SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 1 von 2
Inspection Certification for Filling Area per VAwS Basic principle of the inspection: Regulation of Equipment / Installations Associated with Materials Hazardous to Water and
Specialized Plants / Facilities (VAwS)
Task-Nr./Inspect-Nr.
(Please reference for inquiries)
AF1-WP-140122 KTB Bldg.
5513_5888, TMP_Bulk
Internal Designation Filling Area TMP and Bulk
Gas Station Other Equipment
Operator / Proprietor US-Army
91522 Ansbach_Katterbach
Plant / Business Location US-Army Katterbach BKs Bldg.5513+5888
91522 Ansbach-Katterbach
Reason for Inspection Extent of the Inspection
Prior to commissioning Special inspection
After major modifications Decommissioning
Recurring inspection Follow-up inspection
Regulatory insp. Functional insp.
External insp. Water-tightness insp.
Internal insp. Other
Approval
Agency Approvals: /
Competent Authority: Stadt Ansbach, Nürenberger Str. 32, 61522 Ansbach
Mineral Spring / Water Protected Area yes no Flooding area zone yes no
Information on Gas Station
Effective WGK: 3 Effective Volume (m3): < 12 Hazard Level : D Requirement Profile: R1
Carried Media
Substance Name Volume (m3)
WGK
Max. volume flow x 10 min. Average daily throughput
JP8 12 m3 2
Mogas 12 m3 3
Diesel 12 m3 2
Filling Area or Containment Surface
Type of Seal: In-situ concrete with polysulfide grout
Restraint System not required
Floor area with connection to Separator, Manufacturer: ACO; Type: Oleotop, Z-54-3-462, 2012
Filling with ASS
Demanded retention Volume (m³) 0,9
Existing retention Volume (m³) >0,9
Results of the Inspection (Discrepancies are listed on a separate sheet)
1. No discrepancies The installation is in full working order.
2. Minor discrepancies You are asked to resolve the indicated discrepancies.
3. Considerable discrepancies You are asked to resolve the indicated discrepancies immediately.
4. Dangerous discrepancies A continued operation of the installation is highly questionable due to safety issues.
Additional Inspection Results, Recommendations and Corrective Mmeasures
See attached sheet
Test is Completed Continuation of the Examination Required
Katterbach: 22.01.2014 Follow-up Inspection by: 04/2014 Next Inspection:
Authorized expert / inspector
SGS-TÜV Saar GmbH Europaallee 6, 67657 Kaiserslautern, Telefon: 0631/340738-0, Telefax: 0631/340738-11
Only the German Inspection Report is legally binding
Seite 2 von 2
Sheet attached
Inspection Certification for Filling Area per VAwS from 22.01.2014
Task-Nr. / Inspect-Nr. AF1-WP-140122 KTB Bldg. 5513 & 5888, TMP and Bulk
Location of the Facility: US-Army, Katterbach BKs, Bldg. 5513+5888, 91522 Ansbach-Katterbach
Defects / Notes
The filling area has been subjected to a visual inspection. The assessment of concrete surface showed no significant damage to the concrete. The joints needs to be repaired in some places. Significant deficiency
The oil-water separator was constructed in 2012. There was no new report present of the General Inspectorate.
Minor defect
Refer to the operator’s requirements. Regular checks (if necessary cleaning, renovation).
See also certificate of the overall system testing.
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 1 von 2
Inspection Certification for Filling Area per VAwS Basic principle of the inspection: Regulation of Equipment / Installations Associated with Materials Hazardous to Water and
Specialized Plants / Facilities (VAwS)
Task-Nr./Inspect-Nr.
(Please reference for inquiries)
AF2-WP-140122 KTB Bldg.
5513_5888, TMP and Bulk
Internal Designation Filling Area Pad 1-4
Gas Station Other Equipment
91522 Ansbach_Katterbach
US-Army Katterbach BKs Bldg. 5513, 5888
After major modifications Decommissioning
Recurring inspection Follow-up inspection
Regulatory insp. Functional insp.
Competent Authority: Stadt Ansbach, Nürenberger Str. 32, 61522 Ansbach
Information on Gas Station
Effective WGK: 3 Effective Volume (m3): < 12 Hazard Level : D Requirement Profile: R1
Carried Media
Substance Name Volume (m3)
WGK
Max. volume flow x 10 min. Average daily throughput
JP8 12 m3 2
Filling Area or Containment Surface
Type of Seal: In-situ concrete with polysulfide grout
Restraint System not required
Floor area with connection to Separator, Manufacturer: unknown; Type: unknown
Filling with ASS
Demanded retention Volume (m³) 0,9
Existing retention Volume (m³) >0,9
2. Minor discrepancies You are asked to resolve the indicated discrepancies.
3. Considerable discrepancies You are asked to resolve the indicated discrepancies immediately.
4. Dangerous discrepancies A continued operation of the installation is highly questionable due to safety issues.
Additional Inspection Results, Recommendations and Corrective Measures
Katterbach: 22.01.2014 Follow-up Inspection by: 04/2014 Next Inspection:
Task-Nr. / Inspect-Nr. AF2-WP-140122 KTB Bldg. 5513_5888, TMP and Bulk
Location of the Facility: US-Army, Katterbach BKs, Bldg. 5513+5888, 91522 Ansbach-Katterbach
The filling area has been subjected to a visual inspection. The assessment of concrete surface showed no significant damage to the concrete. The joints need some repairs in different places. Minor Deficiency
The report of the General Inspection of the oil-water separator had Significant Deficiencies. The deficiencies shall be rectified. A review of the General Inspection is required. The relevant documents shall be submitted at the re-investigation of the filling system. This defect has been present since the last inspection 07/2009.
Refer to the operator’s requirements. Regular checks (if necessary cleaning, renovation).
