Appendix_C_-_Task_Order_Price_Proposal_6.7.18.xlsx
XLSX spreadsheet 38 KB Posted
- Attached to
- DLA-Energy Sustainment, Restoration, and
- Solicitation number
- W912GB18R0030
About this file
Appendix C - Task Order Price Proposal 6.7.18
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WS A-Pricing Summary APPENDIX C - Task Order Price Proposal
WORKSHEET A - Oil Water Separator and Pollutant Drainage System Repairs
PRICING SUMMARY SHEET
| Offeror Name |
| Date |
| Revision # |
| Proposed CLIN | Description of Services | CLIN Type | Price |
| CLIN 0001 | Task 1 - Replace Oil Water Separator (Facility POLS6) | FFP | € - 0 |
| CLIN 0002 | Task 2 - Install Storm Lines (Facility SDS01) | FFP | € - 0 |
| CLIN 0003 | Task 3 - Repair Drainage Lines (Facility SDS01) | FFP | € - 0 |
| CLIN 0004 | Task 4 - Repair Hot Pad Containment Area (Facility PHRP1) | FFP | € - 0 |
| CLIN 0005 | Task 5 - Repair Hot Pad Containment Area (Facility PHRP1-1) | FFP | € - 0 |
| CLIN 0006 | Task 6 - Repair Hot Pad Containment Area (Facility PHRP1-2) | FFP | € - 0 |
| CLIN 0007 | Task 7 -Repair Hot Pad Containment Area (Facility PHRP1-3) | FFP | € - 0 |
| CLIN 0008 | Task 8 (Option 1) - Contaminated Soil Disposal (50 cubic meters) | FFP | € - 0 |
| CLIN 0009 | Task 9 (Option 2) - Contaminated Soil Disposal (500 cubic meters) | FFP | € - 0 |
| CLIN 0010 | Task 10 (Option 3) - Contaminated Soil Disposal (100 cubic meters) | FFP | € - 0 |
| CLIN 0011 | Task 11 (Option 4) - Contaminated Soil Disposal (100 cubic meters) | FFP | € - 0 |
| CLIN 0012 | Task 12 - Contract Manpower Reporting Application | FFP | € - 0 |
| Task Order Total | € - 0 |
WS B-TO Price Proposal wText
| APPENDIX C |
| WORKSHEET B - TASK ORDER PRICE PROPOSAL WORKSHEET (FULL TEXT) |
| Offeror Name |
| Date |
| Revision # |
Column A Column B Column C Column D Column E
| 1 | Prime Direct Labor | Burdened Rate* | Hours | Extended Price | Extended Price | ||
| 2 | |||||||
| 3 | Program Manager | € - 0 | x | = | A3 x B3 | ||
| 4 | Project Manager | € - 0 | x | = | A4 x B4 | ||
| 5 | Team Leader | € - 0 | x | = | A5 x B5 | ||
| 6 | Site Supervisor/Superintendent | € - 0 | x | = | A6 x B6 | ||
| 7 | Petroleum Maintenance Technician (Senior) | € - 0 | x | = | A7 x B7 | ||
| 8 | Petroleum Maintenance Technician (Mid-Level) | € - 0 | x | = | A8 x B8 | ||
| 9 | Petroleum Maintenance Technician (Junior) | € - 0 | x | = | A9 x B9 | ||
| 10 | Engineer (Senior) | € - 0 | x | = | A10 x B10 | ||
| 11 | Engineer (Mid-Level) | € - 0 | x | = | A11 x B11 | ||
| 12 | Engineer (Junior) | € - 0 | x | = | A12 x B12 | ||
| 13 | Environmental Scientist (Senior) | € - 0 | x | = | A13 x B13 | ||
| 14 | Environmental Scientist (Mid-Level) | € - 0 | x | = | A14 x B14 | ||
| 15 | Environmental Scientist (Junior) | € - 0 | x | = | A15 x B15 | ||
| 16 | CADD Operator | € - 0 | x | = | A16 x B16 | ||
| 17 | Admin Specialist | € - 0 | x | = | A17 x B17 | ||
