Appendix_C_-_Task_Order_Price_Proposal_6.20.18.xlsx

XLSX spreadsheet 38 KB Posted

Attached to
DLA-Energy Sustainment, Restoration, and
Solicitation number
W912GB18R0030
Issued by

About this file

Appendix C - Task Order Price Proposal 6.20.18

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WS A-Pricing Summary APPENDIX C - Task Order Price Proposal

WORKSHEET A - Oil Water Separator and Pollutant Drainage System Repairs

PRICING SUMMARY SHEET

Offeror Name
Date
Revision #
Proposed CLINDescription of ServicesCLIN TypePrice
CLIN 0001Task 1 - Replace Oil Water Separator (Facility POLS6)FFP€ - 0
CLIN 0002Task 2 - Install Storm Lines (Facility SDS01)FFP€ - 0
CLIN 0003Task 3 - Repair Drainage Lines (Facility SDS01)FFP€ - 0
CLIN 0004Task 4 - Repair Hot Pad Containment Area (Facility PHRP1)FFP€ - 0
CLIN 0005Task 5 - Repair Hot Pad Containment Area (Facility PHRP1-1)FFP€ - 0
CLIN 0006Task 6 - Repair Hot Pad Containment Area (Facility PHRP1-2)FFP€ - 0
CLIN 0007Task 7 -Repair Hot Pad Containment Area (Facility PHRP1-3)FFP€ - 0
CLIN 0008Task 8 (Option 1) - Contaminated Soil Disposal (50 cubic meters)FFP€ - 0
CLIN 0009Task 9 (Option 2) - Contaminated Soil Disposal (500 cubic meters)FFP€ - 0
CLIN 0010Task 10 (Option 3) - Contaminated Soil Disposal (100 cubic meters)FFP€ - 0
CLIN 0011Task 11 (Option 4) - Contaminated Soil Disposal (100 cubic meters)FFP€ - 0
CLIN 0012Task 12 - Contract Manpower Reporting ApplicationFFP€ - 0
Task Order Total€ - 0

WS B-TO Price Proposal wText

APPENDIX C
WORKSHEET B - TASK ORDER PRICE PROPOSAL WORKSHEET (FULL TEXT)
Offeror Name
Date
Revision #

Column A Column B Column C Column D Column E

1Prime Direct LaborBurdened Rate*HoursExtended PriceExtended Price
2
3Program Manager€ - 0x=A3 x B3
4Project Manager€ - 0x=A4 x B4
5Team Leader€ - 0x=A5 x B5
6Site Supervisor/Superintendent€ - 0x=A6 x B6
7Petroleum Maintenance Technician (Senior)€ - 0x=A7 x B7
8Petroleum Maintenance Technician (Mid-Level)€ - 0x=A8 x B8
9Petroleum Maintenance Technician (Junior)€ - 0x=A9 x B9
10Engineer (Senior)€ - 0x=A10 x B10
11Engineer (Mid-Level)€ - 0x=A11 x B11
12Engineer (Junior)€ - 0x=A12 x B12
13Environmental Scientist (Senior)€ - 0x=A13 x B13
14Environmental Scientist (Mid-Level)€ - 0x=A14 x B14
15Environmental Scientist (Junior)€ - 0x=A15 x B15
16CADD Operator€ - 0x=A16 x B16
17Admin Specialist€ - 0x=A17 x B17
18Certified Surveyor€ - 0x=A18 x B18
19Haz Wast Specialist€ - 0x=A19 x B19
20Industrial Hygienist€ - 0x=A20 x B20
21Site Safety and Health Officer (SSHO)€ - 0x=A20 x B21
22Contracts Administrator€ - 0x=A22 x B22
23Project Controls€ - 0x=A23 x B23
24Cost Tracker€ - 0x=A24 x B24
25Quality Control Manager/Specialist€ - 0x=A25 x B25
26Database Developer€ - 0x=A26 x B26
27Database Administrator€ - 0x=A27 x B27
28Subtotal Prime Direct LaborSum (C3 thru C27)
29
30Material, Supplies & Equipment (MSE)€ - 0
31Handling Charge/G&A applied to MSE0.00%C30 x B31
32Subtotal Equipment, Material & SuppliesSum (C30 thru C31)
33
34Subcontractors Costs€ - 0
35Handling Charge/G&A applied to Subcontractor Costs0.00%C34 x B35
36Subtotal SubcontractorSum (C34 thru C35)
37
38Subtotal(D28 + D32 + D36)
39
40Profit applied to Subtotal0.00%D38 x B40
41
42Travel€ - 0
43Handling Charge/G&A applied to Travel0.00%C42 x B43
44Subtotal TravelSum (C42 thru C43)
45
46Grand Total(D38 + D40 + D44)

* Burdened rate for each labor category without profit.