See also certificate of the overall system testing.
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
Rev.: 2 / 11.2013 Page 1 of 4
Certificate Concerning the Examination of Electrical Equipment in Explosion Hazardous Areas
Task-Nr./Inspect-Nr.
(Please indicate for inquiries)
EL-WP-140122 KTB Bldg.
5513_5888, TMP and Bulk
Object: Bulk
Permanent Establishment
US-Army Katterbach BKs Bldg. 5513+5888
91522 Ansbach-Katterbach
Type of Examination:
Examination of the Existing Installation for Suitability and Performance
Checking Basis:
§ 14 Ordinance on industrial safety (BetrSichV)
ATEX Directive 94/9/EG
Explosion protection regulations (BGR 104) of June 2009, it included the reference to the corresponding TRBS
Prevention of ignition hazards due to electrostatic charges
(TRBS 2153)
More:
DIN VDE 0113-1 (DIN EN 60204-1):2011-01
DIN VDE 0100 series
DIN VDE 0165-1-10/1-20/1
DIN VDE 0185-305-1-4
BGV A3
Scope of Testing:
Electric resources
Mechanical resources
External lightning protection
Internal lightning protection/Overvoltage protection
Potential equalization
Floor conductivity
Alarm system
Ventilation
Emergency power
More: KKS
Results of the Test:
1. No discrepancies The installation is in full working order
2. Minor discrepancies You are asked to resolve the indicated discrepancies...
3 Considerable discrepancies You are asked to resolve the indicated discrepancies immediately.
4. Dangerous discrepancies A continued operation of the installation is highly questionable due to safety issues.
Results of the Inspection: (Discrepancies are listed on a separate sheet)
During the test defects have been fixed by technical personnel.
Inspection is Completed Continuation of the Inspection Required
Ansbach: 22.01.2014 Follow-up Inspection by: Next Inspection: 08/2015
Rev.: 2 / 11.2013 Page 2 of 4
Certificate Concerning the Examination of Electrical Equipment in Explosion Hazard-ous Areas from 22.01.2014 Task-Nr./Inspect-Nr. EL-WP-140122 KTB Bldg.5513_5888, TMP and Bulk
Location of the Facility: US-Army, Katterbach BKs, Bldg. 5513 and 5888, 91522 Ansbach-Katter-bach
1. Description of the Test:
There was a recurring inspection of hazardous areas of the facility, and the associated facilities of the station in accordance with § 1 paragraph 2 sentence1 No. 3 BetrSichV.
Explosion endangered stored material of the tested plants:
Diesel (no risk of explosion)
Ex-Protection characteristics: Temperature class: T3 Explosion group:: IIA
Flammable Highly flammable Extremely flammable
JP8
Super (Mogas)
2. Regulatory testing, document review
Manuals OK w. D.
EG-Declaration of conformity, Attestation of conformity OK w. D.
Explosion-protection document OK w. D.
3. Measurements
Insulation tests Wires >200 MΩ. Wires OK Insulation tests Belts. The V-belt has 0.29 MΩ, Belts OK Insulation tests dispensing hose 0.01 MΩ. Dispensing Hose OK
Rev.: 2 / 11.2013 Page 3 of 4
4. Result of Testing
4.1. Summary
Proper condition and interconnection
Electrical appliances, protection systems, MSR-Systems OK w. D.
Mechanical appliances, if exposed to damage OK w. D.
Other equipment, plant components/systems exposed to harmful influences (e.g., by mechanical loads, high pollution, chemicals, moisture, heat or cold), and which affect the safety of explosion protection.
Electrostatic discharge capacity OK w. D.
Interactions between equipment, protective systems and instrumentation devices and their connecting elements with each other and other plant parts.
Protection against electric impact OK w. D.
Protection against earth fault and short-circuit OK w. D.
Grounding arrangements, protective conductors, equipotential bonding OK w. D.
Protection against bridging of foreign potentials OK w. D.
Insulation resistance OK w. D.
MSR- devices for explosion protection for protection systems on functional safety
Devices in accordance with Directive 94/9/EG OK w. D.
Signal and display devices OK w. D.
Emergency stop device OK w. D.
4.2. Electrical cabinets.
The quality requirements are met.
Deficiency:
- None
4.3. Filter Station
- An ignition hazard assessment for the pump is missing, and a classification relating to the explosion protection could not be found (nameplate was missing). Similarly, a statement from the manufacturer regarding the suitability of the motor (old unit 380V) at the current 400V mains supply was missing. Minor defect
- The sealing of the junction was left open. Wires were also coming out. Minor defect
- The available fan motor in the filter station cannot be conclusively assessed, the present Nameplate provides no accurate data for the suitability in a hazardous area.
Further information from the manufacturer is required and if in doubt, the fan motor should be replaced. Minor defect
- Non-explosion-protected equipment is also operated in the hazardous area. If this equip-ment remains necessary, it shall be retrofitted with the necessary furnishings (must be explosion protected) Significant deficiency
4.4. Manhole Pits, TKW-Facility
4.5. Pit hot pad 1
- Grounding cable at rolling pit cover missing. Minor defect
Rev.: 2 / 11.2013 Page 4 of 4
4.6. Pit Hot Pad 2
- Lack of isolation on the emergency stop cable (before cable entry on the equipment) Minor defect
4.7. Pit Hot Pad 3-4
4.8. General:
- The 380 V fan motors (Maico) can continue to operate. There was a written certification from the manufacturer (Maico) before, for the operation of equipment (380V) at 400V AC current.
- There is no need for the KKS-system any more, as all components after reconstruction in 2009/2010 were designed as double-walled.
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 1 von 1
Regarding the inspection of the gas return according to paragraph 20 of the regulation to control the hydrocarbon emission during the fueling process of motor vehicles.
