ATTACH 2B Experience InfoSheet.docx

DOCX document 39 KB Posted

Attached to
FY22 PLAYGROUNDS SINGLE AWARD TASK ORDER CONTRACT (SATOC) Federal contract opportunity
Solicitation number
W912GB22R0008
Issued by
Department of the Army European Command

About this file

This document provides an experience information sheet template for contractors to submit with proposals for a federal playground equipment installation contract. The US Army Corps of Engineers Europe District intends to award an indefinite delivery indefinite quantity single award task order contract for playground equipment installation projects within the US European Command area of responsibility. Offerors must submit experience sheets for a minimum of two and maximum of five relevant past projects, providing details of project location, completion date within the last six years, final cost, percentage completed if not fully finished, and role as prime contractor, subcontractor, joint venture, or key subcontractor on the project. Requirements are outlined for describing experience based on role, with letters of commitment required if taking credit for a key subcontractor's work.

View the file

Other files for this federal contract opportunity

Other files attached to FY22 PLAYGROUNDS SINGLE AWARD TASK ORDER CONTRACT (SATOC), newest first.
File Type Posted
W912GB22R0008_0001 FY22 Playgrounds_.pdf PDF
Attachment - Playground IDIQ Bid Schedule EUROS_17MAR2022.xlsx XLSX spreadsheet
ATTACH 1 FY22 Playgrounds Specs Binder_17MAR2022.pdf PDF
ATTACH 1A_FY22 Playgrounds SATOC SECTION C_SOW_17MAR2022 amend.docx DOCX document
Amendment 0003.pdf PDF
Amendment_0002.pdf PDF
ATTACH 1A_FY22 Playgrounds SATOC SECTION C_SOW_11MAR2022 amend.docx DOCX document
Attachment - Playground IDIQ Bid Schedule EUROS_11MAR2022.xlsx XLSX spreadsheet
ATTACH 2B Experience InfoSheet_11MAR2022 amend.docx DOCX document
Exhibits Binder FY22 Playgrounds SATOC.pdf PDF
W912GB22R0008_00001 FY22 Playgrounds_.pdf PDF
01 33 16 Design After Award.pdf PDF
ATTACH 9_IMCOM-E Locations_FY22 Playgrounds SATOC.pdf PDF
Attachment - Playground IDIQ Bid Schedule EUROS_03MAR2022.xlsx XLSX spreadsheet
ATTACH 1A_FY22 Playgrounds SATOC SECTION C_SOW_03MAR2022 .docx DOCX document
ATTACH 7 Letter of Commitment Forms.docx DOCX document
ATTACH 5 BLA Template.docx DOCX document
ATTACH 3 PPQ Form.docx DOCX document
ATTACH 8 DIN EU Standard.pdf PDF
ATTACH 4 Playground IDIQ Bid Schedule EUROS.xlsx XLSX spreadsheet
ATTACH 2A ExperienceOverviewSheet.docx DOCX document
FY22 Playgrounds SATOC SOW.docx DOCX document
ATTACH 6 BLG Template.docx DOCX document
ATTACH 1 FY22 Playgrounds Specs Binder.pdf PDF
W912GB22R0008.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2B

FY22 Playgrounds SATOC

EXPERIENCE INFORMATION SHEET

PROJECT NO. _____, Page 1 (project number is taken from column 1 on Attachment 2A) Minimum of 2 projects, maximum of 5 projects, more than 5 projects will not be evaluated.

Project Name and Location:

Experience:

1. The location work was performed___________________________________

2. The day, month, and year work was completed; work must not be earlier than six calendar years before the closing date of the RFP or has been ongoing for at least one year before the closing date of this RFP: _______________

3. The final cost of this project: $ _________________________

4. Is this project more than 75% complete? ____ Yes ____ No If “No” explain percentage of completion, if not 75% complete for any reason, rating may be lower

5. Do not provide a listing of existing or previous contracts, but rather provide detailed information of playgrounds design/equipment installation work for projects that meet the submission criteria in the RFP.

(Continue typing if required to provide more information)

ATTACHMENT 2 - EXPERIENCE INFORMATION SHEET

PROJECT NO. _____ Page 2

Offeror: A contractor and/or company submitting a proposal for this solicitation.

Prime Contractor: A contractor that performed at least 75% of the work, and managed all other work for the project.

Sub Contractor: A contractor that performed part of the project work, but did not manage the entire project.

Joint Venture: More than one contractor with a legal binding agreement to work together.

Key Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror is allowed to take credit for the Key Subcontractor’s experience the project.

6. Mark one of these selections:

Work was completed as the ____ Prime ____ Subcontractor ___ Joint Venture __ Key Subcontractor

a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.

b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.

c. If work was performed as a Key Subcontractor, explain how the work performed as a Key Subcontractor provides an added benefit for experience:

d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals:

e. Ensure you provide a letter signed by both the Offeror and the Key Subcontractor in order to take credit for the project work. Besides the signed letter, no additional information is required other than what is on Page 1 of this form.