0 |
| C-0013 | Backfill trenches, IAW Section 02300 | 250 | CM | € - 0 | € - 0 |
| C-0014 | Install and connect drain/seepage lines, IAW Section C.6.2.6 | 250 | LM | € - 0 | € - 0 |
| C-0015 | Furnish and install trench\gutter draiange IAW C.6.2.6.1 | 25 | LM | € - 0 | € - 0 |
| C-0016 | Install bituminous surface material, IAW Section C.6.2.8 | 1000 | CM | € - 0 | € - 0 |
| C-0017 | Clean-up IAW Section C.6.2.16 | 5000 | SM | € - 0 | € - 0 |
| C-0018 | Safety fence, delivered and installed, IAW Section C.6.2.13.1 | 5000 | LM | € - 0 | € - 0 |
| C-0019 | Locate existing utility lines, IAW Section 02300 | 5000 | SM | € - 0 | € - 0 |
| C-0020 | Soil excavation, by hand: class 3-5, IAW Section 02300 | 500 | CM | € - 0 | € - 0 |
| C-0021 | Furnish and place topsoil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0022 | Furnish and place sub-grade soil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0023 | Furnish and install rolled sod IAW C.6.2.5.5 | 1000 | SM | € - 0 | € - 0 |
| C-0024 | Furnish and install geotextile seperation layer IAW C.6.2.5.6 | 1000 | SM | € - 0 | € - 0 |
| C-0025 | Furnish and install biodegradable type erosion control material IAW C.6.2.5.7 | 1000 | SM | € - 0 | € - 0 |
| C-0026 | Trim/cut tree limbs and bushes/brush and dispose of materials IAW C.6.2.5.8 | 400 | HR | € - 0 | € - 0 |
| C-0027 | Painting IAW C.6.2.5.9 | 1000 | SM | € - 0 | € - 0 |
| C-0028 | Water Line IAW C.6.2.6.2 | 1000 | LM | € - 0 | € - 0 |
| TOTAL COST (0005-0028) | € - 0 |
| DELIVERY AND INSTALLATION OF FENCING | ||||||
| IAW SOW and Additional Task Order Specs | ||||||
| C-0029 | AA | Welded bar fence IAW C.6.2.13.3 | 1500 | SM | € - 0 | € - 0 |
| C-0029 | AB | Chain Link Fence IAW C.6.2.13.4 | 400 | SM | € - 0 | € - 0 |
| C-0029 | AC | Wooden fence IAW C.6.2.13.2 | 100 | SM | € - 0 | € - 0 |
| C-0029 | AD | Round Fence Post IAW C.6.2.13.5 | 100 | M | € - 0 | € - 0 |
| C-0029 | AE | Square/Rect. Fence Post IAW C.6.2.13.5 | 500 | M | € - 0 | € - 0 |
| C-0029 | AF | Wooden fence post IAW C.6.2.13.2.1 | 50 | M | € - 0 | € - 0 |
| C-0029 | AG | Concrete Foundation IAW C.6.2.13.6 | 300 | CM | € - 0 | € - 0 |
| C-0029 | AH | Chain Link fence Gate IAW C.6.2.13.7 | 40 | SM | € - 0 | € - 0 |
| C-0029 | AI | Welded bar fence Gate IAW C.6.2.13.7 | 200 | SM | € - 0 | € - 0 |
| C-0029 | AJ | Wooden fence Gate IAW C.6.2.13.7 | 10 | SM | € - 0 | € - 0 |
| C-0029 | AK | Replace hardware IAW C.6.2.13.8 | 50 | EA | € - 0 | € - 0 |
| TOTAL COST (0029AA-AK) | € - 0 |
| DEMOLITION | ||||||
| IAW Section 02 41 00 | ||||||
| C-0030 | AA | Remove and dispose of fence post | 500 | EA | € - 0 | € - 0 |
| C-0030 | AB | Remove and dispose of fence material | 1000 | SM | € - 0 | € - 0 |
| C-0030 | AC | Remove and dispose of post foundation | 300 | CM | € - 0 | € - 0 |
| C-0030 | AD | Remove and dispose of old plastic Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AE | Remove and dispose of old wooden Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AF | Remove and dispose of old metal Equipment including connection mat. | 300 | CM | € - 0 | € - 0 |