| 18 | Certified Surveyor | € - 0 | x | = | A18 x B18 | ||
| 19 | Haz Wast Specialist | € - 0 | x | = | A19 x B19 | ||
| 20 | Industrial Hygienist | € - 0 | x | = | A20 x B20 | ||
| 21 | Site Safety and Health Officer (SSHO) | € - 0 | x | = | A20 x B21 | ||
| 22 | Contracts Administrator | € - 0 | x | = | A22 x B22 | ||
| 23 | Project Controls | € - 0 | x | = | A23 x B23 | ||
| 24 | Cost Tracker | € - 0 | x | = | A24 x B24 | ||
| 25 | Quality Control Manager/Specialist | € - 0 | x | = | A25 x B25 | ||
| 26 | Database Developer | € - 0 | x | = | A26 x B26 | ||
| 27 | Database Administrator | € - 0 | x | = | A27 x B27 | ||
| 28 | Subtotal Prime Direct Labor | Sum (C3 thru C27) | |||||
| 29 | |||||||
| 30 | Material, Supplies & Equipment (MSE) | $0.00 | |||||
| 31 | Handling Charge/G&A applied to MSE | 0.00% | C30 x B31 | ||||
| 32 | Subtotal Equipment, Material & Supplies | Sum (C30 thru C31) | |||||
| 33 | |||||||
| 34 | Subcontractors Costs | $0.00 | |||||
| 35 | Handling Charge/G&A applied to Subcontractor Costs | 0.00% | C34 x B35 | ||||
| 36 | Subtotal Subcontractor | Sum (C34 thru C35) | |||||
| 37 | |||||||
| 38 | Subtotal | (D28 + D32 + D36) | |||||
| 39 | |||||||
| 40 | Profit applied to Subtotal | 0.00% | D38 x B40 | ||||
| 41 | |||||||
| 42 | Travel | $0.00 | |||||
| 43 | Handling Charge/G&A applied to Travel | 0.00% | C42 x B43 | ||||
| 44 | Subtotal Travel | Sum (C42 thru C43) | |||||
| 45 | |||||||
| 46 | Grand Total | (D38 + D40 + D44) |
* Burdened rate for each labor category without profit.
WS C-Task Order Pricing
| APPENDIX C |
| WORKSHEET C - Oil Water Separator and Pollutant Drainage System Repairs |
| Offeror Name | |||||||||||||||||||||||||||||||||||||||||||||||||
| Date | |||||||||||||||||||||||||||||||||||||||||||||||||
| Revision # | |||||||||||||||||||||||||||||||||||||||||||||||||
| Task 1 | Task 2 | Task 3 | Task 4 | Task 5 | Task 6 | Task 7 | Task 8 (Option 1) | Task 9 (Option 2) | Task 10 (Option 3) | ||||||||||||||||||||||||||||||||||||||||
| Column A | Column B | Column C | Column D | Column E | Column C | Column D | Column E | Column C | Column D | Column E | Column C | Column D | Column E | Column C | Column D | Column E | Column C | Column D | Column E | Column C | Column D | Column E | Column C | Column D | Column E | Column C | Column D | Column E | Column C | ||||||||||||||||||||
| Burdened Rate* | |||||||||||||||||||||||||||||||||||||||||||||||||
| 1 | Prime Direct Labor | Hours | Extended Price | Extended Price | 1 | Hours | Extended Price | Extended Price | 1 | Hours | Extended Price | Extended Price | 1 | Hours | Extended Price | Extended Price | 1 | Hours | Extended Price | Extended Price | 1 | Hours | Extended Price | Extended Price | 1 | Hours | Extended Price | Extended Price | 1 | Hours | Extended Price | Extended Price | 1 | Hours | Extended Price | Extended Price | 1 | Hours | |||||||||||