Task-Nr./Inspect-Nr.
(Please indicate for inquiries) GP-WP-140122 KTB Bldg. 5513_5888, TMP_Bulk
Operator/ proprietor US-Army 91522 Ansbach-Katterbach
Plant / business location US-Army Katterbach BKs Bldg. 5513+5888 91522 Ansbach-Katterbach
Test object Gas return system
- Fa. Sening, Typ TAG 1, TÜ.AGG 191-93
Basic principle of the inspection TRbF 40
VDTÜV
20. BImSchV
Reason for inspection prior to commissioning recurring inspection follow-up inspection
Nr. Serial Number Volume
[m³] Medium Note
Tank1 50/157985 20,0 Super (Mogas) Remote filling Carburetor with fuel gas displacement, Gas recirculation and vent line test content:
Pressure / Leak test of the piping Functional testing of the locking device Visual inspection of connections and components of the GPS and the VERE Identification of Vapour Recovery Couplings in Remote fill pit / manhole available
The requirements of 20 BlmSchV are met.
A pressure and leak testing of the pipeline with 2.0 bar overpressure was performed, the pressure testing of the gas-shuttle pipe showed no complaint.
The functional testing of the locking device was not performed.
Test is completed Continuation of the examination required
Katterbach, 22.01.2014 Follow-up inspection by: Next inspection: 12/2018
Dipl.-Ing. (FH) Joachim Duwe
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 1 von 2
Certificate of a Plant for Flammable, Highly Flammable, Extremely Flammable Liquids
Basic principle of the inspection: Ordinance on Industrial Safety and Health (BetrSichV) §§ 14-16, TRBS 1201-5
(Please indicate for inquiries)
GA-WP-140122 KTB Bldg.
5513_5888, TMP_Bulk
Related Equipment: Quantity: 20
Katterbach BKs Geb.5513+5888
91522 Ansabch-Katterbach
Reason for Inspection Extent of the Inspection prior to commissioning follow-up inspection Verification of inspection period
Regulations test after major modifications recurring inspection other inspection technical test after modification special inspection other test
Building permit BImSchG Permission other
Information on Plant
Anlagenart Gas Station Bulk Flugfeldbetankungsanlage Füllstelle Rohrleitung
Stoffangaben flammable highly flammable extremely flammable
1 Gas Station with 2 Tanks mit 2 Dispenser, 2 Bulk
3 Warehouse for firing 4 Filling / transfer plant 5 pipeline 6 Warehouse for transportable containers 7 HBV-Anlage
Index Serial Number Volume (m3) Stored material / medium Requirement Profile under-/ above-ground
2 090405 100,0 JP8 R10 x
2 090404 100,0 JP8 R10 x
2 50/157986 30,0 Diesel - X
2 50/157985 20,0 Mogas R12 X
2 50/157987 100,0 JP8 R10 X
2 50/157984 100,0 JP8 R10 X
2 090466 10,0 JP8- Drain tank Bulk R10 X
2 01/65276 10,0 JP8- Drain Tank Pads R10 x
4 Type of sealing: 2 filling areas designed as a tray with connection to a separator x
4 Type of sealing: 4 filling areas designed as a tray with connection to a separator
5 5 double-walled piping x
Max. Volume flow: 470 m³ Effective WGK: 3 Hazard Level: D
Results of the inspection (Eventual discrepancies are listed on a separate sheet)
1. No discrepancies The installation is in an outstanding condition.
2. Minor discrepancies You are asked to resolve the indicated discrepancies.
3. Considerable discrepancies You are asked to resolve the indicated discrepancies immediately.
4. Dangerous discrepancies A continued operation of the installation is highly questionable due to safety issues.
Additional inspection results, recommendations and corrective measures
The certificate of inspection of the electrical part of the plant was not available. Any shortcomings are listed there to be observed.
Place and date Next inspection:
12/2018
Inspection interval (months) according to operator:
Katterbach: 22.01.2014
Authorized expert / inspect
Inspection Certification for Total Certificate per BetrSichV from 22.01.2014
Task-Nr./Inspect-Nr.. GA-WP-140122 KTB Bldg. 5513_5888, TMP_Bulk
Location of the Facility: US-Army, Katterbach BKs, Geb. 5513+5888, 91522 Ansbach-Katterbach
The following tests were performed:
- Leak testing of 8 underground storage tanks OK
- Leak testing of 5 double walled pipes OK
- Examination of the TMP+Bulk filling area Considerable discrepancies
- Examination of the filling area Pad 1-4 Considerable discrepancies
- Verification of compliance with the 20 BlmSchV (gas shuttles) OK
- Verification of compliance with the 21 BlmSchV (vapor recovery facilities), including pressure testing of the gas return line OK
- Testing of the equipment and facilities to RL 94/9 EG-TMP Minor discrepancies. (next test: 08/2015)
- Testing of the equipment and facilities to RL 94/9 EG-Bulk Considerable discrepancies. (next test:
04/2014)
- Examination of the entire system
The examination of the separator (Pad 1-4) according to DIN 1999 (from Peter Spieleder from 08.07.2009) was present. From the test, additional significant deficiencies revealed. Significant deficiency On the operator's obligations referenced (regular inspections, functional checks, etc.)
The filling of the tanker via:
• 2 filling gallows (uploading) with dead men switch, (upgraded with a safety Level device)
• 2 pantographs (bottemloading) with safety device (ANA)
The filling of the helicopter on the Pats 1-4 via:
• 1 pantographs with dead men switch, Any deficiencies / conditions / notes of individual certificates must be observed.
Defects in the single examination are not listed here, but rather referred to them.