| C-0030 | AG | Remove and dispose of earth | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AH | Remove and dispose of bituminous mat. | 200 | CM | € - 0 | € - 0 |
| C-0030 | AI | Remove and dispose of reinforced concrete | 400 | CM | € - 0 | € - 0 |
| C-0030 | AJ | Remove and dispose of unreinforced concrete | 500 | CM | € - 0 | € - 0 |
| C-0030 | AK | Remove and dispose of concrete pavers | 1600 | SM | € - 0 | € - 0 |
| C-0030 | AL | Remove and dispose of rubberized fall material | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AM | Remove and dispose of artificial grass fall material | 100 | CM | € - 0 | € - 0 |
| C-0030 | AN | Remove and dispose of wood fiber fall material | 200 | CM | € - 0 | € - 0 |
| TOTAL COST (0030AA-AN) | € - 0 |
| EQUIPMENT PRICING SCHEDULE | |||||
| IAW Section H & B | |||||
| Attach the Equipment Pricing Schedule for the BASE YEAR 4 | |||||
| 0031 | Exchange Rate multiplier established day of Task Order negotiation which converts from dollars to Euro if applicable | 0.8703 | Equipment Dollar Amount Total (if applicable) = | € - 0 | |
| 0032 | AA | Equipment Total Price in Euro | € - 0 |
| DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC) | ||||
| IAW Section B and C.5 | ||||
| 0033 | Cost applied to equipment price per individual task order, excluding shipping and handling (example 0.0%) | 0.00% | DLCEIC = | € - 0 |
| SHIPPING | ||
| IAW Section H & B and FAR 47 | ||
| 0034 | Cost determined per individual task order | € - 0 |
| TOTAL BASE YEAR | |
| € - 0 |
BASE YR 5
| SECTION B | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | ||||||
| BASE YEAR 5 | |||||||
| LINE | |||||||
| ITEM | DESCRIPTION | EST | |||||
| QTY | U/I | Unit Price | Total Price | ||||
| 0001 | LABOR | ||||||
| IAW Section C, Paragraph C.1.6.1.8 | |||||||
| 0001 | AA | Labor | 1200 | HR | € - 0 | € - 0 | |
| 0001 | AB | Tractor / Lift Operator | 800 | HR | € - 0 | € - 0 | |
| 0001 | AC | Fall Material HIC test and report | 50 | EA | € - 0 | € - 0 | |
| 0001 | AD (i) | Preventive Maintenance and Inspection (for greater than 300 inspections to be performed) | 400 | EA | € - 0 | € - 0 | |
| 0001 | AD (ii) | Preventive Maintenance and Inspection (for between 100 and 300 inspections to be performed) | 200 | EA | € - 0 | € - 0 | |
| 0001 | AD (iii) | Preventive Maintenance and Inspection (for fewer than 100 inspections to be performed) | 50 | EA | € - 0 | € - 0 | |
| 0001 | AE (i) | Annual Safety Audit (for greater than 100 inspections to be performed) | 200 | EA | € - 0 | € - 0 | |
| 0001 | AE (ii) | Annual Safety Audit (for between 50 to 100 inspections to be performed) | 75 | EA | € - 0 | € - 0 | |
| 0001 | AE (iii) | Annual Safety Audit (for fewer than 50 inspections to be performed) | 25 | EA | € - 0 | € - 0 | |
| TOTAL COST (0001AA-AF) | € - 0 |
| 0002 | RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE | |||||
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | ||||||