| 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | ||||||||||||||||||||||||||||||||||||||||
| 3 | Program Manager | € - 0 | x | = | € - 0 | 3 | = | € - 0 | 3 | = | € - 0 | 3 | = | € - 0 | 3 | = | € - 0 | 3 | = | € - 0 | 3 | = | € - 0 | 3 | = | € - 0 | 3 | = | € - 0 | 3 | |||||||||||||||||||
| 4 | Project Manager | € - 0 | x | = | € - 0 | 4 | = | € - 0 | 4 | = | € - 0 | 4 | = | € - 0 | 4 | = | € - 0 | 4 | = | € - 0 | 4 | = | € - 0 | 4 | = | € - 0 | 4 | = | € - 0 | 4 | |||||||||||||||||||
| 5 | Team Leader | € - 0 | x | = | € - 0 | 5 | = | € - 0 | 5 | = | € - 0 | 5 | = | € - 0 | 5 | = | € - 0 | 5 | = | € - 0 | 5 | = | € - 0 | 5 | = | € - 0 | 5 | = | € - 0 | 5 | |||||||||||||||||||
| 6 | Site Supervisor/Superintendent | € - 0 | x | = | € - 0 | 6 | = | € - 0 | 6 | = | € - 0 | 6 | = | € - 0 | 6 | = | € - 0 | 6 | = | € - 0 | 6 | = | € - 0 | 6 | = | € - 0 | 6 | = | € - 0 | 6 | |||||||||||||||||||
| 7 | Petroleum Maintenance Technician (Senior) | € - 0 | x | = | € - 0 | 7 | = | € - 0 | 7 | = | € - 0 | 7 | = | € - 0 | 7 | = | € - 0 | 7 | = | € - 0 | 7 | = | € - 0 | 7 | = | € - 0 | 7 | = | € - 0 | 7 | |||||||||||||||||||
| 8 | Petroleum Maintenance Technician (Mid-Level) | € - 0 | x | = | € - 0 | 8 | = | € - 0 | 8 | = | € - 0 | 8 | = | € - 0 | 8 | = | € - 0 | 8 | = | € - 0 | 8 | = | € - 0 | 8 | = | € - 0 | 8 | = | € - 0 | 8 | |||||||||||||||||||
| 9 | Petroleum Maintenance Technician (Junior) | € - 0 | x | = | € - 0 | 9 | = | € - 0 | 9 | = | € - 0 | 9 | = | € - 0 | 9 | = | € - 0 | 9 | = | € - 0 | 9 | = | € - 0 | 9 | = | € - 0 | 9 | = | € - 0 | 9 | |||||||||||||||||||
| 10 | Engineer (Senior) | € - 0 | x | = | € - 0 | 10 | = | € - 0 | 10 | = | € - 0 | 10 | = | € - 0 | 10 | = | € - 0 | 10 | = | € - 0 | 10 | = | € - 0 | 10 | = | € - 0 | 10 | = | € - 0 | 10 | |||||||||||||||||||
| 11 | Engineer (Mid-Level) | € - 0 | x | = | € - 0 | 11 | = | € - 0 | 11 | = | € - 0 | 11 | = | € - 0 | 11 | = | € - 0 | 11 | = | € - 0 | 11 | = | € - 0 | 11 | = | € - 0 | 11 | = | € - 0 | 11 | |||||||||||||||||||
| 12 | Engineer (Junior) | € - 0 | x | = | € - 0 | 12 | = | € - 0 | 12 | = | € - 0 | 12 | = | € - 0 | 12 | = | € - 0 | 12 | = | € - 0 | 12 | = | € - 0 | 12 | = | € - 0 | 12 | = | € - 0 | 12 | |||||||||||||||||||
| 13 | Environmental Scientist (Senior) | € - 0 | x | = | € - 0 | 13 | = | € - 0 | 13 | = | € - 0 | 13 | = | € - 0 | 13 | = | € - 0 | 13 | = | € - 0 | 13 | = | € - 0 | 13 | = | € - 0 | 13 | = | € - 0 | 13 | |||||||||||||||||||
| 14 | Environmental Scientist (Mid-Level) | € - 0 | x | = | € - 0 | 14 | = | € - 0 | 14 | = | € - 0 | 14 | = | € - 0 | 14 | = | € - 0 | 14 | = | € - 0 | 14 | = | € - 0 | 14 | = | € - 0 | 14 | = | € - 0 | 14 | |||||||||||||||||||
| 15 | Environmental Scientist (Junior) | € - 0 | x | = | € - 0 | 15 | = | € - 0 | 15 | = | € - 0 | 15 | = | € - 0 | 15 | = | € - 0 | 15 | = | € - 0 | 15 | = | € - 0 | 15 | = | € - 0 | 15 | = | € - 0 | 15 | |||||||||||||||||||