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 1 von 2
Report
Regarding the Inspection of the Gas Return According to Paragraph 6 of the Regulation to Control the Hydrocarbon Emission during the Fueling Process of Motor Vehicles. (21. BImSchV)
Periodic Inspection and Testing
Operator/ Proprietor: US-Army
Plant / Business Location: US-Army Katterbach BKs Bldg. 5513 and 5888 91522 Ansbach-Katterbach
Task-Nr./Inspect-Nr.
GRF-ÜGR-WP-140122 KTB Bldg. 5513_5888, TMP_Bulk
Gas return system according to certificate Nr.: 2.36
Basis for the inspection
21st BlmSchV, VdTÜV-Merkblatt (data sheet) 908
Gas pump: Salzkotten, GR 125
Control valve: Veeder Root, EPV 10
Correlation with the system description: yes no
Remarks: Certificate for the gas return system not available
Pressure test of gas return lines: yes no
Remarks: Test pressure 2 Bar
Checking of piping schematic for gas return: yes no
Remarks: No As-builts available
Checking for leak-tightness of the gas return on pump suction side:
(see data sheet Nr. 3.3) yes no
Remarks: None
Requirements:
Configuration: 2
Fuel material rate: 40 l
Permissible gas-volume rate: 95 % to 105 %
Correction factor for air: 1.06
Result of the inspection:
According to the results of the individual measurements the system requirements in accordance with § 3 of 21 BlmSchV are met. The monitoring device (Fafnir VAPORIX) is in function. The pressure test the gas return line showed no complaints.
Notes:
Katterbach: 22.01.2014 Follow-up Inspection by: Next Inspection: 01/2019
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 2 von 2
Sheet Attached for the Review Certificate a Plant after 21 BlmSchV from 22/01/2014 Task-Nr. / Inspect-Nr. GRF-ÜGR-WP-140122 KTB Bldg. 5513_5888, TMP_Bulk
Standort der Anlage: US-Army, Katterbach, Bldg. 5513 and 5888, 91522 Ansbach-Katterbach
Measurement Protocol: (Specified in l/min, %): see below, measured values are corrected
Measuring Instruments:
- Terminal: Gilbarco FB 1
- Gas meter: Make: Bürkert
Serial- Nr.
Manufacturer / Column Type
Dispenser- Nr.
Filling points
Medium Air-volume (rate) at 39.5 l
Fuel / min
Measurement result allowed yes no
520632 Salzkotten/
Super (Mogas)
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 1 von 2
Inspection Certification for Pipes per VAwS
Basic principle of the inspection: Regulation of Equipment / Installations Associated with Materials Hazardous to Water and
Specialized Plants / Facilities (VAwS)
Task-Nr./Inspect-Nr.
(Please reference for inquiries)
RL1-WP-KTB Bldg.
5513_5888, TMP_Bulk
Internal Designation Double-Walled Piping Nr. 1
US-Army Katterbach BKs Bldg. 5513 and 5888
After major modifications Decommissioning
Recurring inspection Follow-up inspection
Regulatory insp. Functional insp.
Competent Authority: Stadt Ansbach, Nurenberger Str.32, 91522 Ansbach
Information for the Pipeline Installation
Effective Volume (m3): > 10 Effective WGK: 3 Hazard Level : C
Pipes Lay out / Operation Construction Admission
Below ground
Above ground
Single wall
Double wall incl. leakage alarm
Intrinsically safe suction pipe
Protection tube/canal
KKS
Connecting piping
Contents: various
Length: various
Diameter: DN 25, DN 100
Max. Working Pressure: <= 6 Bar
Media: 1.4404
Sealing Type: PE
Pipeline FSR 30/48,83/120 Z-65.25-1
Leak detection device DLR-G Z-65.26-349
Carried Media Amount WGK Hazardous classification
JP-8 > 10 m3 2 Flammable, average daily throughput
Mogas > 10 m3 2 Highly flammable, average daily throughput
Diesel > 10 m3 3 Average daily throughput
Results of the Inspection (Discrepancies are listed on a separate sheet)
1. No discrepancies The installation is in full working order.
2. Minor discrepancies You are asked to resolve the indicated discrepancies.
3. Considerable discrepancies You are asked to resolve the indicated discrepancies immediately.
4. Dangerous discrepancies A continued operation of the installation is highly questionable due to safety issues.
Test Complete Continuation of Inspection Required
Ansbach: 22.01.2014 Follow-up Inspection by: Next Inspection: 01/2019
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 2 von 2
Task-Nr. / Inspect-Nr. RL1-WP-140122 KTB Bldg. 5513_5888, TMP_Bulk
Location of the Facility: US-Army, Katterbach BKs, Bldg. 5513 and 5888, 91522 Ansbach-Katterbach
The underground pipes were examined.
Manufacturer / marketing authorization holder: Brugg Pipe Systems GmbH Type: Flexwell Safety Pipe
Executive Specialist Company according to WHG: Brugg Pipe Systems GmbH
The test included 14 double-walled pipelines
- Pressure refueling line from Tank 6 to Filter Pit 2 (Pad 3 and 4)
- Pressure filling line (for Filter Pit 2) from Tank 5 to Tank 6
- Forced circulation / filling pipe Tanks 5 and 6
- Pressure refueling line from Tank 5 to truck fill stand
- Filling line from Pump House Facility 5513 to Tank 5
- Emptying pipe from pit at Pad 2 to Filter shaft 1
- Emptying pipe from pit at Pad 1A to Filter shaft 1
- Emptying pipe from pit at Pad 1B to Filter shaft 1
- Discharge line of Filter pit 1 to Filter pit 2
- Discharge line of Filter pit 2 to Slop tank 8
- Emptying pipe from Pit pad 3 to Filter pit 2
- Emptying pipe from Pit pad 4 to Filter pit 2
- Pressure refueling line of Filter pit 2 to Pad 3
- Pressure refueling line of Filter pit 2 to Pad 4
The examination of the leak detection system and the examination of documents revealed no deficiencies.