| 0002 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0002 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0002 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0002 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| 0002 | AE | Wood Fiber | 500 | CM | € - 0 | € - 0 |
| TOTAL COST (0002AA-AE) | € - 0 |
| 0003 | RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT | |||||
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | ||||||
| 0003 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0003 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0003 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0003 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| 0003 | AE | Wood Fiber | 500 | CM | € - 0 | € - 0 |
| TOTAL COST (0003AA-AE) | € - 0 |
| C-0004 | DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE | |||||
| Delivery and installation of resilient surface system IAW Section C.6.2.4 | ||||||
| C-0004 | AA | Gravel | 3000 | CM | € - 0 | € - 0 |
| C-0004 | AB | Sand | 1000 | CM | € - 0 | € - 0 |
| C-0004 | AC | Re-compact and level base after equipment installation | 10000 | SM | € - 0 | € - 0 |
| TOTAL COST (0004AA-AC) | € - 0 |
| MISCELLANEOUS WORK DESCRIPTION | |||||
| C-0005 | Delivery and installation of rubber curbing, including porous concrete base, IAW Section 32 18 16.13 | 8000 | LM | € - 0 | € - 0 |
| C-0006 | Delivery and installation of concrete curbing, including porous concrete base, IAW Section C.6.2.10 | 5500 | LM | € - 0 | € - 0 |
| C-0007 | Delivery and installation of porous concrete, 15 cm thickness (pavers), IAW Section C.6.2.12 | 5000 | SM | € - 0 | € - 0 |
| C-0008 | Sewer/drain trench in soil, class 3-5, IAW Section 02300 and Section C.6.2.6 | 250 | CM | € - 0 | € - 0 |
| C-0009 | Furnish and install reinforced concrete (B25), IAW Section C.6.2.9 | 150 | CM | € - 0 | € - 0 |
| C-0010 | Remove and stockpile topsoil on site, IAW Section 02300 | 1000 | CM | € - 0 | € - 0 |
| C-0011 | Furnish and install unreinforced concrete (B25), IAW Section C.6.2.9 | 1000 | CM | € - 0 | € - 0 |
| C-0012 | Soil excavation, machine: class 3-5, IAW Section 02300 | 3000 | CM | € - 0 | € - 0 |
| C-0013 | Backfill trenches, IAW Section 02300 | 250 | CM | € - 0 | € - 0 |
| C-0014 | Install and connect drain/seepage lines, IAW Section C.6.2.6 | 250 | LM | € - 0 | € - 0 |
| C-0015 | Furnish and install trench\gutter draiange IAW C.6.2.6.1 | 25 | LM | € - 0 | € - 0 |
| C-0016 | Install bituminous surface material, IAW Section C.6.2.8 | 1000 | CM | € - 0 | € - 0 |
| C-0017 | Clean-up IAW Section C.6.2.16 | 5000 | SM | € - 0 | € - 0 |
| C-0018 | Safety fence, delivered and installed, IAW Section C.6.2.13.1 | 5000 | LM | € - 0 | € - 0 |
| C-0019 | Locate existing utility lines, IAW Section 02300 | 5000 | SM | € - 0 | € - 0 |
| C-0020 | Soil excavation, by hand: class 3-5, IAW Section 02300 | 500 | CM | € - 0 | € - 0 |
| C-0021 | Furnish and place topsoil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0022 | Furnish and place sub-grade soil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0023 | Furnish and install rolled sod IAW C.6.2.5.5 | 1000 | SM | € - 0 | € - 0 |