| 16 | CADD Operator | € - 0 | x | = | € - 0 | 16 | = | € - 0 | 16 | = | € - 0 | 16 | = | € - 0 | 16 | = | € - 0 | 16 | = | € - 0 | 16 | = | € - 0 | 16 | = | € - 0 | 16 | = | € - 0 | 16 | |||||||||||||||||||
| 17 | Admin Specialist | € - 0 | x | = | € - 0 | 17 | = | € - 0 | 17 | = | € - 0 | 17 | = | € - 0 | 17 | = | € - 0 | 17 | = | € - 0 | 17 | = | € - 0 | 17 | = | € - 0 | 17 | = | € - 0 | 17 | |||||||||||||||||||
| 18 | Certified Surveyor | € - 0 | x | = | € - 0 | 18 | = | € - 0 | 18 | = | € - 0 | 18 | = | € - 0 | 18 | = | € - 0 | 18 | = | € - 0 | 18 | = | € - 0 | 18 | = | € - 0 | 18 | = | € - 0 | 18 | |||||||||||||||||||
| 19 | Haz Wast Specialist | € - 0 | x | = | € - 0 | 19 | = | € - 0 | 19 | = | € - 0 | 19 | = | € - 0 | 19 | = | € - 0 | 19 | = | € - 0 | 19 | = | € - 0 | 19 | = | € - 0 | 19 | = | € - 0 | 19 | |||||||||||||||||||
| 20 | Industrial Hygienist | € - 0 | x | = | € - 0 | 20 | = | € - 0 | 20 | = | € - 0 | 20 | = | € - 0 | 20 | = | € - 0 | 20 | = | € - 0 | 20 | = | € - 0 | 20 | = | € - 0 | 20 | = | € - 0 | 20 | |||||||||||||||||||
| 21 | Site Safety and Health Officer (SSHO) | € - 0 | x | = | € - 0 | 21 | = | € - 0 | 21 | = | € - 0 | 21 | = | € - 0 | 21 | = | € - 0 | 21 | = | € - 0 | 21 | = | € - 0 | 21 | = | € - 0 | 21 | = | € - 0 | 21 | |||||||||||||||||||
| 22 | Contracts Administrator | € - 0 | x | = | € - 0 | 22 | = | € - 0 | 22 | = | € - 0 | 22 | = | € - 0 | 22 | = | € - 0 | 22 | = | € - 0 | 22 | = | € - 0 | 22 | = | € - 0 | 22 | = | € - 0 | 22 | |||||||||||||||||||
| 23 | Project Controls | € - 0 | x | = | € - 0 | 23 | = | € - 0 | 23 | = | € - 0 | 23 | = | € - 0 | 23 | = | € - 0 | 23 | = | € - 0 | 23 | = | € - 0 | 23 | = | € - 0 | 23 | = | € - 0 | 23 | |||||||||||||||||||
| 24 | Cost Tracker | € - 0 | x | = | € - 0 | 24 | = | € - 0 | 24 | = | € - 0 | 24 | = | € - 0 | 24 | = | € - 0 | 24 | = | € - 0 | 24 | = | € - 0 | 24 | = | € - 0 | 24 | = | € - 0 | 24 | |||||||||||||||||||
| 25 | Quality Control Manager/Specialist | € - 0 | x | = | € - 0 | 25 | = | € - 0 | 25 | = | € - 0 | 25 | = | € - 0 | 25 | = | € - 0 | 25 | = | € - 0 | 25 | = | € - 0 | 25 | = | € - 0 | 25 | = | € - 0 | 25 | |||||||||||||||||||
| 26 | Database Developer | € - 0 | x | = | € - 0 | 26 | = | € - 0 | 26 | = | € - 0 | 26 | = | € - 0 | 26 | = | € - 0 | 26 | = | € - 0 | 26 | = | € - 0 | 26 | = | € - 0 | 26 | = | € - 0 | 26 | |||||||||||||||||||
| 27 | Database Administrator | € - 0 | x | = | € - 0 | 27 | = | € - 0 | 27 | = | € - 0 | 27 | = | € - 0 | 27 | = | € - 0 | 27 | = | € - 0 | 27 | = | € - 0 | 27 | = | € - 0 | 27 | = | € - 0 | 27 | |||||||||||||||||||
| 28 | Subtotal Prime Direct Labor | $0.00 | 28 | $0.00 | 28 | $0.00 | 28 | $0.00 | 28 | $0.00 | 28 | $0.00 | 28 | $0.00 | 28 | $0.00 | 28 | $0.00 | 28 | ||||||||||||||||||||||||||||||
| 29 | 29 | 29 | 29 | 29 | 29 | 29 | 29 | 29 | 29 | ||||||||||||||||||||||||||||||||||||||||
| 30 | Material, Supplies & Equipment (MSE) | $0.00 | 30 | $0.00 | 30 | $0.00 | 30 | $0.00 | 30 | $0.00 | 30 | $0.00 | 30 | $0.00 | 30 | $0.00 | 30 | $0.00 | 30 | ||||||||||||||||||||||||||||||