Leaks in detachable connections and fittings into the filter and refueling bays must be identified quickly and reliably retained.
The shafts are concrete (without coating). In the visual inspection no flaws were detected. The shafts must be checked regularly or as an alternative, the installation of leakage probes.
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 1 von 2
Basic principle of the inspection: Regulation of Equipment / Installations Associated with Materials Hazardous to Water and
Task-Nr./Inspect-Nr.
(Please reference for inquiries)
RL2-WP-KTB Bldg.
Internal Designation Double-Walled Piping Nr. 2
Plant / business location US-Army Katterbach BKs Bldg. 5513+5888
After major modifications Decommissioning
Recurring inspection Follow-up inspection
Regulatory insp. Functional insp.
Effective Volume (m3): > 10 Effective WGK: 3 Hazard Level : C
Pipes Lay out / Operation Construction Admission
Below ground
Above ground
Single wall
Double wall incl. leakage alarm
Intrinsically safe suction pipe
Protection tube/canal
KKS
Interconnection Piping
Contents: various
Length: various
Diameter: DN 100
Max. Working Pressure: <= 6 Bar
Media: 1.4404
Sealing Type: PE
Pipeline FSR 83/120 Z-65.25-1
Mogas > 10 m3 2 Highly flammable, average daily throughput
Diesel > 10 m3 3 Average daily throughput
Results of the Inspection (Discrepancies are listed on a separate sheet)
1. No discrepancies The installation is in full working order.
2. Minor discrepancies You are asked to resolve the indicated discrepancies.
3. Considerable discrepancies You are asked to resolve the indicated discrepancies immediately.
4. Dangerous discrepancies A continued operation of the installation is highly questionable due to safety issues.
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 2 von 2
Task-Nr. / Inspect-Nr. RL2-WP-140122 KTB Bldg. 5513_5888, TMP_Bulk
Manufacturer / marketing authorization holder: Brugg Pipe Systems GmbH Type: Flexwell Safety Pipe
Executive Specialist Company according to WHG: Gödtel & Theissinger GmbH, Olsbrücken
The test included 4 double-walled pipelines
- Filling line from remote fill pit 1 to Tank 6
- Filling line from remote fill pit 1 to Tank 5
- Filling line from remote fill pit 1 to Tank 4
- Filling line from remote fill pit 1 to Tank 3
The examination of the leak detection system and the examination of documents revealed no deficiencies.
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 1 von 2
Basic principle of the inspection: Regulation of Equipment / Installations Associated with Materials Hazardous to Water and
Task-Nr./Inspect-Nr.
(Please indicate for inquiries)
RL3-WP-KTB Bldg.
Internal Designation Double-walled Pipeline Nr. 3
US-Army Katterbach BKs Bldg. 5513+5888
After major modifications Decommissioning
Recurring inspection Follow-up inspection
Regulatory insp. Functional insp.
Effective Volume (m3): > 10 Effective WGK: 3 Hazard Level : C
Pipes Lay out / Operation Construction Admission
Below ground
Above ground
Single wall
Double wall incl. leakage alarm
Intrinsically safe suction pipe
Protection tube/canal
KKS
Connecting piping
Contents: various
Length: various
Diameter: DN 25, DN 80
Max. Working Pressure: <= 6 Bar
Media: 1.4404
Sealing Type: PE
Mogas > 10 m3 3 Highly flammable, average daily throughput
Diesel > 10 m3 2 Average daily throughput
Results of the Inspection (Discrepancies are listed on a separate sheet)
1. No discrepancies The installation is in full working order.
2. Minor discrepancies You are asked to resolve the indicated discrepancies.
3. Considerable discrepancies You are asked to resolve the indicated discrepancies immediately.
4. Dangerous discrepancies A continued operation of the installation is highly questionable due to safety issues.
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 2 von 2
Task-Nr. / Inspect-Nr. RL2-WP-140122 KTB Bldg. 5513_5888, TMP_Bulk
The underground double-walled pipes were examined.
Manufacturer / marketing authorization holder: Brugg Pipe Systems GmbH Type: Flexwell Safety Pipe
Executive Specialist Company according to WHG: Brugg Pipe Systems GmbH
The test included 5 double-walled pipelines
- Suction pipe from Tank 5 to Dispenser 1
- Suction pipe from Tank 5 to Dispenser 1
- Gas return pipe from Dispenser 2 to Tank 4
- Suction pipe from Tank 3 to Dispenser 3
- Suction pipe from Tank 5 to Dispenser 4
The examination of the leak detection system and the examination of documents revealed no complaint.
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 1 von 2
Basic principle of the inspection: Regulation of Equipment / Installations Associated with Materials Hazardous to Water and
Task-Nr./Inspect-Nr.
(Please indicate for inquiries)
RL4-WP-KTB Bldg.
Internal Designation Double-walled Pipeline Nr. 4
US-Army Katterbach BKs
After major modifications Decommissioning
Recurring inspection Follow-up inspection
Regulatory insp. Functional insp.