| C-0024 | Furnish and install geotextile seperation layer IAW C.6.2.5.6 | 1000 | SM | € - 0 | € - 0 |
| C-0025 | Furnish and install biodegradable type erosion control material IAW C.6.2.5.7 | 1000 | SM | € - 0 | € - 0 |
| C-0026 | Trim/cut tree limbs and bushes/brush and dispose of materials IAW C.6.2.5.8 | 400 | HR | € - 0 | € - 0 |
| C-0027 | Painting IAW C.6.2.5.9 | 1000 | SM | € - 0 | € - 0 |
| C-0028 | Water Line IAW C.6.2.6.2 | 1000 | LM | € - 0 | € - 0 |
| TOTAL COST (0005-0028) | € - 0 |
| DELIVERY AND INSTALLATION OF FENCING | ||||||
| IAW SOW and Additional Task Order Specs | ||||||
| C-0029 | AA | Welded bar fence IAW C.6.2.13.3 | 1500 | SM | € - 0 | € - 0 |
| C-0029 | AB | Chain Link Fence IAW C.6.2.13.4 | 400 | SM | € - 0 | € - 0 |
| C-0029 | AC | Wooden fence IAW C.6.2.13.2 | 100 | SM | € - 0 | € - 0 |
| C-0029 | AD | Round Fence Post IAW C.6.2.13.5 | 100 | M | € - 0 | € - 0 |
| C-0029 | AE | Square/Rect. Fence Post IAW C.6.2.13.5 | 500 | M | € - 0 | € - 0 |
| C-0029 | AF | Wooden fence post IAW C.6.2.13.2.1 | 50 | M | € - 0 | € - 0 |
| C-0029 | AG | Concrete Foundation IAW C.6.2.13.6 | 300 | CM | € - 0 | € - 0 |
| C-0029 | AH | Chain Link fence Gate IAW C.6.2.13.7 | 40 | SM | € - 0 | € - 0 |
| C-0029 | AI | Welded bar fence Gate IAW C.6.2.13.7 | 200 | SM | € - 0 | € - 0 |
| C-0029 | AJ | Wooden fence Gate IAW C.6.2.13.7 | 10 | SM | € - 0 | € - 0 |
| C-0029 | AK | Replace hardware IAW C.6.2.13.8 | 50 | EA | € - 0 | € - 0 |
| TOTAL COST (0029AA-AK) | € - 0 |
| DEMOLITION | ||||||
| IAW Section 02 41 00 | ||||||
| C-0030 | AA | Remove and dispose of fence post | 500 | EA | € - 0 | € - 0 |
| C-0030 | AB | Remove and dispose of fence material | 1000 | SM | € - 0 | € - 0 |
| C-0030 | AC | Remove and dispose of post foundation | 300 | CM | € - 0 | € - 0 |
| C-0030 | AD | Remove and dispose of old plastic Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AE | Remove and dispose of old wooden Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AF | Remove and dispose of old metal Equipment including connection mat. | 300 | CM | € - 0 | € - 0 |
| C-0030 | AG | Remove and dispose of earth | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AH | Remove and dispose of bituminous mat. | 200 | CM | € - 0 | € - 0 |
| C-0030 | AI | Remove and dispose of reinforced concrete | 400 | CM | € - 0 | € - 0 |
| C-0030 | AJ | Remove and dispose of unreinforced concrete | 500 | CM | € - 0 | € - 0 |
| C-0030 | AK | Remove and dispose of concrete pavers | 1600 | SM | € - 0 | € - 0 |
| C-0030 | AL | Remove and dispose of rubberized fall material | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AM | Remove and dispose of artificial grass fall material | 100 | CM | € - 0 | € - 0 |
| C-0030 | AN | Remove and dispose of wood fiber fall material | 200 | CM | € - 0 | € - 0 |
| TOTAL COST (0030AA-AN) | € - 0 |
| EQUIPMENT PRICING SCHEDULE | |||||
| IAW Section H & B | |||||
| Attach the Equipment Pricing Schedule for the BASE YEAR 5 | |||||
| 0031 | Exchange Rate multiplier established day of Task Order negotiation which converts from dollars to Euro if applicable | 0.8703 | Equipment Dollar Amount Total (if applicable) = | € - 0 | |