WS C-Task Order Pricing

APPENDIX C
WORKSHEET C - Oil Water Separator and Pollutant Drainage System Repairs
Offeror Name
Date
Revision #
Task 1Task 2Task 3Task 4Task 5Task 6Task 7Task 8 (Option 1)Task 9 (Option 2)Task 10 (Option 3)
Column AColumn BColumn CColumn DColumn EColumn CColumn DColumn EColumn CColumn DColumn EColumn CColumn DColumn EColumn CColumn DColumn EColumn CColumn DColumn EColumn CColumn DColumn EColumn CColumn DColumn EColumn CColumn DColumn EColumn C
Burdened Rate*
1Prime Direct LaborHoursExtended PriceExtended Price1HoursExtended PriceExtended Price1HoursExtended PriceExtended Price1HoursExtended PriceExtended Price1HoursExtended PriceExtended Price1HoursExtended PriceExtended Price1HoursExtended PriceExtended Price1HoursExtended PriceExtended Price1HoursExtended PriceExtended Price1Hours
2222222222
3Program Manager€ - 0x=€ - 03=€ - 03=€ - 03=€ - 03=€ - 03=€ - 03=€ - 03=€ - 03=€ - 03
4Project Manager€ - 0x=€ - 04=€ - 04=€ - 04=€ - 04=€ - 04=€ - 04=€ - 04=€ - 04=€ - 04
5Team Leader€ - 0x=€ - 05=€ - 05=€ - 05=€ - 05=€ - 05=€ - 05=€ - 05=€ - 05=€ - 05
6Site Supervisor/Superintendent€ - 0x=€ - 06=€ - 06=€ - 06=€ - 06=€ - 06=€ - 06=€ - 06=€ - 06=€ - 06
7Petroleum Maintenance Technician (Senior)€ - 0x=€ - 07=€ - 07=€ - 07=€ - 07=€ - 07=€ - 07=€ - 07=€ - 07=€ - 07
8Petroleum Maintenance Technician (Mid-Level)€ - 0x=€ - 08=€ - 08=€ - 08=€ - 08=€ - 08=€ - 08=€ - 08=€ - 08=€ - 08
9Petroleum Maintenance Technician (Junior)€ - 0x=€ - 09=€ - 09=€ - 09=€ - 09=€ - 09=€ - 09=€ - 09=€ - 09=€ - 09
10Engineer (Senior)€ - 0x=€ - 010=€ - 010=€ - 010=€ - 010=€ - 010=€ - 010=€ - 010=€ - 010=€ - 010
11Engineer (Mid-Level)€ - 0x=€ - 011=€ - 011=€ - 011=€ - 011=€ - 011=€ - 011=€ - 011=€ - 011=€ - 011
12Engineer (Junior)€ - 0x=€ - 012=€ - 012=€ - 012=€ - 012=€ - 012=€ - 012=€ - 012=€ - 012=€ - 012
13Environmental Scientist (Senior)€ - 0x=€ - 013=€ - 013=€ - 013=€ - 013=€ - 013=€ - 013=€ - 013=€ - 013=€ - 013
14Environmental Scientist (Mid-Level)€ - 0x=€ - 014=€ - 014=€ - 014=€ - 014=€ - 014=€ - 014=€ - 014=€ - 014=€ - 014
15Environmental Scientist (Junior)€ - 0x=€ - 015=€ - 015=€ - 015=€ - 015=€ - 015=€ - 015=€ - 015=€ - 015=€ - 015
16CADD Operator€ - 0x=€ - 016=€ - 016=€ - 016=€ - 016=€ - 016=€ - 016=€ - 016=€ - 016=€ - 016
17Admin Specialist€ - 0x=€ - 017=€ - 017=€ - 017=€ - 017=€ - 017=€ - 017=€ - 017=€ - 017=€ - 017
18Certified Surveyor€ - 0x=€ - 018=€ - 018=€ - 018=€ - 018=€ - 018=€ - 018=€ - 018=€ - 018=€ - 018
19Haz Wast Specialist€ - 0x=€ - 019=€ - 019=€ - 019=€ - 019=€ - 019=€ - 019=€ - 019=€ - 019=€ - 019