Effective Volume (m3): > 10 Effective WGK: 3 Hazard Level : C
Pipes Lay out / Operation Construction Admission
Below ground
Above ground
Single wall
Double wall incl. leakage alarm
Intrinsically safe suction pipe
Protection tube/canal
KKS
Connecting piping
Contents: various
Length: various
Diameter: DN 25, DN 100
Max. Working Pressure: <= 6 Bar
Media: 1.4404
Sealing Type: PE
Mogas > 10 m3 3 Highly flammable, average daily throughput
Diesel > 10 m3 2 Average daily throughput
Results of the Inspection (Discrepancies are listed on a separate sheet)
1. No discrepancies The installation is in full working order.
2. Minor discrepancies You are asked to resolve the indicated discrepancies.
3. Considerable discrepancies You are asked to resolve the indicated discrepancies immediately.
4. Dangerous discrepancies A continued operation of the installation is highly questionable due to safety issues.
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 2 von 2
Task-Nr. / Inspect-Nr. RL4-WP-KTB Bldg. 5513_5888, TMP_Bulk
Manufacturer / marketing authorization holder: Brugg Pipe Systems GmbH Type: Flexwell Safety Pipe
Executive Specialist Company according to WHG: Brugg Rohrsysteme GmbH
The audit comprised 7 double-walled pipelines
- Main flush line from pad 3 to Pump House Bldg. 5513
- Flush line of the pantograph of Pad 1A to Pit Pad 1B
- Flush line of the pantograph of Pad 1B to Pit Pad 1B
- Flush line from Pit Pad 1B to Pit Pad 3
- Flush line of the pantograph of Pad 2 to Pit Pad 1B
- Flush line of pantograph from Pad 3 to Pit Pad 3
- Flush line of the pantograph of Pad 4 to Pit Pad 3
The examination of the leak detection system and the examination of documents (regulatory inspection) revealed no deficiencies.
Leaks in detachable connections and fittings into the filter and refueling bays must be quickly identified and reliably retained.
The shafts are constructed of concrete (without coating). In the visual inspection, no flaws were found. The shafts must be checked regularly or as an alternative, the installation of leakage probes should be considered.
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 1 von 2
Basic principle of the inspection: Regulation of Equipment / Installations Associated with Materials Hazardous to Water and
Task-Nr./Inspect-Nr.
(Please reference for inquiries)
RL5-WP-KTB Bldg.
Internal Designation Double-walled Piping Nr. 5
US-Army Katterbach BKs
After major modifications Decommissioning
Recurring inspection Follow-up inspection
Regulatory insp. Functional insp.
Effective Volume (m³): > 10 Effective WGK: 3 Hazard Level : C
Pipes Lay out / Operation Construction Admission
Below ground
Above ground
Single wall
Double wall incl. leakage alarm
Intrinsically safe suction pipe
Protection tube/canal
KKS
Connecting Piping
Contents: various
Length: various
Diameter: DN 25, DN 100
Max. Working Pressure: <= 6 Bar
Media: 1.4404
Sealing Type: PE
Pipeline FSR 30/48, 83/120 Z-65.25-1
Mogas > 10 m3 3 Highly flammable, average daily throughput
Diesel > 10 m3 2 Average daily throughput
Results of the Inspection (Discrepancies are listed on a separate sheet)
1. No discrepancies The installation is in full working order.
2. Minor discrepancies You are asked to resolve the indicated discrepancies.
3. Considerable discrepancies You are asked to resolve the indicated discrepancies immediately.
4. Dangerous discrepancies A continued operation of the installation is highly questionable due to safety issues.
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 2 von 2
Task-Nr. / Inspect-Nr. RL5-WP-140122 KTB Bldg. 5513_5888, TMP_Bulk
Manufacturer / marketing authorization holder: Brugg Pipe Systems GmbH Type: Flexwell Safety Pipe
Executive Specialist Company according to WHG: Brugg Rohrsysteme GmbH
The test included 14 double-walled pipelines
- Pressure refueling line from Tank 1 and 2 to Filter pit 1
- Filling line EKW-discharge to Pump House Facility 5513
- Filling line of remote fill pit to Tank 2
- Filling line of remote fill pit to Tank 1
- Pressure refueling line from Tank 1 to Tank 2
- Forced circulation / tank filling line Tanks 1 and 2
- Filling line from pump house Facility 5513 to Tank 1
- Emptying pipe of the TKW-fill stand to Slop Tank 7
- Discharge line from the pump house Facility 5513 to Slop Tank 7
- Discharge line from Tank 1 to Tank 2
- Discharge line from Tank 2 to Slop Tank 7
- Pressure filling line from Pit pad 1A to Pit pad 1B
- Pressure refueling line of Filter pit 1 to Pit pad 1B
- Pressure refueling line of Filter pit 1 to Pit pad 2
The examination of the leak detection system and the examination of documents (regulatory test) revealed no deficiencies.
Leaks in detachable connections and fittings into the filter and refueling bays must be quickly identified and reliably retained.
The shafts are constructed of concrete (without coating). In the visual inspection, no flaws were found. The shafts must be checked regularly or as an alternative, the installation of leakage probes should be considered.
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 1 von 1
Inspection Certification for Tanks and Equipment as per VAwS
Basic principle of the inspection: Regulation of Equipment / Installations Associated with Materials Hazardous to Water and
Specialized Plants / Facilities (VAwS); Ordinance on Industrial Safety and Health (BetrSichV)
TB-WP-140122 090405
KTB Bldg.5513_5888, TMP_Bulk
Internal Designation Tank 1
Gas Station Other Equipment
US-Army Katterbach BKs
After major modifications Decommissioning
Recurring inspection Follow-up inspection
Regulatory insp. Functional insp.
External insp. Water tightness insp.