| 0032 | AA | Equipment Total Price in Euro | € - 0 |
| DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC) | ||||
| IAW Section B and C.5 | ||||
| 0033 | Cost applied to equipment price per individual task order, excluding shipping and handling (example 0.0%) | 0.00% | DLCEIC = | € - 0 |
| SHIPPING | ||
| IAW Section H & B and FAR 47 | ||
| 0034 | Cost determined per individual task order | € - 0 |
| TOTAL BASE YEAR | |
| € - 0 |
6 month Option
| SECTION B | SCHEDULE OF SERVICES AND RATES PLAYGROUNDS | ||||||
| 6-month Option | |||||||
| LINE | |||||||
| ITEM | DESCRIPTION | EST | |||||
| QTY | U/I | Unit Price | Total Price | ||||
| 0001 | LABOR | ||||||
| IAW Section C, Paragraph C.1.6.1.8 | |||||||
| 0001 | AA | Labor | 1200 | HR | € - 0 | € - 0 | |
| 0001 | AB | Tractor / Lift Operator | 800 | HR | € - 0 | € - 0 | |
| 0001 | AC | Fall Material HIC test and report | 50 | EA | € - 0 | € - 0 | |
| 0001 | AD (i) | Preventive Maintenance and Inspection (for greater than 300 inspections to be performed) | 400 | EA | € - 0 | € - 0 | |
| 0001 | AD (ii) | Preventive Maintenance and Inspection (for between 100 and 300 inspections to be performed) | 200 | EA | € - 0 | € - 0 | |
| 0001 | AD (iii) | Preventive Maintenance and Inspection (for fewer than 100 inspections to be performed) | 50 | EA | € - 0 | € - 0 | |
| 0001 | AE (i) | Annual Safety Audit (for greater than 100 inspections to be performed) | 200 | EA | € - 0 | € - 0 | |
| 0001 | AE (ii) | Annual Safety Audit (for between 50 to 100 inspections to be performed) | 75 | EA | € - 0 | € - 0 | |
| 0001 | AE (iii) | Annual Safety Audit (for fewer than 50 inspections to be performed) | 25 | EA | € - 0 | € - 0 | |
| TOTAL COST (0001AA-AF) | € - 0 |
| 0002 | RESILIENT SURFACE SYSTEM, POURED IN PLACE OVER MINERAL OR AGGREGATE | |||||
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | ||||||
| 0002 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0002 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0002 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0002 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| 0002 | AE | Wood Fiber | 500 | CM | € - 0 | € - 0 |
| TOTAL COST (0002AA-AE) | € - 0 |
| 0003 | RUBBER SURFACE SYSTEM, PLACED OVER CONCRETE OR ASPHALT | |||||
| Delivery and installation of resilient surface system IAW Section C.5.1.3, C.6.2.3 and Technical Specification 32 18 16.13 | ||||||
| 0003 | AA | Cost per centimeter layer | 500 | SM | € - 0 | € - 0 |
| 0003 | AB | Rubber Tiles (min. 5cm thick) | 500 | SM | € - 0 | € - 0 |
| 0003 | AC | Rubber Tiles (min. 7cm thick) | 1000 | SM | € - 0 | € - 0 |
| 0003 | AD | Artificial Grass IAW C.6.2.14 | 1000 | SM | € - 0 | € - 0 |
| 0003 | AE | Wood Fiber | 500 | CM | € - 0 | € - 0 |
| TOTAL COST (0003AA-AE) | € - 0 |
| C-0004 | DELIVERY AND INSTALLATION OF MINERAL AGGREGATE BASE | |||||
| Delivery and installation of resilient surface system IAW Section C.6.2.4 | ||||||
| C-0004 | AA | Gravel | 3000 | CM | € - 0 | € - 0 |