| 31 | Handling Charge/G&A applied to MSE | 0.00% | $0.00 | 31 | 0.00% | $0.00 | 31 | 0.00% | $0.00 | 31 | 0.00% | $0.00 | 31 | 0.00% | $0.00 | 31 | 0.00% | $0.00 | 31 | 0.00% | $0.00 | 31 | 0.00% | $0.00 | 31 | 0.00% | $0.00 | 31 | 0.00% | ||||||||||||||||||||
| 32 | Subtotal Equipment, Material & Supplies | $0.00 | 32 | $0.00 | 32 | $0.00 | 32 | $0.00 | 32 | $0.00 | 32 | $0.00 | 32 | $0.00 | 32 | $0.00 | 32 | $0.00 | 32 | ||||||||||||||||||||||||||||||
| 33 | 33 | 33 | 33 | 33 | 33 | 33 | 33 | 33 | 33 | ||||||||||||||||||||||||||||||||||||||||
| 34 | Subcontractors Costs | $0.00 | 34 | $0.00 | 34 | $0.00 | 34 | $0.00 | 34 | $0.00 | 34 | $0.00 | 34 | $0.00 | 34 | $0.00 | 34 | $0.00 | 34 | ||||||||||||||||||||||||||||||
| 35 | Handling Charge/G&A applied to Subcontractor Costs | 0.00% | $0.00 | 35 | 0.00% | $0.00 | 35 | 0.00% | $0.00 | 35 | 0.00% | $0.00 | 35 | 0.00% | $0.00 | 35 | 0.00% | $0.00 | 35 | 0.00% | $0.00 | 35 | 0.00% | $0.00 | 35 | 0.00% | $0.00 | 35 | 0.00% | ||||||||||||||||||||
| 36 | Subtotal Subcontractor | $0.00 | 36 | $0.00 | 36 | $0.00 | 36 | $0.00 | 36 | $0.00 | 36 | $0.00 | 36 | $0.00 | 36 | $0.00 | 36 | $0.00 | 36 | ||||||||||||||||||||||||||||||
| 37 | 37 | 37 | 37 | 37 | 37 | 37 | 37 | 37 | 37 | ||||||||||||||||||||||||||||||||||||||||
| 38 | Subtotal | $0.00 | 38 | $0.00 | 38 | $0.00 | 38 | $0.00 | 38 | $0.00 | 38 | $0.00 | 38 | $0.00 | 38 | $0.00 | 38 | $0.00 | 38 | ||||||||||||||||||||||||||||||
| 39 | 39 | 39 | 39 | 39 | 39 | 39 | 39 | 39 | 39 | ||||||||||||||||||||||||||||||||||||||||
| 40 | Profit applied to Subtotal | 0.00% | $0.00 | 40 | 0.00% | $0.00 | 40 | 0.00% | $0.00 | 40 | 0.00% | $0.00 | 40 | 0.00% | $0.00 | 40 | 0.00% | $0.00 | 40 | 0.00% | $0.00 | 40 | 0.00% | $0.00 | 40 | 0.00% | $0.00 | 40 | 0.00% | ||||||||||||||||||||
| 41 | 41 | 41 | 41 | 41 | 41 | 41 | 41 | 41 | 41 | ||||||||||||||||||||||||||||||||||||||||
| 42 | Travel | $0.00 | 42 | $0.00 | 42 | $0.00 | 42 | $0.00 | 42 | $0.00 | 42 | $0.00 | 42 | $0.00 | 42 | $0.00 | 42 | $0.00 | 42 | ||||||||||||||||||||||||||||||
| 43 | Handling Charge/G&A applied to Travel | 0.00% | $0.00 | 43 | 0.00% | $0.00 | 43 | 0.00% | $0.00 | 43 | 0.00% | $0.00 | 43 | 0.00% | $0.00 | 43 | 0.00% | $0.00 | 43 | 0.00% | $0.00 | 43 | 0.00% | $0.00 | 43 | 0.00% | $0.00 | 43 | 0.00% | ||||||||||||||||||||
| 44 | Subtotal Travel | $0.00 | 44 | $0.00 | 44 | $0.00 | 44 | $0.00 | 44 | $0.00 | 44 | $0.00 | 44 | $0.00 | 44 | $0.00 | 44 | $0.00 | 44 | ||||||||||||||||||||||||||||||
| 45 | 45 | 45 | 45 | 45 | 45 | 45 | 45 | 45 | 45 | ||||||||||||||||||||||||||||||||||||||||
| 46 | Grand Total | $0.00 | 46 | $0.00 | 46 | $0.00 | 46 | $0.00 | 46 | $0.00 | 46 | $0.00 | 46 | $0.00 | 46 | $0.00 | 46 | $0.00 | 46 |
* Burdened rate for each labor category without profit.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.