Competent authority: Stadt Ansbach, Nürenberger Str.32, 91522 Ansbach
Information on Tank Effective WGK: 2 Hazard Level : C
1. Type of Unit Fueling station Fuel storage Storage for furnace HBV-unit / station Elevator
2. Container type Cylindrical tank Spherical tank Battery tank Flat bottom tank Other tank
3. Container
Material Steel plastic material other
4. Material Name JP8 WGK: 2
5. Container / Manufacturer Kammerer Manufact.-Nr.: 090405 Year built: 2009
Unit Information Volume (m³) 100,0 Quantity of chambers /containers / barrels: 1
Container installation above ground below ground indoors outdoors
6. Leak / Double wall with LAG Inner casing with LAG Collection space / collection tank Without (See Attached Sheet)
Secondary Protect Construction type: Volume (m³):
7. Piping below ground above ground Single wall system Double wall with LAG
Suction piping Protective pipe / duct KKS other
Authority:
Tank DIN 6608 Overfill protection Z-65.11-228 Flame arrestor
Leakage detector Z-65.23-409
2. Minor discrepancies You are asked to resolve the indicated discrepancies.
3. Considerable discrepancies You are asked to resolve the indicated discrepancies immediately.
4. Dangerous discrepancies A continued operation of the installation is highly questionable due to safety issues.
Additional Inspection Results, Recommendations and Corrective Measures The manhole of the tank is monitored with a probe, it is switched to the Veeder Root contents indicator. Components used (monitoring system TLS-350R and explosion probes) correspond. Wiring type and line connections for the sensor are suitable.
Test complete Continuation of inspection required
Katterbach: 22.01.2014 Follow-up inspection by: Next inspection: 01/2019
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 1 von 1
Basic principle of the inspection: Regulation of Equipment / Installations Associated with Materials Hazardous to Water and
(Please reference for inquiries)
TB-WP-140122 090404
KTB Bldg.5513_5888, TMP_Bulk
Internal Designation Tank 2
Gas Station Other Equipment
US-Army Katterbach BKs
After major modifications Decommissioning
Recurring inspection Follow-up inspection
Regulatory insp. Functional insp.
Competent Authority: Stadt Ansbach, Nürenberger Str.32, 91522 Ansbach
1. Type of Unit Fueling station Fuel storage Storage for furnace HBV-unit / station Elevator
2. Container type Cylindrical tank Spherical tank Battery tank Flat bottom tank Other tank
3. Container
Material Steel plastic material other
4. Material Name JP8 WGK: 2
5. Container / Manufacturer Kammerer Manufact.-Nr.: 090404 Year built: 2009
Unit Information Volume (m³) 100,0 Quantity of chambers /containers / barrels: 1
Container Installation above ground below ground indoors outdoors
6. Leak / Double wall with LAG Inner casing with LAG Collection space / collection tank Without (See Attached Sheet)
Secondary Protect Construction type: Volume (m³):
7. Piping below ground above ground Single wall system Double wall with LAG
Suction piping Protective pipe / duct KKS other
Authority:
Tank DIN 6608 Overfill protection Z-65.11-228 Flame arrestor
2. Minor discrepancies You are asked to resolve the indicated discrepancies.
3. Considerable discrepancies You are asked to resolve the indicated discrepancies immediately.
4. Dangerous discrepancies A continued operation of the installation is highly questionable due to safety issues.
Additional Inspection Results, Recommendations and Corrective Measures The manhole of the tank is monitored with a probe, it is switched to the Veeder Root contents indicator. Components used (monitoring system TLS-350R and explosion-probes) correspond. Wiring type and line connections for the sensor are suitable.
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 1 von 1
Basic principle of the inspection: Regulation of Equipment / Installations Associated with Materials Hazardous to Water and
TB-WP-140122 50_157986
KTB Bldg.5513_5888, TMP_Bulk
Internal designation Tank 3
Gas Station Other Equipment
US-Army Katterbach BKs
After major modifications Decommissioning
Recurring inspection Follow-up inspection
Regulatory insp. Functional insp.
1. Type of Unit Fueling station Fuel storage Storage for furnace HBV-unit / station Elevator
2. Container type Cylindrical tank Spherical tank Battery tank Flat bottom tank Other tank
3. Container
Material Steel plastic material other
4. Material Name Diesel WGK: 2
5. Container / Manufacturer BTD Manufact.-Nr.: 50/157986 Year built: 2008
Unit Information Volume (m³) 30,0 Quantity of chambers /containers / barrels: 1
Container Installation above ground below ground indoors outdoors
6. Leak / Double wall with LAG Inner casing with LAG Collection space / collection tank Without (See Attached Sheet)
Secondary Protect Construction type: Volume (m³):
7. Piping below ground above ground Single wall system Double wall with LAG
Suction piping Protective pipe / duct KKS other
Authority:
Tank DIN 6608 Overfill protection PTB III B/S 1685 Flame arrestor Level indicator PTB III B/S 2222
2. Minor discrepancies You are asked to resolve the indicated discrepancies.
3. Considerable discrepancies You are asked to resolve the indicated discrepancies immediately.
4. Dangerous discrepancies A continued operation of the installation is highly questionable due to safety issues.
Additional Inspection Results, Recommendations and Corrective Measures The manhole of the tank is monitored with a probe, it is switched to the Veeder Root contents indicator. Components used (monitoring system TLS-350R and ex-probes) correspond. Wiring type and line connections for the sensor are suitable.
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 1 von 1
Basic principle of the inspection: Regulation of Equipment / Installations Associated with Materials Hazardous to Water and
TB-WP-140122 50_157985
KTB Bldg.5513_5888, TMP_Bulk
Internal Designation Tank 4
Gas Station Other Equipment
US-Army Katterbach BKs
After major modifications Decommissioning
Recurring inspection Follow-up inspection
Regulatory insp. Functional insp.