| C-0004 | AB | Sand | 1000 | CM | € - 0 | € - 0 |
| C-0004 | AC | Re-compact and level base after equipment installation | 10000 | SM | € - 0 | € - 0 |
| TOTAL COST (0004AA-AC) | € - 0 |
| MISCELLANEOUS WORK DESCRIPTION | |||||
| C-0005 | Delivery and installation of rubber curbing, including porous concrete base, IAW Section 32 18 16.13 | 8000 | LM | € - 0 | € - 0 |
| C-0006 | Delivery and installation of concrete curbing, including porous concrete base, IAW Section C.6.2.10 | 5500 | LM | € - 0 | € - 0 |
| C-0007 | Delivery and installation of porous concrete, 15 cm thickness (pavers), IAW Section C.6.2.12 | 5000 | SM | € - 0 | € - 0 |
| C-0008 | Sewer/drain trench in soil, class 3-5, IAW Section 02300 and Section C.6.2.6 | 250 | CM | € - 0 | € - 0 |
| C-0009 | Furnish and install reinforced concrete (B25), IAW Section C.6.2.9 | 150 | CM | € - 0 | € - 0 |
| C-0010 | Remove and stockpile topsoil on site, IAW Section 02300 | 1000 | CM | € - 0 | € - 0 |
| C-0011 | Furnish and install unreinforced concrete (B25), IAW Section C.6.2.9 | 1000 | CM | € - 0 | € - 0 |
| C-0012 | Soil excavation, machine: class 3-5, IAW Section 02300 | 3000 | CM | € - 0 | € - 0 |
| C-0013 | Backfill trenches, IAW Section 02300 | 250 | CM | € - 0 | € - 0 |
| C-0014 | Install and connect drain/seepage lines, IAW Section C.6.2.6 | 250 | LM | € - 0 | € - 0 |
| C-0015 | Furnish and install trench\gutter draiange IAW C.6.2.6.1 | 25 | LM | € - 0 | € - 0 |
| C-0016 | Install bituminous surface material, IAW Section C.6.2.8 | 1000 | CM | € - 0 | € - 0 |
| C-0017 | Clean-up IAW Section C.6.2.16 | 5000 | SM | € - 0 | € - 0 |
| C-0018 | Safety fence, delivered and installed, IAW Section C.6.2.13.1 | 5000 | LM | € - 0 | € - 0 |
| C-0019 | Locate existing utility lines, IAW Section 02300 | 5000 | SM | € - 0 | € - 0 |
| C-0020 | Soil excavation, by hand: class 3-5, IAW Section 02300 | 500 | CM | € - 0 | € - 0 |
| C-0021 | Furnish and place topsoil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0022 | Furnish and place sub-grade soil IAW C.6.2.5.3 | 1000 | CM | € - 0 | € - 0 |
| C-0023 | Furnish and install rolled sod IAW C.6.2.5.5 | 1000 | SM | € - 0 | € - 0 |
| C-0024 | Furnish and install geotextile seperation layer IAW C.6.2.5.6 | 1000 | SM | € - 0 | € - 0 |
| C-0025 | Furnish and install biodegradable type erosion control material IAW C.6.2.5.7 | 1000 | SM | € - 0 | € - 0 |
| C-0026 | Trim/cut tree limbs and bushes/brush and dispose of materials IAW C.6.2.5.8 | 400 | HR | € - 0 | € - 0 |
| C-0027 | Painting IAW C.6.2.5.9 | 1000 | SM | € - 0 | € - 0 |
| C-0028 | Water Line IAW C.6.2.6.2 | 1000 | LM | € - 0 | € - 0 |
| TOTAL COST (0005-0028) | € - 0 |
| DELIVERY AND INSTALLATION OF FENCING | ||||||
| IAW SOW and Additional Task Order Specs | ||||||
| C-0029 | AA | Welded bar fence IAW C.6.2.13.3 | 1500 | SM | € - 0 | € - 0 |
| C-0029 | AB | Chain Link Fence IAW C.6.2.13.4 | 400 | SM | € - 0 | € - 0 |
| C-0029 | AC | Wooden fence IAW C.6.2.13.2 | 100 | SM | € - 0 | € - 0 |
| C-0029 | AD | Round Fence Post IAW C.6.2.13.5 | 100 | M | € - 0 | € - 0 |