20Industrial Hygienist€ - 0x=€ - 020=€ - 020=€ - 020=€ - 020=€ - 020=€ - 020=€ - 020=€ - 020=€ - 020
21Site Safety and Health Officer (SSHO)€ - 0x=€ - 021=€ - 021=€ - 021=€ - 021=€ - 021=€ - 021=€ - 021=€ - 021=€ - 021
22Contracts Administrator€ - 0x=€ - 022=€ - 022=€ - 022=€ - 022=€ - 022=€ - 022=€ - 022=€ - 022=€ - 022
23Project Controls€ - 0x=€ - 023=€ - 023=€ - 023=€ - 023=€ - 023=€ - 023=€ - 023=€ - 023=€ - 023
24Cost Tracker€ - 0x=€ - 024=€ - 024=€ - 024=€ - 024=€ - 024=€ - 024=€ - 024=€ - 024=€ - 024
25Quality Control Manager/Specialist€ - 0x=€ - 025=€ - 025=€ - 025=€ - 025=€ - 025=€ - 025=€ - 025=€ - 025=€ - 025
26Database Developer€ - 0x=€ - 026=€ - 026=€ - 026=€ - 026=€ - 026=€ - 026=€ - 026=€ - 026=€ - 026
27Database Administrator€ - 0x=€ - 027=€ - 027=€ - 027=€ - 027=€ - 027=€ - 027=€ - 027=€ - 027=€ - 027
28Subtotal Prime Direct Labor€ - 028€ - 028€ - 028€ - 028€ - 028€ - 028€ - 028€ - 028€ - 028
29292929292929292929
30Material, Supplies & Equipment (MSE)€ - 030€ - 030€ - 030€ - 030€ - 030€ - 030€ - 030€ - 030€ - 030
31Handling Charge/G&A applied to MSE0.00%€ - 0310.00%€ - 0310.00%€ - 0310.00%€ - 0310.00%€ - 0310.00%€ - 0310.00%€ - 0310.00%€ - 0310.00%€ - 0310.00%
32Subtotal Equipment, Material & Supplies€ - 032€ - 032€ - 032€ - 032€ - 032€ - 032€ - 032€ - 032€ - 032
33333333333333333333
34Subcontractors Costs€ - 034€ - 034€ - 034€ - 034€ - 034€ - 034€ - 034€ - 034€ - 034
35Handling Charge/G&A applied to Subcontractor Costs0.00%€ - 0350.00%€ - 0350.00%€ - 0350.00%€ - 0350.00%€ - 0350.00%€ - 0350.00%€ - 0350.00%€ - 0350.00%€ - 0350.00%
36Subtotal Subcontractor€ - 036€ - 036€ - 036€ - 036€ - 036€ - 036€ - 036€ - 036€ - 036
37373737373737373737
38Subtotal€ - 038€ - 038€ - 038€ - 038€ - 038€ - 038€ - 038€ - 038€ - 038
39393939393939393939
40Profit applied to Subtotal0.00%€ - 0400.00%€ - 0400.00%€ - 0400.00%€ - 0400.00%€ - 0400.00%€ - 0400.00%€ - 0400.00%€ - 0400.00%€ - 0400.00%
41414141414141414141
42Travel€ - 042€ - 042€ - 042€ - 042€ - 042€ - 042€ - 042€ - 042€ - 042
43Handling Charge/G&A applied to Travel0.00%€ - 0430.00%€ - 0430.00%€ - 0430.00%€ - 0430.00%€ - 0430.00%€ - 0430.00%€ - 0430.00%€ - 0430.00%€ - 0430.00%
44Subtotal Travel€ - 044€ - 044€ - 044€ - 044€ - 044€ - 044€ - 044€ - 044€ - 044
45454545454545454545
46Grand Total€ - 046€ - 046€ - 046€ - 046€ - 046€ - 046€ - 046€ - 046€ - 046

* Burdened rate for each labor category without profit.

This is the start of the file's text. The full file is on GovTribe.