Information on Tank Effective WGK: 3 Hazard Level : D
1. Type of Unit Fueling station Fuel storage Storage for furnace HBV-unit / station Elevator
2. Container type Cylindrical tank Spherical tank Battery tank Flat bottom tank Other tank
3. Container
Material Steel plastic material other
4. Material Name Super(Mogas) WGK: 3
5. Container / Manufacturer BTD Manufact.-Nr.: 50/157985 Year built: 2008
Unit Information Volume (m³) 20,0 Quantity of chambers /containers / barrels: 1
Container Installation above ground below ground indoors outdoors
6. Leak / Double wall with LAG Inner casing with LAG Collection space / collection tank Without (See Attached Sheet)
Secondary Protect Construction type: Volume (m³):
7. Piping below ground above ground Single wall system Double wall with LAG
Suction piping Protective pipe / duct KKS other
Authority:
Tank DIN 6608 Overfill protection PTB III B/S 1685 Flame arrestor
2. Minor discrepancies You are asked to resolve the indicated discrepancies.
3. Considerable discrepancies You are asked to resolve the indicated discrepancies immediately.
4. Dangerous discrepancies A continued operation of the installation is highly questionable due to safety issues.
Additional Inspection Results, Recommendations and Corrective Measures The manhole of the tank is monitored with a probe, it is switched to the Veeder Root contents indicator. Components used (monitoring system TLS-350R and ex-probes) correspond. Wiring type and line connections for the sensor are suitable.
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 1 von 1
Basic principle of the inspection: Regulation of Equipment / Installations Associated with Materials Hazardous to Water and
TB-WP-140122 50_157987
KTB Bldg.5513_5888, TMP_Bulk
Internal Designation Tank 5
Gas Station Other Equipment
US-Army Katterbach BKs
After major modifications Decommissioning
Recurring inspection Follow-up inspection
Regulatory insp. Functional insp.
1. Type of Unit Fueling station Fuel storage Storage for furnace HBV-unit / station Elevator
2. Container type Cylindrical tank Spherical tank Battery tank Flat bottom tank Other tank
3. Container
Material Steel Plastic material other
4. Material Name JP8 WGK: 2
5. Container / Manufacturer BTD Manufact.-Nr.: 50/157987 Year built: 2008
Unit Information Volume (m³) 100,0 Quantity of chambers /containers / barrels: 1
Container Installation above ground below ground indoors outdoors
6. Leak / Double wall with LAG Inner casing with LAG Collection space / collection tank Without (see attached sheet)
Secondary Protect Construction type: Volume (m³):
7. Piping below ground above ground Single wall system Double wall with LAG
Suction piping Protective pipe / duct KKS other
Zulassungen:
Tank DIN 6608 Overfill protection PTB III B/S 1685 Flame arrestor
2. Minor discrepancies You are asked to resolve the indicated discrepancies.
3. Considerable discrepancies You are asked to resolve the indicated discrepancies immediately.
4. Dangerous discrepancies A continued operation of the installation is highly questionable due to safety issues.
Additional Inspection Results, Recommendations and Corrective Measures The manhole of the tank is monitored with a probe, it is switched to the Veeder Root contents indicator. Components used (monitoring system TLS-350R and ex-probes) correspond. Wiring type and line connections for the sensor are suitable.
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 1 von 1
Basic principle of the inspection: Regulation of Equipment / Installations Associated with Materials Hazardous to Water and
TB-WP-140122 50_157984
KTB Bldg.5513_5888, TMP_Bulk
Internal Designation Tank 6
Gas Station Other Equipment
US-Army Katterbach BKs Bdlg. 5513 and 5888
After major modifications Decommissioning
Recurring inspection Follow-up inspection
Regulatory insp. Functional insp.
1. Type of Unit Fueling station Fuel storage Storage for furnace HBV-unit / station Elevator
2. Container type Cylindrical tank Spherical tank Battery tank Flat bottom tank Other tank
3. Container
Material Steel Plastic material other
4. Material Name JP8 WGK: 2
5. Container / Manufacturer BTD Manufact.-Nr.: 50/157984 Year built: 2008
Unit Information Volume (m³) 100,0 Quantity of chambers /containers / barrels: 1
Container Installation above ground below ground indoors outdoors
6. Leak / Double wall with LAG Inner casing with LAG Collection space / collection tank Without (See Attached Sheet)
Secondary Protect Construction type: Volume (m³):
7. Piping below ground above ground Single wall system Double wall with LAG
Suction piping Protective pipe / duct KKS other
Authority:
Tank DIN 6608 Overfill protection PTB III B/S 1685 Flame arrestor
2. Minor discrepancies You are asked to resolve the indicated discrepancies.
3. Considerable discrepancies You are asked to resolve the indicated discrepancies immediately.
4. Dangerous discrepancies A continued operation of the installation is highly questionable due to safety issues.
Additional Inspection Results, Recommendations and Corrective Measures The manhole of the tank is monitored with a probe, it is switched to the Veeder Root contents indicator. Components used (monitoring system TLS-350R and ex-probes) correspond. Wiring type and line connections for the sensor are suitable.
Test is complete Continuation of inspection required
SGS-TÜV Saar GmbH Am TÜV 1 D-66280 Sulzbach t +49 6897 506-123 f +49 6897 506-294 www.sgs-tuev-saar.de
All services are based on the applicable terms and conditions of SGS, which are made available on request, provided.
FB-WH-VT – 001 - Bescheinigung Prüfung VAwS-BetrSichV Rev. 4 / 08.2009 Rev.: 6 / 06.2013 Seite 1 von 1
Basic principle of the inspection: Regulation of Equipment / Installations Associated with Materials Hazardous to Water and
TB-WP-140122 090466
KTB Bldg.5513_5888, TMP_Bulk
Internal Designation Tank 7 (Slop Tank - Bulk)
Gas Station Other Equipment
US-Army Katterbach BKs
After major modifications Decommissioning
Recurring inspection Follow-up inspection
Regulatory insp. Functional insp.
Information on Tank Effective WGK: 2 Hazard Level : B
1. Type of Unit Fueling station Fuel storage Storage for furnace HBV-unit / station Elevator
2. Container type Cylindrical tank Spherical tank Battery tank Flat bottom tank Other tank
3. Container
Material Steel plastic material other
4.…