| C-0029 | AE | Square/Rect. Fence Post IAW C.6.2.13.5 | 500 | M | € - 0 | € - 0 |
| C-0029 | AF | Wooden fence post IAW C.6.2.13.2.1 | 50 | M | € - 0 | € - 0 |
| C-0029 | AG | Concrete Foundation IAW C.6.2.13.6 | 300 | CM | € - 0 | € - 0 |
| C-0029 | AH | Chain Link fence Gate IAW C.6.2.13.7 | 40 | SM | € - 0 | € - 0 |
| C-0029 | AI | Welded bar fence Gate IAW C.6.2.13.7 | 200 | SM | € - 0 | € - 0 |
| C-0029 | AJ | Wooden fence Gate IAW C.6.2.13.7 | 10 | SM | € - 0 | € - 0 |
| C-0029 | AK | Replace hardware IAW C.6.2.13.8 | 50 | EA | € - 0 | € - 0 |
| TOTAL COST (0029AA-AK) | € - 0 |
| DEMOLITION | ||||||
| IAW Section 02 41 00 | ||||||
| C-0030 | AA | Remove and dispose of fence post | 500 | EA | € - 0 | € - 0 |
| C-0030 | AB | Remove and dispose of fence material | 1000 | SM | € - 0 | € - 0 |
| C-0030 | AC | Remove and dispose of post foundation | 300 | CM | € - 0 | € - 0 |
| C-0030 | AD | Remove and dispose of old plastic Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AE | Remove and dispose of old wooden Equipment including connection mat. | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AF | Remove and dispose of old metal Equipment including connection mat. | 300 | CM | € - 0 | € - 0 |
| C-0030 | AG | Remove and dispose of earth | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AH | Remove and dispose of bituminous mat. | 200 | CM | € - 0 | € - 0 |
| C-0030 | AI | Remove and dispose of reinforced concrete | 400 | CM | € - 0 | € - 0 |
| C-0030 | AJ | Remove and dispose of unreinforced concrete | 500 | CM | € - 0 | € - 0 |
| C-0030 | AK | Remove and dispose of concrete pavers | 1600 | SM | € - 0 | € - 0 |
| C-0030 | AL | Remove and dispose of rubberized fall material | 1000 | CM | € - 0 | € - 0 |
| C-0030 | AM | Remove and dispose of artificial grass fall material | 100 | CM | € - 0 | € - 0 |
| C-0030 | AN | Remove and dispose of wood fiber fall material | 200 | CM | € - 0 | € - 0 |
| TOTAL COST (0030AA-AN) | € - 0 |
| EQUIPMENT PRICING SCHEDULE | |||||
| IAW Section H & B | |||||
| Attach the Equipment Pricing Schedule for the BASE YEAR 5 | |||||
| 0031 | Exchange Rate multiplier established day of Task Order negotiation which converts from dollars to Euro if applicable | 0.8703 | Equipment Dollar Amount Total (if applicable) = | € - 0 | |
| 0032 | AA | Equipment Total Price in Euro | € - 0 |
| DESIGN LAYOUT, CERTIFIED EQUIPMENT INSTALLATION, CERTIFICATION PERCENTAGE (DLCEIC) | ||||
| IAW Section B and C.5 | ||||
| 0033 | Cost applied to equipment price per individual task order, excluding shipping and handling (example 0.0%) | 0.00% | DLCEIC = | € - 0 |
| SHIPPING | ||
| IAW Section H & B and FAR 47 | ||
| 0034 | Cost determined per individual task order | € - 0 |
| TOTAL BASE YEAR | |
| € - 0 |
SUM
| Base Period | |
| Bottom Line Sum Base Year 1 | € - 0 |
| Bottom Line Sum Base Year 2 | € - 0 |
| Bottom Line Sum Base Year 3 | € - 0 |
| Bottom Line Sum Base Year 4 | € - 0 |
| Bottom Line Sum Base Year 5 | € - 0 |
| Total Bottom Line Sum | € - 0 |
File details come from the government source that posted it. Updated .